TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

 Fossil fuels Nuclear Renewables
Solid Liquid Gas Uranium Hydro Other
renewable
Total amount in specific units* 1147.9** 160.1*** 33.3*** 1 407? n.d ?? n.d ??

TABLE 2. ENERGY CONSUMPTION

2000 2005 2010 2015 2017* Compound annual growth rate (%) 2000 to 2017
Final Energy consumption [EJ]
- Total 3.757 5.102 6.327 6.858 7.314 4.00
- Heat and Other - - - - - -
- Electricity 0.340 0.487 0.669 0.838 0.926 6.07
- Natural Gas 1.218 1.965 3.181 3.850 4.097 7.40
- Coal/Lignite/Peat 0.003 0.002 0.001 0.008 0.009 6.68
- Oil products 2.180 2.576 2.441 2.111 2.231 0.14
- Bioenergy and Waste 0.016 0.072 0.034 0.051 0.051 7.06

TABLE 3. ELECTRICITY PRODUCTION

2000 2005 2010
2015
2017 2018 2019* Compound annual growth rate (%) 2000 to 2019
Electricity production (TWh)
- Steam 80.71 93.38 94.07 86.97 90.34 85.66 85.77 0.32
- Gas turbines 20.87 32.13 58.40 75.42 79.48 70.32 68.62 7.25
- Combined cycle 12.86 36.19 70.66 100.94 115.08 129.20 135.20 14.84
- Diesel 0.36 0.21 0.13 0.07 0.09 0.08 0.04 -12.12
- Hydro 3.66 16.10 9.53 14.09 15.40 15.77 30.59 13.30
- Nuclear - - - 2.91 7.45 7.25 7.24 -
- Wind 0.04 0.07 0.16 0.22 0.31 0.91 0.72 -
- Solar 0.0001 0.0001 0.0001 0.0009 0.09 -
- Biogas - - 0.01 0.01 0.04 -
- Heat recovery - - - - 0.04 -
- Total 118.49 178.09 232.96 280.64 308.31 309.18 328.18 6.18

TABLE 4. ENERGY RELATED RATIOS

2000 2005 2010 2015 2018 2019*
Nuclear/Total electricity (%) - - - 1.27 2.09 1.84

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2019

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2019
BUSHEHR-1 PWR 915 Operational NPPDCO JSC ASE 1975-05-01 2011-05-08 2011-09-03 2013-09-23 73.4
BUSHEHR-2 PWR 974 Under Construction NPPDCO JSC ASE 2019-09-27
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. PLANNED NUCLEAR POWER PLANTS

Reactor unit/Project name Owner Type Capacity in MW(e) Construction start year Expected commercial year
BUSHEHR-2 AEOI VVER 1 057 2019 2025
BUSHEHR-3 AEOI VVER 1 057 2021 2027