Romania

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

 Fossil fuels Nuclear  Renewables
Solid Liquid Gas Uranium Hydro Other
renewable
Total amount in specific units* n.a. n.a. n.a. n.a. n.a. n.a.
Total amount in exajoules (EJ) n.a. n.a. n.a. n.a. n.a. n.a.

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 1 019 1 118 991 954 1 028 0.04
Coal, Lignate and Peat 59 87 44 41 33 -2.85
Oil 269 324 275 318 366 1.56
Natural gas 303 343 283 235 261 -0.75
Bioenergy and Waste 117 135 170 151 166 1.78
Electricity 122 140 148 155 158 1.31
Heat 150 90 70 54 43 -6.04

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 51 934 59 413 60 979 66 296 55 935 0.37
Coal, Lignate and Peat 19 300 22 138 20 742 18 220 9 482 -3.49
Oil 3 399 1 894 692 474 600 -8.30
Natural gas 9 001 9 612 7 262 9 386 9 460 0.25
Bioenergy and Waste 0 7 111 524 547 0.00
Hydro 14 778 20 207 20 243 17 007 15 701 0.30
Nuclear 5 456 5 555 11 623 11 640 11 466 3.78
Wind 0 0 306 7 063 6 945 0.00
Solar 0 0 0 1 982 1 733 0.00

TABLE 4. ENERGY RELATED RATIOS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 2021*
Nulcear/total electricity(%) 10.9 8.6 19.5 17.3 19.9 18.5

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
CERNAVODA-1 PHWR 650 Operational SNN AECL 3/31/1983 4/16/1996 7/11/1996 12/2/1996 96.6
CERNAVODA-2 PHWR 650 Operational SNN AECL 7/1/1983 5/6/2007 8/7/2007 11/1/2007 87.7
CERNAVODA-3 PHWR 655 Suspended Constr. SNN AECL 2/9/1984
CERNAVODA-4 PHWR 655 Suspended Constr. SNN AECL 8/15/1985
CERNAVODA-5 PHWR 655 Cancelled Constr. SNN AECL 5/12/1987 3/11/2014
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
CERNAVODA-1 PHWR 650 Operational SNN AECL 1983-03-31 ######## ######## ######## 96.6
CERNAVODA-2 PHWR 650 Operational SNN AECL 1983-07-01 ######## ######## ######## 87.7
CERNAVODA-3 PHWR 655 Suspended Constr. SNN AECL 1984-02-09 0
CERNAVODA-4 PHWR 655 Suspended Constr. SNN AECL 1985-08-15 0
CERNAVODA-5 PHWR 655 Cancelled Constr. SNN AECL 1987-05-12 ######## 0