Hungary

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

Fossil fuels Nuclear Renewables
Solid Liquid Gas Uranium Hydro Other
Total amount* 10 494.4 68.37 1667.5 31.8
Total amount in exajoules (EJ) 0.016 60.110

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 730 865 803 798 836 0.68
Coal, Lignate and Peat 35 35 29 22 18 -3.36
Oil 217 273 253 272 291 1.47
Natural gas 280 337 269 239 258 -0.39
Bioenergy and Waste 29 46 80 91 81 5.28
Electricity 106 116 123 130 144 1.53
Heat 64 58 50 44 44 -1.79

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 35 191 35 756 37 371 30 360 34 930 -0.04
Coal, Lignate and Peat 9 707 7 146 6 350 5 908 3 826 -4.55
Oil 4 404 455 490 77 45 -20.48
Natural gas 6 602 12 379 11 598 5 108 9 091 1.61
Bioenergy and Waste 120 1 730 2 449 2 302 2 396 16.15
Hydro 178 202 188 234 244 1.59
Nuclear 14 180 13 834 15 761 15 834 16 055 0.62
Wind 0 10 534 693 655 0.00
Solar 0 0 1 141 2 459 0.00
Geothermal 0 0 0 0 16 0.00
Other 0 0 0 63 143 0.00

TABLE 4. ENERGY RELATED RATIOS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 2021*
Nulcear/total electricity(%) 40.6 37.2 42.1 52.7 48 46.8

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
PAKS-1 PWR 479 Operational PAKS Zrt AEE 01/08/1974 14/12/1982 28/12/1982 10/08/1983 89.4
PAKS-2 PWR 479 Operational PAKS Zrt AEE 01/08/1974 26/08/1984 06/09/1984 14/11/1984 80.7
PAKS-3 PWR 479 Operational PAKS Zrt AEE 01/10/1979 15/09/1986 28/09/1986 01/12/1986 99.7
PAKS-4 PWR 479 Operational PAKS Zrt AEE 01/10/1979 09/08/1987 16/08/1987 01/11/1987 91.1
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
PAKS-1 PWR 479 Operational PAKS Zrt AEE 1974-08-01 1982-12-14 1982-12-28 1983-08-10 89.4
PAKS-2 PWR 479 Operational PAKS Zrt AEE 1974-08-01 1984-08-26 1984-09-06 1984-11-14 80.7
PAKS-3 PWR 479 Operational PAKS Zrt AEE 1979-10-01 1986-09-15 1986-09-28 1986-12-01 99.7
PAKS-4 PWR 479 Operational PAKS Zrt AEE 1979-10-01 1987-08-09 1987-08-16 1987-11-01 91.1

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Station/project name Type Capacity (MW(e)) Expected construction start year Expected commercial year
Paks 5 VVER-1200 1200 n.a. n.a.
Paks 6 VVER-1200 1200 n.a. n.a.