(ITERP2/08) Test Facility TIMO for Testing the ITER Model Cryopump

   
H. Haas 1, C. Day 1, A. Mack 1, S. Methe 1, J. C. Boissin 2, P. Schummer 2, D. K. Murdoch 3
 
1 Forschungszentrum Karlsruhe, Hauptabteilung Ingenieurtechnik, P.O. Box 3640, D-76021 Karlsruhe, Germany
2 L'Air Liquide, Division des Techniques Avancées, B.P. 15, F-38360 Sassenage, France
3 NET Team, Max Planck Inst. für Plasmaphysik, Boltzmannstr. 2, D-85748 Garching, Germany

Abstract
Within the framework of the European Fusion Technology Programme, FZK is involved in the research and development process for a vacuum pump system of a future fusion reactor. As a result of these activities, the concept and the necessary requirements for the primary vacuum system of the ITER  fusion reactor were defined. Continuing that development process, FZK has been preparing the test facility TIMO (Test facility for ITER Model pump) since 1996. This test facility provides for testing a cryopump all needed infrastructure as for example a process gas supply including a metering system, a test vessel, the cryogenic supply for the different temperature levels and a gas analysing system. For manufacturing the ITER model pump an order was given to the company L' Air Liquide in the form of a NET contract.

   

Read the full paper in PDF format.