United Kingdom
TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES
Fossil Fuels | Nuclear | Renewables | ||||
Coal | Crude Oil | Natural Gas | Uranium | Hydro | Other Renewables | |
Total amount in specific units* | 986(7) | 411 | 221 | … | … | … |
TABLE 2. ENERGY CONSUMPTION
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 6 257 | 6 240 | 5 777 | 5 301 | 4 878 | -1.24 |
Coal, Lignate and Peat | 268 | 210 | 188 | 199 | 129 | -3.59 |
Oil | 2 615 | 2 640 | 2 316 | 2 259 | 1 889 | -1.61 |
Natural gas | 2 165 | 2 109 | 1 971 | 1 599 | 1 631 | -1.41 |
Bioenergy and Waste | 26 | 28 | 120 | 154 | 223 | 11.40 |
Electricity | 1 184 | 1 253 | 1 183 | 1 091 | 1 005 | -0.82 |
Heat | 102 | 54 | 55 | 54 | 54 | -3.13 |
TABLE 3. ELECTRICITY PRODUCTION
Electricity production (GWh) | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 377 069 | 398 356 | 382 069 | 339 570 | 311 064 | -13.94 |
Coal, Lignate and Peat | 122 300 | 136 336 | 108 730 | 76 963 | 6 069 | -9.49 |
Oil | 8 446 | 5 339 | 4 805 | 2 038 | 1 150 | -1.46 |
Natural gas | 148 077 | 152 640 | 175 654 | 99 876 | 110 294 | 12.32 |
Bioenergy and Waste | 4 455 | 11 659 | 13 673 | 33 503 | 45 503 | 0.29 |
Hydro | 7 780 | 7 852 | 6 741 | 9 037 | 8 251 | -2.59 |
Nuclear | 85 063 | 81 618 | 62 140 | 70 345 | 50 278 | 24.52 |
Wind | 947 | 2 904 | 10 286 | 40 275 | 76 007 | 60.89 |
Solar | 1 | 8 | 40 | 7 533 | 13 511 | 0.00 |
Geothermal | 0 | 0 | 0 | 0 | 0 | 0.00 |
Tidal | 0 | 0 | 2 | 2 | 11 | 0.00 |
TABLE 4. ENERGY RELATED RATIOS
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | 2021* |
Nulcear/total electricity(%) | 21.9 | 20 | 15.6 | 18.9 | 14.5 | 14.8 |
TABLE 5. STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS
Reactor Unit | Type | Net Capacity [MW(e)] |
Status | Operator | Reactor Supplier |
Construction date |
First Criticality Date |
First Grid Date |
Commercial Date |
Shutdown Date |
UCF for 2021 |
BERKELEY-1 | GCR | 138 | Permanent Shutdown | ML | TNPG | 1957-01-01 | 1961-08-01 | 1962-06-12 | 1962-06-12 | 1989-03-31 | 0 |
BERKELEY-2 | GCR | 138 | Permanent Shutdown | ML | TNPG | 1957-01-01 | 1962-03-01 | 1962-06-24 | 1962-10-20 | 1988-10-26 | 0 |
BRADWELL-1 | GCR | 123 | Permanent Shutdown | ML | TNPG | 1957-01-01 | 1961-08-01 | 1962-07-01 | 1962-07-01 | 2002-03-31 | 0 |
BRADWELL-2 | GCR | 123 | Permanent Shutdown | ML | TNPG | 1957-01-01 | 1962-04-01 | 1962-07-06 | 1962-11-12 | 2002-03-30 | 0 |
CALDER HALL-1 | GCR | 49 | Permanent Shutdown | SL | UKAEA | 1953-08-01 | 1956-05-01 | 1956-08-27 | 1956-10-01 | 2003-03-31 | 0 |
CALDER HALL-2 | GCR | 49 | Permanent Shutdown | SL | UKAEA | 1953-08-01 | 1956-12-01 | 1957-02-01 | 1957-02-01 | 2003-03-31 | 0 |
CALDER HALL-3 | GCR | 49 | Permanent Shutdown | SL | UKAEA | 1955-08-01 | 1958-01-01 | 1958-03-01 | 1958-05-01 | 2003-03-31 | 0 |
CALDER HALL-4 | GCR | 49 | Permanent Shutdown | SL | UKAEA | 1955-08-01 | 1958-12-01 | 1959-04-01 | 1959-04-01 | 2003-03-31 | 0 |
CHAPELCROSS-1 | GCR | 48 | Permanent Shutdown | ML | UKAEA | 1955-10-01 | 1958-11-09 | 1959-02-01 | 1959-03-01 | 2004-06-29 | 0 |
CHAPELCROSS-2 | GCR | 48 | Permanent Shutdown | ML | UKAEA | 1955-10-01 | 1959-05-30 | 1959-07-01 | 1959-08-01 | 2004-06-29 | 0 |
CHAPELCROSS-3 | GCR | 48 | Permanent Shutdown | ML | UKAEA | 1955-10-01 | 1959-08-31 | 1959-11-01 | 1959-12-01 | 2004-06-29 | 0 |
CHAPELCROSS-4 | GCR | 48 | Permanent Shutdown | ML | UKAEA | 1955-10-01 | 1959-12-22 | 1960-01-01 | 1960-03-01 | 2004-06-29 | 0 |
DOUNREAY DFR | FBR | 11 | Permanent Shutdown | UKAEA | UKAEA | 1955-03-01 | 1959-11-14 | 1962-10-01 | 1962-10-01 | 1977-03-01 | 0 |
DOUNREAY PFR | FBR | 234 | Permanent Shutdown | UKAEA | TNPG | 1966-01-01 | 1974-03-01 | 1975-01-10 | 1976-07-01 | 1994-03-31 | 0 |
DUNGENESS A-1 | GCR | 225 | Permanent Shutdown | ML | TNPG | 1960-07-01 | 1965-06-01 | 1965-09-21 | 1965-10-28 | 2006-12-31 | 0 |
DUNGENESS A-2 | GCR | 225 | Permanent Shutdown | ML | TNPG | 1960-07-01 | 1965-09-01 | 1965-11-01 | 1965-12-30 | 2006-12-31 | 0 |
DUNGENESS B-1 | GCR | 545 | Permanent Shutdown | EDF UK | APC | 1965-10-01 | 1982-12-23 | 1983-04-03 | 1985-04-01 | 2021-06-07 | 0.6 |
DUNGENESS B-2 | GCR | 545 | Permanent Shutdown | EDF UK | APC | 1965-10-01 | 1985-12-04 | 1985-12-29 | 1989-04-01 | 2021-06-07 | 0.6 |
HARTLEPOOL A-1 | GCR | 590 | Operational | EDF UK | NPC | 1968-10-01 | 1983-06-24 | 1983-08-01 | 1989-04-01 | 56.4 | |
HARTLEPOOL A-2 | GCR | 595 | Operational | EDF UK | NPC | 1968-10-01 | 1984-09-09 | 1984-10-31 | 1989-04-01 | 56.3 | |
HEYSHAM A-1 | GCR | 485 | Operational | EDF UK | NPC | 1970-12-01 | 1983-04-06 | 1983-07-09 | 1989-04-01 | 65.2 | |
HEYSHAM A-2 | GCR | 575 | Operational | EDF UK | NPC | 1970-12-01 | 1984-06-03 | 1984-10-11 | 1989-04-01 | 65.2 | |
HEYSHAM B-1 | GCR | 620 | Operational | EDF UK | NPC | 1980-08-01 | 1988-06-23 | 1988-07-12 | 1989-04-01 | 38.9 | |
HEYSHAM B-2 | GCR | 620 | Operational | EDF UK | NPC | 1980-08-01 | 1988-11-01 | 1988-11-11 | 1989-04-01 | 72.3 | |
HINKLEY POINT A-1 | GCR | 235 | Permanent Shutdown | ML | EE/B&W/T | 1957-11-01 | 1964-05-01 | 1965-02-16 | 1965-03-30 | 2000-05-23 | 0 |
HINKLEY POINT A-2 | GCR | 235 | Permanent Shutdown | ML | EE/B&W/T | 1957-11-01 | 1964-10-01 | 1965-03-19 | 1965-05-05 | 2000-05-23 | 0 |
HINKLEY POINT B-1 | GCR | 485 | Permanent Shutdown | EDF UK | TNPG | 1967-09-01 | 1976-09-24 | 1976-10-30 | 1978-10-02 | 2022-08-01 | 57.6 |
HINKLEY POINT B-2 | GCR | 480 | Permanent Shutdown | EDF UK | TNPG | 1967-09-01 | 1976-02-01 | 1976-02-05 | 1976-09-27 | 2022-07-06 | 59.1 |
HINKLEY POINT C-1 | PWR | 1630 | Under Construction | EDF-CGN | ORANO | 2018-12-11 | 0 | ||||
HINKLEY POINT C-2 | PWR | 1630 | Under Construction | EDF-CGN | ORANO | 2019-12-12 | 0 | ||||
HUNTERSTON A-1 | GCR | 150 | Permanent Shutdown | ML | GEC | 1957-10-01 | 1963-08-01 | 1964-02-05 | 1964-02-05 | 1990-03-30 | 0 |
HUNTERSTON A-2 | GCR | 150 | Permanent Shutdown | ML | GEC | 1957-10-01 | 1964-03-01 | 1964-06-01 | 1964-07-01 | 1989-12-31 | 0 |
HUNTERSTON B-1 | GCR | 490 | Permanent Shutdown | EDF UK | TNPG | 1967-11-01 | 1976-01-31 | 1976-02-06 | 1976-02-07 | 2021-11-26 | 83.1 |
HUNTERSTON B-2 | GCR | 495 | Permanent Shutdown | EDF UK | TNPG | 1967-11-01 | 1977-03-27 | 1977-03-31 | 1977-04-01 | 2022-01-07 | 76 |
OLDBURY A-1 | GCR | 217 | Permanent Shutdown | ML | TNPG | 1962-05-01 | 1967-08-01 | 1967-11-07 | 1967-12-31 | 2012-02-29 | 0 |
OLDBURY A-2 | GCR | 217 | Permanent Shutdown | ML | TNPG | 1962-05-01 | 1967-12-01 | 1968-04-06 | 1968-09-30 | 2011-06-30 | 0 |
SIZEWELL A-1 | GCR | 210 | Permanent Shutdown | ML | EE/B&W/T | 1961-04-01 | 1965-06-01 | 1966-01-21 | 1966-03-25 | 2006-12-31 | 0 |
SIZEWELL A-2 | GCR | 210 | Permanent Shutdown | ML | EE/B&W/T | 1961-04-01 | 1965-12-01 | 1966-04-09 | 1966-09-15 | 2006-12-31 | 0 |
SIZEWELL B | PWR | 1198 | Operational | EDF UK | PPC | 1988-07-18 | 1995-01-31 | 1995-02-14 | 1995-09-22 | 64.2 | |
TORNESS-1 | GCR | 595 | Operational | EDF UK | NNC | 1980-08-01 | 1988-03-25 | 1988-05-25 | 1988-05-25 | 59.3 | |
TORNESS-2 | GCR | 605 | Operational | EDF UK | NNC | 1980-08-01 | 1988-12-23 | 1989-02-03 | 1989-02-03 | 68.2 | |
TRAWSFYNYDD-1 | GCR | 195 | Permanent Shutdown | ML | APC | 1959-07-01 | 1964-09-01 | 1965-01-14 | 1965-03-24 | 1991-02-06 | 0 |
TRAWSFYNYDD-2 | GCR | 195 | Permanent Shutdown | ML | APC | 1959-07-01 | 1964-12-01 | 1965-02-02 | 1965-03-24 | 1991-02-04 | 0 |
WINDSCALE AGR | GCR | 24 | Permanent Shutdown | UKAEA | UKAEA | 1958-11-01 | 1962-08-09 | 1963-02-01 | 1963-03-01 | 1981-04-03 | 0 |
WINFRITH SGHWR | SGHWR | 92 | Permanent Shutdown | UKAEA | ICL/FE | 1963-05-01 | 1967-09-01 | 1967-12-01 | 1968-01-01 | 1990-09-11 | 0 |
WYLFA-1 | GCR | 490 | Permanent Shutdown | ML | EE/B&W/T | 1963-09-01 | 1969-11-01 | 1971-01-24 | 1971-11-01 | 2015-12-30 | 0 |
WYLFA-2 | GCR | 490 | Permanent Shutdown | ML | EE/B&W/T | 1963-09-01 | 1970-09-01 | 1971-07-21 | 1972-01-03 | 2012-04-25 | 0 |
TABLE 5B: NUCLEAR SITE OPERATION STATUS
Reactor name | Shutdown date |
Shutdown reason | Decom. strategy |
Current decom. phase |
Current fuel management phase |
Decom. licensee | Licence terminated |
BERKELEY-1 | Mar-89 | Economic case no longer viable, After major component failure | Deferred dismantling, placing all radiological areas into safe enclosure | Passive Safe encl | - | Magnox S | - |
BERKELEY-2 | Oct-88 | Economic case no longer viable, After major component failure | Deferred dismantling, placing all radiological areas into safe enclosure | Passive Safe encl | - | Magnox S | - |
BRADWELL-1 | 02-Mar | Economic case no longer viable, After major component failure | Deferred dismantling, placing all radiological areas into safe enclosure | Passive Safe encl | - | Magnox S | - |
BRADWELL-2 | 02-Mar | Economic case no longer viable, After major component failure | Deferred dismantling, placing all radiological areas into safe enclosure | Passive Safe encl | - | Magnox S | - |
CALDER HALL-1 | 03-Mar | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | SL | - |
CALDER HALL-2 | 03-Mar | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | SL | - |
CALDER HALL-3 | 03-Mar | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | SL | - |
CALDER HALL-4 | 03-Mar | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | SL | - |
CHAPELCROSS-1 | 04-Jun | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
CHAPELCROSS-2 | 04-Jun | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
CHAPELCROSS-3 | 04-Jun | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
CHAPELCROSS-4 | 04-Jun | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
DOUNREAY DFR | Mar-77 | R&D objective completed | A combination of immediate & deferred dismantling | Safe encl | - | DSR | - |
DOUNREAY PFR | Mar-94 | R&D objective completed | A combination of immediate & deferred dismantling | Safe encl | - | Magnox N | - |
DUNGENESS A-1 | 06-Dec | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox S | - |
DUNGENESS A-2 | 06-Dec | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox S | - |
HINKLEY POINT A-1 | May-00 | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox S | - |
HINKLEY POINT A-2 | May-00 | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox S | - |
HUNTERSTON A-1 | Mar-90 | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
HUNTERSTON A-2 | Dec-89 | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
SIZEWELL A-1 | 06-Dec | Economic case no longer viable, After major component failure | Deferred dismantling, placing all radiological areas into safe enclosure | Passive Safe encl | - | Magnox S | - |
SIZEWELL A-2 | 06-Dec | Economic case no longer viable, After major component failure | Deferred dismantling, placing all radiological areas into safe enclosure | Passive Safe encl | - | Magnox S | - |
TRAWSFYNYDD-1 | Feb-91 | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
TRAWSFYNYDD-2 | Feb-91 | Economic case no longer viable, After major component failure | A combination of immediate & deferred dismantling | Passive Safe encl | - | Magnox N | - |
WINDSCALE AGR | Apr-81 | R&D objective completed | A combination of immediate & deferred dismantling | Active Safe encl | - | SL | - |
WINFRITH SGHWR | Sep-90 | R&D objective completed | Immediate dismantling & removal of all radioactive material | - | - | UKAEA | 2019 |
TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS(16)
Reactor Unit | Shutdown Reason | Decommission Strategy(17) | Current decommissioning phase | Current fuel management phase | Decommissioning License | License Terminated Year |
BERKELEY 1 | End of lifespan | Preparation for Care and Maintenance | Defueled | Magnox Ltd (ML | N/A | |
BERKELEY 2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
BRADWELL 1 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
BRADWELL 2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
CALDER HALL 1 | End of lifespan | Preparation for Care and Maintenance | Defueled | Sellafield Ltd (SL) | N/A | |
CALDER HALL 2 | End of lifespan | Preparation for Care and Maintenance | Defueling | SL | N/A | |
CALDER HALL 3 | End of lifespan | Preparation for Care and Maintenance | Defueling | SL | N/A | |
CALDER HALL 4 | End of lifespan | Preparation for Care and Maintenance | Defueled | SL | N/A | |
CHAPLECROSS 1 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
CHAPLECROSS 2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
CHAPLECROSS 3 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
CHAPLECROSS 4 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
DUNGENESS A1 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
DUNGENESS A2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
HINKLEY POINT A1 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
HINKLEY POINT A2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
HUNTERSTON A1 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
HUNTERSTON A2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
OLDBURY A1 | End of lifespan | Retrieval, processing, storage, and dispatch of waste | Defueled | ML | N/A | |
OLDBURY A2 | End of lifespan | Retrieval, processing, storage, and dispatch of waste | Defueled | ML | N/A | |
SIZEWELL A1 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
SIZEWELL A2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
TRAWSFYNYDD 1 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
TRAWSFYNYDD 2 | End of lifespan | Preparation for Care and Maintenance | Defueled | ML | N/A | |
WYLFA 1 | End of lifespan | Reactor defueling | Defueling | ML | N/A | |
WYLFA 2 | End of lifespan | Reactor defueling | Defueling | ML | N/A |
TABLE 7. PLANNED NUCLEAR POWER PLANTS
Reactor Unit/Project Name | Owner/developer | Type | Capacity (GW) | Construction Start Year | Expected Commercial Year |
HINKLEY POINT C | EDF/CGN | EPR | 3.2 GW | 2016 | 2025 |
SIZEWELL C | EDF/CGN | EPR | 3.2 GW | TBC | TBC |
TABLE 8. INTERNATIONAL TREATIES, CONVENTIONS AND AGREEMENTS
Agreement on privileges and immunities of the IAEA | Signature: Ratification: |
1 December 1959 19 September 1961 |
Convention on Nuclear Safety | Signature: Ratification: Applicable to the UK from(39): |
20 September 1994 17 January 1996 24 October 1996 |
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management | Signature: Ratification: Applicable to the UK from: |
29 September 1997 12 March 2001 18 June 2001 |
Convention on Early Notification of a Nuclear Accident | Signature: Ratification: Applicable to the UK from: |
26 September 1986 9 February 1990 12 March 1990 |
Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency | Signature: Ratification: Applicable to the UK from: |
26 September 1986 9 February 1990 12 March 1990 |
Convention on the Prevention of Marine Pollution by Dumping of Wastes and other Matter (London Convention) 1996 Protocol to the London Convention |
Signature: Ratification: Applicable to the UK from: Signature: Ratification: Applicable to the UK from: |
29 December 1972 17 November 1975 17 December 1975 22 September 1997 15 December 1998 24 March 2006 |
Convention on the Physical Protection of Nuclear Material Amendment to the Convention on the Physical Protection of Nuclear Material |
Signature: Ratification: Applicable to the UK from: Ratification: Applicable to the UK from: |
13 June 1980 6 September 1991 6 October 1991 8 April 2010 8 May 2016 |
Convention for the Protection of the Marine Environment of the North-East Atlantic | Signature: Ratification: Applicable to the UK from: |
03 November 1992 15 July 1997 25 March 1998 |
Convention relating to Civil Liability in the Field of Maritime Carriage of Nuclear Material | Signature: |
17 December 1971 |
United Nations Convention on the Law of the Sea | Signature and Accession: Applicable to the UK from: |
25 July 1997 25 August 1997 |
Convention on Environmental Impact Assessment in a Transboundary Context (ESPOO Convention) | Signature: Ratification: Applicable to the UK from: |
26 February 1991 10 October 1997 8 January 1998 |
Convention on Access to Information, Public Participation in Decision-Making, and Access to Justice in Environmental Matters (Aarhus Convention) | Signature: Ratification: Applicable to the UK from: |
25 June 1998 23 February 2005 24 May 2005 |
Vienna Convention on Civil Liability for Nuclear Damage | Signature: | 11 November 1964 |
Convention on Third Party Liability in the Field of Nuclear Energy as amended by the Additional Protocol of 28 January 1964 and by the Protocol of 16 November 1982 (Paris Convention) | Signature: Ratification: Applicable to the UK from: |
29 July 1960 23 February 1966 1 April 1968 |
Convention Supplementary to the Paris Convention of 29 July 1960 on Third Party Liability in the Field of Nuclear Energy as amended by the Additional Protocol of 28 January 1964 and by the Protocol of 16 November 1982 (Brussels Convention) | Signature Ratification: Applicable to the UK from: |
31 January 1963 24 March 1966 1 August 1991 |
Protocol to amend the Convention Supplementary to the Paris Convention of 29 July 1960 on Third Party Liability in the Field of Nuclear Energy as amended by the Additional Protocol of 28 January 1964 and by the Protocol of 16 November 1982 | Signature: Ratification: Applicable to the UK from: |
12 February 2004 17 December 2021 01 January 2022 |
Treaty on the Non-Proliferation of nuclear weapons | Signature: Ratification: Applicable to the UK from: |
1 July 1968 27 November 1968 5 March 1970 |
TABLE 9. NUCLEAR COOPERATION AGREEMENTS
Country | Year Signed | Entry into force |
Australia | 2018 | 5 April 2019 |
Canada | 2018 | 29 March 2019 |
China | 1985 | 3 June 1985 |
Euratom | 2020 | 1 Jan 2020 |
India | 2015 | 16 December 2016 |
Japan | 1998 | 12 October 1998 |
Jordan | 2009 | 23 November 2016 |
Korea, Republic of | 1991 | 27 November 1991 |
Russian Federation | 1996 | 3 December 1996 |
United Arab Emirates | 2010 | 11 August 2011 |
United States of America | 2018 | 31 December 2020 |
TABLE 10. ORGANISATIONS INVOLVED IN NUCLEAR POWER RELATED ACTIVITIES
Organisation | Address | Contact Detail(s) |
Nuclear Directorate, Department for Business, Energy, and Industrial Strategy |
1 Victoria Street London SW1H 0ET Tel: +44 (0) 020 7215 5000 |
Tel: +44 (0) 020 7215 5000 Email: enquiries@beis.gov.uk Website: https://www.gov.uk/government/organisations/department-for-business-energy-and-industrial-strategy |
Scottish Government |
St. Andrew's House Regent Road Edinburgh EH1 3DG |
(+44) (0)131 244 4000 ceu@gov.scot Website: http://www.gov.scot/Home |
Welsh Government |
Cathays Park Cardiff CF10 3NQ |
+44 (0) 1443 845 500 Email: CustomerHelp@Wales.GSI.Gov.UK Website: http://gov.wales/?lang=en |
Nuclear Decommissioning Authority |
Head Office Herdus House Westlakes Science & Technology Park Moor Row Cumbria CA24 3HU |
Tel: +44 (0)1925 80 2001 (Switchboard) Tel: +44 (0)1925 80 2077 (General Enquiries) Fax: +44 (0)1925 80 2003 Email: enquiries@nda.gov.uk Website: www.nda.gov.uk |
Office for Nuclear Regulation Building |
Building 4, Redgrave Court Merton Road Bootle L20 7HS |
Email: contact@onr.gov.uk Website: www.onr.org.uk |
Environment Agency |
National Customer Contact Centre PO Box 544 Rotherham S60 1BY |
Tel: +44 (0)3708 506 506. +44 (0) 1709 389 201 Email: enquiries@environment-agency.gov.uk Website: www.environment-agency.gov.uk |
Scottish Environment Protection Agency |
Corporate Office Erskine Court Castle Business Park Stirling FK9 4TR |
Tel: +44 (0)1786 452595 Fax: +44 (0)1786 446885 Website: www.sepa.org.uk |
Natural Resources Wales |
Ty Cambria 29 Newport Road Cardiff CF24 0TP Tel: +44 (0)300 065 3000 |
Tel: +44 (0)300 065 3000 Email: enquiries@naturalresourceswales.gov.uk Website: https://naturalresources.wales/?lang=en |
Low Level Waste Repository Ltd |
Holmrook Cumbria CA19 1XP |
Tel: +44 (0)19467 24800 Email: customerteam@llwrsite.com Website: www.llwrsite.com |
Magnox Limited |
Berkeley Centre Berkeley Gloucestershire GL13 9PB |
Tel: +44 (0)1453 814000 Website: www.magnoxsites.co.uk |
Sellafield Limited |
Seascale Cumbria CA20 1PG |
Tel: +44 (0)19467 28333 Fax: +44 (0)19467 28987 Email: enquiries@sellafieldsites.com Website: www.sellafieldsites.com/ |
Springfields Fuels Ltd |
Springfields Salwick Preston PR4 0XJ |
Tel: +44 (0)1772 762000 Email: springfields.enquiries@westinghouse.com Website: www.westinghousenuclear.com/springfields |
URENCO UK Limited | Capenhurst Chester England CH1 6ER |
Tel: +44 (0)151 473 4000 Fax: +44 (0)151 473 7599 Email: enquiries@urenco.com Website: www.urenco.com |
Research Sites Restoration Limited |
Harwell Site Harwell Oxford Didcot OX11 0RA |
Tel: +44 (0) 1235 820220 |
Research Sites Restoration Limited |
Winfrith Site Winfrith Newburgh Dorchester Dorset DT2 8DH |
Tel: +44 01235 820220 Website: www.research-sites.com |
National Nuclear Laboratory | Central Laboratory Sellafield Seascale Cumbria CA20 1PG |
Tel: +44 019467 79000 Website: www.nnl.co.uk |
Nuclear Industry Association |
5th Floor, Tower House 10 Southampton Street London WC2E 7HA |
Tel: +44 0207766 6640 Website: https://www.niauk.org/ |
UK Atomic Energy Authority |
Culham Science Centre Abingdon OX14 3DB |
Tel: +441235 528822 Website: http://www.ccfe.ac.uk/ |
National Skills Academy for Nuclear |
Head Office Europe Way Cockermouth CA13 0RJ |
Tel: +44 01900 898120 Email: enquiries@nsan.co.uk |
EDF Energy UK Ltd |
40 Grosvenor Place Victoria London SW1X 7EN |
Tel: +44 (0)20 7242 9050 |