Hungary

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

Fossil fuels Nuclear Renewables
Solid Liquid Gas Uranium Hydro Other
Total amount* 10 501.1 68.8 1641 31.5
Total amount in exajoules (EJ)** 0.016 60.110

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2019 Compound
annual growth
rate 2000–2019 (%)
Total 730 865 803 798 836 0.71 -30.58
Coal, Lignate and Peat 35 35 29 22 20 -2.86 -12.35
Oil 217 273 253 272 310 1.88 -22.11
Natural gas 280 337 269 239 246 -0.66 -27.27
Bioenergy and Waste 29 46 80 91 74 5.07 -8.77
Electricity 106 116 123 130 142 1.57 -19.88
Heat 64 58 50 44 43 -2.03 -16.61

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2019 Compound
annual growth
rate 2000–2019 (%)
Total 35 191 35 756 37 371 30 360 34 082 -0.17 -47.49
Coal, Lignate and Peat 9 707 7 146 6 350 5 908 4 183 -4.33 -33.37
Oil 4 404 455 490 77 68 -19.71 -24.78
Natural gas 6 602 12 379 11 598 5 108 8 573 1.38 -35.98
Bioenergy and Waste 120 1 730 2 449 2 302 2 479 17.28 -9.70
Hydro 178 202 188 234 219 1.10 -23.49
Nuclear 14 180 13 834 15 761 15 834 16 288 0.73 -40.53
Wind 0 10 534 693 729 0.00
Solar 0 0 1 141 1 386 0.00
Geothermal 0 0 0 0 18 0.00
Other 0 0 0 63 139 0.00

TABLE 4. ENERGY RELATED RATIOS

2000
2005
2010 2015 year*
Nuclear/total electricity (%)      

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2020

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2020
PAKS-1 PWR 479 Operational PAKS Zrt AEE 8/1/1974 12/14/1982 12/28/1982 8/10/1983 88.1
PAKS-2 PWR 477 Operational PAKS Zrt AEE 8/1/1974 8/26/1984 9/6/1984 11/14/1984 91.0
PAKS-3 PWR 473 Operational PAKS Zrt AEE 10/1/1979 9/15/1986 9/28/1986 12/1/1986 91.7
PAKS-4 PWR 473 Operational PAKS Zrt AEE 10/1/1979 8/9/1987 8/16/1987 11/1/1987 90.7
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor unit Shutdown reason Decommission strategy Current decommissioning phase Current fuel management phase Decommissioning licensee Licence terminated year
             

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Station/project name Type Capacity (MW(e)) Expected construction start year Expected commercial year
Paks 5 VVER-1200 1200 n.a. n.a.
Paks 6 VVER-1200 1200 n.a. n.a.