Slovakia

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

Fossil fuels Nuclear Renewables
Solid Liquid Gas Uranium Hydro Other renewable
Total amount* 1 066 10 26 10 000
Total amount in exajoules (EJ) 0.02 0.21

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 510 505 505 457 480 -0.30
Coal, Lignate and Peat 92 88 92 78 59 -2.20
Oil 126 125 128 115 143 0.65
Natural gas 174 155 139 116 115 -2.07
Bioenergy and Waste 13 14 23 34 55 7.28
Electricity 79 82 87 88 86 0.39
Heat 26 40 36 27 23 -0.55

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 31 158 31 455 27 858 26 903 28 934 -0.37
Coal, Lignate and Peat 6 111 5 980 4 080 3 332 2 205 -4.97
Oil 202 741 600 384 408 3.58
Natural gas 3 344 2 184 2 206 1 604 3 567 0.32
Bioenergy and Waste 32 56 686 1 688 1 717 22.03
Hydro 4 975 4 741 5 649 4 137 4 895 -0.08
Nuclear 16 494 17 727 14 574 15 146 15 444 -0.33
Wind 0 6 6 6 4 0.00
Solar 0 0 17 506 663 0.00
Geothermal 0 0 0 0 0 0.00
Other 0 20 40 100 31 0.00

TABLE 4. ENERGY RELATED RATIOS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 2021*
Nulcear/total electricity(%) 53.4 56.1 51.8 55.9 53.1 52.3

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
BOHUNICE-3 PWR 466 Operational SE ŠKODA 12/1/1976 8/7/1984 8/20/1984 2/14/1985 93.7
BOHUNICE-4 PWR 466 Operational SE ŠKODA 12/1/1976 8/2/1985 8/9/1985 12/18/1985 93.4
MOCHOVCE-1 PWR 467 Operational SE ŠKODA 10/13/1983 6/9/1998 7/4/1998 10/29/1998 87.1
MOCHOVCE-2 PWR 469 Operational SE ŠKODA 10/13/1983 12/1/1999 12/20/1999 4/11/2000 92.4
MOCHOVCE-3 PWR 440 Under Construction SE ŠKODA 1/27/1987 10/28/2022 11/11/2022 1/20/2023
MOCHOVCE-4 PWR 440 Under Construction SE ŠKODA 1/27/1987 7/18/2024 8/15/2024 10/10/2024
BOHUNICE A1 HWGCR 93 Permanent Shutdown JAVYS ŠKODA 8/1/1958 10/24/1972 12/25/1972 12/25/1972 2/22/1977
BOHUNICE-1 PWR 408 Permanent Shutdown JAVYS AEE 4/24/1972 11/27/1978 12/17/1978 4/1/1980 12/31/2006
BOHUNICE-2 PWR 408 Permanent Shutdown JAVYS AEE 4/24/1972 3/15/1980 3/26/1980 1/1/1981 12/31/2008
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
BOHUNICE A1 HWGCR 93 Permanent Shutdown JAVYS ŠKODA 1958-08-01 1972-10-24 1972-12-25 1972-12-25 1977-02-22 0
BOHUNICE-1 PWR 408 Permanent Shutdown JAVYS AEE 1972-04-24 1978-11-27 1978-12-17 1980-04-01 2006-12-31 0
BOHUNICE-2 PWR 408 Permanent Shutdown JAVYS AEE 1972-04-24 1980-03-15 1980-03-26 1981-01-01 2008-12-31 0
BOHUNICE-3 PWR 466 Operational SE ŠKODA 1976-12-01 1984-08-07 1984-08-20 1985-02-14 93.7
BOHUNICE-4 PWR 466 Operational SE ŠKODA 1976-12-01 1985-08-02 1985-08-09 1985-12-18 93.4
MOCHOVCE-1 PWR 467 Operational SE ŠKODA 1983-10-13 1998-06-09 1998-07-04 1998-10-29 87.5
MOCHOVCE-2 PWR 469 Operational SE ŠKODA 1983-10-13 1999-12-01 1999-12-20 2000-04-11 92.4
MOCHOVCE-3 PWR 440 Under Construction SE ŠKODA 1987-01-27 2022-10-28 2022-11-11 2023-01-20 0
MOCHOVCE-4 PWR 440 Under Construction SE ŠKODA 1987-01-27 2024-07-18 2024-08-15 2024-10-10 0

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Reactor name Shutdown
date
Shutdown reason Decom.
strategy
Current decom.
phase
Current fuel management
phase
Decom. licensee Licence
terminated
BOHUNICE A1 Feb-77 Accident A combination of immediate & deferred dismantling Partial Dismantling, Waste conditioning - Onsite - JAVYS -
BOHUNICE-1 06-Dec Political decision Immediate dismantling & removal of all radioactive material Dismantling, Waste conditioning - Onsite, Waste Shipment - Offsite - JAVYS 2025
BOHUNICE-2 08-Dec Political decision Immediate dismantling & removal of all radioactive material Dismantling, Waste conditioning - Onsite, Waste Shipment - Offsite - JAVYS -