Germany

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES 2020

Fossil fuels Nuclear Renewables
Solid1
[million t]
Liquid
[million t]
Gas
[billion m3]
Uranium
[t]
Hydro
(installed)
[TW]
Other
renewable
(installed)
[TW]
Total amount in specific units 35700 18 22 0 0.005 0.126
Total amount in exajoules (EJ) 324.9 0.8 0.8 0 1.7 39.8

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 9 924 9 868 9 921 9 496 9 091 -0.44
Coal, Lignate and Peat 626 501 544 590 460 -1.53
Oil 4 769 4 348 3 957 3 848 3 584 -1.42
Natural gas 2 304 2 270 2 340 2 149 2 226 -0.17
Bioenergy and Waste 197 413 674 626 686 6.43
Electricity 1 738 1 878 1 912 1 851 1 725 -0.04
Heat 290 458 493 432 411 1.75

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 576 543 623 114 633 120 648 309 572 666 -0.03
Coal, Lignate and Peat 304 162 297 753 273 457 283 710 143 333 -3.69
Oil 4 785 11 998 8 741 6 209 4 887 0.11
Natural gas 52 495 73 960 90 352 63 017 95 202 3.02
Bioenergy and Waste 10 121 17 960 40 275 57 382 57 435 9.07
Hydro 25 962 26 417 27 353 24 898 24 876 -0.21
Nuclear 169 606 163 055 140 556 91 786 64 382 -4.73
Wind 9 352 27 774 38 547 80 624 132 102 14.16
Solar 60 1 282 11 729 38 726 48 641 39.78
Geothermal 0 0 28 133 231 0.00
Other 0 2 915 2 082 1 824 1 577 0.00

TABLE 4. ENERGY RELATED RATIOS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 2021*
Nuclear/total electricity (%) 30.6 26.6 22.6 14.1 11.3 11.9

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
EMSLAND PWR 1335 Operational KLE KWU 10/08/1982 14/04/1988 19/04/1988 20/06/1988 95.4
ISAR-2 PWR 1410 Operational PElektra KWU 15/09/1982 15/01/1988 22/01/1988 09/04/1988 94.6
NECKARWESTHEIM-2 PWR 1310 Operational EnKK KWU 09/11/1982 29/12/1988 03/01/1989 15/04/1989 92.3
AVR JUELICH HTGR 13 Permanent Shutdown AVR BBK 01/08/1961 16/08/1966 17/12/1967 19/05/1969 31/12/1988
BIBLIS-A PWR 1167 Permanent Shutdown RWE KWU 01/01/1970 16/07/1974 25/08/1974 26/02/1975 06/08/2011
BIBLIS-B PWR 1240 Permanent Shutdown RWE KWU 01/02/1972 25/03/1976 25/04/1976 31/01/1977 06/08/2011
BROKDORF PWR 1410 Permanent Shutdown PElektra KWU 01/01/1976 08/10/1986 14/10/1986 22/12/1986 31/12/2021 99.4
BRUNSBUETTEL BWR 771 Permanent Shutdown KKB KWU 15/04/1970 23/06/1976 13/07/1976 09/02/1977 06/08/2011
GRAFENRHEINFELD PWR 1275 Permanent Shutdown E.ON KWU 01/01/1975 09/12/1981 30/12/1981 17/06/1982 27/06/2015
GREIFSWALD-1 PWR 408 Permanent Shutdown EWN AEE 01/03/1970 15/12/1973 17/12/1973 12/07/1974 18/12/1990
GREIFSWALD-2 PWR 408 Permanent Shutdown EWN AEE 01/03/1970 03/12/1974 23/12/1974 16/04/1975 14/02/1990
GREIFSWALD-3 PWR 408 Permanent Shutdown EWN AEE 01/04/1972 16/10/1977 24/10/1977 01/05/1978 28/02/1990
GREIFSWALD-4 PWR 408 Permanent Shutdown EWN AEE 01/04/1972 22/07/1979 03/09/1979 01/11/1979 02/06/1990
GREIFSWALD-5 PWR 408 Permanent Shutdown EWN AEE 01/12/1976 26/03/1989 24/04/1989 01/11/1989 24/11/1989
GROHNDE PWR 1360 Permanent Shutdown PElektra KWU 01/06/1976 01/09/1984 05/09/1984 01/02/1985 31/12/2021 92.5
GUNDREMMINGEN-A BWR 237 Permanent Shutdown KGB AEG,GE 12/12/1962 14/08/1966 01/12/1966 12/04/1967 13/01/1977
GUNDREMMINGEN-B BWR 1284 Permanent Shutdown KGG KWU 20/07/1976 09/03/1984 16/03/1984 19/07/1984 31/12/2017
GUNDREMMINGEN-C BWR 1288 Permanent Shutdown KGG KWU 20/07/1976 26/10/1984 02/11/1984 18/01/1985 31/12/2021 99.7
ISAR-1 BWR 878 Permanent Shutdown E.ON KWU 01/05/1972 20/11/1977 03/12/1977 21/03/1979 06/08/2011
KNK II FBR 17 Permanent Shutdown KBG IA 01/09/1974 10/10/1977 09/04/1978 03/03/1979 23/08/1991
KRUEMMEL BWR 1346 Permanent Shutdown KKK KWU 05/04/1974 14/09/1983 28/09/1983 28/03/1984 06/08/2011
LINGEN BWR 183 Permanent Shutdown KWL AEG 01/10/1964 31/01/1968 01/07/1968 01/10/1968 05/01/1977
MUELHEIM-KAERLICH PWR 1219 Permanent Shutdown KGG BBR 15/01/1975 01/03/1986 14/03/1986 18/08/1987 09/09/1988
MZFR PHWR 52 Permanent Shutdown KBG SIEMENS 01/12/1961 29/09/1965 09/03/1966 19/12/1966 03/05/1984
NECKARWESTHEIM-1 PWR 785 Permanent Shutdown EnKK KWU 01/02/1972 26/05/1976 03/06/1976 01/12/1976 06/08/2011
OBRIGHEIM PWR 340 Permanent Shutdown EnBW SIEM,KWU 15/03/1965 22/09/1968 29/10/1968 31/03/1969 11/05/2005
PHILIPPSBURG-1 BWR 890 Permanent Shutdown EnKK KWU 01/10/1970 09/03/1979 05/05/1979 26/03/1980 06/08/2011
PHILIPPSBURG-2 PWR 1402 Permanent Shutdown EnKK KWU 07/07/1977 13/12/1984 17/12/1984 18/04/1985 31/12/2019
RHEINSBERG PWR 62 Permanent Shutdown EWN AEE 01/01/1960 01/03/1966 06/05/1966 11/10/1966 01/06/1990
STADE PWR 640 Permanent Shutdown E.ON KWU 01/12/1967 08/01/1972 29/01/1972 19/05/1972 14/11/2003
THTR-300 HTGR 296 Permanent Shutdown HKG HRB 03/05/1971 13/09/1983 16/11/1985 01/06/1987 29/09/1988
UNTERWESER PWR 1345 Permanent Shutdown E.ON KWU 01/07/1972 16/09/1978 29/09/1978 06/09/1979 06/08/2011
WUERGASSEN BWR 640 Permanent Shutdown PE AEG,KWU 26/01/1968 20/10/1971 18/12/1971 11/11/1975 26/08/1994
GREIFSWALD-6 PWR 408 Cancelled Constr. EWN AEE 01/12/1976 01/01/1990
GREIFSWALD-7 PWR 408 Cancelled Constr. EWN AEE 01/12/1978 01/10/1990
GREIFSWALD-8 PWR 408 Cancelled Constr. EWN AEE 01/12/1978 01/10/1990
KALKAR FBR 295 Cancelled Constr. SBK INB 23/04/1973 20/03/1991
STENDAL-1 PWR 900 Cancelled Constr. EWN AEE 01/12/1982 01/03/1991
STENDAL-2 PWR 900 Cancelled Constr. EWN AEE 01/12/1984 01/03/1991
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor name Shutdown date Shutdown reason Decom. strategy Current decom. phase Current fuel management phase Decom. licensee Licence terminated
AVR Jülich (AVR) 31-Dec-1988 Experimental programme ended Dismantling Dismantling Storage at Jülich JEN GmbH (part of EWN)
Biblis-A (KWB A) 06-Aug-2011 Phase out regulation Dismantling Dismantling Storage in on-site facility RWE Nuclear GmbH
Biblis-B (KWB B) 06-Aug-2011 Phase out regulation Dismantling Dismantling Storage in on-site facility RWE Nuclear GmbH
Brunsbüttel (KKB) 06-Aug-2011 Phase out regulation Dismantling Dismantling Storage in on-site facility Kernkraftwerk Brunsbüttel GmbH & Co. oHG
Grafenrheinfeld (KKG) 27-Jun-2015 Phase out regulation Dismantling Dismantling Storage in on-site facility PreussenElektra GmbH
Greifswald-1 (KGR 1) 18-Dec-1990 Safety concerns Dismantling Dismantling Storage Zwischenlager Nord (ZLN) EWN GmbH
Greifswald-2 (KGR 2) 14-Feb-1990 Safety concerns Dismantling Dismantling Storage Zwischenlager Nord (ZLN) EWN GmbH
Greifswald-3 (KGR 3) 28-Feb-1990 Safety concerns Dismantling Dismantling Storage Zwischenlager Nord (ZLN) EWN GmbH
Greifswald-4 (KGR 4) 02-Jun-1990 Safety concerns Dismantling Dismantling Storage Zwischenlager Nord (ZLN) EWN GmbH
Greifswald-5 (KGR 5) 30-Nov-1989 Economic Dismantling Dismantling Storage Zwischenlager Nord (ZLN) EWN GmbH
Gundremmingen-A (KRB-A) 13-Jan-1977 Economic Dismantling Dismantling Reprocessing Kernkraftwerk Gundremmingen GmbH
Gundremmingen-B (KRB-B) 31-Dec-2017 Phase out regulation Dismantling Dismantling Storage in on-site facility Kernkraftwerk Gundremmingen GmbH
HDR Großwelzheim (HDR) 20-Apr-1971 Technical Dismantling Licence terminated Reprocessed in WAK Karlsruher Institut für Technologie (KIT) 1998
Isar-1 (KKI 1) 06-Aug-2011 Phase out regulation Dismantling Dismantling Storage in on-site facility PreussenElektra GmbH
Kompakte natrium-gekühlte Kernanlage (KNK II) 23-Aug-1991 Experimental programme ended Dismantling Dismantling Storage Zwischenlager Nord (ZLN) KTE GmbH (part of EWN)
Lingen (KWL) 05-Jan-1977 Economic Dismantling Dismantling Transport to Sellafield (GB) Kernkraftwerk Lingen GmbH
Mülheim-Kärlich (KMK) 09-Sep-1988 Phase out regulation Dismantling Dismantling Reprocessed in La Hague (F) RWE Nuclear GmbH
Mehrzweckforschungs-reaktor (MZFR) 03-May-1984 Experimental programme ended Dismantling Dismantling Reprocessed in WAK KTE GmbH (part of EWN)
Neckarwestheim-1 (GKN-1) 06-Aug-2011 Phase out regulation Dismantling Dismantling Storage in on-site facility EnBW Kernkraft GmbH (EnKK)
Niederaichbach (KKN) 31-Jul-1974 Technical Dismantling Licence terminated Transported to Commissariat à l’energie atomique Karlsruher Institut für Technologie (KIT) 1995
Obrigheim (KWO) 11-May-2005 Phase out regulation Dismantling Dismantling Storage Zwischenlager Neckarwestheim EnBW Kernkraft GmbH (EnKK)
Philippsburg-1 (KKP-1) 06-Aug-2011 Phase out regulation Dismantling Dismantling Storage in on-site facility EnBW Kernkraft GmbH (EnKK)
Philippsburg-2 (KKP-2) 31-Dec-2019 Phase out regulation Dismantling Dismantling Storage in on-site facility EnBW Kernkraft GmbH (EnKK)
Rheinsberg (KKR) 01-Jun-1990 Safety concerns Dismantling Dismantling Storage Zwischenlager Nord (ZLN) EWN GmbH
Stade (KKS) 14-Nov-2003 Phase out regulation Dismantling Dismantling Reprocessed in France PreussenElektra GmbH
Thorium-hochtemperaturreaktor (THTR-300) 29-Sep-1988 Economic, technical Safe enclosure Safe enclosure Storage at Ahaus Hochtemperatur-Kernkraftwerk GmbH (HKG)
Unterweser (KKU) 06-Aug-2011 Phase out regulation Dismantling Dismantling Storage in on-site facility PreussenElektra GmbH
VAK Kahl (VAK) 25-Nov-1985 Experimental programme ended Dismantling Licence terminated Reprocessed in WAK/disposal in Sweden Versuchsatomkraftwerk Kahl GmbH (VAK) 2010
Würgassen (KWW) 26-Aug-1994 Economic Dismantling Preparation for site release Reprocessed in La Hague (F) PreussenElektra GmbH