France
TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES
Fossil fuels | Nuclear | Renewables | ||||
Solid | Liquid | Gas | Uranium | Hydro | Other electric renewables | |
Total amount in specific units | 0 | 0.7 Mtoe | 2.4 TWh PCS | n.a. | 25.7 GW installed | 34.1 GW installed |
TABLE 2. ENERGY STATISTICS
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 6 868 | 7 090 | 6 752 | 6 454 | 5 834 | -0.81 |
Coal, Lignate and Peat | 255 | 229 | 197 | 182 | 116 | -3.84 |
Oil | 3 393 | 3 339 | 2 969 | 2 886 | 2 455 | -1.61 |
Natural gas | 1 320 | 1 441 | 1 379 | 1 181 | 1 145 | -0.71 |
Bioenergy and Waste | 375 | 385 | 488 | 493 | 475 | 1.19 |
Electricity | 1 384 | 1 520 | 1 596 | 1 573 | 1 477 | 0.33 |
Heat | 141 | 176 | 123 | 140 | 166 | 0.80 |
TABLE 3. ELECTRICITY PRODUCTION, CONSUMPTION AND CAPACITY
Electricity production (GWh) | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 539 447 | 575 581 | 568 677 | 578 246 | 530 586 | -0.08 |
Coal, Lignate and Peat | 30 860 | 30 705 | 26 315 | 14 537 | 4 944 | -8.75 |
Oil | 7 165 | 7 925 | 5 521 | 6 673 | 5 609 | -1.22 |
Natural gas | 11 514 | 23 069 | 23 758 | 21 144 | 35 317 | 5.76 |
Bioenergy and Waste | 3 560 | 5 048 | 6 471 | 8 776 | 11 162 | 5.88 |
Hydro | 71 133 | 56 332 | 67 526 | 60 513 | 66 532 | -0.33 |
Nuclear | 415 162 | 451 529 | 428 521 | 437 428 | 353 833 | -0.80 |
Wind | 48 | 962 | 9 945 | 21 421 | 39 792 | 39.94 |
Solar | 5 | 11 | 620 | 7 754 | 13 398 | 48.39 |
Geothermal | 0 | 0 | 0 | 92 | 133 | |
Other | 0 | 0 | 135 | 715 | 561 | |
Tidal | 507 | 481 | 476 | 487 | 482 | -0.25 |
TABLE 4. ENERGY RELATED RATIOS
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | 2021* |
Nulcear/total electricity(%) | 76.4 | 78.5 | 74.1 | 76.3 | 70.6 | 69 |
TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021
Reactor Unit | Type | Net Capacity [MW(e)] |
Status | Operator | Reactor Supplier |
Construction Date |
First Criticality Date |
First Grid Date |
Commercial Date |
Shutdown Date |
UCF for 2021 |
BELLEVILLE-1 | PWR | 1310 | Operational | EDF | FRAM | 5/1/1980 | 9/9/1987 | 10/14/1987 | 6/1/1988 | 90.5 | |
BELLEVILLE-2 | PWR | 1310 | Operational | EDF | FRAM | 8/1/1980 | 5/25/1988 | 7/6/1988 | 1/1/1989 | 77.2 | |
BLAYAIS-1 | PWR | 910 | Operational | EDF | FRAM | 1/1/1977 | 5/20/1981 | 6/12/1981 | 12/1/1981 | 85.3 | |
BLAYAIS-2 | PWR | 910 | Operational | EDF | FRAM | 1/1/1977 | 6/28/1982 | 7/17/1982 | 2/1/1983 | 67.5 | |
BLAYAIS-3 | PWR | 910 | Operational | EDF | FRAM | 4/1/1978 | 7/29/1983 | 8/17/1983 | 11/14/1983 | 85.6 | |
BLAYAIS-4 | PWR | 910 | Operational | EDF | FRAM | 4/1/1978 | 5/1/1983 | 5/16/1983 | 10/1/1983 | 73.3 | |
BUGEY-2 | PWR | 910 | Operational | EDF | FRAM | 11/1/1972 | 4/20/1978 | 5/10/1978 | 3/1/1979 | 82.7 | |
BUGEY-3 | PWR | 910 | Operational | EDF | FRAM | 9/1/1973 | 8/31/1978 | 9/21/1978 | 3/1/1979 | 79.3 | |
BUGEY-4 | PWR | 880 | Operational | EDF | FRAM | 6/1/1974 | 2/17/1979 | 3/8/1979 | 7/1/1979 | 51.7 | |
BUGEY-5 | PWR | 880 | Operational | EDF | FRAM | 7/1/1974 | 7/15/1979 | 7/31/1979 | 1/3/1980 | 56.8 | |
CATTENOM-1 | PWR | 1300 | Operational | EDF | FRAM | 10/29/1979 | 10/24/1986 | 11/13/1986 | 4/1/1987 | 69.1 | |
CATTENOM-2 | PWR | 1300 | Operational | EDF | FRAM | 7/28/1980 | 8/7/1987 | 9/17/1987 | 2/1/1988 | 70.8 | |
CATTENOM-3 | PWR | 1300 | Operational | EDF | FRAM | 6/15/1982 | 2/16/1990 | 7/6/1990 | 2/1/1991 | 39.5 | |
CATTENOM-4 | PWR | 1300 | Operational | EDF | FRAM | 9/28/1983 | 5/4/1991 | 5/27/1991 | 1/1/1992 | 95.3 | |
CHINON B-1 | PWR | 905 | Operational | EDF | FRAM | 3/1/1977 | 10/28/1982 | 11/30/1982 | 2/1/1984 | 71.7 | |
CHINON B-2 | PWR | 905 | Operational | EDF | FRAM | 3/1/1977 | 9/23/1983 | 11/29/1983 | 8/1/1984 | 70.3 | |
CHINON B-3 | PWR | 905 | Operational | EDF | FRAM | 10/1/1980 | 9/18/1986 | 10/20/1986 | 3/4/1987 | 67.9 | |
CHINON B-4 | PWR | 905 | Operational | EDF | FRAM | 2/1/1981 | 10/13/1987 | 11/14/1987 | 4/1/1988 | 95.7 | |
CHOOZ B-1 | PWR | 1500 | Operational | EDF | FRAM | 1/1/1984 | 7/25/1996 | 8/30/1996 | 5/15/2000 | 79.0 | |
CHOOZ B-2 | PWR | 1500 | Operational | EDF | FRAM | 12/31/1985 | 3/10/1997 | 4/10/1997 | 9/29/2000 | 78.0 | |
CIVAUX-1 | PWR | 1495 | Operational | EDF | FRAM | 10/15/1988 | 11/29/1997 | 12/24/1997 | 1/29/2002 | 62.1 | |
CIVAUX-2 | PWR | 1495 | Operational | EDF | FRAM | 4/1/1991 | 11/27/1999 | 12/24/1999 | 4/23/2002 | 34.4 | |
CRUAS-1 | PWR | 915 | Operational | EDF | FRAM | 8/1/1978 | 4/2/1983 | 4/29/1983 | 4/2/1984 | 55.5 | |
CRUAS-2 | PWR | 915 | Operational | EDF | FRAM | 11/15/1978 | 8/1/1984 | 9/6/1984 | 4/1/1985 | 76.0 | |
CRUAS-3 | PWR | 915 | Operational | EDF | FRAM | 4/15/1979 | 4/9/1984 | 5/14/1984 | 9/10/1984 | 84.9 | |
CRUAS-4 | PWR | 915 | Operational | EDF | FRAM | 10/1/1979 | 10/1/1984 | 10/27/1984 | 2/11/1985 | 94.8 | |
DAMPIERRE-1 | PWR | 890 | Operational | EDF | FRAM | 2/1/1975 | 3/15/1980 | 3/23/1980 | 9/10/1980 | 44.5 | |
DAMPIERRE-2 | PWR | 890 | Operational | EDF | FRAM | 4/1/1975 | 12/5/1980 | 12/10/1980 | 2/16/1981 | 81.9 | |
DAMPIERRE-3 | PWR | 890 | Operational | EDF | FRAM | 9/1/1975 | 1/25/1981 | 1/30/1981 | 5/27/1981 | 65.8 | |
DAMPIERRE-4 | PWR | 890 | Operational | EDF | FRAM | 12/1/1975 | 8/5/1981 | 8/18/1981 | 11/20/1981 | 84.6 | |
FLAMANVILLE-1 | PWR | 1330 | Operational | EDF | FRAM | 12/1/1979 | 9/29/1985 | 12/4/1985 | 12/1/1986 | 64.5 | |
FLAMANVILLE-2 | PWR | 1330 | Operational | EDF | FRAM | 5/1/1980 | 6/12/1986 | 7/18/1986 | 3/9/1987 | 94.6 | |
GOLFECH-1 | PWR | 1310 | Operational | EDF | FRAM | 11/17/1982 | 4/24/1990 | 6/7/1990 | 2/1/1991 | 96.4 | |
GOLFECH-2 | PWR | 1310 | Operational | EDF | FRAM | 10/1/1984 | 5/21/1993 | 6/18/1993 | 3/4/1994 | 37.2 | |
GRAVELINES-1 | PWR | 910 | Operational | EDF | FRAM | 2/1/1975 | 2/21/1980 | 3/13/1980 | 11/25/1980 | 58.8 | |
GRAVELINES-2 | PWR | 910 | Operational | EDF | FRAM | 3/1/1975 | 8/2/1980 | 8/26/1980 | 12/1/1980 | 59.0 | |
GRAVELINES-3 | PWR | 910 | Operational | EDF | FRAM | 12/1/1975 | 11/30/1980 | 12/12/1980 | 6/1/1981 | 83.1 | |
GRAVELINES-4 | PWR | 910 | Operational | EDF | FRAM | 4/1/1976 | 5/31/1981 | 6/14/1981 | 10/1/1981 | 49.9 | |
GRAVELINES-5 | PWR | 910 | Operational | EDF | FRAM | 10/1/1979 | 8/5/1984 | 8/28/1984 | 1/15/1985 | 70.7 | |
GRAVELINES-6 | PWR | 910 | Operational | EDF | FRAM | 10/1/1979 | 7/21/1985 | 8/1/1985 | 10/25/1985 | 65.3 | |
NOGENT-1 | PWR | 1310 | Operational | EDF | FRAM | 5/26/1981 | 9/12/1987 | 10/21/1987 | 2/24/1988 | 83.2 | |
NOGENT-2 | PWR | 1310 | Operational | EDF | FRAM | 1/1/1982 | 10/4/1988 | 12/14/1988 | 5/1/1989 | 84.7 | |
PALUEL-1 | PWR | 1330 | Operational | EDF | FRAM | 8/15/1977 | 5/13/1984 | 6/22/1984 | 12/1/1985 | 46.0 | |
PALUEL-2 | PWR | 1330 | Operational | EDF | FRAM | 1/1/1978 | 8/11/1984 | 9/14/1984 | 12/1/1985 | 83.4 | |
PALUEL-3 | PWR | 1330 | Operational | EDF | FRAM | 2/1/1979 | 8/7/1985 | 9/30/1985 | 2/1/1986 | 75.1 | |
PALUEL-4 | PWR | 1330 | Operational | EDF | FRAM | 2/1/1980 | 3/29/1986 | 4/11/1986 | 6/1/1986 | 82.9 | |
PENLY-1 | PWR | 1330 | Operational | EDF | FRAM | 9/1/1982 | 4/1/1990 | 5/4/1990 | 12/1/1990 | 72.5 | |
PENLY-2 | PWR | 1330 | Operational | EDF | FRAM | 8/1/1984 | 1/10/1992 | 2/4/1992 | 11/1/1992 | 86.6 | |
ST. ALBAN-1 | PWR | 1335 | Operational | EDF | FRAM | 1/29/1979 | 8/4/1985 | 8/30/1985 | 5/1/1986 | 85.4 | |
ST. ALBAN-2 | PWR | 1335 | Operational | EDF | FRAM | 7/31/1979 | 6/7/1986 | 7/3/1986 | 3/1/1987 | 85.2 | |
ST. LAURENT B-1 | PWR | 915 | Operational | EDF | FRAM | 5/1/1976 | 1/4/1981 | 1/21/1981 | 8/1/1983 | 52.0 | |
ST. LAURENT B-2 | PWR | 915 | Operational | EDF | FRAM | 7/1/1976 | 5/12/1981 | 6/1/1981 | 8/1/1983 | 71.0 | |
TRICASTIN-1 | PWR | 915 | Operational | EDF | FRAM | 11/1/1974 | 2/21/1980 | 5/31/1980 | 12/1/1980 | 81.4 | |
TRICASTIN-2 | PWR | 915 | Operational | EDF | FRAM | 12/1/1974 | 7/22/1980 | 8/7/1980 | 12/1/1980 | 51.4 | |
TRICASTIN-3 | PWR | 915 | Operational | EDF | FRAM | 4/1/1975 | 11/29/1980 | 2/10/1981 | 5/11/1981 | 85.5 | |
TRICASTIN-4 | PWR | 915 | Operational | EDF | FRAM | 5/1/1975 | 5/31/1981 | 6/12/1981 | 11/1/1981 | 86.7 | |
FLAMANVILLE-3 | PWR | 1630 | Under Construction | EDF | ORANO | 12/3/2007 | |||||
BUGEY-1 | GCR | 540 | Permanent Shutdown | EDF | FRAM | 12/1/1965 | 3/21/1972 | 4/15/1972 | 7/1/1972 | 5/27/1994 | |
CHINON A-1 | GCR | 70 | Permanent Shutdown | EDF | LEVIVIER | 2/1/1957 | 9/16/1962 | 6/14/1963 | 2/1/1964 | 4/16/1973 | |
CHINON A-2 | GCR | 180 | Permanent Shutdown | EDF | LEVIVIER | 8/1/1959 | 8/17/1964 | 2/24/1965 | 2/24/1965 | 6/14/1985 | |
CHINON A-3 | GCR | 360 | Permanent Shutdown | EDF | GTM | 3/1/1961 | 3/1/1966 | 8/4/1966 | 8/4/1966 | 6/15/1990 | |
CHOOZ-A (ARDENNES) | PWR | 305 | Permanent Shutdown | SENA | A/F/W | 1/1/1962 | 10/18/1966 | 4/3/1967 | 4/15/1967 | 10/30/1991 | |
EL-4 (MONTS D'ARREE) | HWGCR | 70 | Permanent Shutdown | EDF | GAAA | 7/1/1962 | 12/23/1966 | 7/9/1967 | 6/1/1968 | 7/31/1985 | |
FESSENHEIM-1 | PWR | 880 | Permanent Shutdown | EDF | FRAM | 9/1/1971 | 3/7/1977 | 4/6/1977 | 1/1/1978 | 2/22/2020 | |
FESSENHEIM-2 | PWR | 880 | Permanent Shutdown | EDF | FRAM | 2/1/1972 | 6/27/1977 | 10/7/1977 | 4/1/1978 | 6/30/2020 | |
G-2 (MARCOULE) | GCR | 39 | Permanent Shutdown | COGEMA | SACM | 3/1/1955 | 7/21/1958 | 4/22/1959 | 4/22/1959 | 2/2/1980 | |
G-3 (MARCOULE) | GCR | 40 | Permanent Shutdown | COGEMA | SACM | 3/1/1956 | 6/11/1959 | 4/4/1960 | 4/4/1960 | 6/20/1984 | |
PHENIX | FBR | 130 | Permanent Shutdown | CEA/EDF | CNCLNEY | 11/1/1968 | 8/31/1973 | 12/13/1973 | 7/14/1974 | 2/1/2010 11:59:00 PM | 0.0 |
ST. LAURENT A-1 | GCR | 390 | Permanent Shutdown | EDF | FRAM | 10/1/1963 | 1/7/1969 | 3/14/1969 | 6/1/1969 | 4/18/1990 | |
ST. LAURENT A-2 | GCR | 465 | Permanent Shutdown | EDF | FRAM | 1/1/1966 | 7/4/1971 | 8/9/1971 | 11/1/1971 | 5/27/1992 | |
SUPER-PHENIX | FBR | 1200 | Permanent Shutdown | EDF | ASPALDO | 12/13/1976 | 9/7/1985 | 1/14/1986 | 12/1/1986 | 12/31/1998 |
Data source: IAEA - Power Reactor Information System (PRIS). | |||||||||||
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report. |
TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS
Reactor Unit | Type | Net Capacity [MW(e)] |
Status | Operator | Reactor Supplier |
Construction date |
First Criticality Date |
First Grid Date |
Commercial Date |
Shutdown Date |
UCF for 2021 |
BELLEVILLE-1 | PWR | 1310 | Operational | EDF | FRAM | 1980-05-01 | 1987-09-09 | 1987-10-14 | 1988-06-01 | 90.5 | |
BELLEVILLE-2 | PWR | 1310 | Operational | EDF | FRAM | 1980-08-01 | 1988-05-25 | 1988-07-06 | 1989-01-01 | 77.2 | |
BLAYAIS-1 | PWR | 910 | Operational | EDF | FRAM | 1977-01-01 | 1981-05-20 | 1981-06-12 | 1981-12-01 | 85.3 | |
BLAYAIS-2 | PWR | 910 | Operational | EDF | FRAM | 1977-01-01 | 1982-06-28 | 1982-07-17 | 1983-02-01 | 67.5 | |
BLAYAIS-3 | PWR | 910 | Operational | EDF | FRAM | 1978-04-01 | 1983-07-29 | 1983-08-17 | 1983-11-14 | 85.6 | |
BLAYAIS-4 | PWR | 910 | Operational | EDF | FRAM | 1978-04-01 | 1983-05-01 | 1983-05-16 | 1983-10-01 | 73.3 | |
BUGEY-1 | GCR | 540 | Permanent Shutdown | EDF | FRAM | 1965-12-01 | 1972-03-21 | 1972-04-15 | 1972-07-01 | 1994-05-27 | 0 |
BUGEY-2 | PWR | 910 | Operational | EDF | FRAM | 1972-11-01 | 1978-04-20 | 1978-05-10 | 1979-03-01 | 82.7 | |
BUGEY-3 | PWR | 910 | Operational | EDF | FRAM | 1973-09-01 | 1978-08-31 | 1978-09-21 | 1979-03-01 | 79.3 | |
BUGEY-4 | PWR | 880 | Operational | EDF | FRAM | 1974-06-01 | 1979-02-17 | 1979-03-08 | 1979-07-01 | 51.7 | |
BUGEY-5 | PWR | 880 | Operational | EDF | FRAM | 1974-07-01 | 1979-07-15 | 1979-07-31 | 1980-01-03 | 56.8 | |
CATTENOM-1 | PWR | 1300 | Operational | EDF | FRAM | 1979-10-29 | 1986-10-24 | 1986-11-13 | 1987-04-01 | 69.1 | |
CATTENOM-2 | PWR | 1300 | Operational | EDF | FRAM | 1980-07-28 | 1987-08-07 | 1987-09-17 | 1988-02-01 | 70.8 | |
CATTENOM-3 | PWR | 1300 | Operational | EDF | FRAM | 1982-06-15 | 1990-02-16 | 1990-07-06 | 1991-02-01 | 39.5 | |
CATTENOM-4 | PWR | 1300 | Operational | EDF | FRAM | 1983-09-28 | 1991-05-04 | 1991-05-27 | 1992-01-01 | 95.3 | |
CHINON A-1 | GCR | 70 | Permanent Shutdown | EDF | LEVIVIER | 1957-02-01 | 1962-09-16 | 1963-06-14 | 1964-02-01 | 1973-04-16 | 0 |
CHINON A-2 | GCR | 180 | Permanent Shutdown | EDF | LEVIVIER | 1959-08-01 | 1964-08-17 | 1965-02-24 | 1965-02-24 | 1985-06-14 | 0 |
CHINON A-3 | GCR | 360 | Permanent Shutdown | EDF | GTM | 1961-03-01 | 1966-03-01 | 1966-08-04 | 1966-08-04 | 1990-06-15 | 0 |
CHINON B-1 | PWR | 905 | Operational | EDF | FRAM | 1977-03-01 | 1982-10-28 | 1982-11-30 | 1984-02-01 | 71.7 | |
CHINON B-2 | PWR | 905 | Operational | EDF | FRAM | 1977-03-01 | 1983-09-23 | 1983-11-29 | 1984-08-01 | 70.3 | |
CHINON B-3 | PWR | 905 | Operational | EDF | FRAM | 1980-10-01 | 1986-09-18 | 1986-10-20 | 1987-03-04 | 67.9 | |
CHINON B-4 | PWR | 905 | Operational | EDF | FRAM | 1981-02-01 | 1987-10-13 | 1987-11-14 | 1988-04-01 | 95.7 | |
CHOOZ B-1 | PWR | 1500 | Operational | EDF | FRAM | 1984-01-01 | 1996-07-25 | 1996-08-30 | 2000-05-15 | 79 | |
CHOOZ B-2 | PWR | 1500 | Operational | EDF | FRAM | 1985-12-31 | 1997-03-10 | 1997-04-10 | 2000-09-29 | 78 | |
CHOOZ-A (ARDENNES) | PWR | 305 | Permanent Shutdown | SENA | A/F/W | 1962-01-01 | 1966-10-18 | 1967-04-03 | 1967-04-15 | 1991-10-30 | 0 |
CIVAUX-1 | PWR | 1495 | Operational | EDF | FRAM | 1988-10-15 | 1997-11-29 | 1997-12-24 | 2002-01-29 | 62.1 | |
CIVAUX-2 | PWR | 1495 | Operational | EDF | FRAM | 1991-04-01 | 1999-11-27 | 1999-12-24 | 2002-04-23 | 34.4 | |
CRUAS-1 | PWR | 915 | Operational | EDF | FRAM | 1978-08-01 | 1983-04-02 | 1983-04-29 | 1984-04-02 | 55.5 | |
CRUAS-2 | PWR | 915 | Operational | EDF | FRAM | 1978-11-15 | 1984-08-01 | 1984-09-06 | 1985-04-01 | 76 | |
CRUAS-3 | PWR | 915 | Operational | EDF | FRAM | 1979-04-15 | 1984-04-09 | 1984-05-14 | 1984-09-10 | 84.9 | |
CRUAS-4 | PWR | 915 | Operational | EDF | FRAM | 1979-10-01 | 1984-10-01 | 1984-10-27 | 1985-02-11 | 94.8 | |
DAMPIERRE-1 | PWR | 890 | Operational | EDF | FRAM | 1975-02-01 | 1980-03-15 | 1980-03-23 | 1980-09-10 | 44.5 | |
DAMPIERRE-2 | PWR | 890 | Operational | EDF | FRAM | 1975-04-01 | 1980-12-05 | 1980-12-10 | 1981-02-16 | 81.9 | |
DAMPIERRE-3 | PWR | 890 | Operational | EDF | FRAM | 1975-09-01 | 1981-01-25 | 1981-01-30 | 1981-05-27 | 65.8 | |
DAMPIERRE-4 | PWR | 890 | Operational | EDF | FRAM | 1975-12-01 | 1981-08-05 | 1981-08-18 | 1981-11-20 | 84.6 | |
EL-4 (MONTS D'ARREE) | HWGCR | 70 | Permanent Shutdown | EDF | GAAA | 1962-07-01 | 1966-12-23 | 1967-07-09 | 1968-06-01 | 1985-07-31 | 0 |
FESSENHEIM-1 | PWR | 880 | Permanent Shutdown | EDF | FRAM | 1971-09-01 | 1977-03-07 | 1977-04-06 | 1978-01-01 | 2020-02-22 | 0 |
FESSENHEIM-2 | PWR | 880 | Permanent Shutdown | EDF | FRAM | 1972-02-01 | 1977-06-27 | 1977-10-07 | 1978-04-01 | 2020-06-30 | 0 |
FLAMANVILLE-1 | PWR | 1330 | Operational | EDF | FRAM | 1979-12-01 | 1985-09-29 | 1985-12-04 | 1986-12-01 | 64.5 | |
FLAMANVILLE-2 | PWR | 1330 | Operational | EDF | FRAM | 1980-05-01 | 1986-06-12 | 1986-07-18 | 1987-03-09 | 94.6 | |
FLAMANVILLE-3 | PWR | 1630 | Under Construction | EDF | ORANO | 2007-12-03 | 0 | ||||
G-2 (MARCOULE) | GCR | 39 | Permanent Shutdown | COGEMA | SACM | 1955-03-01 | 1958-07-21 | 1959-04-22 | 1959-04-22 | 1980-02-02 | 0 |
G-3 (MARCOULE) | GCR | 40 | Permanent Shutdown | COGEMA | SACM | 1956-03-01 | 1959-06-11 | 1960-04-04 | 1960-04-04 | 1984-06-20 | 0 |
GOLFECH-1 | PWR | 1310 | Operational | EDF | FRAM | 1982-11-17 | 1990-04-24 | 1990-06-07 | 1991-02-01 | 96.4 | |
GOLFECH-2 | PWR | 1310 | Operational | EDF | FRAM | 1984-10-01 | 1993-05-21 | 1993-06-18 | 1994-03-04 | 37.2 | |
GRAVELINES-1 | PWR | 910 | Operational | EDF | FRAM | 1975-02-01 | 1980-02-21 | 1980-03-13 | 1980-11-25 | 58.8 | |
GRAVELINES-2 | PWR | 910 | Operational | EDF | FRAM | 1975-03-01 | 1980-08-02 | 1980-08-26 | 1980-12-01 | 59 | |
GRAVELINES-3 | PWR | 910 | Operational | EDF | FRAM | 1975-12-01 | 1980-11-30 | 1980-12-12 | 1981-06-01 | 83.2 | |
GRAVELINES-4 | PWR | 910 | Operational | EDF | FRAM | 1976-04-01 | 1981-05-31 | 1981-06-14 | 1981-10-01 | 49.9 | |
GRAVELINES-5 | PWR | 910 | Operational | EDF | FRAM | 1979-10-01 | 1984-08-05 | 1984-08-28 | 1985-01-15 | 70.7 | |
GRAVELINES-6 | PWR | 910 | Operational | EDF | FRAM | 1979-10-01 | 1985-07-21 | 1985-08-01 | 1985-10-25 | 65.3 | |
NOGENT-1 | PWR | 1310 | Operational | EDF | FRAM | 1981-05-26 | 1987-09-12 | 1987-10-21 | 1988-02-24 | 83.2 | |
NOGENT-2 | PWR | 1310 | Operational | EDF | FRAM | 1982-01-01 | 1988-10-04 | 1988-12-14 | 1989-05-01 | 84.7 | |
PALUEL-1 | PWR | 1330 | Operational | EDF | FRAM | 1977-08-15 | 1984-05-13 | 1984-06-22 | 1985-12-01 | 46 | |
PALUEL-2 | PWR | 1330 | Operational | EDF | FRAM | 1978-01-01 | 1984-08-11 | 1984-09-14 | 1985-12-01 | 83.4 | |
PALUEL-3 | PWR | 1330 | Operational | EDF | FRAM | 1979-02-01 | 1985-08-07 | 1985-09-30 | 1986-02-01 | 75.1 | |
PALUEL-4 | PWR | 1330 | Operational | EDF | FRAM | 1980-02-01 | 1986-03-29 | 1986-04-11 | 1986-06-01 | 82.9 | |
PENLY-1 | PWR | 1330 | Operational | EDF | FRAM | 1982-09-01 | 1990-04-01 | 1990-05-04 | 1990-12-01 | 72.5 | |
PENLY-2 | PWR | 1330 | Operational | EDF | FRAM | 1984-08-01 | 1992-01-10 | 1992-02-04 | 1992-11-01 | 86.6 | |
PHENIX | FBR | 130 | Permanent Shutdown | CEA/EDF | CNCLNEY | 1968-11-01 | 1973-08-31 | 1973-12-13 | 1974-07-14 | 2010-02-01 | 0 |
ST. ALBAN-1 | PWR | 1335 | Operational | EDF | FRAM | 1979-01-29 | 1985-08-04 | 1985-08-30 | 1986-05-01 | 85.4 | |
ST. ALBAN-2 | PWR | 1335 | Operational | EDF | FRAM | 1979-07-31 | 1986-06-07 | 1986-07-03 | 1987-03-01 | 85.2 | |
ST. LAURENT A-1 | GCR | 390 | Permanent Shutdown | EDF | FRAM | 1963-10-01 | 1969-01-07 | 1969-03-14 | 1969-06-01 | 1990-04-18 | 0 |
ST. LAURENT A-2 | GCR | 465 | Permanent Shutdown | EDF | FRAM | 1966-01-01 | 1971-07-04 | 1971-08-09 | 1971-11-01 | 1992-05-27 | 0 |
ST. LAURENT B-1 | PWR | 915 | Operational | EDF | FRAM | 1976-05-01 | 1981-01-04 | 1981-01-21 | 1983-08-01 | 52 | |
ST. LAURENT B-2 | PWR | 915 | Operational | EDF | FRAM | 1976-07-01 | 1981-05-12 | 1981-06-01 | 1983-08-01 | 71 | |
SUPER-PHENIX | FBR | 1200 | Permanent Shutdown | EDF | ASPALDO | 1976-12-13 | 1985-09-07 | 1986-01-14 | 1986-12-01 | 1998-12-31 | 0 |
TRICASTIN-1 | PWR | 915 | Operational | EDF | FRAM | 1974-11-01 | 1980-02-21 | 1980-05-31 | 1980-12-01 | 81.4 | |
TRICASTIN-2 | PWR | 915 | Operational | EDF | FRAM | 1974-12-01 | 1980-07-22 | 1980-08-07 | 1980-12-01 | 51.4 | |
TRICASTIN-3 | PWR | 915 | Operational | EDF | FRAM | 1975-04-01 | 1980-11-29 | 1981-02-10 | 1981-05-11 | 85.5 | |
TRICASTIN-4 | PWR | 915 | Operational | EDF | FRAM | 1975-05-01 | 1981-05-31 | 1981-06-12 | 1981-11-01 | 86.7 |