Finland

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

Estimated available energy sources
Fossil fuels Nuclear Renewables
Solid Liquid Gas Uranium Hydro Other renewables
Total amount in specific units* 5.9 0 0 15 800 3.3 n.a.
Total amount in exajoules (EJ) 0.06 0.05 0.37

TABLE 2. ENERGY STATISTICS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 1 033 1 069 1 116 1 035 1 027 -0.03
Coal, Lignate and Peat 53 47 45 36 33 -2.35
Oil 345 358 341 303 291 -0.85
Natural gas 38 35 34 26 32 -0.77
Bioenergy and Waste 188 178 206 227 242 1.27
Electricity 272 290 300 282 276 0.08
Heat 137 161 190 160 152 0.54

TABLE 3. INSTALLED CAPACITY, ELECTRICITY PRODUCTION AND CONSUMPTION

Electricity production (GWh) 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 69 786 70 334 80 366 68 351 68 723 -0.08
Coal, Lignate and Peat 13 137 11 688 21 414 8 787 5 180 -4.55
Oil 587 500 484 212 201 -5.22
Natural gas 10 131 11 231 11 259 5 195 3 991 -4.55
Bioenergy and Waste 8 712 9 687 11 188 11 805 12 020 1.62
Hydro 14 660 13 784 12 922 16 769 15 883 0.40
Nuclear 22 479 23 271 22 800 23 245 23 291 0.18
Wind 78 170 294 2 327 7 938 26.00
Solar 2 3 5 11 218 26.45
Geothermal 0 0 0 0 0 0.00
Other 0 0 50 15 11 0.00

TABLE 4. ENERGY RELATED RATIOS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 2021*
Nulcear/total electricity(%) 32.1 32.9 28.4 33.7 33.9 32.8

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
LOVIISA-1 PWR 507 Operational FORTUMPH AEE 5/1/1971 1/21/1977 2/8/1977 5/9/1977 94.7
LOVIISA-2 PWR 507 Operational FORTUMPH AEE 8/1/1972 10/17/1980 11/4/1980 1/5/1981 93.0
OLKILUOTO-1 BWR 890 Operational TVO ASEASTAL 2/1/1974 7/21/1978 9/2/1978 10/10/1979 95.3
OLKILUOTO-2 BWR 890 Operational TVO ASEASTAL 11/1/1975 10/13/1979 2/18/1980 7/10/1982 90.3
OLKILUOTO-3 PWR 1600 Operational TVO ORANO 8/12/2005 12/21/2021 3/12/2022 0.0
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
LOVIISA-1 PWR 507 Operational FORTUMPH AEE 1971-05-01 1977-01-21 1977-02-08 1977-05-09 94.7
LOVIISA-2 PWR 507 Operational FORTUMPH AEE 1972-08-01 1980-10-17 1980-11-04 1981-01-05 93
OLKILUOTO-1 BWR 890 Operational TVO ASEASTAL 1974-02-01 1978-07-21 1978-09-02 1979-10-10 95.3
OLKILUOTO-2 BWR 890 Operational TVO ASEASTAL 1975-11-01 1979-10-13 1980-02-18 1982-07-10 90.3
OLKILUOTO-3 PWR 1600 Operational TVO ORANO 2005-08-12 2021-12-21 2022-03-12 0

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Reactor unit/Project name Owner Type Capacity in MW(e) Expected construction start year Expected commercial year
 - - - - - -