Bulgaria
TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES
Fossil fuels | Nuclear | Renewables | ||||
Solid | Liquid | Gas | Uranium | Hydro | Other renewable | |
Total amount | 1994 | c.d.* | 7331 | —** | —** | —** |
TABLE 2. ENERGY STATISTICS
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 402 | 436 | 375 | 410 | 411 | 0.11 |
Coal, Lignate and Peat | 41 | 43 | 19 | 16 | 14 | -5.20 |
Oil | 150 | 168 | 132 | 146 | 155 | 0.16 |
Natural gas | 65 | 61 | 46 | 60 | 54 | -0.90 |
Bioenergy and Waste | 23 | 31 | 38 | 49 | 60 | 4.87 |
Electricity | 87 | 92 | 97 | 102 | 103 | 0.84 |
Heat | 37 | 41 | 42 | 37 | 26 | -1.77 |
TABLE 3. INSTALLED CAPACITY ELECTRICITY PRODUCTION AND CONSUMPTION
Electricity production (GWh) | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 40 924 | 44 365 | 46 639 | 49 205 | 40 731 | -0.02 |
Coal, Lignate and Peat | 17 207 | 18 625 | 22 606 | 22 522 | 13 533 | -1.19 |
Oil | 661 | 606 | 393 | 182 | 299 | -3.89 |
Natural gas | 1 912 | 1 729 | 1 967 | 1 864 | 2 292 | 0.91 |
Bioenergy and Waste | 15 | 17 | 35 | 272 | 1 703 | 26.69 |
Hydro | 2 951 | 4 730 | 5 693 | 6 147 | 3 320 | 0.59 |
Nuclear | 18 178 | 18 653 | 15 249 | 15 383 | 16 626 | -0.45 |
Wind | 0 | 5 | 681 | 1 452 | 1 477 | 0.00 |
Solar | 0 | 0 | 15 | 1 383 | 1 481 | 0.00 |
TABLE 4. ENERGY RELATED RATIOS
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | 2021* |
Nulcear/total electricity(%) | 45 | 44.1 | 33.1 | 31.3 | 40.8 | 34.6 |
TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021
Reactor Unit | Type | Net Capacity [MW(e)] |
Status | Operator | Reactor Supplier |
Construction Date |
First Criticality Date |
First Grid Date |
Commercial Date |
Shutdown Date |
UCF for 2021 |
KOZLODUY-5 | PWR | 1003 | Operational | KNPP | AEE | 7/9/1980 | 11/5/1987 | 11/29/1987 | 12/23/1988 | 88.4 | |
KOZLODUY-6 | PWR | 1003 | Operational | K N N P | AEE | 4/1/1982 | 5/29/1991 | 8/2/1991 | 12/30/1993 | 89.5 | |
KOZLODUY-1 | PWR | 408 | Permanent Shutdown | K N N P | AEE | 4/1/1970 | 6/30/1974 | 7/24/1974 | 10/28/1974 | 12/31/2002 | |
KOZLODUY-2 | PWR | 408 | Permanent Shutdown | KOZNPP | AEE | 4/1/1970 | 8/22/1975 | 8/24/1975 | 11/10/1975 | 12/31/2002 | |
KOZLODUY-3 | PWR | 408 | Permanent Shutdown | K N N P | AEE | 10/1/1973 | 12/4/1980 | 12/17/1980 | 1/20/1981 | 12/31/2006 | |
KOZLODUY-4 | PWR | 408 | Permanent Shutdown | K N N P | AEE | 10/1/1973 | 4/25/1982 | 5/17/1982 | 6/20/1982 | 12/31/2006 | |
BELENE-1 | PWR | 953 | Cancelled Constr. | K N N P | JSC ASE | 1/1/1987 | 3/28/2012 | ||||
BELENE-2 | PWR | 953 | Cancelled Constr. | K N N P | JSC ASE | 3/31/1987 | 3/28/2012 |
Data source: IAEA - Power Reactor Information System (PRIS). | |||||||||||
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report. |
TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS
Reactor Unit | Type | Net Capacity [MW(e)] |
Status | Operator | Reactor Supplier |
Construction date |
First Criticality Date |
First Grid Date |
Commercial Date |
Shutdown Date |
UCF for 2021 |
BELENE-1 | PWR | 953 | Cancelled Constr. | K N N P | JSC ASE | 1987-01-01 | 2012-03-28 | 0 | |||
BELENE-2 | PWR | 953 | Cancelled Constr. | K N N P | JSC ASE | 1987-03-31 | 2012-03-28 | 0 | |||
KOZLODUY-1 | PWR | 408 | Permanent Shutdown | K N N P | AEE | 1970-04-01 | 1974-06-30 | 1974-07-24 | 1974-10-28 | 2002-12-31 | 0 |
KOZLODUY-2 | PWR | 408 | Permanent Shutdown | K N N P | AEE | 1970-04-01 | 1975-08-22 | 1975-08-24 | 1975-11-10 | 2002-12-31 | 0 |
KOZLODUY-3 | PWR | 408 | Permanent Shutdown | K N N P | AEE | 1973-10-01 | 1980-12-04 | 1980-12-17 | 1981-01-20 | 2006-12-31 | 0 |
KOZLODUY-4 | PWR | 408 | Permanent Shutdown | K N N P | AEE | 1973-10-01 | 1982-04-25 | 1982-05-17 | 1982-06-20 | 2006-12-31 | 0 |
KOZLODUY-5 | PWR | 1003 | Operational | KNPP | AEE | 1980-07-09 | 1987-11-05 | 1987-11-29 | 1988-12-23 | 88.4 | |
KOZLODUY-6 | PWR | 1003 | Operational | K N N P | AEE | 1982-04-01 | 1991-05-29 | 1991-08-02 | 1993-12-30 | 89.5 |
TABLE 7. PLANNED NUCLEAR POWER PLANTS
Reactor name | Shutdown date |
Shutdown reason | Decom. strategy |
Current decom. phase |
Current fuel management phase |
Decom. licensee | Licence terminated |
KOZLODUY-1 | 02-Dec | EC agreement followed by Government decision | A combination of immediate & deferred dismantling | Dismantling, Licence terminated | AFR-RS (Dry Storage), AFR-OS (Dry Storage), AFR-RS (Wet Storage), AFR-OS (Wet Storage) | E-03492 | 2031 |
KOZLODUY-2 | 02-Dec | EC agreement followed by Government decision | A combination of immediate & deferred dismantling | Dismantling, Licence terminated | AFR-RS (Dry Storage), AFR-OS (Dry Storage), AFR-RS (Wet Storage), AFR-OS (Wet Storage) | E-03493 | 2031 |
KOZLODUY-3 | 06-Dec | EC agreement followed by Government decision | A combination of immediate & deferred dismantling | Dismantling, Licence terminated | AFR-RS (Dry Storage), AFR-OS (Dry Storage), AFR-RS (Wet Storage), AFR-OS (Wet Storage) | E-00174 | 2031 |
KOZLODUY-4 | 06-Dec | EC agreement followed by Government decision | A combination of immediate & deferred dismantling | Dismantling, Licence terminated | AFR-RS (Dry Storage), AFR-OS (Dry Storage), AFR-RS (Wet Storage), AFR-OS (Wet Storage) | E-0008 | 2031 |
TABLE 8. SPENT FUEL INVENTORY
WWER-440 | WWER-1000 | Total | ||||
Fuel baskets/ CONSTOR casks | Fuel assemblies | Fuel baskets | Fuel assemblies | Fuel baskets/ CONSTOR casks | Fuel assemblies | |
Spent Fuel Pools 5 and 6 | - | - | - | 392/385 | - | 777 |
Wet storage facility | 45 | 1268 | 55 | 660 | 100 | 1928 |
Dry storage facility | 19 | 1596 | - | - | 19 | 1596 |
TABLE FOR DISPOSAL IN THE NATIONAL DISPOSAL FACILITY FOR LOW- AND INTERMEDIATE-LEVEL RAW. LOOKING FOR AN END POINT OF THE MANAGEMENT OF DSRS, SE RAW CONSIDERS THE OPPORTUNITY FOR IMPLEMENTING BOREHOLE DISPOSAL CONCEPT (BDC) IN BULGARIA. THAT IS WHY SE RAW PREPARES PRELIMINARY INVENTORY SUITABLE FOR BD, REVIEWS THE GEOLOGICAL DATA FOR SITES AND AREAS SUITABLE FOR BDS, ETC. SE RAW AS OPERATOR AND BULGARIAN NUCLEAR REGULATORY AGENCY AS REGULATOR PARTICIPATE IN THE IAEA COORDINATED RESEARCH PROJECT (CRP) TO DEVELOP A STANDARDIZED FRAMEWORK FOR DSRS BOREHOLE DISPOSAL.
Academic year | Name of professional direction |
Name of profession | Name of specialty | Class/ Form of education |
Number of students |
2021/2022 | Electrical engineering and energy | Technician of energy facilities and installations | Nuclear energetics –III degree of professional qualification | VIII/Daily form of education |
21 |
2021/2022 | Electrical engineering and energy | Technician of energy facilities and installations | Nuclear energetics –III degree of professional qualification | IX/Dual system of training |
26 |
2021/2022 | Electrical engineering and energy | Technician of energy facilities and installations | Nuclear energetics –III degree of professional qualification | X/Daily form of education |
16 |
2021/2022 | Electrical engineering and energy | Technician of energy facilities and installations | Nuclear energetics –III degree of professional qualification | XI/Daily form of education |
13 |
TABLE FOR DISPOSAL IN THE NATIONAL DISPOSAL FACILITY FOR LOW- AND INTERMEDIATE-LEVEL RAW. LOOKING FOR AN END POINT OF THE MANAGEMENT OF DSRS, SE RAW CONSIDERS THE OPPORTUNITY FOR IMPLEMENTING BOREHOLE DISPOSAL CONCEPT (BDC) IN BULGARIA. THAT IS WHY SE RAW PREPARES PRELIMINARY INVENTORY SUITABLE FOR BD, REVIEWS THE GEOLOGICAL DATA FOR SITES AND AREAS SUITABLE FOR BDS, ETC. SE RAW AS OPERATOR AND BULGARIAN NUCLEAR REGULATORY AGENCY AS REGULATOR PARTICIPATE IN THE IAEA COORDINATED RESEARCH PROJECT (CRP) TO DEVELOP A STANDARDIZED FRAMEWORK FOR DSRS BOREHOLE DISPOSAL.
University | Name of specialty | Bachelor’s degree program | Master degree program | Total | |||
1st year | 2nd year | 3rd year | 4th year | ||||
Sofia University | Engineering Physic | 20 | 6 | 7 | 8 | 41 | |
Nuclear Technology and Nuclear Power Engineering, | 6 | 4 | 4 | 1 | 6 | 21 | |
Nuclear and Particle Physics | 7 | 3 | 3 | 0 | 3 | 16 | |
Nuclear Chemistry | 1 | 1 | 2 | 3 | 0 | 7 | |
Plovdiv University | Engineering Physic | 18 | 12 | 12 | 13 | 0 | 55 |
Technical University - Sofia | Thermal and Nuclear Power Engineering |
12 | 11 | 9 | 6 | 57 | 95 |
Engineering Physic | 0 | 0 | 0 | 3 | 0 | 3 | |
University of National and World Economy | Nuclear security | - | - | - | - | 7 | 7 |
University of Chemical Technology and Metallurgy | Chemical technologies in nuclear energy | - | - | - | - | 2 | 2 |
South-West University | Nuclear and Particle Physics | - | - | - | - | 1 | 1 |