China

TABLE 3. ESTIMATED AVAILABLE ENERGY SOURCES

Estimated available energy sources
Fossil Fuels Nuclear Renewables
Solid(1) Liquid(2) Gas(3) Uranium(4) Hydro(5) Wind power(6)
Total amount in Exajoule (EJ)* 13778.9 32.4 4 26.55 5.42 9.5

TABLE 4. ENERGY STATISTICS

Annual Average
Growth Rate (%)
1970 1980 1990 2000 2005 2011 2000-2011
Final Energy Consumption(Exajoule)
Total 17.64 28.89 42.60 69.08 101.86 8.25
solids 12.74 22.01 29.48 48.91 69.67 8.13
liquids 3.65 4.80 9.46 13.68 18.95 6.52
- Gases 0.55 0.61 0.94 1.80 5.09 16.64
Nuclear 0.00 0.00 0.17 0.55 0.81 15.25
Hydro 0.71 1.47 2.51 4.08 6.52 9.07
Other renewables 0.00 0.00 0.04 0.07 0.81 31.45
Energy generation
Total 18.66 30.42 39.53 63.29 93.07 8.10
Solids 12.95 22.54 28.93 49.11 72.41 8.70
Liquids 4.44 5.84 6.80 7.59 8.47 2.02
Gases 0.56 0.61 1.07 1.90 4.00 12.74
Nuclear 0.00 0.00 0.20 0.57 0.84 13.94
Hydro 0.71 1.43 2.53 4.11 6.52 8.99
Other renewables 0.00 0.00 0.00 0.00 0.84 --
Net import
Total

TABLE 5. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY

Annual Average
Growth Rate (%)
1970 1980 1990 2000 2005 2012 2000 to 2012
Installed Capacity (gig watt effective)
Thermal 45.55 101.84 223.43 383.54 819.1 11.43
Hydro 20.32 36.05 72.97 117.89 249 10.77
Nuclear .. .. 2.17 6.57 12.57 15.76
Wind power .. .. .. .. 60.83 --
Geothermal .. .. .. .. .. --
Other renewable .. .. .. .. ..3.28 --
- Total 65.87 137.89 298.57 508.00 1144.9 --
Electricity Generation(TWH)
Thermal 242.42 494.48 1114.19 2047.34 3855.4 10.90
Hydro 58.21 126.72 222.41 397.02 860.85 11.94
Nuclear .. .. 16.74 53.09 98.3 15.90
Wind power .. .. .. .. 100.4 ..
Geothermal .. .. .. --
Other renewable .. .. .. .. -- ..
- Total (1) 300.63 623.04 1355.60 2500.2 4937.7 11.37
Total electricity consumption (TWH)

TABLE 6. ENERGY RELATED RATIOS

1970 1980 1990 2000 2005 2011
Energy consumption per capita (GJ/capita) 17.97 25.44 33.75 52.98 75.78
Electricity per capita (kW.h/capita) 306.00 549.00 1067.00 1913.00 3497.00
Electricity generation/ Energy generation 4.72 6.00 9.98 11.53 14.78
Nuclear/Total electricity (%) 0 0 1.24 2.13 1.84
Import energy ratio (%) -- -- -- -- --

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2015

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2015
CEFR FBR 20 Operational CIAE IZ 2000-05-10 2010-07-21 2011-07-21 0.0
CHANGJIANG-1 PWR 610 Operational HNPC DEC 2010-04-25 2015-10-12 2015-11-07 2015-12-25 0.0
CHANGJIANG-2 PWR 610 Operational HNPC DEC 2010-11-21 2016-06-09 2016-06-20 2016-08-12 0.0
DAYA BAY-1 PWR 944 Operational DNMC FRAM 1987-08-07 1993-07-28 1993-08-31 1994-02-01 78.8
DAYA BAY-2 PWR 944 Operational DNMC FRAM 1988-04-07 1994-01-21 1994-02-07 1994-05-06 98.7
FANGCHENGGANG-1 PWR 1000 Operational GFNPC DEC 2010-07-30 2015-10-13 2015-10-25 2016-01-01 0.0
FANGCHENGGANG-2 PWR 1000 Operational GFNPC DEC 2010-12-23 2016-06-29 2016-07-15 2016-10-01 0.0
FANGJIASHAN-1 PWR 1012 Operational QNPC NPIC 2008-12-26 2014-10-21 2014-11-04 2014-12-15 84.5
FANGJIASHAN-2 PWR 1012 Operational QNPC NPIC 2009-07-17 2014-12-25 2015-01-12 2015-02-12 93.2
FUQING-1 PWR 1000 Operational FQNP NPIC 2008-11-21 2014-07-24 2014-08-20 2014-11-22 74.1
FUQING-2 PWR 1000 Operational FQNP NPIC 2009-06-17 2015-07-22 2015-08-06 2015-10-16 100.0
FUQING-3 PWR 1000 Operational FQNP NPIC 2010-12-31 2016-07-03 2016-09-07 2016-10-24 0.0
HONGYANHE-1 PWR 1061 Operational LHNPC DEC 2007-08-18 2013-01-16 2013-02-17 2013-06-06 87.8
HONGYANHE-2 PWR 1061 Operational LHNPC DEC 2008-03-28 2013-10-24 2013-11-23 2014-05-13 65.6
HONGYANHE-3 PWR 1061 Operational LHNPC DEC 2009-03-07 2014-10-27 2015-03-23 2015-08-16 100.0
HONGYANHE-4 PWR 1000 Operational LHNPC DEC 2009-08-15 2016-03-05 2016-04-01 0.0
LING AO-1 PWR 950 Operational DNMC FRAM 1997-05-15 2002-02-04 2002-02-26 2002-05-28 86.8
LING AO-2 PWR 950 Operational DNMC FRAM 1997-11-28 2002-08-27 2002-09-14 2003-01-08 93.7
LING AO-3 PWR 1007 Operational DNMC DEC 2005-12-15 2010-06-09 2010-07-15 2010-09-15 90.1
LING AO-4 PWR 1007 Operational DNMC DEC 2006-06-15 2011-02-25 2011-05-03 2011-08-07 90.3
NINGDE-1 PWR 1018 Operational NDNP DEC 2008-02-18 2012-11-24 2012-12-28 2013-04-15 88.0
NINGDE-2 PWR 1018 Operational NDNP SHE 2008-11-12 2013-12-20 2014-01-04 2014-05-04 80.6
NINGDE-3 PWR 1018 Operational NDNP CFHI 2010-01-08 2015-03-08 2015-03-21 2015-06-10 91.3
NINGDE-4 PWR 1018 Operational NDNP CFHI 2010-09-29 2016-03-16 2016-03-29 2016-07-21 0.0
QINSHAN 2-1 PWR 610 Operational NPQJVC CNNC 1996-06-02 2001-11-15 2002-02-06 2002-04-15 89.3
QINSHAN 2-2 PWR 610 Operational NPQJVC CNNC 1997-04-01 2004-02-25 2004-03-11 2004-05-03 95.1
QINSHAN 2-3 PWR 619 Operational NPQJVC CNNC 2006-04-28 2010-07-13 2010-08-01 2010-10-05 86.2
QINSHAN 2-4 PWR 610 Operational NPQJVC CNNC 2007-01-28 2011-11-17 2011-11-25 2011-12-30 91.1
QINSHAN 3-1 PHWR 677 Operational TQNPC AECL 1998-06-08 2002-09-21 2002-11-19 2002-12-31 83.2
QINSHAN 3-2 PHWR 677 Operational TQNPC AECL 1998-09-25 2003-01-18 2003-06-12 2003-07-24 97.3
QINSHAN-1 PWR 298 Operational CNNO CNNC 1985-03-20 1991-10-31 1991-12-15 1994-04-01 91.1
TIANWAN-1 PWR 990 Operational JNPC IZ 1999-10-20 2005-12-20 2006-05-12 2007-05-17 91.1
TIANWAN-2 PWR 990 Operational JNPC IZ 2000-09-20 2007-05-01 2007-05-14 2007-08-16 88.2
YANGJIANG-1 PWR 1000 Operational YJNPC CFHI 2008-12-16 2013-12-23 2013-12-31 2014-03-25 79.7
YANGJIANG-2 PWR 1000 Operational YJNPC CFHI 2009-06-04 2015-03-02 2015-03-10 2015-06-05 99.8
YANGJIANG-3 PWR 1000 Operational YJNPC CFHI 2010-11-15 2015-10-11 2015-10-18 2016-01-01 0.0
FANGCHENGGANG-3 PWR 1000 Under Construction GFNPC CFHI 2015-12-24
FUQING-4 PWR 1000 Under Construction FQNP NPIC 2012-11-17
FUQING-5 PWR 1000 Under Construction FQNP NPIC 2015-05-07
FUQING-6 PWR 1000 Under Construction FQNP NPIC 2015-12-22
HAIYANG-1 PWR 1000 Under Construction SDNPC WH 2009-09-24
HAIYANG-2 PWR 1000 Under Construction SDNPC WH 2010-06-20
HONGYANHE-5 PWR 1000 Under Construction LHNPC DEC 2015-03-29
HONGYANHE-6 PWR 1000 Under Construction LHNPC DEC 2015-07-24
SANMEN-1 PWR 1000 Under Construction SMNPC WH/MHI 2009-04-19
SANMEN-2 PWR 1000 Under Construction SMNPC WH/MHI 2009-12-15
SHIDAO BAY-1 HTGR 200 Under Construction HSNPC Tsinghua 2012-12-09
TAISHAN-1 PWR 1660 Under Construction TNPC AREVA 2009-11-18
TAISHAN-2 PWR 1660 Under Construction TNPC AREVA 2010-04-15
TIANWAN-3 PWR 990 Under Construction JNPC IZ 2012-12-27
TIANWAN-4 PWR 990 Under Construction JNPC IZ 2013-09-27
TIANWAN-5 PWR 1000 Under Construction JNPC SHE 2015-12-27
TIANWAN-6 PWR 1000 Under Construction JNPC CFHI 2016-09-07
YANGJIANG-4 PWR 1000 Under Construction YJNPC CFHI 2012-11-17
YANGJIANG-5 PWR 1000 Under Construction YJNPC CFHI 2013-09-18
YANGJIANG-6 PWR 1000 Under Construction YJNPC CFHI 2013-12-23
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table 7 is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 8. APPROVED PREPARATORY WORK FOR NNP CONSTRUCTION

Project Name Model Installed Capacity (MW) Expected Const.
Year
Expected Operate Year
Approved NNP Const.
YANGJIANG UNIT 5 ACPR1000 1086 2013 2018
YANGJIANG UNIT 6 ACPR1000 1086 2014 2019
TIANWAN UNIT 4 VVER1000 1060 2013 ——
Approved Preparatory Work For NNP Const.
HAIYANG UNIT 3
HAIYANG UNIT 4
TIANWAN UNIT 5
TIANWAN UNIT 6
XUDABAO UNIT 1
XUDABAO UNIT 2
LUFENG UNIT 1
LUFENG UNIT 2
HONGYANHE UNIT 5
HONGYANHE UNIT 6
FUQING UNIT 5
FUQING UNIT 6
SANMEN UNIT 3
SANMEN UNIT 4