TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006                    
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
ARGENTINA AR -1 ATUCHA-1 PHWR 335 357 1179 NASA SIEMENS 1968-6 1974-3 1974-6 67.0   72.0   -
  AR -2 EMBALSE PHWR 600 648 2015 NASA AECL 1974-4 1983-4 1984-1 84.0   87.0   -
                             
ARMENIA AM -19 ARMENIA-2 PWR 376 408 1375 JSC FAEA 1975-7 1980-1 1980-5 58.0   67.0   -
                             
BELGIUM BE -2 DOEL-1 PWR 392 412 1192 ELECTRAB ACECOWEN 1969-7 1974-8 1975-2 85.0   89.0   -
  BE -4 DOEL-2 PWR 433 454 1311 ELECTRAB ACECOWEN 1971-9 1975-8 1975-12 81.0   86.0   -
  BE -5 DOEL-3 PWR 1006 1056 2775 ELECTRAB FRAMACEC 1975-1 1982-6 1982-10 85.0   88.0   -
  BE -7 DOEL-4 PWR 1008 1041 2988 ELECTRAB ACECOWEN 1978-12 1985-4 1985-7 83.0   84.0   -
                             
  BE -3 TIHANGE-1 PWR 962 1009 2873 ELECTRAB ACLF 1970-6 1975-3 1975-10 83.0   89.0   -
  BE -6 TIHANGE-2 PWR 1008 1055 3064 ELECTRAB FRAMACEC 1976-4 1982-10 1983-6 86.0   88.0   -
  BE -8 TIHANGE-3 PWR 1015 1065 3000 ELECTRAB ACECOWEN 1978-11 1985-6 1985-9 87.0   89.0   -
                             
BRAZIL BR -1 ANGRA-1 PWR 626 657 1876 ELETRONU WH 1971-5 1982-4 1985-1 41.0   59.0   -
  BR -2 ANGRA-2 PWR 1275 1350 3764 ELETRONU KWU 1976-1 2000-7 2001-2 75.0   83.0   -
                             
BULGARIA BG -5 KOZLODUY-5 PWR 953 1000 3000 KOZNPP AEE 1980-7 1987-11 1988-12 50.0   64.0   DH
  BG -6 KOZLODUY-6 PWR 953 1000 3000 KOZNPP AEE 1982-4 1991-8 1993-12 58.0   72.0   DH
                             
CANADA CA -10 BRUCE-3 PHWR 750 805 2832 BRUCEPOW NEI.P 1972-7 1977-12 1978-2 70.0   73.0   -
  CA -11 BRUCE-4 PHWR 750 805 2832 BRUCEPOW NEI.P 1972-9 1978-12 1979-1 69.0   70.0   -
  CA -18 BRUCE-5 PHWR 795 840 2832 BRUCEPOW OH/AECL 1978-6 1984-12 1985-3 82.0   83.0   -
  CA -19 BRUCE-6 PHWR 822 891 2690 BRUCEPOW OH/AECL 1978-1 1984-6 1984-9 79.0   80.0   -
                             
  CA -20 BRUCE-7 PHWR 822 840 2832 BRUCEPOW OH/AECL 1979-5 1986-2 1986-4 82.0   83.0   -
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
CANADA CA -21 BRUCE-8 PHWR 795 840 2690 BRUCEPOW OH/AECL 1979-8 1987-3 1987-5 80.0   82.0   -
  CA -22 DARLINGTON-1 PHWR 878 934 2776 OPG OH/AECL 1982-4 1990-12 1992-11 82.0   83.0   -
  CA -23 DARLINGTON-2 PHWR 878 934 2776 OPG OH/AECL 1981-9 1990-1 1990-10 74.0   76.0   -
  CA -24 DARLINGTON-3 PHWR 878 934 2776 OPG OH/AECL 1984-9 1992-12 1993-2 83.0   85.0   -
                             
  CA -25 DARLINGTON-4 PHWR 878 934 2776 OPG OH/AECL 1985-7 1993-4 1993-6 84.0   85.0   -
  CA -12 GENTILLY-2 PHWR 635 675 2156 HQ BBC 1974-4 1982-12 1983-10 78.0   84.0   -
  CA -4 PICKERING-1 PHWR 515 542 1744 OPG OH/AECL 1966-6 1971-4 1971-7 61.0   67.0   -
  CA -7 PICKERING-4 PHWR 515 542 1744 OPG OH/AECL 1968-5 1973-5 1973-6 66.0   67.0   -
                             
  CA -13 PICKERING-5 PHWR 516 540 1744 OPG OH/AECL 1974-11 1982-12 1983-5 73.0   74.0   -
  CA -14 PICKERING-6 PHWR 516 540 1744 OPG OH/AECL 1975-10 1983-11 1984-2 76.0   77.0   -
  CA -15 PICKERING-7 PHWR 516 540 1744 OPG OH/AECL 1976-3 1984-11 1985-1 78.0   79.0   -
  CA -16 PICKERING-8 PHWR 516 540 1744 OPG OH/AECL 1976-9 1986-1 1986-2 75.0   76.0   -
                             
  CA -17 POINT LEPREAU PHWR 635 680 2180 NBEPC AECL 1975-5 1982-9 1983-2 82.0   83.0   -
                             
CHINA CN -2 GUANGDONG-1 PWR 944 984 2905 GNPJVC GEC 1987-8 1993-8 1994-2 80.0   85.0   -
  CN -3 GUANGDONG-2 PWR 944 984 2905 GNPJVC GEC 1988-4 1994-2 1994-5 80.0   83.0   -
  CN -6 LINGAO 1 PWR 938 990 2895 LANPC FRAM 1997-5 2002-2 2002-5 86.0   87.0   -
  CN -7 LINGAO 2 PWR 938 990 2895 LANPC FRAM 1997-11 2002-12 2003-1 88.0   88.0   -
                             
  CN -1 QINSHAN 1 PWR 288 310 966 QNPC CNNC 1985-3 1991-12 1994-4 76.0   77.0   -
  CN -4 QINSHAN 2-1 PWR 610 650 1930 NPQJVC CNNC 1996-6 2002-2 2002-4 77.0   77.0   -
  CN -5 QINSHAN 2-2 PWR 610 650 1930 NPQJVC CNNC 1997-4 2004-3 2004-5 89.0   88.0   -
  CN -8 QINSHAN 3-1 PHWR 650 700 2064 TQNPC AECL 1998-6 2002-11 2002-12 87.0   86.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
CHINA CN -9 QINSHAN 3-2 PHWR 650 700 2064 TQNPC AECL 1998-9 2003-6 2003-7 86.0   86.0   -
  CN -10 TIANWAN 1 PWR 1000 1060 3000 JNPC AEE&ZAES 1999-10 2006-5 (1)     (1)     -
                             
CZECH R. CZ -4 DUKOVANY-1 PWR 412 440 1375 CEZ SKODA 1979-1 1985-2 1985-5 83.0   83.0   -
  CZ -5 DUKOVANY-2 PWR 412 440 1375 CEZ SKODA 1979-1 1986-1 1986-3 84.0   83.0   -
  CZ -8 DUKOVANY-3 PWR 427 456 1375 CEZ SKODA 1979-3 1986-11 1986-12 83.0   83.0   -
  CZ -9 DUKOVANY-4 PWR 412 440 1375 CEZ SKODA 1979-3 1987-6 1987-7 85.0   84.0   -
                             
  CZ -23 TEMELIN-1 PWR 930 975 3000 CEZ SKODA 1987-2 2000-12 2002-6 70.0   72.0   DH
  CZ -24 TEMELIN-2 PWR 930 975 3000 CEZ SKODA 1987-2 2002-12 2003-4 69.0   68.0   DH
                             
FINLAND FI -1 LOVIISA-1 PWR 488 510 1500 FORTUMPH AEE 1971-5 1977-2 1977-5 86.0   87.0   -
  FI -2 LOVIISA-2 PWR 488 510 1500 FORTUMPH AEE 1972-8 1980-11 1981-1 88.0   89.0   -
  FI -3 OLKILUOTO-1 BWR 860 890 2500 TVO ASEASTAL 1974-2 1978-9 1979-10 91.0   92.0   -
  FI -4 OLKILUOTO-2 BWR 860 890 2500 TVO ASEASTAL 1975-8 1980-2 1982-7 93.0   94.0   -
                             
FRANCE FR -54 BELLEVILLE-1 PWR 1310 1363 3817 EDF FRAM 1980-5 1987-10 1988-6 69.0   77.0   -
  FR -55 BELLEVILLE-2 PWR 1310 1363 3817 EDF FRAM 1980-8 1988-7 1989-1 70.0   78.0   -
  FR -32 BLAYAIS-1 PWR 910 951 2785 EDF FRAM 1977-1 1981-6 1981-12 71.0   79.0   -
  FR -33 BLAYAIS-2 PWR 910 951 2785 EDF FRAM 1977-1 1982-7 1983-2 75.0   82.0   -
                             
  FR -34 BLAYAIS-3 PWR 910 951 2785 EDF FRAM 1978-4 1983-8 1983-11 75.0   82.0   -
  FR -35 BLAYAIS-4 PWR 910 951 2785 EDF FRAM 1978-4 1983-5 1983-10 74.0   82.0   -
  FR -13 BUGEY-2 PWR 910 945 2785 EDF FRAM 1972-11 1978-5 1979-3 66.0   74.0   -
  FR -14 BUGEY-3 PWR 910 945 2785 EDF FRAM 1973-9 1978-9 1979-3 66.0   76.0   -
                             
  FR -15 BUGEY-4 PWR 880 917 2785 EDF FRAM 1974-6 1979-3 1979-7 67.0   76.0   -
                             
                             
(1) Performance factors calculated only for period of full commercial operation, and only to 2005.                
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
FRANCE FR -16 BUGEY-5 PWR 880 917 2785 EDF FRAM 1974-7 1979-7 1980-1 68.0   78.0   -
  FR -50 CATTENOM-1 PWR 1300 1362 3817 EDF FRAM 1979-10 1986-11 1987-4 67.0   72.0   -
  FR -53 CATTENOM-2 PWR 1300 1362 3817 EDF FRAM 1980-7 1987-9 1988-2 72.0   79.0   -
  FR -60 CATTENOM-3 PWR 1300 1362 3817 EDF FRAM 1982-6 1990-7 1991-2 74.0   81.0   -
                             
  FR -65 CATTENOM-4 PWR 1300 1362 3817 EDF FRAM 1983-9 1991-5 1992-1 78.0   85.0   -
  FR -40 CHINON-B-1 PWR 905 954 2785 EDF FRAM 1977-3 1982-11 1984-2 74.0   80.0   -
  FR -41 CHINON-B-2 PWR 905 954 2785 EDF FRAM 1977-3 1983-11 1984-8 73.0   80.0   -
  FR -56 CHINON-B-3 PWR 905 954 2785 EDF FRAM 1980-10 1986-10 1987-3 73.0   81.0   -
                             
  FR -57 CHINON-B-4 PWR 905 954 2785 EDF FRAM 1981-2 1987-11 1988-4 74.0   82.0   -
  FR -62 CHOOZ-B-1 PWR 1500 1560 4270 EDF FRAM 1984-1 1996-8 2000-5 77.0   82.0   -
  FR -70 CHOOZ-B-2 PWR 1500 1560 4270 EDF FRAM 1985-12 1997-4 2000-9 77.0   84.0   -
  FR -72 CIVAUX-1 PWR 1495 1561 4270 EDF FRAM 1988-10 1997-12 2002-1 79.0   82.0   -
                             
  FR -73 CIVAUX-2 PWR 1495 1561 4270 EDF FRAM 1991-4 1999-12 2002-4 78.0   83.0   -
  FR -42 CRUAS-1 PWR 915 956 2785 EDF FRAM 1978-8 1983-4 1984-4 71.0   82.0   -
  FR -43 CRUAS-2 PWR 915 956 2785 EDF FRAM 1978-11 1984-9 1985-4 73.0   82.0   -
  FR -44 CRUAS-3 PWR 915 956 2785 EDF FRAM 1979-4 1984-5 1984-9 72.0   83.0   -
                             
  FR -45 CRUAS-4 PWR 915 956 2785 EDF FRAM 1979-10 1984-10 1985-2 71.0   81.0   -
  FR -22 DAMPIERRE-1 PWR 890 937 2785 EDF FRAM 1975-2 1980-3 1980-9 70.0   77.0   -
  FR -29 DAMPIERRE-2 PWR 890 937 2785 EDF FRAM 1975-4 1980-12 1981-2 68.0   78.0   -
  FR -30 DAMPIERRE-3 PWR 890 937 2785 EDF FRAM 1975-9 1981-1 1981-5 72.0   79.0   -
                             
  FR -31 DAMPIERRE-4 PWR 890 937 2785 EDF FRAM 1975-12 1981-8 1981-11 70.0   78.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
FRANCE FR -11 FESSENHEIM-1 PWR 880 920 2660 EDF FRAM 1971-9 1977-4 1978-1 67.0   74.0   -
  FR -12 FESSENHEIM-2 PWR 880 920 2660 EDF FRAM 1972-2 1977-10 1978-4 70.0   77.0   -
  FR -46 FLAMANVILLE-1 PWR 1330 1382 3817 EDF FRAM 1979-12 1985-12 1986-12 69.0   76.0   -
  FR -47 FLAMANVILLE-2 PWR 1330 1382 3817 EDF FRAM 1980-5 1986-7 1987-3 70.0   78.0   -
                             
  FR -61 GOLFECH-1 PWR 1310 1363 3817 EDF FRAM 1982-11 1990-6 1991-2 74.0   84.0   -
  FR -68 GOLFECH-2 PWR 1310 1363 3817 EDF FRAM 1984-10 1993-6 1994-3 74.0   85.0   -
  FR -20 GRAVELINES-1 PWR 910 951 2785 EDF FRAM 1975-2 1980-3 1980-11 69.0   77.0   -
  FR -21 GRAVELINES-2 PWR 910 951 2785 EDF FRAM 1975-3 1980-8 1980-12 73.0   81.0   -
                             
  FR -27 GRAVELINES-3 PWR 910 951 2785 EDF FRAM 1975-12 1980-12 1981-6 74.0   81.0   -
  FR -28 GRAVELINES-4 PWR 910 951 2785 EDF FRAM 1976-4 1981-6 1981-10 74.0   80.0   -
  FR -51 GRAVELINES-5 PWR 910 951 2785 EDF FRAM 1979-10 1984-8 1985-1 74.0   82.0   -
  FR -52 GRAVELINES-6 PWR 910 951 2785 EDF FRAM 1979-10 1985-8 1985-10 76.0   82.0   -
                             
  FR -58 NOGENT-1 PWR 1310 1363 3817 EDF FRAM 1981-5 1987-10 1988-2 69.0   77.0   -
  FR -59 NOGENT-2 PWR 1310 1363 3817 EDF FRAM 1982-1 1988-12 1989-5 74.0   83.0   -
  FR -36 PALUEL-1 PWR 1330 1382 3817 EDF FRAM 1977-8 1984-6 1985-12 69.0   77.0   -
  FR -37 PALUEL-2 PWR 1330 1382 3817 EDF FRAM 1978-1 1984-9 1985-12 67.0   75.0   -
                             
  FR -38 PALUEL-3 PWR 1330 1382 3817 EDF FRAM 1979-2 1985-9 1986-2 69.0   76.0   -
  FR -39 PALUEL-4 PWR 1330 1382 3817 EDF FRAM 1980-2 1986-4 1986-6 70.0   78.0   -
  FR -63 PENLY-1 PWR 1330 1382 3817 EDF FRAM 1982-9 1990-5 1990-12 75.0   82.0   -
  FR -64 PENLY-2 PWR 1330 1382 3817 EDF FRAM 1984-8 1992-2 1992-11 76.0   84.0   -
                             
  FR -10 PHENIX FBR 130 250 591 CEA/EDF CNCLNEY 1968-11 1973-12 1974-2 44.0   62.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
FRANCE FR -48 ST. ALBAN-1 PWR 1335 1381 3817 EDF FRAM 1979-1 1985-8 1986-5 67.0   77.0   -
  FR -49 ST. ALBAN-2 PWR 1335 1381 3817 EDF FRAM 1979-7 1986-7 1987-3 64.0   76.0   -
  FR -17 ST. LAURENT-B-1 PWR 915 956 2785 EDF FRAM 1976-5 1981-1 1983-8 71.0   77.0   -
  FR -23 ST. LAURENT-B-2 PWR 915 956 2785 EDF FRAM 1976-7 1981-6 1983-8 70.0   78.0   -
                             
  FR -18 TRICASTIN-1 PWR 915 955 2785 EDF FRAM 1974-11 1980-5 1980-12 72.0   79.0   -
  FR -19 TRICASTIN-2 PWR 915 955 2785 EDF FRAM 1974-12 1980-8 1980-12 72.0   79.0   -
  FR -25 TRICASTIN-3 PWR 915 955 2785 EDF FRAM 1975-4 1981-2 1981-5 75.0   81.0   -
  FR -26 TRICASTIN-4 PWR 915 955 2785 EDF FRAM 1975-5 1981-6 1981-11 73.0   81.0   -
                             
GERMANY DE -12 BIBLIS-A (KWB A) PWR 1167 1225 3517 RWE KWU 1970-1 1974-8 1975-2 67.0   75.0   -
  DE -18 BIBLIS-B (KWB B) PWR 1240 1300 3733 RWE KWU 1972-2 1976-4 1977-1 68.0   80.0   -
  DE -32 BROKDORF (KBR) PWR 1370 1440 3765 EON KWU 1976-1 1986-10 1986-12 87.0   90.0   -
  DE -13 BRUNSBUETTEL (KKB) BWR 771 806 2292 KKB KWU 1970-4 1976-7 1977-2 57.0   69.0   -
                             
  DE -33 EMSLAND (KKE) PWR 1329 1400 3850 KLE SIEM,KWU 1982-8 1988-4 1988-6 93.0   93.0   -
  DE -23 GRAFENRHEINFELD (KKG) PWR 1275 1345 3765 EON KWU 1975-1 1981-12 1982-6 86.0   87.0   -
  DE -27 GROHNDE (KWG) PWR 1360 1430 3900 KWG KWU 1976-6 1984-9 1985-2 90.0   92.0   -
  DE -26 GUNDREMMINGEN-B (GUN-B) BWR 1284 1344 3840 RWE KWU 1976-7 1984-3 1984-7 82.0   88.0   -
                             
  DE -28 GUNDREMMINGEN-C (GUN-C) BWR 1288 1344 3840 KGG KWU 1976-7 1984-11 1985-1 79.0   87.0   -
  DE -16 ISAR-1 (KKI 1) BWR 878 912 2575 EON KWU 1972-5 1977-12 1979-3 78.0   84.0   -
  DE -31 ISAR-2 (KKI 2) PWR 1400 1475 3950 EON KWU 1982-9 1988-1 1988-4 88.0   92.0   -
  DE -20 KRUEMMEL (KKK) BWR 1260 1316 3690 KKK KWU 1974-4 1983-9 1984-3 76.0   80.0   -
                             
  DE -15 NECKARWESTHEIM-1 (GKN 1) PWR 785 840 2497 EnKK KWU 1972-2 1976-6 1976-12 80.0   87.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
GERMANY DE -44 NECKARWESTHEIM-2 (GKN 2) PWR 1305 1395 3850 EnKK SIEM,KWU 1982-11 1989-1 1989-4 92.0   93.0   -
  DE -14 PHILIPPSBURG-1 (KKP 1) BWR 890 926 2575 EnKK KWU 1970-10 1979-5 1980-3 76.0   82.0   -
  DE -24 PHILIPPSBURG-2 (KKP 2) PWR 1392 1458 3950 EnKK KWU 1977-7 1984-12 1985-4 88.0   90.0   -
  DE -17 UNTERWESER (KKU) PWR 1345 1410 3900 EON KWU 1972-7 1978-9 1979-9 79.0   84.0   -
                             
HUNGARY HU -1 PAKS-1 PWR 437 467 1375 PAKS RT. AEE 1974-8 1982-12 1983-8 86.0   85.0   -
  HU -2 PAKS-2 PWR 441 468 1375 PAKS RT. AEE 1974-8 1984-9 1984-11 79.0   78.0   DH
  HU -3 PAKS-3 PWR 433 460 1375 PAKS RT. AEE 1979-10 1986-9 1986-12 87.0   86.0   DH
  HU -4 PAKS-4 PWR 444 471 1375 PAKS RT. AEE 1979-10 1987-8 1987-11 89.0   87.0   DH
                             
INDIA IN -13 KAIGA-1 PHWR 202 220 801 NPCIL NPCIL 1989-9 2000-10 2000-11 75.0   90.0   -
  IN -14 KAIGA-2 PHWR 202 220 801 NPCIL NPCIL 1989-12 1999-12 2000-3 76.0   88.0   -
  IN -9 KAKRAPAR-1 PHWR 202 220 801 NPCIL NPCIL 1984-12 1992-11 1993-5 69.0   77.0   -
  IN -10 KAKRAPAR-2 PHWR 202 220 801 NPCIL NPCIL 1985-4 1995-3 1995-9 80.0   88.0   -
                             
  IN -5 MADRAS-1 PHWR 202 220 801 NPCIL NPCIL 1971-1 1983-7 1984-1 49.0   58.0   DS
  IN -6 MADRAS-2 PHWR 202 220 801 NPCIL NPCIL 1972-10 1985-9 1986-3 55.0   62.0   DS
  IN -7 NARORA-1 PHWR 202 220 801 NPCIL NPCIL 1976-12 1989-7 1991-1 56.0   64.0   -
  IN -8 NARORA-2 PHWR 202 220 801 NPCIL NPCIL 1977-11 1992-1 1992-7 68.0   76.0   -
                            -
  IN -3 RAJASTHAN-1 PHWR 90 100 693 NPCIL AECL 1965-8 1972-11 1973-12 21.0   28.0   PH
  IN -4 RAJASTHAN-2 PHWR 187 200 693 NPCIL AECL/DAE 1968-4 1980-11 1981-4 53.0   60.0   PH
  IN -11 RAJASTHAN-3 PHWR 202 220 801 NPCIL NPCIL 1990-2 2000-3 2000-6 77.0   88.0   PH
  IN -12 RAJASTHAN-4 PHWR 202 220 801 NPCIL NPCIL 1990-10 2000-11 2000-12 77.0   91.0   PH
                             
  IN -1 TARAPUR-1 BWR 150 160 530 NPCIL GE 1964-10 1969-4 1969-10 55.0   76.0   -
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
INDIA IN -2 TARAPUR-2 BWR 150 160 530 NPCIL GE 1964-10 1969-5 1969-10 55.0   74.0   -
  IN -23 TARAPUR-3 PHWR 490 540 1730 NPCIL NPCIL 2000-5 2006-6 2006-8 61.0   79.0   -
  IN -24 TARAPUR-4 PHWR 490 540 1730 NPCIL NPCIL 2000-3 2005-6 2005-9 47.0   69.0   -
                             
JAPAN JP -5 FUKUSHIMA-DAIICHI-1 BWR 439 460 1380 TEPCO GE/GETSC 1967-7 1970-11 1971-3 53.0   56.0   -
  JP -9 FUKUSHIMA-DAIICHI-2 BWR 760 784 2381 TEPCO GE/T 1969-6 1973-12 1974-7 58.0   59.0   -
  JP -10 FUKUSHIMA-DAIICHI-3 BWR 760 784 2381 TEPCO TOSHIBA 1970-12 1974-10 1976-3 64.0   64.0   -
  JP -16 FUKUSHIMA-DAIICHI-4 BWR 760 784 2381 TEPCO HITACHI 1973-2 1978-2 1978-10 69.0   69.0   -
                             
  JP -17 FUKUSHIMA-DAIICHI-5 BWR 760 784 2381 TEPCO TOSHIBA 1972-5 1977-9 1978-4 70.0   71.0   -
  JP -18 FUKUSHIMA-DAIICHI-6 BWR 1067 1100 3293 TEPCO GE/T 1973-10 1979-5 1979-10 69.0   70.0   -
  JP -25 FUKUSHIMA-DAINI-1 BWR 1067 1100 3293 TEPCO TOSHIBA 1976-3 1981-7 1982-4 74.0   75.0   -
  JP -26 FUKUSHIMA-DAINI-2 BWR 1067 1100 3293 TEPCO HITACHI 1979-5 1983-6 1984-2 73.0   74.0   -
                             
  JP -35 FUKUSHIMA-DAINI-3 BWR 1067 1100 3293 TEPCO TOSHIBA 1981-3 1984-12 1985-6 64.0   65.0   -
  JP -38 FUKUSHIMA-DAINI-4 BWR 1067 1100 3293 TEPCO HITACHI 1981-5 1986-12 1987-8 71.0   72.0   -
  JP -12 GENKAI-1 PWR 529 559 1650 KYUSHU MHI 1971-9 1975-2 1975-10 72.0   72.0   -
  JP -27 GENKAI-2 PWR 529 559 1650 KYUSHU MHI 1977-2 1980-6 1981-3 82.0   81.0   -
                             
  JP -45 GENKAI-3 PWR 1127 1180 3423 KYUSHU MHI 1988-6 1993-6 1994-3 86.0   85.0   DS
  JP -46 GENKAI-4 PWR 1127 1180 3423 KYUSHU MHI 1992-7 1996-11 1997-7 86.0   85.0   DS
  JP -11 HAMAOKA-1 BWR 515 540 1593 CHUBU TOSHIBA 1971-6 1974-8 1976-3 51.0   51.0   -
  JP -24 HAMAOKA-2 BWR 806 840 2436 CHUBU TOSHIBA 1974-6 1978-5 1978-11 64.0   64.0   -
                             
  JP -36 HAMAOKA-3 BWR 1056 1100 3293 CHUBU TOSHIBA 1983-4 1987-1 1987-8 76.0   77.0   -
  JP -49 HAMAOKA-4 BWR 1092 1137 3293 CHUBU TOSHIBA 1989-10 1993-1 1993-9 80.0   81.0   -
                             
                             
                           
The column Non Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
JAPAN JP -60 HAMAOKA-5 BWR 1325 1380 3926 CHUBU TOSHIBA 2000-7 2004-4 2005-1 64.0   62.0   -
  JP -58 HIGASHI DORI 1 (TOHOKU) BWR 1067 1100 3293 TOHOKU TOSHIBA 2000-11 2005-3 2005-12 99.0   100.0   -
  JP -23 IKATA-1 PWR 538 566 1650 SHIKOKU MHI 1973-6 1977-2 1977-9 77.0   78.0   DS
  JP -32 IKATA-2 PWR 538 566 1650 SHIKOKU MHI 1978-2 1981-8 1982-3 81.0   81.0   DS
                             
  JP -47 IKATA-3 PWR 846 890 2660 SHIKOKU MHI 1986-11 1994-3 1994-12 87.0   85.0   DS
  JP -33 KASHIWAZAKI KARIWA-1 BWR 1067 1100 3293 TEPCO TOSHIBA 1980-6 1985-2 1985-9 72.0   73.0   -
  JP -39 KASHIWAZAKI KARIWA-2 BWR 1067 1100 3293 TEPCO TOSHIBA 1985-11 1990-2 1990-9 75.0   76.0   -
  JP -52 KASHIWAZAKI KARIWA-3 BWR 1067 1100 3293 TEPCO TOSHIBA 1989-3 1992-12 1993-8 73.0   74.0   -
                             
  JP -53 KASHIWAZAKI KARIWA-4 BWR 1067 1100 3293 TEPCO HITACHI 1990-3 1993-12 1994-8 72.0   73.0   -
  JP -40 KASHIWAZAKI KARIWA-5 BWR 1067 1100 3293 TEPCO HITACHI 1985-6 1989-9 1990-4 79.0   79.0   -
  JP -55 KASHIWAZAKI KARIWA-6 BWR 1315 1356 3926 TEPCO TOSHIBA 1992-11 1996-1 1996-11 84.0   84.0   -
  JP -56 KASHIWAZAKI KARIWA-7 BWR 1315 1356 3926 TEPCO HITACHI 1993-7 1996-12 1997-7 78.0   78.0   -
                             
  JP -4 MIHAMA-1 PWR 320 340 1031 KEPCO WH 1967-2 1970-8 1970-11 51.0   55.0   -
  JP -6 MIHAMA-2 PWR 470 500 1456 KEPCO WH 1968-5 1972-4 1972-7 62.0   62.0   -
  JP -14 MIHAMA-3 PWR 780 826 2440 KEPCO MHI 1972-8 1976-2 1976-12 69.0   69.0   -
  JP -15 OHI-1 PWR 1120 1175 3423 KEPCO WH 1972-10 1977-12 1979-3 66.0   66.0   DS
                             
  JP -19 OHI-2 PWR 1120 1175 3423 KEPCO WH 1972-12 1978-10 1979-12 72.0   72.0   DS
  JP -50 OHI-3 PWR 1127 1180 3423 KEPCO MHI 1987-10 1991-6 1991-12 84.0   83.0   -
  JP -51 OHI-4 PWR 1127 1180 3423 KEPCO MHI 1988-6 1992-6 1993-2 86.0   85.0   -
  JP -22 ONAGAWA-1 BWR 498 524 1593 TOHOKU TOSHIBA 1980-7 1983-11 1984-6 70.0   72.0   -
                             
  JP -54 ONAGAWA-2 BWR 796 825 2436 TOHOKU TOSHIBA 1991-4 1994-12 1995-7 73.0   77.0   -
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
JAPAN JP -57 ONAGAWA-3 BWR 796 825 2436 TOHOKU TOSHIBA 1998-1 2001-5 2002-1 73.0   73.0   -
  JP -28 SENDAI-1 PWR 846 890 2660 KYUSHU MHI 1979-12 1983-9 1984-7 83.0   82.0   -
  JP -37 SENDAI-2 PWR 846 890 2660 KYUSHU MHI 1981-10 1985-4 1985-11 84.0   83.0   -
  JP -48 SHIKA-1 BWR 505 540 1593 HOKURIKU HITACHI 1989-7 1993-1 1993-7 79.0   80.0   -
                             
  JP -59 SHIKA-2 BWR 1304 1358 3926 HOKURIKU HITACHI 2001-8 2005-7 2006-3 34.0   34.0   -
  JP -7 SHIMANE-1 BWR 439 460 1380 CHUGOKU HITACHI 1970-7 1973-12 1974-3 73.0   73.0   -
  JP -41 SHIMANE-2 BWR 789 820 2436 CHUGOKU HITACHI 1985-2 1988-7 1989-2 82.0   82.0   -
  JP -8 TAKAHAMA-1 PWR 780 826 2440 KEPCO WH/MHI 1970-4 1974-3 1974-11 68.0   67.0   -
                             
  JP -13 TAKAHAMA-2 PWR 780 826 2440 KEPCO MHI 1971-3 1975-1 1975-11 68.0   68.0   -
  JP -29 TAKAHAMA-3 PWR 830 870 2660 KEPCO MHI 1980-12 1984-5 1985-1 84.0   83.0   DS
  JP -30 TAKAHAMA-4 PWR 830 870 2660 KEPCO MHI 1981-3 1984-11 1985-6 86.0   84.0   DS
  JP -21 TOKAI-2 BWR 1060 1100 3293 JAPC GE 1973-10 1978-3 1978-11 73.0   73.0   -
                             
  JP -43 TOMARI-1 PWR 550 579 1650 HEPCO MHI 1985-7 1988-12 1989-6 86.0   85.0   -
  JP -44 TOMARI-2 PWR 550 579 1650 HEPCO MHI 1986-5 1990-8 1991-4 84.0   83.0   -
  JP -3 TSURUGA-1 BWR 340 357 1070 JAPC GE 1966-11 1969-11 1970-3 68.0   72.0   -
  JP -34 TSURUGA-2 PWR 1110 1160 3411 JAPC MHI 1982-11 1986-6 1987-2 81.0   81.0   -
                             
KOREA RP KR -1 KORI-1 PWR 573 603 1723 KHNP WH 1972-8 1977-6 1978-4 75.0   78.0   -
  KR -2 KORI-2 PWR 637 675 1876 KHNP WH 1977-12 1983-4 1983-7 87.0   85.0   -
  KR -5 KORI-3 PWR 963 1004 2775 KHNP WH 1979-10 1985-1 1985-9 88.0   84.0   -
  KR -6 KORI-4 PWR 967 1006 2775 KHNP WH 1980-4 1985-11 1986-4 90.0   86.0   -
                             
  KR -9 ULCHIN-1 PWR 939 985 2775 KHNP FRAM 1983-1 1988-4 1988-9 85.0   85.0   -
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
KOREA RP KR -10 ULCHIN-2 PWR 937 984 2775 KHNP FRAM 1983-7 1989-4 1989-9 88.0   86.0   -
  KR -13 ULCHIN-3 PWR 994 1047 2825 KHNP DHICKOPC 1993-7 1998-1 1998-8 90.0   90.0   -
  KR -14 ULCHIN-4 PWR 993 1045 2825 KHNP DHICKOPC 1993-11 1998-12 1999-12 92.0   89.0   -
  KR -19 ULCHIN-5 PWR 994 1048 2825 KHNP DHICKOPC 1999-10 2003-12 2004-7 90.0   89.0   -
                             
  KR -20 ULCHIN-6 PWR 991 1048 2825 KHNP DHICKOPC 2000-9 2005-1 2005-6 91.0   90.0   -
  KR -3 WOLSONG-1 PHWR 578 622 2064 KHNP AECL 1977-10 1982-12 1983-4 86.0   86.0   -
  KR -4 WOLSONG-2 PHWR 684 730 2061 KHNP AECL/DHI 1992-9 1997-4 1997-7 94.0   91.0   -
  KR -15 WOLSONG-3 PHWR 682 729 2061 KHNP AECL/DHI 1994-3 1998-3 1998-7 94.0   92.0   -
                             
  KR -16 WOLSONG-4 PHWR 685 730 2061 KHNP AECL/DHI 1994-7 1999-5 1999-10 97.0   93.0   -
  KR -7 YONGGWANG-1 PWR 945 985 2775 KHNP WH 1981-6 1986-3 1986-8 89.0   87.0   -
  KR -8 YONGGWANG-2 PWR 939 978 2775 KHNP WH 1981-12 1986-11 1987-6 87.0   85.0   -
  KR -11 YONGGWANG-3 PWR 985 1039 2825 KHNP DHICKAEC 1989-12 1994-10 1995-3 91.0   89.0   -
                             
  KR -12 YONGGWANG-4 PWR 988 1039 2825 KHNP DHICKAEC 1990-5 1995-7 1996-1 92.0   89.0   -
  KR -17 YONGGWANG-5 PWR 987 1046 2825 KHNP DHICKOPC 1997-6 2001-12 2002-5 84.0   82.0   -
  KR -18 YONGGWANG-6 PWR 993 1050 2825 KHNP DHICKOPC 1997-11 2002-9 2002-12 86.0   85.0   -
                             
LITHUANIA LT -47 IGNALINA-2 LWGR 1185 1300 4800 INPP MAEP 1978-1 1987-8 1987-8 60.0   73.0   -
                             
MEXICO MX -1 LAGUNA VERDE-1 BWR 680 682 2027 CFE GE 1976-10 1989-4 1990-7 77.0   82.0   -
  MX -2 LAGUNA VERDE-2 BWR 680 682 2027 CFE GE 1977-6 1994-11 1995-4 79.0   83.0   -
                             
NETHERLANDS NL -2 BORSSELE PWR 482 515 1366 EPZ KWU/STOR 1969-7 1973-7 1973-10 82.0   87.0   -
                             
PAKISTAN PK -2 CHASNUPP 1 PWR 300 325 999 PAEC CNNC 1993-8 2000-6 2000-9 70.0   72.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
PAKISTAN PK -1 KANUPP PHWR 125 137 433 PAEC CGE 1966-8 1971-10 1972-12 26.0   43.0   DS
                             
ROMANIA RO -1 CERNAVODA-1 PHWR 655 706 2180 SNN AECL 1982-7 1996-7 1996-12 86.0   87.0   DH
                             
RUSSIA RU -96 BALAKOVO-1 PWR 950 1000 3000 REA FAEA 1980-12 1985-12 1986-5 62.0   68.0   DH,PH
  RU -97 BALAKOVO-2 PWR 950 1000 3000 REA FAEA 1981-8 1987-10 1988-1 61.0   67.0   DH,PH
  RU -98 BALAKOVO-3 PWR 950 1000 3000 REA FAEA 1982-11 1988-12 1989-4 66.0   73.0   DH,PH
  RU -99 BALAKOVO-4 PWR 950 1000 3200 REA FAEA 1984-4 1993-4 1993-12 71.0   78.0   DH,PH
                             
  RU -21 BELOYARSKY-3(BN-600) FBR 560 600 1470 REA FAEA 1969-1 1980-4 1981-11 74.0   75.0   DH,PH
  RU -141 BILIBINO-1 LWGR 11 12 62 REA FAEA 1970-1 1974-1 1974-4 58.0   80.0   DH
  RU -142 BILIBINO-2 LWGR 11 12 62 REA FAEA 1970-1 1974-12 1975-2 57.0   81.0   DH
  RU -143 BILIBINO-3 LWGR 11 12 62 REA FAEA 1970-1 1975-12 1976-2 59.0   81.0   DH
                             
  RU -144 BILIBINO-4 LWGR 11 12 62 REA FAEA 1970-1 1976-12 1977-1 58.0   78.0   DH
  RU -30 KALININ-1 PWR 950 1000 3000 REA FAEA 1977-2 1984-5 1985-6 71.0   71.0   DH,PH
  RU -31 KALININ-2 PWR 950 1000 3000 REA FAEA 1982-2 1986-12 1987-3 71.0   73.0   DH,PH
  RU -36 KALININ-3 PWR 950 1000 3200 REA FAEA 1985-10 2004-12 2005-11 77.0   77.0   -
                             
  RU -12 KOLA-1 PWR 411 440 1375 REA FAEA 1970-5 1973-6 1973-12 65.0   76.0   DH,PH
  RU -13 KOLA-2 PWR 411 440 1375 REA FAEA 1973-1 1974-12 1975-2 65.0   76.0   DH,PH
  RU -32 KOLA-3 PWR 411 440 1375 REA FAEA 1977-4 1981-3 1982-12 72.0   82.0   DH,PH
  RU -33 KOLA-4 PWR 411 440 1375 REA FAEA 1976-8 1984-10 1984-12 71.0   81.0   DH,PH
                             
  RU -17 KURSK-1 LWGR 925 1000 3200 REA FAEA 1972-6 1976-12 1977-10 57.0   60.0   DH,PH
  RU -22 KURSK-2 LWGR 925 1000 3200 REA FAEA 1973-1 1979-1 1979-8 60.0   63.0   DH,PH
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
RUSSIA RU -38 KURSK-3 LWGR 925 1000 3200 REA FAEA 1978-4 1983-10 1984-3 71.0   73.0   DH,PH
  RU -39 KURSK-4 LWGR 925 1000 3200 REA FAEA 1981-5 1985-12 1986-2 75.0   76.0   DH,PH
  RU -15 LENINGRAD-1 LWGR 925 1000 3200 REA FAEA 1970-3 1973-12 1974-11 68.0   69.0   DH,PH
  RU -16 LENINGRAD-2 LWGR 925 1000 3200 REA FAEA 1970-6 1975-7 1976-2 68.0   69.0   DH,PH
                             
  RU -34 LENINGRAD-3 LWGR 925 1000 3200 REA FAEA 1973-12 1979-12 1980-6 69.0   71.0   DH,PH
  RU -35 LENINGRAD-4 LWGR 925 1000 3200 REA FAEA 1975-2 1981-2 1981-8 71.0   73.0   DH,PH
  RU -9 NOVOVORONEZH-3 PWR 385 417 1375 REA FAEA 1967-7 1971-12 1972-6 71.0   72.0   DH,PH
  RU -11 NOVOVORONEZH-4 PWR 385 417 1375 REA FAEA 1967-7 1972-12 1973-3 77.0   79.0   DH,PH
                             
  RU -20 NOVOVORONEZH-5 PWR 950 1000 3000 REA FAEA 1974-3 1980-5 1981-2 61.0   62.0   DH,PH
  RU -23 SMOLENSK-1 LWGR 925 1000 3200 REA FAEA 1975-10 1982-12 1983-9 70.0   73.0   DH,PH
  RU -24 SMOLENSK-2 LWGR 925 1000 3200 REA FAEA 1976-6 1985-5 1985-7 73.0   76.0   DH,PH
  RU -67 SMOLENSK-3 LWGR 925 1000 3200 REA FAEA 1984-5 1990-1 1990-10 78.0   81.0   DH,PH
                             
  RU -59 VOLGODONSK-1 PWR 950 1000 3200 REA FAEA 1981-9 2001-3 2001-12 86.0   85.0   -
                             
S.AFRICA ZA -1 KOEBERG-1 PWR 900 944 2785 ESKOM FRAM 1976-7 1984-4 1984-7 67.0   75.0   -
  ZA -2 KOEBERG-2 PWR 900 944 2785 ESKOM FRAM 1976-7 1985-7 1985-11 67.0   76.0   -
                             
SLOVAKIA SK -3 BOHUNICE-2 PWR 408 440 1375 EBO AEE 1972-4 1980-3 1981-1 74.0   77.0   -
  SK -13 BOHUNICE-3 PWR 408 440 1375 SE,plc SKODA 1976-12 1984-8 1985-2 75.0   80.0   DH
  SK -14 BOHUNICE-4 PWR 408 440 1375 SE,plc SKODA 1976-12 1985-8 1985-12 77.0   82.0   DH
  SK -6 MOCHOVCE-1 PWR 405 440 1375 SE,plc SKODA 1983-10 1998-7 1998-10 78.0   83.0   -
                             
  SK -7 MOCHOVCE-2 PWR 405 440 1375 SE,plc SKODA 1983-10 1999-12 2000-4 75.0   83.0   -
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
SLOVENIA SI -1 KRSKO PWR 666 730 1994 NEK WH 1975-3 1981-10 1983-1 80.0   84.0   -
                             
SPAIN ES -6 ALMARAZ-1 PWR 944 977 2729 CNAT WH 1973-7 1981-5 1983-9 84.0   86.0   -
  ES -7 ALMARAZ-2 PWR 956 980 2729 CNAT WH 1973-7 1983-10 1984-7 87.0   87.0   -
  ES -8 ASCO-1 PWR 995 1033 2931 ANAV WH 1974-5 1983-8 1984-12 84.0   85.0   -
  ES -9 ASCO-2 PWR 997 1027 2910 ANAV WH 1975-3 1985-10 1986-3 86.0   88.0   -
                             
  ES -10 COFRENTES BWR 1064 1092 3237 ID GE 1975-9 1984-10 1985-3 87.0   88.0   -
  ES -2 SANTA MARIA DE GARONA BWR 446 466 1381 NUCLENOR GE 1966-5 1971-3 1971-5 76.0   79.0   -
  ES -11 TRILLO-1 PWR 1003 1066 3010 CNAT KWU 1979-8 1988-5 1988-8 85.0   86.0   -
  ES -16 VANDELLOS-2 PWR 1045 1087 2941 ANAV WH 1980-12 1987-12 1988-3 84.0   84.0   -
                             
SWEDEN SE -9 FORSMARK-1 BWR 1016 1025 2928 FKA ABBATOM 1973-6 1980-6 1980-12 80.0   86.0   -
  SE -11 FORSMARK-2 BWR 1000 1038 2928 FKA ABBATOM 1975-1 1981-1 1981-7 80.0   86.0   -
  SE -14 FORSMARK-3 BWR 1190 1212 3300 FKA ABBATOM 1979-1 1985-3 1985-8 85.0   90.0   -
  SE -2 OSKARSHAMN-1 BWR 467 487 1375 OKG ABBATOM 1966-8 1971-8 1972-2 61.0   64.0   -
                             
  SE -3 OSKARSHAMN-2 BWR 602 623 1800 OKG ABBATOM 1969-9 1974-10 1975-1 75.0   79.0   -
  SE -12 OSKARSHAMN-3 BWR 1160 1197 3300 OKG ABBATOM 1980-5 1985-3 1985-8 83.0   88.0   -
  SE -4 RINGHALS-1 BWR 843 860 2500 RAB ABBATOM 1969-2 1974-10 1976-1 68.0   73.0   -
  SE -5 RINGHALS-2 PWR 867 917 2660 RAB WH 1970-10 1974-8 1975-5 67.0   74.0   -
                             
  SE -7 RINGHALS-3 PWR 1045 1095 3000 RAB WH 1972-9 1980-9 1981-9 71.0   80.0   -
  SE -10 RINGHALS-4 PWR 907 960 2775 RAB WH 1973-11 1982-6 1983-11 76.0   86.0   -
                             
SWITZERLAND CH -1 BEZNAU-1 PWR 365 380 1130 NOK WH 1965-9 1969-7 1969-9 82.0   87.0   DH
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
SWITZERLAND CH -3 BEZNAU-2 PWR 365 380 1130 NOK WH 1968-1 1971-10 1971-12 87.0   87.0   DH
  CH -4 GOESGEN PWR 970 1020 2900 KKG KWU 1973-12 1979-2 1979-11 88.0   89.0   DH
  CH -5 LEIBSTADT BWR 1165 1220 3138 KKL GETSCO 1974-1 1984-5 1984-12 80.0   86.0   -
  CH -2 MUEHLEBERG BWR 355 372 1097 BKW GETSCO 1967-3 1971-7 1972-11 86.0   87.0   -
                             
UK GB -18A DUNGENESS-B1 GCR 545 615 1500 BE APC 1965-10 1983-4 1985-4 42.0   45.0   -
  GB -18B DUNGENESS-B2 GCR 545 615 1500 BE APC 1965-10 1985-12 1989-4 50.0   50.0   -
  GB -19A HARTLEPOOL-A1 GCR 595 655 1500 BE NPC 1968-10 1983-8 1989-4 71.0   73.0   -
  GB -19B HARTLEPOOL-A2 GCR 595 655 1500 BE NPC 1968-10 1984-10 1989-4 75.0   77.0   -
                             
  GB -20A HEYSHAM-A1 GCR 585 625 1500 BE NPC 1970-12 1983-7 1989-4 74.0   76.0   -
  GB -20B HEYSHAM-A2 GCR 575 625 1500 BE NPC 1970-12 1984-10 1989-4 71.0   73.0   -
  GB -22A HEYSHAM-B1 GCR 615 680 1550 BE NPC 1980-8 1988-7 1989-4 73.0   76.0   -
  GB -22B HEYSHAM-B2 GCR 615 680 1550 BE NPC 1980-8 1988-11 1989-4 73.0   76.0   -
                             
  GB -16A HINKLEY POINT-B1 GCR 620 655 1494 BE TNPG 1967-9 1976-10 1978-10 77.0   77.0   -
  GB -16B HINKLEY POINT-B2 GCR 600 655 1494 BE TNPG 1967-9 1976-2 1976-9 72.0   75.0   -
  GB -17A HUNTERSTON-B1 GCR 610 644 1496 BE TNPG 1967-11 1976-2 1976-2 70.0   79.0   -
  GB -17B HUNTERSTON-B2 GCR 605 644 1496 BE TNPG 1967-11 1977-3 1977-3 69.0   81.0   -
                             
  GB -11A OLDBURY-A1 GCR 217 230 730 BNFL TNPG 1962-5 1967-11 1967-12 77.0   87.0   -
  GB -11B OLDBURY-A2 GCR 217 230 660 BNFL TNPG 1962-5 1968-4 1968-9 74.0   72.0   -
  GB -24 SIZEWELL-B PWR 1196 1250 3425 BE PPC 1988-7 1995-2 1995-9 83.0   85.0   -
  GB -23A TORNESS 1 GCR 625 682 1623 BE NNC 1980-8 1988-5 1988-5 68.0   75.0   -
                             
  GB -23B TORNESS 2 GCR 625 682 1623 BE NNC 1980-8 1989-2 1989-2 67.0   73.0   -
                             
                             
                           
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
UK GB -13A WYLFA 1 GCR 490 540 1920 BNFL EE/B&W/T 1963-9 1971-1 1971-11 70.0   85.0   -
  GB -13B WYLFA 2 GCR 490 540 1920 BNFL EE/B&W/T 1963-9 1971-7 1972-1 59.0   59.0   -
                             
UKRAINE UA -40 KHMELNITSKI-1 PWR 950 1000 3000 NNEGC PAIP 1981-11 1987-12 1988-8 72.0   72.0   DH
  UA -41 KHMELNITSKI-2 PWR 950 1000 3000 NNEGC PAIP 1985-2 2004-8 2005-12 (1)     (1)     -
  UA -27 ROVNO-1 PWR 381 420 1375 NNEGC PAIP 1973-8 1980-12 1981-9 80.0   81.0   DH
  UA -28 ROVNO-2 PWR 376 415 1375 NNEGC PAIP 1973-10 1981-12 1982-7 79.0   81.0   DH
                             
  UA -29 ROVNO-3 PWR 950 1000 3000 NNEGC PAIP 1980-2 1986-12 1987-5 69.0   73.0   DH
  UA -69 ROVNO-4 PWR 950 1000 3000 NNEGC PAA 1986-8 2004-10 2006-4 (1)     (1)     -
  UA -44 SOUTH UKRAINE-1 PWR 950 1000 3000 NNEGC PAA 1977-3 1982-12 1983-10 66.0   66.0   DH
  UA -45 SOUTH UKRAINE-2 PWR 950 1000 3000 NNEGC PAA 1979-10 1985-1 1985-4 61.0   62.0   DH
                             
  UA -48 SOUTH UKRAINE-3 PWR 950 1000 3000 NNEGC PAA 1985-2 1989-9 1989-12 72.0   73.0   DH
  UA -54 ZAPOROZHE-1 PWR 950 1000 3000 NNEGC PAIP 1980-4 1984-12 1985-12 61.0   64.0   DH
  UA -56 ZAPOROZHE-2 PWR 950 1000 3000 NNEGC PAIP 1981-1 1985-7 1986-2 64.0   68.0   DH
  UA -78 ZAPOROZHE-3 PWR 950 1000 3000 NNEGC PAIP 1982-4 1986-12 1987-3 66.0   70.0   DH
                             
  UA -79 ZAPOROZHE-4 PWR 950 1000 3000 NNEGC PAIP 1983-4 1987-12 1988-4 71.0   75.0   DH
  UA -126 ZAPOROZHE-5 PWR 950 1000 3000 NNEGC PAIP 1985-11 1989-8 1989-10 72.0   74.0   DH
  UA -127 ZAPOROZHE-6 PWR 950 1000 3000 NNEGC PAIP 1986-6 1995-10 1996-9 77.0   80.0   DH
                             
USA US -313 ARKANSAS ONE-1 PWR 836 880 2568 ENTGYARK B&W 1968-12 1974-8 1974-12 73.0   78.0   -
  US -368 ARKANSAS ONE-2 PWR 998 1040 3026 ENTERGY CE 1968-12 1978-12 1980-3 82.0   82.0   -
  US -334 BEAVER VALLEY-1 PWR 851 923 2689 FENOC WH 1970-6 1976-6 1976-10 67.0   70.0   -
  US -412 BEAVER VALLEY-2 PWR 851 923 2689 FENOC WH 1974-5 1987-8 1987-11 81.0   85.0   -
                             
                             
(1) Performance factors calculated only for period of full commercial operation, and only to 2005.                
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.          
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
USA US -456 BRAIDWOOD-1 PWR 1178 1240 3587 EXELON WH 1975-12 1987-7 1988-7 84.0   86.0   -
  US -457 BRAIDWOOD-2 PWR 1152 1213 3587 EXELON WH 1975-12 1988-5 1988-10 87.0   89.0   -
  US -260 BROWNS FERRY-2 BWR 1118 1155 3458 TVA GE 1967-5 1974-8 1975-3 60.0   63.0   -
  US -296 BROWNS FERRY-3 BWR 1114 1190 3458 TVA GE 1968-7 1976-9 1977-3 50.0   51.0   -
                             
  US -325 BRUNSWICK-1 BWR 938 990 2923 PROGENGC GE 1970-2 1976-12 1977-3 69.0   72.0   -
  US -324 BRUNSWICK-2 BWR 937 989 2923 PROGENGC GE 1970-2 1975-4 1975-11 67.0   71.0   -
  US -454 BYRON-1 PWR 1164 1225 3587 EXELON WH 1975-12 1985-3 1985-9 82.0   86.0   -
  US -455 BYRON-2 PWR 1136 1196 3587 EXELON WH 1975-12 1987-2 1987-8 87.0   91.0   -
                             
  US -483 CALLAWAY-1 PWR 1190 1236 3565 AMEREN WH 1976-4 1984-10 1984-12 86.0   88.0   -
  US -317 CALVERT CLIFFS-1 PWR 873 918 2700 CONST CE 1969-7 1975-1 1975-5 76.0   76.0   -
  US -318 CALVERT CLIFFS-2 PWR 862 911 2700 CONST CE 1969-7 1976-12 1977-4 79.0   80.0   -
  US -413 CATAWBA-1 PWR 1129 1188 3411 DUKE WH 1975-8 1985-1 1985-6 81.0   83.0   -
                             
  US -414 CATAWBA-2 PWR 1129 1188 3411 DUKE WH 1975-8 1986-5 1986-8 82.0   84.0   -
  US -461 CLINTON-1 BWR 1052 1098 3473 AMERGENE GE 1976-2 1987-4 1987-11 68.0   72.0   -
  US -397 COLUMBIA BWR 1131 1200 3486 ENERGYNW GE 1972-2 1984-5 1984-12 70.0   77.0   -
  US -445 COMANCHE PEAK-1 PWR 1150 1189 3458 TXU WH 1974-12 1990-4 1990-8 83.0   88.0   -
                             
  US -446 COMANCHE PEAK-2 PWR 1150 1189 3458 TXU WH 1974-12 1993-4 1993-8 85.0   89.0   -
  US -298 COOPER BWR 760 801 2381 NPPD GE 1968-6 1974-5 1974-7 69.0   74.0   -
  US -302 CRYSTAL RIVER-3 PWR 838 890 2568 PROGRESS B&W 1968-9 1977-1 1977-3 69.0   71.0   -
  US -346 DAVIS BESSE-1 PWR 891 925 2772 FENOC B&W 1971-3 1977-8 1978-7 63.0   66.0   -
                             
  US -275 DIABLO CANYON-1 PWR 1122 1136 3338 PGE WH 1968-4 1984-11 1985-5 84.0   85.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
USA US -323 DIABLO CANYON-2 PWR 1087 1164 3411 PGE WH 1970-12 1985-10 1986-3 86.0   88.0   -
  US -315 DONALD COOK-1 PWR 1016 1077 3304 IMPCO WH 1969-3 1975-2 1975-8 65.0   68.0   -
  US -316 DONALD COOK-2 PWR 1077 1133 3468 IMPCO WH 1969-3 1978-3 1978-7 62.0   66.0   -
  US -237 DRESDEN-2 BWR 867 913 2527 EXELON GE 1966-1 1970-4 1970-6 65.0   76.0   -
                             
  US -249 DRESDEN-3 BWR 867 913 2527 EXELON GE 1966-10 1971-7 1971-11 65.0   72.0   -
  US -331 DUANE ARNOLD-1 BWR 581 614 1912 FPLDUANE GE 1970-6 1974-5 1975-2 72.0   77.0   -
  US -341 ENRICO FERMI-2 BWR 1111 1154 3430 DETED GE 1972-9 1986-9 1988-1 73.0   76.0   -
  US -348 FARLEY-1 PWR 851 895 2775 ALP WH 1972-8 1977-8 1977-12 80.0   82.0   -
                             
  US -364 FARLEY-2 PWR 860 905 2775 ALP WH 1972-8 1981-5 1981-7 84.0   87.0   -
  US -333 FITZPATRICK BWR 852 882 2536 ENTERGY GE 1970-5 1975-2 1975-7 72.0   75.0   -
  US -285 FORT CALHOUN-1 PWR 478 512 1500 OPPD CE 1968-6 1973-8 1973-9 74.0   79.0   -
  US -416 GRAND GULF-1 BWR 1266 1333 3833 ENTERGY GE 1974-9 1984-10 1985-7 86.0   86.0   -
                             
  US -261 H.B. ROBINSON-2 PWR 710 745 2339 PROGRESS WH 1967-4 1970-9 1971-3 75.0   78.0   -
  US -321 HATCH-1 BWR 876 898 2804 SOUTH GE 1969-9 1974-11 1975-12 76.0   79.0   -
  US -366 HATCH-2 BWR 883 921 2804 SOUTH GE 1972-12 1978-9 1979-9 77.0   81.0   -
  US -354 HOPE CREEK-1 BWR 1059 1139 3339 PSEG GE 1976-3 1986-8 1986-12 81.0   84.0   -
                             
  US -247 INDIAN POINT-2 PWR 1020 1062 3216 ENTERGY WH 1966-10 1973-6 1974-8 68.0   70.0   -
  US -286 INDIAN POINT-3 PWR 1025 1065 3216 ENTERGY WH 1969-8 1976-4 1976-8 63.0   66.0   -
  US -305 KEWAUNEE PWR 556 581 1772 DOMENGY WH 1968-8 1974-4 1974-6 81.0   82.0   -
  US -373 LASALLE-1 BWR 1118 1177 3489 EXELON GE 1973-9 1982-9 1984-1 70.0   73.0   -
                             
  US -374 LASALLE-2 BWR 1120 1179 3489 EXELON GE 1973-9 1984-4 1984-10 70.0   72.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
USA US -352 LIMERICK-1 BWR 1134 1194 3458 EXELON GE 1974-6 1985-4 1986-2 85.0   88.0   -
  US -353 LIMERICK-2 BWR 1134 1194 3458 EXELON GE 1974-6 1989-9 1990-1 91.0   92.0   -
  US -369 MCGUIRE-1 PWR 1100 1158 3411 DUKE WH 1973-2 1981-9 1981-12 76.0   80.0   -
  US -370 MCGUIRE-2 PWR 1100 1158 3411 DUKE WH 1973-2 1983-5 1984-3 81.0   83.0   -
                             
  US -336 MILLSTONE-2 PWR 882 910 2700 DOMIN CE 1970-12 1975-11 1975-12 62.0   64.0   -
  US -423 MILLSTONE-3 PWR 1155 1253 3411 DOMIN WH 1974-8 1986-2 1986-4 71.0   73.0   -
  US -263 MONTICELLO BWR 572 600 1775 NORTHERN GE 1967-6 1971-3 1971-6 79.0   84.0   -
  US -220 NINE MILE POINT-1 BWR 621 642 1850 NMPNSLLC GE 1965-4 1969-11 1969-12 67.0   72.0   -
                             
  US -410 NINE MILE POINT-2 BWR 1135 1205 3467 NMPNSLLC GE 1974-6 1987-8 1988-3 78.0   81.0   -
  US -338 NORTH ANNA-1 PWR 924 973 2893 VEPCO WH 1971-2 1978-4 1978-6 78.0   81.0   -
  US -339 NORTH ANNA-2 PWR 910 958 2893 VEPCO WH 1971-2 1980-8 1980-12 82.0   85.0   -
  US -269 OCONEE-1 PWR 846 891 2568 DUKE B&W 1967-11 1973-5 1973-7 75.0   79.0   -
                             
  US -270 OCONEE-2 PWR 846 891 2568 DUKE B&W 1967-11 1973-12 1974-9 77.0   80.0   -
  US -287 OCONEE-3 PWR 846 891 2568 DUKE B&W 1967-11 1974-9 1974-12 77.0   79.0   -
  US -219 OYSTER CREEK BWR 619 652 1930 AMERGEN GE 1964-12 1969-9 1969-12 68.0   73.0   -
  US -255 PALISADES PWR 778 842 2565 CONSENEC CE 1967-3 1971-12 1971-12 63.0   68.0   -
                             
  US -528 PALO VERDE-1 PWR 1314 1414 3990 AZPSCO CE 1976-5 1985-6 1986-1 74.0   76.0   -
  US -529 PALO VERDE-2 PWR 1314 1414 3990 AZPSCO CE 1976-6 1986-5 1986-9 79.0   79.0   -
  US -530 PALO VERDE-3 PWR 1247 1346 3990 AZPSCO CE 1976-6 1987-11 1988-1 82.0   83.0   -
  US -277 PEACH BOTTOM-2 BWR 1112 1171 3514 EXELON GE 1968-1 1974-2 1974-7 69.0   72.0   -
                             
  US -278 PEACH BOTTOM-3 BWR 1112 1171 3514 EXELON GE 1968-1 1974-9 1974-12 70.0   72.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
USA US -440 PERRY-1 BWR 1235 1303 3758 FENOC GE 1977-5 1986-12 1987-11 77.0   79.0   -
  US -293 PILGRIM-1 BWR 685 711 2028 ENTERGY GE 1968-8 1972-7 1972-12 64.0   68.0   -
  US -266 POINT BEACH-1 PWR 512 543 1540 WEP WH 1967-7 1970-11 1970-12 77.0   83.0   -
  US -301 POINT BEACH-2 PWR 514 545 1540 WEP WH 1968-7 1972-8 1972-10 81.0   83.0   -
                             
  US -282 PRAIRIE ISLAND-1 PWR 523 566 1650 NORTHERN WH 1968-6 1973-12 1973-12 85.0   85.0   -
  US -306 PRAIRIE ISLAND-2 PWR 522 544 1650 NUCMAN WH 1969-6 1974-12 1974-12 87.0   87.0   -
  US -254 QUAD CITIES-1 BWR 867 913 2957 EXELON GE 1967-2 1972-4 1973-2 70.0   75.0   -
  US -265 QUAD CITIES-2 BWR 867 913 2511 EXELON GE 1967-2 1972-5 1973-3 68.0   74.0   -
                             
  US -244 R.E. GINNA PWR 560 608 1775 CONST WH 1966-4 1969-12 1970-7 80.0   83.0   -
  US -458 RIVER BEND-1 BWR 966 1036 3091 ENTGS GE 1977-3 1985-12 1986-6 78.0   81.0   -
  US -272 SALEM-1 PWR 1174 1228 3459 PSEGPOWR WH 1968-9 1976-12 1977-6 62.0   65.0   -
  US -311 SALEM-2 PWR 1130 1170 3459 PSEGPOWR WH 1968-9 1981-6 1981-10 63.0   67.0   -
                             
  US -361 SAN ONOFRE-2 PWR 1070 1127 3438 SCE CE 1974-3 1982-9 1983-8 81.0   80.0   -
  US -362 SAN ONOFRE-3 PWR 1080 1127 3438 SCE CE 1974-3 1983-9 1984-4 80.0   81.0   -
  US -443 SEABROOK-1 PWR 1244 1296 3587 FPL WH 1976-7 1990-5 1990-8 84.0   85.0   -
  US -327 SEQUOYAH-1 PWR 1150 1221 3411 TVA WH 1970-5 1980-7 1981-7 67.0   69.0   -
                             
  US -328 SEQUOYAH-2 PWR 1127 1221 3411 TVA WH 1970-5 1981-12 1982-6 70.0   73.0   -
  US -400 SHEARON HARRIS-1 PWR 900 960 2900 PROGENGC WH 1978-1 1987-1 1987-5 85.0   87.0   -
  US -498 SOUTH TEXAS-1 PWR 1280 1354 3853 STP WH 1975-12 1988-3 1988-8 77.0   78.0   -
  US -499 SOUTH TEXAS-2 PWR 1280 1354 3853 STP WH 1975-12 1989-4 1989-6 79.0   80.0   -
                             
  US -335 ST. LUCIE-1 PWR 839 883 2700 FPL CE 1970-7 1976-5 1976-12 81.0   81.0   -
                             
                             
                           
                           
                           
                           
                           
                           
                           
                           
                           
TABLE 10. REACTORS IN OPERATION, 31 DEC. 2006 - continued                  
                           
Country Reactor Type Capacity Operator NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF % UCF % Non-
MW(e) to to Electrical
Code Name Net Gross Thermal 2005 2005 Applics
                             
USA US -389 ST. LUCIE-2 PWR 839 883 2700 FPL CE 1977-5 1983-6 1983-8 85.0   86.0   -
  US -280 SURRY-1 PWR 799 848 2546 VEPCO WH 1968-6 1972-7 1972-12 71.0   73.0   -
  US -281 SURRY-2 PWR 799 848 2546 VEPCO WH 1968-6 1973-3 1973-5 72.0   74.0   -
  US -387 SUSQUEHANNA-1 BWR 1135 1199 3489 PP&L GE 1973-11 1982-11 1983-6 81.0   83.0   -
                             
  US -388 SUSQUEHANNA-2 BWR 1140 1204 3489 PP&L GE 1973-11 1984-7 1985-2 85.0   86.0   -
  US -289 THREE MILE ISLAND-1 PWR 786 837 2568 AMERGENE B&W 1968-5 1974-6 1974-9 70.0   86.0   -
  US -250 TURKEY POINT-3 PWR 693 729 2300 FPL WH 1967-4 1972-11 1972-12 71.0   76.0   -
  US -251 TURKEY POINT-4 PWR 693 729 2300 FPL WH 1967-4 1973-6 1973-9 72.0   76.0   -
                             
  US -271 VERMONT YANKEE BWR 605 650 1912 ENTERGY GE 1967-12 1972-9 1972-11 81.0   83.0   -
  US -395 VIRGIL C. SUMMER-1 PWR 966 1003 2900 SCEG WH 1973-3 1982-11 1984-1 80.0   83.0   -
  US -424 VOGTLE-1 PWR 1152 1203 3565 SOUTH WH 1976-8 1987-3 1987-6 89.0   89.0   -
  US -425 VOGTLE-2 PWR 1149 1202 3565 SOUTH WH 1976-8 1989-4 1989-5 89.0   90.0   -
                             
  US -382 WATERFORD-3 PWR 1158 1200 3716 ENTERGY CE 1974-11 1985-3 1985-9 85.0   86.0   -
  US -390 WATTS BAR-1 PWR 1121 1202 3459 TVA WH 1973-1 1996-2 1996-5 88.0   89.0   -
  US -482 WOLF CREEK PWR 1166 1213 1213 KGECO WH 1977-5 1985-6 1985-9 85.0   85.0   -
                             
                             
Status as of 31 December 2006, 435 reactors (369682 MW(e)) were connected to the grid, including 6 units (4921 MW(e)) in Taiwan, China:          
   CHIN SHAN-1, BWR, 604 MW(e);                            
   CHIN SHAN-2, BWR, 604 MW(e);                        
   KUOSHENG-1, BWR, 985 MW(e);                        
   KUOSHENG-2, BWR, 948 MW(e);                        
   MAANSHAN-1, PWR, 890 MW(e);                        
   MAANSHAN-2, PWR, 890 MW(e).                        

 


 

 

SUMMARY TABLES