1.  ENERGY, ECONOMIC AND ELECTRICITY INFORMATION

1.1.  General Overview

Romania is a unitary republic in southeastern of Central Europe, in the northern part of the Balkan Peninsula, halfway between the Atlantic Ocean and the Ural Mountains, being placed at a distance ranging between 1050 km (south) and 2800 km against the continent extremities. Romanian territory is unfolding on around 4.5 degrees latitude and 9.5 degrees longitude, being placed at the crossing of the parallel 45° N with the meridian 25° E (at 17 km north of town Fagaras). The country is bordered by Hungary (west), Serbia (south-west), Bulgaria (south), Ukraine (north), Moldavia (north-east) and the Black Sea (east), along 245 km of coastline. The country covers an area of 238,391 square kilometers and is the continent's 13th largest country in area.


figure 1

http://robam.com/harta.htm


Romania's topography is dominated by the great arch of the Carpathian Mountains, which enter northern Romania via Ukraine and take a curving course, first southeastward and then westward across the central part of the country. The Carpathians then turn south again and cross the lower course of the Danube River, which forms Romania's southern boundary with Serbia and Bulgaria. The southern and eastern portions of Romania consist of fertile plains that are drained by the Danube and its tributaries. The Carpathians in Romania may be divided into the Eastern Carpathians, the Southern Carpathians (or the Transylvanian Alps), and the Western Carpathians. The highest point in Romania is the peak Moldoveanu (2,544 m) in the Southern Carpathians. Main features of relief units are:


figure 2

http://www.turism.ro/harta.php


Stretching for approximately 480 km from north to south and about 680 km at its widest extent from west to east, it contains no desert, no too high mountains, or other difficult environments that limit the extent of human occupancy. Romania's climate is intermediate between temperate and continental types, with lower oceanic influences from the west, Mediterranean ones from southwest and stronger continental-excessive ones from the north-east. Average annual temperatures range latitudinal from 11°C in the south to 7 °C in the north and altitudinal with values of -2.5° C in the mountain areas (Omu Peak - Bucegi Massif) and 11.6°C in the southern plain (Zimnicea town - Teleorman county); average yearly rainfall decreases in intensity from west to east, with ranges from 400 mm in the south-east to 1,400 mm in the Carpathian Mountains. Romanian running waters are radially displayed, most of them having the springs in the Carpathians. Their main collector is the Danube River, which crosses the country in the south on 1075 km length (about 40 % of the entire course) and flows into the Black Sea through a large delta. Its basin area is 33,250 km2, excluding the tributaries, which form the first-degree basins. In the mountains areas there are numerous glacial lakes and recently, anthropic lakes which turn into account the rivers hydro-energetic potential.

The vegetation is determined by the relief and by pedo-climatic elements, being displayed in floors. Mountain areas are covered by coniferous forests (especially spruce fir), mixture forests (beech, fir-tree, spruce fir) and beech forests. Higher peaks are covered by alpine lawns and bushes of dwarf pine, juniper, bilberry etc. In the hills and plateaus, there are broad-leaved forests, prevailing beech, common oak or durmast oak; the main forest species often met on low hills and high plains are Quercus cerris and Quercus frainetto. Forests cover about one-fourth of the land. The typical steppe and silvosteppe vegetation, which covered the areas of low humidity in Dobrogea Plateau, Romanian Plain, Moldova Plateau and Western Plain, has been mostly replaced by agricultural crops.

The territory of the country is devised in 41 counties, with 265 towns (of which 93 municipalities) and 2,687 communes (consisting of 13,285 villages), and Bucharest Municipality. The population of Romania, as following the last Census of population, March 27, 2002, was of 21,680,974 inhabitants - with a density of about 90.9 people per km2. These data show a decreasing by more than 1.1 million persons from the previous census, ten years ago. Only 7 cities have a population of over 300,000 plus other 12 cities have a population of over 100,000. Bucharest, the capital city, has about 2.3 million inhabitants. Table 1 shows the historical statistics concerning population information.


TABLE 1. POPULATION INFORMATION

 

 

 

 

 

 

 

Average

annual

growth

rate(%)

 

1970

1980

1990

2000

2005

2006

2000

to

2006

Population (millions)

20.3

22.2

23.2

22.4

21.6

21.5

-0.7

Population density (inhabitants/km2)

87.9

96.4

101.2

97.7

94.1

93.7

 

Urban population (% of total)

40.3

45.8

54.3

54.6

53.7

53.9

 

Area(1000 km2)

 

 

 

 

 

230.0

 

 Source: World Bank World Development Indicators

1.1.1.  Economic Indicators

Table 2 shows the historical GDP data.

TABLE 2. GROSS DOMESTIC PRODUCT (GDP)

 

 

 

 

 

 

 

Average

annual

growth

rate(%)

 

1970

1980

1990

2000

2005

2006

2000

to

2006

GDP (millions of current US$)

 

 

38 299.1

37 052.6

98 844.8

121 609.1

21.9

GDP (millions of constant 2000 US$)

 

 

43 989.6

37 052.6

48 864.4

52 627.0

6

GDP per capita (current US$)

 

 

1 650.3

1 651.0

4 568.9

5 645.2

22.7

Source: World Bank World Development Indicators

1.1.2.  Energy Situation

Among the various main useful minerals we can mention: crude oil, with old exploitation traditions; natural gas; coal, especially cocking pit coal, lignite and brown coal; ferrous and non-ferrous ores, gold, silver and bauxite ore deposits; great reserves of salt as well as numerous non-metalliferrous resources. Table 3 shows the energy reserves, and Table 4 the historical energy statistics.

1.2.  Energy Policy

Since 2001, Romania's macroeconomic environment and business climate have improved. Social and political factors are related today to the trend of transition from fossil energy resources, expendable by definition, to new reliable sources and to a sustainable development, in order to prevent a crisis. The country is facing today the factors above and the Government is trying to cope with difficult economic circumstances. The economic context is characterized by deregulation and competition, supported by the industry that is now under a full restructuring with concerning an increased demand of energy and more clear requirements for a clean and safe environment.

Table 5 illustrates the energy independence degree, as ratio between primary energy production and quantity available.

There are not yet estimations referring to climate change. The consequences of global warming in Romania include in particular changes in the severity and frequency of extreme weather events (temperatures in winter and summer, storms, flooding etc.).

The impact of the Kyoto Protocol in the current energy policy has no a large significance due to the very large decrease by almost 50% of emissions of carbon dioxide during the 1990s. It is to be pointed out that there are efforts to mitigate emissions and to suitably modernize the industry but the emissions decay is mainly as a result of the severe economic recession by the end of 20th century.

1.3.  The Electricity System

With a Romanian electricity history that goes back to 1862 when electric lighting was for the first time used in Bucharest. An electric power plant fitted with steam boilers and Brush dynamos supplying direct current through a 2 kV line (underground cable) was commissioned in the downtown.


TABLE 3. ESTIMATED ENERGY RESERVES

Estimated energy reserves in (*) (Solid and Liquid in million tons, Uranium in metric tons, Gas in billion cubic metres, Hydro in TWhr per year)
  Solid (1) Liquid (2) Gas (3) Uranium (4) Hydro (5)
Amount 494 100,000 163 3,325 40,000
 

(*) Sources: 20th WEC Survey of Energy Resources, 2004 and Uranium 2005: Resources, Production and Demand ("Red Book")
(1) Coal including Lignite: proved recoverable reserves, the tonnage within the proved amount in place that can be recovered in the future under present and expected local economic conditions with existing available technology
(2) Crude oil and natural gas liquids (Oil Shale, Natural Bitumen and Extra-Heavy Oil are not included): proved recoverable reserves, the quantity within the proved amount in place that can be recovered in the future under present and expected local economic conditions with existing available technology
(3) Natural gas: proved recoverable reserves, the volume within the proved amount in place that can be recovered in the future under present and expected local economic conditions with existing available technology
(4) Reasonably Assured Resources (RAR) under < USD 130/kgU
(5) Hydropower: technically exploitable capability, the amount of the gross theoretical capability that can be exploited within the limits of current technology
Source: IAEA Energy and Economic Database.
 

The first European city endowed with electric street lighting was Timisoara, an exquisite town located in the western side of the country. This dates back to 1884. In 1906, the General Society for Gas and Electricity of Bucharest was set up. It was a joint-stock company, with French shareholders, running according to the Romanian Commercial Code. The country's First Energy Law was passed in 1924. It specified explicitly that the installations for production, transmission and distribution of energy were state property. This law was amended and extended in 1930 and 1934, but not fundamentally altered. In 1938, the law for organizing the communal exploitation was enacted. After periods of amazing developments early 20th century, in-between the two world wars, the electricity sector knew a moderate development (an installed capacity of 501 MW and a production of 1.13 TWh in 1938).


TABLE 4. ENERGY STATISTICS

(Energy values are in Exajoule exept where indicated) Annual Average
Growth Rate (%)
Total Energy Requirements 1970 1980 1990 2000 2003 2004 1980 to 2000 2000 to 2004
Total 1.89 3.02 2.45 1.59 1.66 1.67 -3.15 1.23
Solids 0.36 0.58 0.52 0.29 0.34 0.34 -3.44 4.27
Liquids 0.46 0.79 0.64 0.41 0.40 0.42 -3.20 0.43
Gases 1.00 1.56 1.20 0.64 0.69 0.65 -4.39 0.47
Hydro < 0.01 0.05 0.04 0.05 0.05 0.06 0.79 2.81
Nuclear 0.00 0.00 0.00 0.06 0.05 0.06 .. 0.45
Other Renewables and Waste 0.06 0.04 0.05 0.15 0.14 0.15 6.53 0.18
 
Final Energy Consumption 1970 1980 1990 2000 2003 2004 1980 to 2000 2000 to 2004
Total 0.73 0.19 0.28 0.97 1.02 1.02 8.39 1.39
Solids 0.08 .. .. 0.16 0.16 0.17 .. 1.57
Liquids .. .. 0.09 0.20 0.22 0.23 .. 3.08
Gases 0.56 .. .. 0.33 0.40 0.39 .. 4.15
Electricity 0.09 0.19 0.19 0.12 0.14 0.14 -2.28 3.39
Other .. .. .. 0.15 0.10 0.09 .. -11.53
 
Net Energy Balance (Export-Import) 1970 1980 1990 2000 2003 2004 1980 to 2000 2000 to 2004
Total -0.039 0.513 0.785 0.342 0.429 0.497 -2.00 9.80
Solids 0.083 0.150 0.192 0.073 0.095 0.113 -3.54 11.45
Liquids -0.114 0.309 0.315 0.144 0.146 0.199 -3.74 8.31
Gases -0.008 0.051 0.244 0.126 0.197 0.191 4.59 10.97
Other Renewables and Waste < 0.001 0.002 0.034 -0.001 -0.009 -0.005 ? 40.01
 

Source: IAEA Energy and Economic Database.

 

TABLE 5. ENERGY INDEPENDENCE DEGREE


(%)

1992

1993

1994

1995

1996

1997

1998

1999

2000

Total

72.0

71.8

73.0

70.0

69.8

69.0

70.3

75.9

77.3

Coal

68.7

74.8

75.7

72.7

75.1

67.8

64.4

69.0

74.9

Crude oil

51.3

47.3

45.2

43.7

48.6

51.4

51.8

59.4

57.0

Natural gas

82.9

82.0

79.9

75.1

70.9

74.7

74.8

81.5

80.2

Source: National Institute of Statistics of Romania, Romanian Statistics Yearbook 2001


In 1948, the energy industry, like all other industries, was nationalized. The legal framework in the country became that of a centralized state economy. In 1949, the Ministry of electric energy and Power Engineering were founded. All local companies and enterprises were co-coordinated by this newly created structure.

In 1958, the National Power System was created through the interconnection of the local systems. In 1963, the completion of the first parallel - synchronous interconnection of the National Power System with the East European interconnected power system, through commissioning of the 220 kV overhead electric grid.

Electrification of the first railway section (i.e. Ploiesti - Brasov) in the country took place in 1966. In 1968, the Territorial Power Dispatching Centers was set up. From 1980 to 1989, the National Electricity System was confronted with severe difficulties. It operated in isolation, disconnected from the neighboring countries; the system frequency often dropped from 50 Hz to 47 Hz and operated at the failure margin, due to the very high industrial consumption dictated by the forced industrialization of the country and also to the inefficient energy consumption, the pressure of the natural gas in the distribution networks often below normal, particularly in the cold Romanian winters; the industrial plants operated below their design capacities. In the final years of the communist government, the energy sector was additionally corseted by regulations imposing military control; however this legal framework could not even make the energy sector function properly, much less enhance the efficiency of the energy use.

After this period, the electricity sector has embarked in a deep and total restructuring process, with efforts directed towards the marked economy. At the same time, a great decrease in the demand and a steady reduction of the available domestic primary energy resources were recorded between 1990 and 1995.

1.3.1.  Structure of the Electricity Sector

A new restructuring programme started in July 1998 when RENEL has been split and reorganized. By Government Decision No. 365 / 02.07.1998, all nuclear activities were completely separated and the National Electricity Company (CONEL - S.A.) was founded as a joint stock company performing the tasks of transmission, system and market operator. It owned 100% shares in three affiliates:

Also created was the state owned Autonomous Company for Nuclear Activities (RAAN).

The separation of the former Nuclear Power Group and the setting up of the National Nuclear Company S.N. NUCLEARELECTRICA S.A. had been an explicit commitment assumed by Romania when it ratified the Guarantee Agreement with the International Bank for Reconstruction and Development (BIRD) (Government Ordinance No. 41 / 29.08.1995) and the European Bank for Reconstruction and Development (BERD) (Government Ordinance No. 6 / 16.01.1996), which provides that the Romanian side will create an independent public institution for the nuclear activity.

The next stage of this reform process, lasting 12 months, started with the promotion of the new Electricity and Heat Law as Government Emergency Ordinance No. 63 / 28.12.1998, becoming effective in March 1999.

The major targets approached by the law have been:

The whole economic and technical operation and development of the electricity sector will be regulated, ruled, supervised and monitored by the ANRE created according to the new Electricity Law, set up by a Government Emergency Ordinance, in October 1998, as a public institution, independent and autonomous.

The national power company CONEL, as well as NUCLEARELECTRICA, are set as stock companies. The relationship among basic activities - generation, transmission and distribution are based on commercial contracts. Accordingly, between ELECTRICA, the national distributor of electricity, and NUCLEARELECTRICA a power purchase agreement was signed in December 1999. The Electricity Law grants the third part access to the grid.

Contractualization of the power sector main activities is thus achieved and various prices can be settled for each activity and services: (i.e. regulated supply tariffs, regulated distribution tariffs, regulated transmission tariffs, the power purchase price, the system services tariffs, regulated purchase price from the NPP).

The subsequent restructuring stage settled the electricity wholesale market rules. The needed infrastructure for this market is also in process to be designed, achieved and commissioned (hardware, software, and telecommunication links, metering). ANRE is creating and approving the requested issuing prescriptions and rules to set-up the Electrical Power Market (secondary legislation i.e.: Grid Code, Commercial Code, Distribution Code, Supply Code, Metering Code, Licensing procedures and tariffs methodologies).

The electricity wholesale market will be determined by the activity of several producers and buyers, which are being kept in relation through market mechanisms. These mechanisms are supposed to balance the offer with the demand and to settle the market price.

The final restructuring stage will result in exercising the wholesale market functioning and further on, in spinning off the thermal power generating subsidiaries and the distribution subsidiaries. A number of independent companies are thus set up (by Government of Romania Decision No. 627/2000, former CONEL's branches becoming independent companies) and there will be considered for privatization as soon as possible; creating such a competitive structure for the Romanian electricity sector will provide enough incentives for private investors to set up independent power producers either by building new generating capacities or by buying or getting concessions for the existing capacities; private investors will be also encouraged to invest in the power sector.

With this Government Decision No. 627, the power sector has been technically, legally and commercially unbundled. There is a clear separation of generation, transmission/dispatch, and distribution and supply activities. The Romanian electricity market is still in a nutshell, together with the set up of TRANSELECTRICA S.A., as transmission system operator of the entire Romanian power system and administrating the specific market through its subsidiary - the power market (commercial) operator named OPCOM.

The readiness of Transelectrica is mainly based on the transmission fee, fully regulated by ANRE and on the revenues from system services. Transelectrica buys the system services from producers and uses its for the power system needs.

The Romanian electricity market is now mainly based on bilateral contracts:

This level of 15% of market competitiveness has been gradually increased. The regulated contracts of the wholesale electricity market offer a guarantee to the suppliers that are obliged to deliver electricity at regulated prices to the captive consumers. One of the most conspicuous features of the Romanian wholesale market, an inheritance of the past, is the fact that hydro generation is 4 times cheaper than the thermal one. This very large difference in prices on the wholesale market is expected to steadily disappear, by increasing the competitive component of the market. The regulated market will finally turn into a competitive market. The Romanian power sector has the regulatory framework for trade arrangements on the electricity market and is prepared for the next natural steps of the restructuring process: distribution privatization in parallel with the privatization of a number of power plants.

ANRE continued the regulatory activity in 2002 as per its lawful competencies and tasks while undergoing an internal reorganization based on Government Decision (GD) 581/2002 regarding ANRE organization and operation rules.

Electricity and heat generation was the sector restructuring focal point. Externalization of TERMOELECTRICA's thermal power plants has continued leading to the subsequent reorganization of the company, through the setting up of three new subsidiaries. Within HIDROELECTRICA, whose activity will be fully regulated several subsidiaries for maintenance and repair works were established. At the same time, the micro-hydropower plants that were assets belonging to TERMOELECTRICA, ELECTRICA and NUCLEARELECTRICA were assigned to HIDROELECTRICA.

With the establishment in 2001 of ELECTRICA's eight new territorial subsidiaries added to the aforementioned changes in the electricity generation sector, we obtain a much more complex image of the participants in the electricity wholesale market. Although different from 2001, this picture nears the concept of competition associated to the electricity market.

The reorganisation of TERMOELECTRICA and the setting up of the following subsidiaries

were put into practice through GD 1524/2002. On the grounds of the same GD, HIDROELECTRICA will operate under a fully regulated regime in order to ensure protection of captive consumers through impartial allocation of hydro rent. Thus, the energy quantity traded in the wholesale market will be optimised centrally by the market operator.

HIDROELECTRICA has also reorganised its activity by establishing maintenance and repair subsidiaries while hydropower plants that were assets belonging to TERMOELECTRICA, ELECTRICA and NUCLEARELECTRICA were assigned to HIDROELECTRICA. The national strategy for nuclear development in Romania and the Action Plan for its implementation were approved through GD 1259/2002. The design of an efficient electricity market should take into consideration the development trends of the nuclear sector, the more so as investments in this sector are substantial, the surplus of power in the Romanian Power System (SEN) being significant even with only one newly emerged unit.

TRANSELECTRICA continued its restructuring process with a view to increasing efficiency of its basic activities by setting up the following auxiliary service subsidiaries:

In 2002, ANRE objectives were concentrated on sustaining the reform and competition in the electricity and heat sector, on increasing the electricity market efficiency and on the integration into the regional and European market. Special attention was given to consumer protection, efficient use of resources and environment protection.

Increased objectivity has been achieved as regards the regulatory process with the creation of the Regulatory Committee made up of the president, vice-president and three regulators. Under the new organization structure, ANRE has issued technical and commercial regulations in harmony with the changes occurring upon generation, distribution and supply and encouraged the development of the competitive market in consonance with the market opening degree of 33%.

Electricity and heat tariffs and prices were adjusted as well, so that they may cover the justified costs of the large sector companies, in compliance with the agreements signed by the Government with the international organisations and institutions. Monitoring of regulated sector companies was also improved.

At international level, ANRE participation in co-operation projects has continued, as for instance the partnership with MPUC (Maine Public Utilities Commission US) and exchange of experience with regulators in Central and East European countries within the Energy Regulators Regional Association (ERRA).

The co-operation projects benefited from the support of the National Association of Regulatory Utility Commissioners (NARUC) as well as of the US Agency for International Development (USAID) and US Energy Association (USEA).

Romania has officially requested for the integration of its power system to the Union for the Co-ordination of the Transport of Electricity of Western Power Systems (UCTE).

Main milestones for interconnection:

05.04.1994

Romanian Power System joined the second UCTE synchronous zone (Serbia, FYROM, Montenegro, Greece) for a trial parallel operation with the UCTE rules and recommendations observance

10.03.1997

Official application for the integration in the UCTE synchronous zone

17.07.1997

Technical Committee UCTE/Bulgaria/Romania to supervise the admission procedure is established

08.01 - 30.03.2001

Winter interconnection tests successfully performed

09.07 - 20.09.2001

Summer interconnection tests in progress

2002 - 01.02.2003

Interconnected operational tests

2003

Final Report submission and approval on definitive Interconnection

 

figure 3

A remarkable event in 2002 was the start up of the project regarding the creation of the regional Southeast European energy market following the Memorandum of Understanding and the establishment of Athens Forum.

The successful completion of the extended tests for interconnection to UCTE transmission system represented an extraordinary accomplishment for the Romanian energy sector as this allow our country achieve full UCTE membership in the first half of 2003 and therefore develop commercial trades with European partners.

1.3.2.  Decision Making Process and Future Trends

Considering the strategic importance of the energy sector in developing the national economy on sustainable basis, the sector evolution has to be outlined through prognosis and strategies on different horizons of time, so that the development perspectives and the energy supply to be correctly estimated. This necessity is emphasized in the Governmental Programme of the present administration, which takes into consideration "Romania's Economic Strategy on medium term" and also "The Government Action Plan on 2000 - 2004", agreed with the European Commission.

In order to implement the Governmental Programme, the Ministry of Industries and Resources appreciated that it is necessary to elaborate a National Energy Strategy, which to emphasize conditionalities, possible options, related policies and correspondent impacts during the process of taking decisions and establishing directions to operate. This document has as starting point the sustainable development of Romania in the context of further country's admission to EU, and takes into consideration the main objectives and priorities of the long-term National Energy Strategy. The principles laying at the basis of this document are the following:

To accomplish the energy strategy and the energy policies that will be applied to the sector in the next 4 years, a number of decisions must be taken:

1.3.3.  Main Indicators

At the end of the year 2002, the total installed capacity of the Romanian power sector was 18,932 MW: 7,029 MW in coal (37.1%) and 5,164 MW in oil and gas (27.3%), 6,032 MW in hydro (31.9%), 706.5 MW in nuclear (3.7%). It seems to be a very large capacity, largely depassing the demand but we have to keep in mind the age, the availability, the technological level and the intrinsic efficiency of the majority of facilities.

The average production costs, in USD/MWh, for different power sources are:

The electricity tariff for nuclear power, of about 30 USD/MWh, covers SNN SA overall investment, production cost and financial expenses. The average selling price of electricity was in 2002 of about 50 USD/MWh.


TABLE 6. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY

  Annual Average
Growth Rate (%)
Electricity Generation 1970 1980 1990 2000 2003 2004 1980 to 2000 2000 to 2004
Total 35.09 67.49 64.31 51.53 54.78 56.10 -1.34 2.15
Nuclear 0.00 0.00 0.00 5.05 4.54 5.14 .. 0.45
Hydro 2.77 12.64 10.98 14.78 13.26 16.51 0.79 2.81
Geothermal .. .. .. .. .. .. .. ..
Wind 0.00 0.00 < 0.01 .. .. .. .. ..
Other renewables .. .. .. .. .. .. .. ..
Thermal 32.32 54.85 53.33 31.70 36.98 34.44 -2.70 2.10
 
Installed Capacity 1970 1980 1990 2000 2003 2004 1980 to 2000 2000 to 2004
Total 7.35 16.11 22.48 21.85 21.85 21.85 1.54 0.00
Nuclear 0.00 0.00 0.00 0.66 0.66 0.65 .. 0.00
Hydro 1.20 3.46 5.67 6.12 6.12 6.12 2.90 0.00
Geothermal .. .. .. .. .. .. .. ..
Wind 0.00 0.00 < 0.01 .. .. .. .. ..
Other renewables .. .. .. .. .. .. .. ..
Thermal 6.15 12.65 16.81 15.08 15.08 15.08 0.88 0.00
 

Source: IAEA Energy and Economic Database.

 

figure 4

FIG. 1. Power Generation Structure-Romania 2002


Generally, the electricity consumption after 1989 followed the evolution of the whole national economy, mainly of the industrial activity, implying decrease periods, followed by growth periods. Between 1997 and 1999, the energy resources, electricity and heat consumption diminished according to national economy tightening. The decrease of energy consumption induced crisis phenomena in the energy sector, manifested by a supplementary deterioration of the financial situation, slow down of the investment and maintenance programmes, unemployment. Compared to 1999, in 2000 the consumption registered an increase of 2.7%, due to the small recovering of national economy and more evident in 2001. The trend of redressing status is obvious. In 2002, the maximum of consumption load was 8410 MW. It represents only 44% of the total installed capacity. As we already mentioned, this does not mean Romania has large reserves and a real excess of capacity; the issue consists of the low availability of the thermal power units (overall using factor recorded in 2002: 31.5%), mainly because of the advanced age and poor maintenance of these plants. In the last decade, a capacity of more than 3,500 MW in thermal units was closed, as aged and obsolete. Currently, within TERMOELECTRICA, the main operator of thermal power plants, around 82% of the installed capacity is more than 20 years old.

Figure 1 shows the share of the electricity generation in 2002. Tables 6 and 7 show the main indicators of electricity and energy.


TABLE 7. ENERGY RELATED RATIOS

  Annual Average
Growth Rate (%)
  1970 1980 1990 2000 2003 2004 1980 to 2000 2000 to 2004
Energy consumption per capita (GJ/capita) 93.4 136.0 105.5 71.0 76.3 77.1 -3.20 2.10
Electricity per capita (KW.h/capita) 1,732.5 3,039.8 2,771.0 2,296.1 2,519.3 2,587.0 -1.39 3.03
Nuclear/Total electricity (%) 0.0 0.0 0.0 9.8 8.3 9.2 .. -1.66
Annual capacity factor - Total (%) 54.5 47.8 32.7 26.9 28.6 29.3 -2.83 2.15
Annual capacity factor - Thermal (%) 60.0 49.5 36.2 24.0 28.0 26.1 -3.55 2.10
Annual capacity factor - Hydro (%) 26.4 41.8 22.1 27.6 24.7 30.8 -2.05 2.81
Annual capacity factor - Nuclear (%) .. .. .. 88.1 79.1 89.7 .. 0.45
Annual capacity factor - Wind (%) .. .. 11.4 .. .. .. .. ..
Annual capacity factor - Geothermal (%) .. .. .. .. .. .. .. ..
Annual capacity factor - Other renewables (%) .. .. .. .. .. .. .. ..
 

Source: IAEA Energy and Economic Database.

 

2.  NUCLEAR POWER STATUS

2.1.  Historical Development and current nuclear power organizational structure

2.1.1.  Overview

From the details on the history of nuclear power in Romania, emphasized in the previous Nuclear Power Country Profile, we are re-iterating here only some aspects. A total of 5 nuclear power reactors were initially intended to be built in Romania on Cernavoda site, on the Danube river, selected in the late '70s and fully complying with the requirements of the national and international standards related to nuclear power plants.

The works on the Cernavoda NPP site started in 1980 for Unit 1 and in 1982 for the other 4 units. To spare the financial efforts and to focus on Unit 1, in 1991 it was decided to proceed with the works on Unit 1 only and to stop temporarily the works on the other units. The project management activities on Unit 1 were assumed by AECL - ANSALDO Consortium (AAC) through a contract concluded in June 1991. Unit 1 has been completed in 1996.

The main actor in nuclear power is Societatea Nationala "NUCLEARELECTRICA" (SNN) S.A., a state 100% owned stock company, established in July 1998, following the first stage of restructuring in the power sector, splitted from the former centralized Romanian utility RENEL. "Nuclearelectrica" has three main branches:

Cernavoda NPP Project is based on technology transfer process from Canada, Italy and United States. The transfer of a technology recognized as Western safe design covers mainly nuclear island, secondary cycle and turbo-generator.

Pitesti Fuel Plant supplies the whole nuclear fuel for Cernavoda Unit 1 (consumption of 105 tonnes of natural uranium per year, with loading/unloading of about 5300 fuel bundles, at an average discharge burnup of 170 MWh/kg U). The factory has been upgraded in co-operation with Canadian partner Zircatec and is certified as a qualified supplier of CANDU 6 fuel and was extended at double of its capacity with minor changes.

The quality of the fuel bundles manufactured at Pitesti is very good: in the last four years, the number of fuel bundles which experienced failure in the reactor (or were suspected of failure) did not exceed 1.

Between 2 December 1996 and the end of 2002, Cernavoda Unit 1 has delivered around 30 million MWh of electricity. It reached a capacity factor of 89.3%, which is good by international standards (see Figure 2). Only Romanian specialists professionally manage Cernavoda Unit 1, their efficiency earning praise from foreign experts. It provides more than 10 % of Romania's electricity consumption, making superfluous an import of about 1.4 million tonnes of liquid fuels per year, leading to annual savings of over 110 million USD.

The first reactor started commercial activity under a trial authorization. The final two-year authorization license was granted by the National Commission for Nuclear Activity Control (CNCAN) in 1999 and renewed in 2001. The license can be revoked at anytime if the work force, population or environment is considered to be in danger. However, no radioactive emissions have ever been reported from the plant.


figure 5

FIG. 3. CANDU 6 NPP Gross Capacity Factor

 

2.1.2.  Current Organizational Chart(s)

The "NUCLEARELECTRICA" Company has three levels of coordination as follows:

At the level of SNN SA headquarters, there are four main divisions:

figure 6

 

2.2.  Nuclear Power Plants: Status and Operations

First of all we have to underline the commitment of the Romanian authorities to complete Cernavoda Unit 2. The Ordinance No. 126 / 2000, issued on 31 August 2000 by the former Government of Romania, represents an important decision in favor of Unit 2. This one defines the completion of Cernavoda Unit 2 as a project of national interest and priority for Romania and defines the financing sources of the project (SNN own sources, external loans based on sovereign guarantee, public funds from the Government). It also offers a set of financial incentives for the project (profit tax exemption for SNN, exemption from any import taxes due in Romania; Romanian income taxes exemption for foreign contractual partners; the payment of the accounts payable which SNN registers at 30 June 2000 towards ministry of Finance, in respect of the sovereign guarantee for the external loans, contracted for the completion of Unit 1, were postponed until 31 December 2006 and the related penalties were cancelled).

A further preliminary evaluation of the influence of the Ordinance No. 126 / 2000 pointed out the tariff for delivered electricity maintaining the project efficiency decreased to about 30 US dollars/MWh, compared with previous results.

The new Government, installed in November 2000, re-iterated from the beginning that public funds from the state budget, SNN own resources, foreign loans for import and a EURATOM loan for the local portion of the contract, guaranteed by the Romanian Government, could be potential financing sources for the project.

The resulted input is reflected in the financing of activities for 2001, providing 1690 billion lei (equivalent of about 60 million US dollars) granted from budgetary funds, by Law No. 216 / 2001. Through the Government Decision No. 270 / 2001 it was established an inter-ministerial Committee for the co-ordination of commercial negotiations, providing the financing and for the follow-up of the works progress. We would like to emphasize some arguments sustaining the importance, within the specific condition of Romania, of completing the Cernavoda Nuclear Power Plant - Unit 2:

1. The necessity of increasing the power production in Romania results from the following arguments:

- Considering the standard scenario for the development at a constant pace (Competitiveness Scenario), from the "National Sustainable Development Strategy of Romania", characterized by a GDP/capita average annual growth rate of 6.5%, which would allow Romania to reach in 2020 about 50% of the EU countries GDP/capita, selected as a realistic case by the Romanian Government, an increase of the electricity production of 4% arises, consistent with 2.5% increase of the final energy consumption for the interval 2001-2004;

  1. This scenario considers a decrease of "energointensitivity" with 3% per year and a set of realistic measures for saving energy;
  2. The GDP growth in 2001 was 5.3%, with an annual growth rate of the electricity demand of 2.1%, more than in the Government forecasting;

- Over than 50% of the installed capacity has more than 20 years of lifetime, characterized with poor maintenance and high pollution; some of this capacity will be rehabilitated, but about 4,500 MW capacities of obsolete conventional power plants will be retired from operation by 2004;

- The Government of Romania limits the import of primary resources at 40%, from Security in Energy Supply reasons;

The main power projects considered by the National Strategy for the Development of the Romanian Energy Sector for the next future are the following:

1. Completion of the 700 MW capacity of the Cernavoda NPP-Unit 2 by 2005;
2. Rehabilitation of 1280 MW of the existing thermal power plants within 2001-2004;
3. Concluding contracts for other 410 MW of the existing thermal power plants, to be completed after 2004;
4. Rehabilitation of about 2,200 MW of the existing hydro plants, projects completed after 2004;
5. Completion of 183 MW in hydro plants projects in progress;
6. Re-evaluation of about 900 MW in hydro plants, in different stages of progress, including relatively high investment costs;
7. New combined cycle capacities of about 300-400 MW, among them 100 MW are considered for the next future.

2. Cernavoda NPP - Unit 2 Project represents the main priority of the above mentioned programme, considering the following arguments:

This Project represents a least cost option in accordance with the" Least Cost Development Study of the Romanian electricity and heat generation capacities" which was completed in April 1998 by an international consulting consortium TRACTEBEL-Belgium, SEP-Holland and EDF-France, financed by the European Commission with PHARE funds;

Cernavoda NPP - UNIT 2 is considered by the National Strategy for the Development of Romanian Energy Sector, through its technological features and economical performance indicators, the best solution to fulfill the power demand considering the sustainable development of the country;

After 7 years of commercial operation of the Cernavoda NPP - Unit 1, the technological and economical performance indicators, combined with the low environment impact, have proven that the decision to complete Unit 2 is a right one.

3. The necessity of EURATOM loan, as part of Cernavoda NPP - Unit 2 financing:

- Considering the Council Decision of 21 March 1994, amending the Decision 77/27O/EURATOM, to authorize the Commission to contract EURATOM borrowings in order to contribute to the financing required for improving the safety degree and efficiency of nuclear power stations in certain non-member countries (94/179/EURATOM), Romania is included on the list of eligible non-members countries. The Cernavoda NPP - Unit 2 Project is eligible for EURATOM loan considering the following:

- The project is under construction;
- A set of 156 design changes and 166 minor design modifications/ improvements are necessary for compliance with new licensing requirements applicable to Unit 2; they are confirmed by the by the Independent Consultants selected by the EC (Consortiums NNC-British Energy-INGENCO for Nuclear Safety and HPCAquatest for Environment Impact);
- There are advantages of the EURATOM loan for the Cernavoda NPP-Unit 2 Project, also considering the accession process of Romania to the European Union.

We are listing some of these advantages:

The delays in Unit 2 commissioning will affect the Security of Energy supply, obliging Romania to increase the oil imports with about 1.4 million tonnes per year; the stability of the Romanian electrical grid, in process of interconnection with UCTE, could be also affected.

The traditional Canadian and Italian partners are now focused on securing financing to complete the project by 2005. When Unit 2 goes commercial, Cernavoda will cover almost 20% of domestic consumption, also enhancing Romania's chances to become a major electricity exporter. Certain nuclear equipment will be bought from Canada and Italy. The Romanian industry will receive about 400 million USD to complete Unit 2 and thousands of jobs will be created. Needless to say, the project will have a significant impact on Romania's economy over the next few years. Table 8 shows the actual status of the NPPs at Cernavoda site.


TABLE 8. STATUS OF NUCLEAR POWER PLANTS IN ROMANIA

Station Type Net Operator Status Reactor Construction Criticality Grid Commercial Shutdown
    Cpacity (Mwe)     Supplier Date Date Date Date Date
CERNAVODA-1 PHWR  653 SNN Operational AECL 01-Jul-82 16-Apr-96 11-Jul-96 02-Dec-96  
CERNAVODA-2 PHWR  655 SNN Operational AECL 01-Jul-83 06-May-07 07-Aug-07 31-Oct-07  

Source: IAEA Power Reactor Information System as of 31 December 2006.

 

2.2.1.  Cernavoda NPP Unit #2 Project Status

Preservation works were performed on Unit 2 between 1992 and 1995. Starting with the second half of 1996, remedy works were initiated especially in the construction area, and since 1 January 1998 a small progress work programme started inside the reactor building and the service building. Over that period important equipment and materials manufactured by the national industry were brought on site: feeders, heat exchangers, pumps etc. All this activities were performed under the project management of AECL - ANSALDO, based on addenda to the contract for Unit 1 concluded in 1991. Cernavoda Units 3 to 5 are under preservation for a final decision with respect to their future.

Briefly, the Unit #2 project status is being now the following:

Most of the procured mechanical equipment is under preservation in Unit #2 buildings or warehouses. The main erected equipment is in the following areas: in the reactor building - calandria (reactor vessel), steam generators, pressurizer, deaerator - condenser, cranes and hoists; in the service building - equipment airlock, water tanks; in the turbines building - steam turbine cylinders, de-aerator, condensate storage tank, draining pumps, heat exchangers of the intermediate cooling circuit, main cranes.

A Construction All Risk (CAR) Insurance is in force for Unit #2 starting from April 1995. Nuclear All Risk - Material Damage and Nuclear Liability insurance policies are placed to the international nuclear "pools" from February 1995.

The time schedule to perform the works necessary for Unit #2 completion, from the full financing available up to the commercial operation of Unit #2, is estimated at about 54 months. This is subject of further possible reduction considering the type of contract and project organization.

2.2.2.  Project value, evaluation of the remaining works, works schedule for the Unit #2 completion

The overall cost amount related to Unit #2 Project has been estimated at about 1,400 mil. USD and comprises the following:

In accordance with the AECL - ANSALDO proposal concerning the Unit #2 completion, estimated costs are shown in Table 9.


TABLE 9. ESTIMATED COSTS FOR UNIT #2 COMPLETION


No

Category

Estimated costs,
million USD

Out of which imported

1.

Design & engineering works

15

10

2.

Equipment, materials and components procurement

290

150

3.

Construction - erection (manpower)

75

0

4.

Works management + technical assistance

160

140

5.

Commissioning

40

30

6.

Complementary works

20

10

7.

Miscellaneous and contingencies

20

20

 

TOTAL

620

350

 

Nuclear fuel and heavy water procurement (First Load)

130

 

Source: Nuclearelectrica SA.


The estimation was performed considering, in order to implement the Unit #2 project, an organization (Project Management Team-PMT) capable to ensure an integrated system of engineering and project management has been set up, similar with Unit 1 approach. Other foreign companies may participate in the Project, together with AECL-Canada and ANSALDO-Italy, in case their resources and facilities can be used to its benefit, accordingly with the principles for the new commercial contract, discussed by the end of 1999 with the traditional partners from Canada and Italy.

The contribution of the national industry in supplying equipment, materials and technical services was identified based on the actual capabilities of the domestic suppliers qualified for the Cernavoda project. Considering the uncertainty characteristic of the transition economy and the industry restructuring, it is possible that the predicted domestic supply level may change, increasing the cost of imported components and services. The costs for the first nuclear fuel load and heavy water inventory were considered at the level of the international market. The estimated cash flow of the capital cost is shown in Table 10.

2.2.3.  National participation

The completion of the Unit #2, a replica of the Unit 1, will benefit from the existing infrastructures and technical facilities developed over the completion process of Unit 1, as well as of the Romanian staff (customer, contractors, suppliers and designers) properly qualified and organized. An important number of contractors, with qualified personnel and technology for nuclear power plant construction, is committed in works performance on site. Part of them were established before the year 1990 dedicated to support the nuclear programme, another part, private organizations now, were created after 1990 as a result of a natural restructuring process and of the economy reform.


TABLE 10. CAPITAL COST CASH FLOW


Year

Value

% of the total value to be fulfilled

million USD

1

21

157

2

24

180

3

22

165

4

19

145

5

14

103

TOTAL

100

750

Source: Nuclearelectrica SA.


Within former RENEL was developed an industrial support structure for the Cernavoda Project, represented by the Nuclear Fuel Plant in Pitesti, and the Heavy Water Plant, located in the southwest of Romania, near Drobeta-Turnu Severin. The "brain" support for the Romanian Nuclear Programme was provided by the Nuclear Research Institute - ICN for specific Research and Development (R&D) activities and by the Center for Nuclear Projects Engineering and Technologies - CITON for design-engineering activities.

Romania also implemented a dedicated nuclear infrastructure, beginning with an educational system to industry and research-engineering capabilities. From the industrial sector can be mentioned: General Turbo Bucuresti, Petrotub Roman, Electroputere Craiova, Titan Nuclear Equipment TEN Bucuresti, FECNE Bucuresti, SCN Pitesti, ICN Pitesti, Aversa Bucuresti, UZUC Ploiesti, ARIO Bistrita, CONDEM Bucuresti, Ductil Buzau, TEPRO Iasi, Sarma Campia Turzii, Ventilatorul Bucuresti, Vulcan Bucuresti, CASTUMAG, Automatica, etc. from construction-erection sector: Nuclear Montaj, Trustul de Montaj Utilaj Chimic, CNE SA (Nuclear Civil Works Company), etc. from design-erection sector: Power Studies and Design Institute, EUROTEST, Institute for Thermopower Components Research and Design, etc. One can further mention players operating in international business, such as ROMENERGO, and in the financial sector banks or the specialized insuring market one finds in the Romanian Atomic Pool. Specialized industries such as uranium mining, milling and concentrating in Compania Nationala a Uraniului (CNU) were also developed.

There are key local on-site actors for Unit 2 completion as: CNE - S.A., Cernavoda, STIZO S.A., Cernavoda, UNIFY CO LTD., S.R.L. Cernavoda, HIDROCORA, S.R.L., Cernavoda (for civil works), NUCLEARMONTAJ S.A. Cernavoda, TMUCB S.A., Cernavoda (for equipment, piping, HVAC, structural steel), R&M NIMB S.A. Cernavoda, KATON EX-IM S.R.L., Cernavoda, AMEA S.A., Cernavoda, SIEA S.A., Cernavoda, ELCOMEX-I.E.A. S.A., Cernavoda, ELECTROCONSID S.A., Cernavoda (for electrical, control and instrumentation).

This attests to the breadth of the Romanian nuclear industry. This industry will play a greater role on completing Unit 2 than it did on Unit 1. If one looks at the Korean experience with CANDU 6 reactors, the future points to a growing role for Romania's nuclear industry in the completion of Units 3 and 4. It should be mentioned that the Romanian suppliers for Unit #2 were qualified from the point of view of the technical capabilities, quality assurance programme and of the manufacturing procedures in compliance with a methodology similar to that used by AECL and ANSALDO Energia to qualify its traditional suppliers.

2.2.4.  Radioactive Waste Management and Plant Decommissioning

Each unit of Cernavoda NPP can accommodate spent fuel for ten years of full operation. Furthermore, Romania is developing radioactive waste management programmes and adopting concepts recognized world-wide (interim dry storage, near surface repository for low and medium level waste). Figure 4 shows the radwaste generation in Cernavoda NPP.

figure 7

FIG. 4. Solid Radwaste Generation

A dry spent fuel intermediate storage facility project (DICA) is in progress; the contract was awarded by AECL, after an international competition. It is based on MACSTOR system designed by AECL, consisting in 27 concrete modules with a capacity of 12,000 fuel bundles each, protected in metal cylinders and stored in baskets. The first capacity will be commissioned in 2003 on the plant's site. All the facility will assure the storage of 300,000 fuel bundles coming from 2 units for a period of 50 years. Next step will be the decision related to the final disposal of low and medium level waste. The storage is envisaged to be sited at the Cernavoda area, and the commissioning is considered for 2005-2006. Site studies are advanced, and a decision will be taken considering the implementation of the process. For the final repository of spent nuclear fuel, generic survey studies are performed and the Romanian experts are looking for solutions consistent with international practice.

Based on the experience of decommissioning of older CANDU nuclear plants, i.e. Douglas Point 220 MW(e) and Gentilly 1,250 MW(e), decommissioning of the Cernavoda project has also been evaluated.

2.2.5.  Environmental impact

Aside from some hydro-electric plants, most of Romania's conventional electricity generating capacity consists of obsolete thermal plants, close to the end of their design lifetime, with low availability, of which 40% burn coal, with high releases of CO2, SO2, NOx, dust and ash. Table 11 shows a comparison between one unit CANDU from Cernavoda and a lignite fuelled thermal power unit of same output.


TABLE 11. COMPARISON BETWEEN A CANDU 600 NPP AND A LIGNITE FUELLED POWER PLANT


 

Waste

Lignite fuelled thermal power

CANDU 600 NPP

Output (MW(e))

 

700

700

Annual fuel consumption (tonnes)

 

6,000,000

90

Annual waste amount (tonnes), out of which:

Ashes

1,500,000

 

 

Fly ash

(20,000)

 

 

CO2

3 - 4,500,000

 

 

SO2

88,000

 

 

NOx

8,800

 

Nuclear spent fuel (tonnes/year)

 

 

90

Low and medium nuclear wastes m3/year

 

 

30-50

Source: Nuclearelectrica SA.


To produce the equivalent yearly electrical power of Cernavoda Unit 1, a lignite coal power plant requires about 6,000,000 tonnes of lignite and "produces" 1,500,000 tonnes of ash, of which 20,000 tonnes is fly-ash, about 4.5 millions tonnes of CO2 and significant quantities of SO2 and NOx. The nuclear option represents a good opportunity for Romania to reduce polluting emissions, within the United Nations Framework on Climate Change and agreed at the Conference in Kyoto, Japan.

It is also still a quite unknown fact that the radiological impact on the population of a nuclear power plant, such as the CANDU station at Cernavoda, is comparable, or less, than that associated with some other alternatives of electrical generation, such as coal (coal contains radioactive elements which are released into the atmosphere when it is burned).

2.2.6.  Fulfillment of the Nuclear Safety Regulatory Authority requirements

The Cernavoda site fully complies to the requirements of international standards concerning nuclear power plants seismicity, geological characteristics, flooding capacity, meteorological phenomena, other events caused by human actions, dispersion in water and air, demographic distribution, the emergency programme, land usage means, cooling water supply under normal and failure conditions, the connection to the national grid, the access to site, industrial centers approaching, the environment protection as well as social-economic aspects. Unit #2 site is already licensed by CNCAN. The nuclear safety standards applicable to Cernavoda NPP Units 1&2 siting, construction and operation comply with all safety principles included in IAEA guideline and regulations.

CNCAN also issued partial authorizations/permits for some mechanical erection activities, based on the Preliminary Safety Report and of other specific documents. The activities carried out up to now, on Unit #2, were based on these certificates. The licensing process for Unit #2 can take benefits from the experience acquired with Unit #1.

2.2.7.  Economic data

The necessity of proceeding with the Cernavoda Unit #2 project was pertinently demonstrated by studies for the electric power sector development. The last of these studies was a "Least cost power and heat generation capacity development study, Romania", prepared by SEP (Holland), Tractebel (Belgium) and EdF (France) under the PHARE Energy Programme Management Unit. This study reviewed the electric power sector development over the period between 1996 - 2020.

In arriving at the optimum plan, a three stage analytical process was used: firstly, a screening analysis was performed to select an initial expansion plan. Secondly, the initial expansion plan together with variations were evaluated, using a sequential analytical model of the system operation imposing a few external constraints. Production costs were combined with the capital costs associated with a given expansion plan in order to determine the present value of the annual cost of system operation over the duration of the study. In the third stage, constraints such as fuel availability were considered in order to develop a practical optimum plan.

The initial expansion plan model used allowed a large number of alternative generating candidates to be considered with the most economical options selected. New projects were added in economic sequences as needed to maintain the desired level of electrical system reliability, or in excess when the fuel cost savings were higher than the additional capital cost induced by the construction of a new unit. The optimum solution was identified by a probabilistic production cost optimization approach incorporated in the models, which allowed a detailed production costing analyses.

The initial expansion strategy was varied to examine the impact of different sets of resources on production cost. New capacity was added to the system to replace units that had reached the end of their useful lives, to replace more expensive existing generation, or to provide for increased demand. It is to be noted that as of today 47% of the electric power stations have an operation life time longer than 20 years, and 84% longer than 10 years, as shown in Figure 5


figure 8

FIG. 5. Share of the Installed Capacity According to the Equipment Age in 1998


The resulting production cost overall value of each of the alternative strategies has been combined with the associated capital cost required for investment, in the present value of the total system cost over the simulation horizon. This allowed a fast and comprehensive comparison of the alternative expansion strategies. To arrive at a comprehensive optimum strategy, decisions had to be made regarding five different aspects:

An iterative approach was used to reach conclusions. The reference expansion plan is revised, based on the outcome of the first round of individual studies, to incorporate those changes found to have beneficial effect. The individual studies are then repeated to confirm that they are still worthwhile when compared with the new reference plan. This process is repeated, with data improvements being made during each step, until a preliminary unconstrained optimum strategy is derived. The results of unconstrained expansion alternatives was used as the initial reference case for performing more detailed production costing analyses to obtain optimum strategy conclusions. In addition, constraints were imposed, most notably the obligation to avoid cyclic consumption of lignite, and the optimum strategy conclusion were again examined to produce a constrained optimum strategy.

The forecast of the electric power demand for 2000 - 2020 consider three scenarios with average annual growth rates for electricity of 2%, 2.8% and 3.8%. It is to be mentioned that the demand in 1997 was about 10% higher than in 1996.

As shown in the Least Cost "Executive Summary", the completion of the Cernavoda Unit #2 is part of the optimum strategy for both constrained and unconstrained strategies. This conclusion remains valid "even if Cernavoda 2 is assumed to have a higher than expected forced outage rate (15% versus the expected 8%) or if Cernavoda 2 is assumed to have a higher than expected capital cost (20% above the expected cost)". Accordingly the completion of Cernavoda Unit #2 represents a priority of the development of the electric power sector in our country, as stipulated in the Government Decision No. 35/1997.

2.2.8.  Financing Plan of the Project

Up to 1998, the construction of Unit #2 was financed from public funds. The decreasing of available cash from state budget and the pressure to put the project in the market framework required new financing approaches.

This consists in financing from foreign loans, mainly from Canadian and Italian Export Credit Agencies, guaranteed by the Government or through other means, public funds and "Nuclearelectrica" Company's own sources, resulting from electricity export or various commercial arrangements, as counter-trading. Multilateral credit agencies borrowings could contribute to the financing package of the project. In addition, equity participation from some investors groups could be considered.

The basic idea of this approach is to reduce Government's level of risk for the foreign loans guarantee point of view. Table 12 below shows the designed financial scheme, mentioning the financing sources and the guarantee means, where necessary.


TABLE 12. FINANCIAL STRUCTURE


 

Million USD

Destination

TOTAL FINANCING

750

 

Out of which:

 

 

   - Public funds (State Budget)

210

Local portion,
including heavy water and nuclear fuel

   - External Loans

485

Import & local portion

   - Other sources
(electricity delivery and commercial arrangements)

55

Import


2.3.  Supply of NPPs

The heavy water plant ROMAG is situated at 7 km north-east of Drobeta Turnu Severin town, on the national road DN67, in the south-western area of Romania, on the left side of the Danube River. ROMAG was projected to produce heavy water in two stages of development: 360 tonnes/year in the 1st stage, with 4 modules (90 tonnes/module), and 360 tonnes/year in the 2nd stage, with another 4 modules, an unfinished investment.

The factory produces heavy water of nuclear quality and it has the greatest capacity of Europe and the second in the world. The project was put into operation between 1980 and 1988. The first quantities of heavy water were produced on 17 July 1988.

The process is based on the isotopic change between H2O and H2S in a biterm system in Girdler-Sulphide installations, in which a primary concentration of deuterium oxide of 4 - 12 % is obtained. The raw material for the deuterium is taken from the Danube. The final concentration till at least 99.78 % D2O is obtained by vacuum distillation.

The production had been halted for three years (1990 - 1992), when the technological installation, the production systems and those of environmental protection were modernized. Three modules of the 1st stage of development worked as follows: two were operating and one was overhauled; work on the fourth module was interrupted (at 92 % of completion).

2.4.  Operation of NPPs

Indicating owners/operators if relevant, operation and maintenance service suppliers and operator training. National Company "NUCLEARELECTRICA" S.A. (SNN), which is the owner and operator of Cernavoda NPP, was founded by the Romanian Government Decision no. 365 in July 1998. CNE PROD Cernavoda, a subsidiary of SNN, has the responsibility for operating the Cernavoda Unit 1, and CNE INVEST Cernavoda, another subsidiary of SNN, for completion of the Cernavoda Unit 2 and preservation of the Units 3-5. There is another subsidiary of SNN, the Nuclear Fuel Plant in Pitesti - Mioveni, the local manufacturer of CANDU type nuclear fuel for the Cernavoda Unit 1. CNE PROD has its own maintenance division and a Training Center with a full scope simulator.

2.5.  Fuel Cycle and Waste Management

Nuclear Fuel Production

The nuclear fuel needed for the Cernavoda NPP -Unit 1 operation is supplied by the Nuclear Fuel Plant from Pitesti. Fabrication of CANDU nuclear fuel started in 1980, through the commissioning of a CANDU type Fuel Pilot Plant as a pilot department of the Nuclear Research institute (ICN). The separation of the Nuclear Fuel facility from ICN, as a distinct company, took place in 1992. In 1994, the Nuclear Fuel Plant was qualified by AECL and ZPI-Canada as a CANDU 6 nuclear fuel supplier.

The capacity of the plant is 90 tonnes per year, respectively 23 bundles per day. At present, FCN provides the annual amount of the fuel necessary for the Unit 1 operation, being able, with small investment to extend its production capacity in order to assure the operation of two units. The high quality of the domestic nuclear fuel is confirmed by the most severe test, so-called " fire test", that is directly into operation. No fuel bundle manufactured at FCN and used at Cernavoda NPP failed under the extremely tough conditions inside the core during the nuclear reactor operation. The average burnup factor achieved by the nuclear fuel bundles in 1998 was of 170.85 MWh/kg U.

2.6.  Research and Development

Table 13 shows the actual status of some nuclear facilities other than NPPs.


TABLE 13. STATUS OF NUCLEAR RESEARCH REATORS AND OTHER NUCLEAR RELATED FACILITIES IN ROMANIA


Nuclear Facilities

Type

Gross Capacity

Status

VVR-S

Nuclear Research Reactor

2 MW(th)

Shutdown state with nuclear fuel out of the core

TRIGA

Nuclear Research Reactor

14 MW(th) (Steady State Core) 20.000 MW(th) per pulse (Pulsating Core)

Operating

Nuclear Fuel Plant

CANDU-6 Nuclear Fuel

Nuclear Fuel needs for Cernavoda 1 NPP operation

Operating

Natural Uranium Concentration Plant

Natural Uranium

Uranium for Nuclear Fuel Plant

Operating

Heavy Water Plant

 

Heavy water needs for Cernavoda NPP

Operating

National final repository

LL & IL Radwaste

20,000 Standard (200 l) drums capacity

Operating

 

2.6.1.  Competent Authorities for Promotion of Nuclear Activities

In the new Governmental organization, the Ministry of Education and Research took the responsibilities of the former National Agency for Science, Technology and Innovation (ANSTI) and is in charge, on one hand, with co-ordination of the overall nuclear programme, formulation, application, monitoring and assessment of policies in the area of research, development and innovation, and, on the other hand, with co-ordination of the formulation, application, monitoring and assessment of policies for development of quality infrastructures in accordance with the governmental strategy and programme in order to extend the national and international heritage in the area of science, technology and innovation with valuable contributions, to secure a sustainable economic development, access to the domestic, European and global markets, to finally develop a knowledge-based information society while meeting people's needs and increasing welfare. The Ministry of Education and Research is also in charge with the whole national education system. The ministry includes a specialized general division - the National Agency for Atomic Energy (ANEA) - through which it fulfils the following tasks related to the peaceful applications of atomic and nuclear phenomena and processes:

The Ministry of Industry and Resources (MIR) is the responsible authority for definition of national participation policies and strategies, for planning and co-ordination of the national nuclear industry activity, representing the State as shareholder of nuclear assets and for co-ordination of part of major R&D and engineering facilities. It has also primary responsibility for the safety of its nuclear installations through the following organizations:

National Company "NUCLEARELECTRICA" S.A. (SNN), already presented. The stockholders assembly (100% by the state) representatives and the members of Administration Board of the society are appointed by the Ministry of Industry and Resources of Romania.

Autonomous Reggie for Nuclear Activities (RAAN) through the Nuclear Research Subsidiary (ICN) Pitesti is the operator of the TRIGA type research reactor, the hot cell facility, the radioactive waste treatment facility on Pitesti - Colibasi site. RAAN, through the Technology and Engineering for Nuclear Projects Subsidiary (CITON), is also in charge with support design activities in the nuclear field and, through the Heavy Water Plant (ROMAG) located in Drobeta Turnu-Severin, in charge of covering the heavy water needs for the Cernavoda NPP.

2.6.2.  Research Establishment

Nuclear Research Subsidiary (SCN) Pitesti - within the Autonomous Reggie for Nuclear Activities (RAAN)

The Nuclear Research Subsidiary (SCN) is consistently involved in the work associated with the national nuclear safety programmes: nuclear fuel, reactor physics, radiation protection, generic CANDU technologies, and management of radioactive wastes, TRIGA reactor conversion. Almost all activities of the Institute were oriented to provide a scientific and technical support for the Nuclear Power Programme in Romania. The major SCN R&D Programmes are focused on:

nuclear safety to ensure technical and scientific support needed for the safety assessment of Cernavoda NPP during its lifetime;

nuclear fuel to elaborate technology and new methods to optimize fuel utilization in Cernavoda NPP;

radiation protection to integrate all aspects regarding ecological impact of nuclear power and to develop techniques for operating nuclear installations based on ALARA principles;

CANDU technologies intended to ensure an optimized maintenance of NPP systems and components;

radioactive waste management to solve the problem of radioactive wastes generated by nuclear facilities, in accordance with national legislation and international standards;

radioisotopes, irradiation techniques and conversion of TRIGA - INR reactor for LEU fuel is intended to ensure, together with the fuel supplier (General Atomic, USA), the conversion of the ICN reactor to low-enriched fuel utilization.

Institute of Physics and Nuclear Engineering (IFIN-HH) Bucuresti-Magurele

The Institute for Physics and Nuclear Engineering performs research activities in the nuclear field and on radioactive waste treatment and is the owner of the research reactor type VVR-S and the national LL and IL radwaste repository. It will also operate the multi-purpose irradiation facility. Its main activities focus on:

Institute for Isotopic and Molecular Technology (ITIM) Bucuresti-Magurele

The research activity of the Institute for Isotopic and Molecular Technology is pointed to several significant directions.

National Institute of Cryogenics and Isotope Separations (ICSI) Ramnicu Valcea

ICSI is an institution of scientific research and technological development in co-ordination of the Romanian Agency of Science, Technology and Innovation. It was founded in the aim of researching and verifying the technologies for heavy water separation and further of tritium. The principal directions of the activities are:

National Institute for Laser, Plasma and Radiation Physics (INFLPR) Bucuresti-Magurele

The National Institute for Laser, Plasma and Radiation Physics performs research activities in laser physics, plasma physics, and physics of electron beams. The main research and development activities are focused on:

National Institute of Research and Development for Technical Physics (IFT) Iasi

The research activity of the National Institute of Research and Development for Technical Physics is pointed to several significant directions:

Technology and Engineering for Nuclear Objectives, RAAN Subsidiary (CITON) Bucuresti-Magurele

CITON supports the nuclear programme in Romania with a large range of services under quality assurance regime by using codes and standards internationally recognized (ASTM, ASME, IEEE, ISI, IEC, CSA series and IAEA guidelines etc.). SITON services cover the following:

detail design for process and support systems associated to a CANDU-600 NPP, as well as civil design for the reactor building, the turbine hall, the service building, spent fuel and waste management; detail design for adjacent installations and support systems for nuclear research reactors and labs;

reliability and probabilistic assessment tudies;

nuclear safety analyses, including environmental impact analyses in case of accidents, fires, earthquakes, flooding etc.;

thermohydraulic calculations and stress analyses for various working regimes using specialized computer programmes;

methodologies for computation and computer assisted design;

technical and economical studies for siting as well as cost estimates for new designs, operational design modifications for NPP systems and components;

technical assistance for equipment fabrication, their installation, testing and commissioning as well as testing and commissioning of process systems;

land registering and requirements for area classification;

analyses and optimizations of power consumption;

prognoses regarding the national power system development especially nuclear power trends.

2.7.  International Co-operation and Initiatives

Romania became a member State of the Agency of Vienna in 1957. From the mid-1960s to the mid-1970s, its technical co-operation program with IAEA covered mainly research in nuclear physics and some medical and other applications of radiation and isotopes. Since 1976, when Romania n nuclear power program was developed, the Agency has supported in particular the activities related to Cernavoda NPP. The assistance was dedicated to nuclear safety (44%), nuclear engineering and technology (15%). However, application nuclear techniques in other fields received also substantial support, as industry and hydrology (14%), medicine (9.5%) and agriculture (4.5%)

Since September 2001, Romania has become a member of the Board of Governors for the term 2001-2003 and contributed to the Secretariat activities related to safeguards, nuclear safety, technical co-operation, as well as to budgetary policy issues.

CNCAN empowered by the nuclear act, ensures implementation of agreements concluded.

Also CNCAN cooperates with the European Union working groups in the field of nuclear safety. In this context, it participates in meetings of the Nuclear Regulatory Working Group (NRWG), European Nuclear Installations Safety Group (ENISG), CONCERT Group, WENRA and NEA/OECD in legislative domain.

2.8.  Human Resources Development

Seven months after the start of commercial operation of Cernavoda NPP Unit #1 (1997), the whole responsibility for the plant's operation was turned-over from the hands of the international western consortium to the Romanian personnel of NUCLEARELECTRICA company.

This decision became effective with one year earlier than in the contract terms, as probation that training acquired by the Romanian personnel was good and as proven by the achieved operation results.

A full-scope simulator was commissioned in The Training Center at Cernavoda in 1998 for improving the operation crews training.

The efficiency of SNN SA activity increased starting with 1999 by implementing a restructuring program. So, the Company's total number of executive staff and employees, including the three branches, decreased from 2,767 in 1999 to 2419 in 2002. The last figure includes the new personnel hired for the Unit 2 Project completion process.

The company is permanently paying attention to improving the skills and know-how for assuring the employment stability of the highly specialised personnel. The Cernavoda Training Center full scope simulator has been proved a permanent and very efficient training for the operators and personnel working in different sectors of the plant. In preparation of Unit 2 commissioning, about 250 persons have been hired and at present they are being trained at the Cernavoda Training Center and Unit 1 facilities. A new recruiting system of the future technical graduates has been implemented by a number of 30 scholarships awarded to students in their last education year.

The personnel of the Nuclear Fuel Plant benefited by training a the supplier for the equipments purchased for the modernization of the technological process.

3.  NATIONAL LAWS AND REGULATIONS

3.1.  Safety Authority and the Licensing Process

The National Commission for Nuclear Activities Control (CNCAN) is the national competent authority in the nuclear field exercising the regulation, authorization and control powers provided under the Law 111/1996, on the safe deployment of nuclear activities, republished. Since December 2000, CNCAN is an independent governmental body reporting only administratively to the Ministry of Waters and Environmental Protection. Actually, the president of CNCAN is a Secretary of State and the minister can not interfere in CNCAN president's decisions. CNCAN is responsible for full surveillance and control in all issues relevant to nuclear safety regarding siting, construction, commissioning, operation of nuclear plants, research reactors and all nuclear facilities in Romania. In addition, CNCAN is in charge with full surveillance and control in all issues relevant to quality assurance, radiation safety, safeguards, export/import control, physical protection and emergency preparedness and monitoring the radioactivity of the environment. CNCAN is the National Counterpart to the IAEA for nuclear safety, radiation safety, safeguards, physical protection, emergency preparedness, illicit trafficking events reporting, IRS and INES reporting systems and Safety Convention reporting activities. CNCAN plays the role of regulatory body integrator in the licensing process of nuclear installations.

The main tasks of CNCAN in the near future represent the completion of the reviewing process for the regulation system by the end of 2001, in order to accelerate actions for EU access and integration process. The credibility of CNCAN is increasing through work transparency, personnel competence, motivation and flexibility, management by projects, internal audits, self assessment, reduced response time, set-up of mobile units, closer involvement with utilities and applicants, etc.

The Ministry of Water and Environmental Protection is responsible for environmental protection legislation and regulations and for the licensing process from the environmental protection point of view. The MIR co-ordinates the Pressure Vessel Authority (ISCIR), which is responsible for licensing and control of pressure vessels, boilers and other pressure installations, including those from the nuclear field. The Ministry of Health is the responsible authority to organize the monitoring network of contamination with radioactive materials of food products over the whole food chain, inclusive drinking water as well as other goods designated to be used by the population, according to the law. Also, the epidemiological surveillance system of the health condition of personnel professionally exposed, and of the hygiene conditions in units in which nuclear activities are deployed, are under its responsibility. The Ministry of Interior is responsible for control of fire protection at nuclear installations and for supervision of physical protection of nuclear installations and nuclear material. The Ministry of Public Finance is the authority in charge of providing and controlling the financial support from Governmental budgetary funds, sovereign guarantees, etc.

3.2.  Main National Laws and Regulations in Nuclear Power

Romania has had laws in place governing the regulation of nuclear activities since 1974. They remained in force until 1996, when a new legislation was issued. In January 1998, important amendments to the Law 111/1996 on the safe deployment of nuclear activities have been approved. Under the umbrella of this new Nuclear Act, all related rules, practices and regulations in nuclear field were started to be assessed for compliance with applicable IAEA guides and standards. The licensing experience gained during construction, commissioning and initial operation of the Cernavoda NPP Unit 1 was also carefully assessed and incorporated in the new legislative framework being now created in Romania.

A comprehensive set of technical instructions, directives, regulations, procedures, industrial standards, nuclear design and safety guides, concerning the quality assurance and safe operation of nuclear facilities and NPPs, cover activities such as project management, procurement, design, manufacturing, civil works, installation, commissioning and operation.

All AECL design guides and safety design guides were endorsed by CNCAN. The IAEA Safety Series are also used as a basis for the CNCAN regulations. Most of the applicable industrial standards have been used during the licensing process of the Cernavoda NPP Unit 1. As of today, technical standards, such as ASME, ASTM, IEEE etc., have been endorsed in Romania.

 

4.  CURRENT ISSUES AND DEVELOPMENTS ON NUCLEAR POWER

4.1.  Energy Policy

The annual production of a CANDU 700 MWe nuclear unit has a steady output and amounts to about 5.2 - 5.4 TWh (gross). This leads to yearly 1.4 million tonnes oil equivalent reduction - representing more than 100 millions USD - and associated decrease of the noxious emissions.

In November 2002, the Romanian government approved "The national strategy for the development of the nuclear sector in Romania". It provides for the increase of the nuclear share of electricity generation from 10% up to 20-40%, observing the requirements of sustainable development, price competitiveness and nuclear safety.

The "Strategy" states that, for the present conditions in Romania, taking into account the cost of the energy from the nuclear plant versus the cost from the fossil fuel power plants, the investment should continue for the next units of Cernavoda NPP. Thus, the completion of Units 3, 4 and 5 is foreseen in the period 2009-2020.

Modern types of contract should be promoted, as BOT (Build-Operate-Transfer), implying the financing by foreign partners, without State guarantees; the Romanian contribution will be based on a public-private partnership. The civil work at these units is mostly completed but, unlike the Unit 2, the equipment is not procured. A large part of the electricity produced at these units will be available for export. At the present time, many political and business contacts are taking place for establishing the framework for continuation of the construction activities at Unit 3 of Cernavoda NPP.

4.2 Privatization and deregulation

General description of open market issues shows also its influence in the nuclear sector reorganization. There are mentioned de-regulation, competition, privatization mergers and acquisitions affected or may affect the electricity and nuclear sector.

The year 2001 was a reference for the energy sector, as it was rich in outstanding events with direct impact on the evolution of the regulatory activity. It started under the sign of the Californian energy crisis, went on with the suspension of deregulation in that state and ended with the collapse of Enron, until recently the incontestable leader on the electricity and natural gas markets. At European level, proposals to amending the directives on the internal markets for gas and electricity continued to stir many debates where legislative issues referring to the electricity transit played an important role.

Considering the above, Romania's Government adopted a package of legislative acts focusing on the energy sector strategy with a view to attracting investment and ensuring the necessary financial resources in order to increase performance and efficiency of the electricity and heat sector. Therefore, the restructuring of transmission and distribution continued more actively as well as the externalization of certain capacities owned by Termoelectrica SA while the market opening degree was enhanced to 33%.

The Romanian wholesale electricity market was established and developed as per the regulatory principles stated in ANRE Commercial Code of the Wholesale Electricity Market, issued in 1999 and derived from the European Directive 96/92/EC and the national secondary legislation of the sector.

Commercial regulation

Commercial regulation activities in 2002 were oriented towards the monitoring of sector companies and the complementing of the regulatory framework with new commercial regulations in line with the structural changes upon generation, distribution and supply, with the electricity market gradual opening and the experience gained by sector companies. Such undertaking requested series of talks with sector companies' representatives not to mention meetings held to accommodate market disputes.

In 2002, commercial regulations were issued with a view to encouraging competition, improving market efficiency and avoiding discrimination, and referred mainly to the:

In order to minimise risks upon transactions at the System Marginal Price, the obligation to conclude bilateral contracts with negotiated prices and maximal quantities between Termoelectrica, Hidroelectrica, Electrocentrale Deva and Electrica was introduced.

Aspects related to the wholesale electricity market, portfolio contracts, available capacities offer, purchase price variation risk for captive consumers are detailed in the Decision regarding the functioning of the electricity wholesale market.

Commercial relations between the electricity wholesale market participants unfolded according to rules laid down by ANRE Order 34/2002 on the functioning of the electricity wholesale market following the reorganization of the Electricity Distribution and Supply Company (Electrica). The order was issued with a view to ensure stability of the electricity tariff for captive consumers as well as to provide revenues for the electricity producers operating on the regulated market as well as for the electricity distribution and transmission operators in order to properly develop their activity.

The Code of Conduct for the electricity wholesale market participants approved by Order 26/2002 sets out:

The Code of Conduct pertains to the relations operating between electricity market participants as well as between the latter and ANRE.

The Ethic Council was created and functions according to a regulation approved by ANRE decision. The Ethic Council takes notice of the deceitful behaviour of market participants and applies appropriate penalties.

Through several successive president orders, 20 electricity end-users were accredited as eligible customers within the market opening degree limit of 33%. The Guide for Electricity Sale to Eligible Customers was issued in order to help the producers/suppliers whose offer on the competition market for eligible customers exceeds the demand.

ANRE Order 36/2002 to approve the Contracting procedure to purchasing electricity generated by energy capacities under commissioning - sets out the:

ANRE Decision 279/2002 specifies the obligation of captive consumer suppliers to purchase, at regulated prices approved by ANRE the quantity of electricity associated to the restriction of the co-generation produced by these plants. The decision takes into consideration the externalization of some of Termoelectrica district-heating plants as well as their specific technical characteristics, namely the small flexibility of electricity generated by own units whose cost-efficient operation is imposed by the heat load demand to co-generation.

The Framework-contracts for the purchase of electricity from an independent power producer, respectively an auto-producer were reviewed by ANRE Order 32/2002.

The Framework-contract for electricity transmission, ancillary services and wholesale market administration between Transelectrica and the beneficiaries was under review as well. Thus, the electricity transmission service will be contracted:

According to its tasks and competencies regarding the monitoring of the electricity import-export activities, ANRE approved the Electricity Foreign Trade Monitoring Procedure. The procedure sets out the rules controlling the energy foreign trade and the associated information flow between sector companies and ANRE; the rules pertain to all electricity sector companies which, in compliance with the conditions in the license can be involved in electricity commerce activities directly or through intermediate suppliers.

The Regulation regarding the commercial arrangements for non-scheduled electricity exchanges with other national power systems was amended. According to the amendments, Transelectrica will administrate the quantity of electricity associated to the non-scheduled exchanges with the interconnection partners in the process of purchasing electricity with a view to covering the transmission network losses.

Electricity market functioning

In accordance with the international evolution and with the progress of the Romanian electricity sector legislation, ANRE laid out the principles for the development of a two-component electricity market: the regulated and the competitive. According to this market, commercial arrangements between participants are based, for most of their part on the framework contracts issued by ANRE. The option for the two components was sought to encourage long-term commercial arrangements with guaranteed prices and quantities and, by facilitating the conclusion of bilateral contracts and the sale/purchase on the spot market to enable producers and suppliers acquire proper managerial abilities for a competitive electricity market (Figure 5).

By the end of 2002, there were 36 electricity generation licensees, 49 electricity supply licensees and 49 accredited eligible customers. 53% of the producers, 15% of the suppliers and 23% of the eligible customers operated on the electricity wholesale market (Figure 6).


figure 9

FIG. 5. THE ELECTRICITY WHOLESALE MARKET

 

figure 10

FIG. 6. EVOLUTION OF ELIGIBLE CUSTOMERS, PRODUCERS AND SUPPLIERS - LICENSE HOLDERS


Privatization

At present, a very important objective the privatization of the electricity distribution and supply sector, to be implemented by S.C. ELECTRICA S.A. is. The cooperation with the French consultant of BNP Paribas started in 2000, within Phare Project RO9805-01-03 "Privatization in electricity distribution sector". The activity with the consultant consisted in the assessment of two areas: Timisoara (at present FDFEE Banat) and Constanta (at present FDFEE Dobrogea) and two distinct modules have been stipulated: "Preparation of Constanta and Timisoara Regional Distribution Companies for privatization" and "Concluding the transaction for the privatization of electricity distribution companies".

Module 1 comprises of the following activities, as main tasks of the consultant:

Module 2 comprises two main tasks:

The objective is the privatization of Electrica SA branches with strategic investors, namely distribution and supply operators, who can prove that they have enough technical and managerial abilities and who have the financial capacity to support the development of the companies they took over.

4.3.  Role of the government in the nuclear R&D

For the continuing support of specific activities in nuclear field, there were promoted and approved the Strategy for the Development of Nuclear Field, the Law regarding the promotion of use in peaceful aims of nuclear energy and the Law regarding the management of spent nuclear fuel and radioactive waste, including the final disposal.

Today, the workings engaged for the R&D programs respond both to the problems regarding the nuclear safety and physics of nuclear reactors, testing of nuclear materials and equipment, development of new concepts of nuclear fuel cycles and to those regarding the decommissioning (nowadays the VVR-S research reactor from the '50s from Bucharest-Magurele is in the decommissioning process), management of nuclear waste, protection of environment.

4.4.  Nuclear Energy and Climate Change

Due to its technology the Cernavoda Unit 1 NPP prevents the release into the atmosphere of about 4 million tonnes of CO2 annualy.

During the first five years of operation, the quality of air, soil or water in the surrounding area was not influenced by the Unit 1 NPP operation.

Non - radioactive discharges into water (Danube River and Danube Black Sea Canal) were below the authorized limits. The monitoring of specific pollutants, as hydrazine, morpholine and cyclohexylamine has indicated that the concentration of these chemicals is below detectable limits.

A non-radioactive chemical waste management program has been implemented for Unit 1NPP since start-up. It is continuously updated according to the Romanian legislation regarding waste management. The program includes collection, temporary storage and disposal of chemical wastes. CNE-PROD policy in this area takes care of on-site adequate management of wastes in order to prevent an impact on the environment.

4.5.  Safety and waste management issues

The Cernavoda NPP has been operating safely throughout a period of six years. The events reported in 2002 according to INES scale were rated 17 (2 out of scale, 14 level 0 and 1 level 1). During the six years of operations, only 1 event occured in 1999 rated 2 on the INES scale.

In 2002, the average dose received by workers was of 1.12 mSv, and the maximum dose was of 9.23 mSv. The legal limit for exposed workers is 20 mSv/yr.

The evolution of the annual average dose value for exposed workers (mSv/yr) for the last six year is as follows:


1996

1997

1998

1999

2000

2001

2002

0.40

3.81

0.76

1.29

1.25

1.26

1.12


Taking into account the collective radiation exposure (man x Sv), in 2002 Cernavoda Unit 1 NPP was placed on the 5th position out of 27 PHWR units in service.

SNN SA has permantly implemented a safety policy. Its major objective is to guarantee safety and healthy workplaces for each employee and contractor. Consequently, no professional illness has occured during these years.

In 2002 there were 6 individual work-related accidents at Cernavoda NPP and 1 at Pitesti Fuel Factory. No professional illness has been reported.


THE NUMBER OF WORK - RELATED ACCIDENTS WITHIN SNN SA BRANCHES

1997

1998

1999

2000

2001

2002

5

1

4

2

10

7


Over the years, the operation has strictly met the environment requirements. The environmental monitoring results have proved the conformity with the company's environmental policy and the environmental authorization.

Radiological Environmental Impact

Radioactive discharges into water and air were well below the authorized levels. The annual effective dose received by a member of the public pertaining to a critical group (the most exposed) from radioactive emissions into the environment was of 0.0083mSv in 2002 while the annual average dose received by a member of the public from the natural background is 2.4 mSv.

More detailed information on the radiological impact is provided by the SNN SA report presenting the results of the radioactive environmental monitoring program which is implemented by the Environmental Monitoring Laboratory (located at 2 km from NPP site).

In 2002, the volume of low and intermediate level solid waste was 30.93 m3 (except spent resins). The total volume, since in service (December 2, 1996) is of 121.18 m3.

They are stored in a special concrete storage facility located within the fence of the plant.

The annual quantity of spent fuel was of about 99 tU. Since the commissioning, the entire cumulative quantity of spent fuel received was 573 tU. The spent fuel is stored for at least six years in the spent fuel bay of the Unit 1 NPP.

Impact on people & environment. Cummulated releases of radioactive effluents (µSv): Legal dose for population: 1000µSv - in 2002, the average annual dose was only 0,83% from the legal dose.

Volume of radioactive waste (m3):
Total in 6 years of operation: 121,18 m3
Average annual design value: 30 m3

The Intermediate Nuclear Spent Fuel Storage Facility

The Intermediate Nuclear Spent Fuel Storage Facility is based on the MACSTOR system designed by AECL-Canada. The facility assures the storage of 3000,000 spent fuel bundles coming from the Units 1&2, for a period of 50 years.

In 2002 the first module was built and the foundation of second one was poured.

4.6.  Other issues

Cernavoda Unit 3 Project

Providing the material resources necessary for developing the construction works from the Romanian authorized suppliers was an important objective of the year 2002. The procurment of heavy water from RAAN-ROMAG continued as well.

On March 7, 2002, an Interministerial Commission to resume the works at Cernavoda Unit 3 NPP bz 2004 and Unit 4 in the future was set up.

At the same it was decided to organize a joint "team" made up of institutes and national companies in the field to: update general site studies, organize expert inspections of the existing structures and of their conservation until works are resumed, carry out studies relating to Romania's energy balance and equilibrum of the National

Power System, in the event of NPP Cernavoda Unit 3 and 4 reactors commissioning.

For the finalization of Cernavoda NPP Unit 3 that is 16% completed the Government indents to attract more partners and set up joint ventures instead of utilizing an external credit with government guarantees that would involve the Romanian state. Until now, besides SN "Nuclearelectrica" SA, companies from other four countries expressed their intention to participate in the development of a feasibility study and the reactor completion, respectively.

Local Community Support

The Local Community Support Act for Improving the living conditions in the town of Cernavoda started in 1991, including a number of 21 objectives related to the project of the Cernavoda NPP: urbanistic, social, cultural buildings for the town, as well as dwellings for the operation and executive staff of the nuclear power plant.

By the end of the year 2002, 6 objectives were completed and other 6 were under different stages of completion.

In 2002, two important objectives were completed and inaugurated:

Other social & economic effects of Cernavoda NPP Unit 1:

 

REFERENCES

[1]

"Overview of Nuclear Legislation in Central and Eastern Europe and the NIS", NEA/OECD, 1998.

[2]

Least Cost power and Heat Generation Capacity Development Study, Romania, SEP, Tractebel and EdF, 1997.

[3]

"Impuls", Information Bulletin of CONEL (in Romanian) 1997-2000.

[4]

National Electricity Company S.A. - CONEL, Annual Report 1998.

[5]

"Politici energetice ale Romaniei" (in Romanian), IEA. OECD, 1994.

[6]

Statistics Year Book of Romania 1998-2001, Statistics National Commission (CNS).

[7]

"Statistical Bulletin - Industry", CNS, 1999-2001.

[8]

"Encyclopaedia Britannica", 1996.

[9]

"Core Issues" The Journal of Uranium Institute, London, No. 1, 1999.

[10]

"Larousse, Mica Enciclopedie de Geografie" (in Romanian), Editura Lider, Bucuresti, 1999.

[11]

"Monitorul Oficial al Romaniei" (in Romanian), 1996-2001.

[12]

Data & Statistics/The World Bank, www.worldbank.org/data.

[13]

IAEA Energy and Economic Data Base (EEDB).

[14]

IAEA Power Reactor Information System (PRIS).

[15]

TRANSELECTRICA S.A. - Annual Report 2001.

[16]

Ministry of Industry and Resources, The National Strategy for the Development of Romanian Energy sector on Medium Term 2001-2004 (Synthesis), 2001.

[17]

Government of Romania, Romania's Economic Strategy on medium term, 2001.

[18]

Government of Romania, Action Plan on 2001-2004, 2001, www.guv.ro

[19]

Nuclearelectrica S.A. - Semnal "N" (in Romanian), 2000 -2002.

[20]

Nuclear Energy and the Kyoto Protocol, OECD/NEA, 2002.

[21]

AREN, "Nuclear Energy" Magazine, vol. 13, 2002.

[22]

Romanian Atomic Forum - ROMATOM Yearbook 2002.

[23]

Price Waterhouse Coopers, Romania - Fact Sheet, April 2002

 

Appendix 1

INTERNATIONAL, MULTILATERAL AND BILATERAL AGREEMENTS

AGREEMENTS WITH THE IAEA

bullet  Amendments to Articles VI and XIV of the Agency statute

Ratified:

22 February 2001

bullet Agreement on Privileges and Immunities

Entry into force:

7 October 1970

bullet NPT related safeguards agreement
INFCIRC No: 180 82

Entry into force:

27 October 19

bullet Additional protocol

Entry into force:

7 July 2000

bullet Supplementary agreement on provision of technical assistance by the IAEA

Entry into force:

28 October 1981

bullet Agreement on the Agency's assistance for establishment of a research reactor project
INFCIRC No: 206

Entry into force:

30 March 1973

bullet Agreement on assistance for the transfer of enriched uranium for irradiation studies in a research reactor;
INFCIRC No: 307

Entry into force:

1 July 1983

MAIN INTERNATIONAL TREATIES

bullet NPT

Entry into force:

4 February 1970

bullet Convention on the physical protection of nuclear material

Entry into force:

23 December 1993

bullet Convention on early notification of a nuclear accident

Entry into force:

13 July 1990

bullet Convention on assistance in the case of a nuclear accident or radiological emergency

Entry into force:

13 July 1990

bullet Vienna convention on civil liability for nuclear damage

Entry into force:

29 March 1993

bullet Joint protocol relating to the application of Vienna and Paris conventions

Entry into force:

29 March 1993

bullet Protocol to amend the Vienna convention on civil liability for nuclear damage

Ratification:

29 December 1998

bullet Convention on supplementary compensation for nuclear damage

Ratification:

2 March 1999

bullet Convention on nuclear safety

Entry into force:

24 October 1996

bullet Joint convention on the safety of spent fuel management and on the safety of radioactive waste management

Entry into force:

18 June 2001

BILATERAL AGREEMENTS

bullet  Agreement between Governments of Romania and Argentina for co-operation in the peaceful uses of nuclear energy

In force:

27 November 1990

bullet  Agreement between Governments of Romania and the Hellenic Republic on early notification of a nuclear accident and information exchange on nuclear facilities - Athens, 10 March 1995

In force:

23 March 1995

bullet Agreement between CNCAN of Romania and Greek Commission for Atomic Energy on early notification of a nuclear accident and on information exchange about nuclear facilities - Bucharest, 22 December 1997

In force:

25 May 1998

bullet Protocol of understanding on co-operation in the nuclear safety domain between CNCAN of Romania and the Institute for Nuclear Safety of Republic of Korea (KINS) - Bucharest, 21 September 1996

In force:

11 November 1996

bullet Protocol of understanding on co-operation in the nuclear safety domain between CNCAN of Romania and Atomic Energy Control Board (AECB) of Canada - Ottawa, 23 June 1997

In force:

25 May 1998

bullet  Agreement between Governments of Romania and Hungarian Republic on early notification of nuclear accidents - Bucharest, 26 May 1997

In force:

3 October 1997

bullet Protocol on co-operation and information exchange in the nuclear safety domain between CNCAN and Hungarian Authority for Atomic Energy - Budapest, 12 June 1997

In force:

25 May 1998

bullet  Agreement between Governments of Romania and USA on peaceful applications of nuclear energy - Washington D.C., 15 July 1998

In force:

25 June 1999

bullet Agreement of co-operation and information exchange in the nuclear safety domain between CNCAN of Romania and the Society for Nuclear Safety of Facilities and Reactors of Germany - Berlin, 10 November 1998

In force:

23 February 1999

bullet Memorandum of Understanding for co-operation between CNCAN of Romania and the National Atomic Energy Commission (CNEA) of Argentina

In force:

8 May 2000

bullet Administrative Understanding between Canadian Nuclear Safety Commission and CNCAN implementing the Agreement for Co-operation in the Development and Application of Atomic Energy for Peaceful Purposes

In force:

29 May 2000

OTHER RELEVANT INTERNATIONAL TREATIES etc.

bullet EURATOM

Non-Member

 

bullet Agreement on trading and commercial and economical co-operation
- Luxembourg, 22 October 1990

Entry into force:

15 March 1991

bullet Treaty on ban of nuclear weapon tests in the atmosphere, in outer space and under water

Entry into force:

23 December 1963

bullet Treaty on the prohibition of the emplacement of nuclear weapons and other weapons of mass destruction in depth of seas, oceans and their underground

Entry into force:

10 July 1972

bullet  Comprehensive nuclear test ban treaty (CTBT)

Entry into force:

4 October 1999

bullet The Convention on the Physical Protection of Nuclear material

Entry in force:

8 February 1987

bullet Improved procedures for designation

Accepted on 22 February 1990 in of safeguards inspectors statement to Board of Governors

bullet Zangger Committee

Member (1974)

 

bullet Wassenaar Arrangement

Member (1996)

 

bullet Australia Group

Member (2000)

 

bullet Nuclear Suppliers Group

Member

 

bullet Nuclear Export Guidelines

Agreed

 

bullet Acceptance of NUSS Codes suitable

Summary: Revised codes considered for preparing and applying NPP's safety standards. In 1987 used by Regulatory as minimum requirement for adequate of NPP's operation. (21 March 1990)

bullet Unified Institute for Nuclear Research, Member - under the Modified Statute (1992) Doubna, Russian Federation

Ratification:

21 July 1994

 

Appendix 2

DIRECTORY OF THE MAIN ORGANIZATIONS, INSTITUTIONS AND COMPANIES INVOLVED IN NUCLEAR POWER RELATED ACTIVITIES

MINISTRIES

Ministry of Industry and Resources
Energy General Division
Calea Victoriei No. 152, Sector 1
70034 Bucharest

Tel: +(40-21) 650 48 60
Fax:  +(40-21) 2129409
http://www.mincom.ro

Ministry of Public Finances
Apolodor str., No. 17, Sector 5
Bucharest

Tel: +(40-21) 410 11 89
Fax:  +(40-21) 312 16 30
http://www.mfinante.ro

Ministry of Education And Research
- Research Department
Mendeleev Str. No. 21-25, Sector 1 70168 Bucharest

Tel: +(40-21) 212 85 59
Fax: +(40-21) 312 14 10
E-mail: programe@mct.ro
Web: http://www.mct.ro

NATIONAL ATOMIC ENERGY AND POWER AUTHORITIES

National Atomic Energy Agency
Ministry of Education and Research
Mendeleev Str. No. 21-25, Sector 1
70168 Bucharest

Tel: (40-21) 3128707
Fax: (40-21) 6503175

National Commission for Nuclear Activities
Control (CNCAN) (Nuclear Regulatory Body)
B-dul Libertatii nr. 14, P.O.Box 42-4
Sector 5, Bucuresti,

Tel: +(40-21) 410 05 72
Fax: +(40-21) 337 3887
E-mail: lucian.biro@cncan.ro

National Agency For Power Regulation
(ANRE) (Electricity Regulatory Body)
Constantin Nacu nr. 3
Sector 2, 70219 - Bucharest

Tel: +(40-21) 311 22 44
Fax +(40-21) 312 43 65
E-mail: anre@anre.ro
http://www.anre.ro

OTHER NUCLEAR ORGANIZATIONS

Institute of Geotechnical & Geophysical Studies
(GEOTEC SA Bucuresti)
Romanian Electricity Authority
5 - 7 Galati Str. 70211, Sector 2
Bucharest

Tel: (40-21) 6148551
Fax: (40-21) 3127689
Telex: 11443 ISPH R

Institute for Nuclear Research & Engineering
P.O. Box 11-2
RO 72400, Bucharest

Tel: (40-248) 6148551
Fax: (40-248) 262 449

Horia Hulubei National Institute of Physics and Nuclear Engineering
Str. Atomistilor no. 407
P.O.Box: MG-6
RO 76900 Bucharest

Tel: +40 21 7807040
Fax: +40 21 4231701
Email: ifin@nipne.ro
Web: http://www.nipne.ro

Republican Commandment for Intervention
In case of Nuclear Accident (CANCOC)
19 Ceasornicului Str. Sector 1
Bucharest

Fax: (40-21) 3110265

NUCLEAR ELECTRICITY PRODUCER

CNE-PROD Cernavoda
(Branch of SNN-S.A.)
8625 Cernavoda str.
Medgidiei nr. 1 P.O.BOX 42
(Electricity producer, Cernavoda NPP Unit #1, in commercial operation since 1996)

Tel: +(40 241) 238 610
Fax: +(40 241) 239 679
E-mail: ibucur@cne.ro

TRANSMISSION SYSTEM OPERATOR

TRANSELECTRICA SA
Blvd. Magheru #33, Sector 1
70164 - Bucharest

Tel: +(40-21) 303 58 21
Web: http://portal.transelectrica.ro

POWER MARKET OPERATOR

OPCOM S.A.
Blvd. Magheru #33, Sector 1
70164 - Bucharest

Tel: +(40-21) 307 14 10
Fax +(40-21) 307 14 00
Web: http://www.oper.ro

ELECTRICITY DISTRIBUTION

ELECTRICA S.A.
9, Grigore Alexandrescu Street, 1 Bucharest

Tel: + (4021) 208 5999
Fax: + (4021) 208 5998
E-mail: office@electrica.ro
Web: http://www.electrica.ro

NUCLEAR INDUSTRY

AMEA SA Cernavoda
8625 Cernavoda, jud. Constanta
(Procurement of services and products)

Tel: +40 241237857
Fax: +40 241237857

ASA HOLDING SA Bucuresti
str. Luca Stroici Nr. 15, Sector 2
Cod 70224 Bucuresti

Tel: +(40 21)211-8454; 211-7770
Fax: +(40 21)210-1588
E-mail: doina@asa.ro
http://www.asa.ro

AUTOMATICA SA Bucuresti
Calea Floreasca 159, Sector 1
(Power Panels, Annunciation Equipment, Interconnecting Component, Regulating System/Reactivity Logic Cabinets)

Tel: +(4021)230 8364
Fax: +(4021)230 2841
E-mail: autom@automation.ipa.ro

AVERSA SA Bucuresti
Str. Ziduri Mosi 25
(Cooling Pumps, Misc.Centrifugal Pumps,
Nuclear & Non-nuclear Sump Pumps)

Tel: +4021 252 50 00
Fax: +4021 252 07 69
E-mail: aversa@fx.ro
Web: http://www.aversa.ro

CNE-INVEST Cernavoda
(Branch of SNN-S.A.)
8625 str. Medgidiei nr. 3
P.O.BOX 1
(Projects: Cernavoda NPP Units #2 <under construction>, #3-5<cancelled, in conservation>)

Tel: +40 241 239 962
Fax: +40 241 239 266
E-mail: marculescunv@impromex.ro

CITON Bucuresti - Magurele
P.O.Box 52(MG)
04 74554 Bucuresti - Magurele
(Design Services for Technology and Engineering for Nuclear Projects)

Tel/Fax: +4021457 44 31
E-mail: panaita@router.citon.ro

ELCOMEX srl Cernavoda
Cernavoda cod 8625
Constanta
(Works for electric montage, actuators and electric facility for elevators)

Tel: +40 241 237 169

ENERGOMONTAJ SA - GSE - IEA Bucuresti
Str.Ilioara nr.54
Sector 3, Bucuresti,
CP 74592
(Electric & Automatic Facilities)

Tel: +4021 321 33 54
Fax: +40 21 212 22 10
Telex: 10320

ENERGOMONTAJ SIEA SA Bucuresti
Str. Ilioara nr.54
Sector 3 Bucuresti
Cod 74592
(Supports for Electric Aparata & AMC, Piping for Insulated, Services & Tests for Relays & AMC

Tel: +4021 321 33 54
Telex: 10320 R

EUROTEST SA Bucuresti
Str. Splaiul Unirii nr.313
cod 73204 sect.3
(Tray for thermal olding, tray for ante & post irradiation, tray for LOCA & earth)

Tel: +4021 6206136
Fax: +4021 3232628

FCN Pitesti
(Branch of SNN-S.A.)
Str. Cimpului nr. 1
0402 Mioveni Pitesti, CP 1
Judetul Arges
(Fuel Fabrication for Reactors CANDU)

Tel: +40 248 260 160
Fax: +40 248 262 499
Telex: 18251 R
E-mail: fcn@fcn.ro

FEA Bucuresti
Calea Floreasca nr.242-246
Bucuresti, Sector 1
(Current Alarm Units, Function Generators & Signal Selectors, Resistance To Current Converters)

Tel: +4021 633 39 74
Fax: +4021 312 76 33

FECNE SA Bucuresti
Sos.Berceni nr.104
Sector 4, 75632 Bucuresti,
(ECC System Tanks, Components Mechanic Welded & Non-destructive Controls)

Tel: +4021 683 60 05
Fax: +4021 330 34 04
Telex: 10243

FEPA SA Birlad
Str. Republicii nr.316 6400
Birlad
jud. Vaslui
(Electro Pneumatic Apparata for Automation)

Tel: +40235 415 990
Fax: 40236 467 977
Telex: 21723

GENERAL TURBO SA Bucuresti
Sos. Berceni nr. 104
Bucuresti, sector 4
(Turbogenerators, Asynchrony Engine)

Tel: +40 21 334 92 74
Fax: + 40 21 334 92 83

HESPER SA Bucuresti
Str. Dr. Constantin Istrati nr. 1 75213
Bucuresti Sector 4
(Air Control Panels Closure Plug Installation, Valve Station, Cold Test Facility)

Tel: +4021 623 19 10
Fax: +4021 4237687 / 3372460
Telex: 11633

IAICA SA Alexandria
Str. Dunarii nr. 372
Alexandria
judetul Teleorman, CP. 0700
(Pneumatic & Electric Dampers Diffuser, Air Handling Units)

Tel: +40 247 312 145
Telex: 16133

IAMSAT Bucuresti
Soseaua Orhideelor nr.27-29
Sector 4, Bucuresti, CP 77139
(Mounting for Electric & Automatic Equipment)

Tel: +4021 63 77 855
Telex: 10576

IAR SA Brasov
Str. Aeroportului, nr.1
Brasov, CP 2200
(Special Fire-resistant Doors)

Tel: 40921 50 014 or 61266

ICIM Bucuresti
Bucuresti
Splaiul Independentei nr.294
(Environment engineering research)

Tel: +40 21 637 30 20

ICN Pitesti
Pitesti, Colibasi
Judetul Arges
(Exploitation for Radwaste Treatment Station)

Tel: +40 248 213 535
Fax: +4021 312 58 96

ICPAIUC SA Bucuresti
Bucuresti str. Fabrica de Chibrituri nr.48
(Design & research institute for HVAC equipment)

Tel: +40 21 64130 00
Fax: +40 21 337 32 29

ICPET SA Bucuresti
Sos Berceni nr. 104.
cod 75632, sector 4
Bucuresti

Tel: +40 21 683 20 70
Fax: +40 21 683 27 47

PEROM SA Bacau
str. Republicii nr. 166
cod 5500, Bacau
Judetul Bacau

Tel: +40234 174344; +4034 175 376
Fax: +40234 173 548

PROMT SA Timisoara
Aleea CFR nr 7
cod 1900, Timisoara
Judetul Timis
(Overhead Travelling Cranes, Boiler Room Cranes, New Fuel Handling Cranes, Monorails and Hoists)

Tel: +40256 194 880
Fax: +40256 194 880

IFIN Bucuresti
Str.Atomistilor, nr.1
Magurele, Bucuresti
(Portable and Fixed Contamination Monitors, Personal Monitors, Dosimetry Laboratory/Body Counters)

Tel: +4021 780 70 40
Fax: +4021 312 22 45
Telex: 1291

Kvaerner SA Bucuresti
Sos.Berceni nr.104
Sector 4, Bucuresti
(Sample Cabinets Canisters, Nuclear Pressure Reducing Devices, Ion Exchange Columns)

Tel: +4021 684 10 20
Fax: +4021 684 69 30

INDES SA Sibiu
Str. Ocnei, nr. 33
Cod 2400, Sibiu
Judetul Sibiu
(Channel Closure Installation Equipment, Spent Fuel Storage Tray Supports)

Tel: + 40292 434 100
Telex: 69341

IUG SA Craiova
Str. Tehnicii, nr.1
Craiova
Judetul Dolj, CP 1100
(Head Transport Carriage, Bridge & Maintenance Lock Tracks)

Tel: +40251 144 100
Telex: 41323

MECANICA FINA SA Bucuresti
Str. Popa Lazar
nr. 5-25, Sector 2
Bucuresti, CP 73334
(Pressure Gauges, Liquid Injection System Pressure Switches/Differential, Thermometers, Thermo-couples, Instrument Isolating Valves & Manifolds, Filter Regulators, Electric Pneumatic Transducers)

Tel: +4021 635 00 00
Telex: 11583

NIMB SA Cernavoda
Cernavoda
cod 8625, judetul Constanta (Metallic build & facility for NPP)

Tel: +40241 238 488
Fax:+40241 238 890

NUCLEAR & VACUUM SA Bucuresti
Com. Magurele 76900
Str.Atomistilor 1, Sector 5
CP 52-06
(Nuclear Apparatus, Vacuum Pumps)

Tel: +4021 807 365
Fax:
+4021 807 365
Telex:
11350; 11397

NUCLEAR MONTAJ SA Bucuresti
str. Caransebes nr. 1
sector 6
Bucuresti
(Mounting and Repairing of Mechanical Parts of Nuclear and Classic Power Plant Inclusive Auxiliaries)

Tel: +4094 344 233; 4095 114 590
Fax: +4094 734 211; 4095 734 580
E-mail: nuclearb@fx.ro
www.nuclear.ro

PETROTUB SA Roman
Sos. Roman - Iasi
km. 333, Roman
judetul Neamt, CP 5550
(Rolled Pipes on Hot & Cold)

Tel: +4033 731 201
Telex: 25263

REGIA AUTONOMA PENTRU

Tel: +40252 323 848

ACTIVITATI NUCLEARE (RAAN)
Calea Tg. Jiu km 7
Drobeta Turnu Severin
jud. Caras-Severin

Fax: +40252 322 335; +4052 323 685
E-mail: raan@expert.ro

REPUBLICA SA Bucuresti
Bd. Basarabiei nr. 256
Sector 3, Bucuresti
(C.S. & S.S. Pipe for Small Diameters)

Tel: +4021 627 59 45
Fax: +4021 627 45 70
Telex: 10862

RETROM SA Pascani
str. Moldovei nr. 17 bis
cod 5725 Pascani
jud. Iasi

Tel: +40232 762 092
Fax: +40232 765 044

ROMENERGO SA Bucuresti
Calea Victoriei nr. 91 - 93
Sector 1 P.O.BOX 1 - 736 Bucharest
(Procurement for products and services for nuclear projects)

Tel: +4021 659 47 20
Fax: +4021 312 06 34
Telex: 011525

ROMAG Drobeta Turnu Severin
Calea Tg. Jiu km 7
Drobeta Turnu Severin
jud. Caras-Severin
Bucharest
(Heavy Water)

Tel: ++40 (0)252 322 397
     ++40 (0)252 321 561
Fax: ++40 (0)52 317908
Telex: 42270
E-mail: romag@intelsev.ro
http://www.romag.ro

SACRO SA Bucuresti
Soseaua Berceni nr 104
Sector 4, Bucharest

Tel: +4021 682 59 80
Fax: +4021 312 24 69
Telex: 11892

Societatea Nationala "NUCLEARELECTRICA" S.A.
Boulevard General Gheorghe Magheru nr. 33
6th floor, Sector 1, 70164-Bucharest
P.O.BOX 22-102 Bucharest
(National company for nuclear fuel and nuclear electricity production)

Tel: +40 21 203 82 00
Fax: +40 21 311 24 33
E-mail: irotaru@snn.rdsnet.ro
Web: http://www.nuclearelectrica.ro

STIZO SA Bucuresti
Calea Mosilor nr.36
Sector 3, 75443-Bucharest
(Works for Technological Insulated, Insulating material on side of NPP)

Tel: + 4021 614 43 60
Telex: 11568 R

TEHNOMET SA Timisoara
Calea Buziasului nr. 5A
Cod 1500 Timisoara
Judetul Timis

Tel: +40256 222 055;
     +40256 222 097;
Fax: +40256 190 800;
E-mail: tehnomet@mail.dnttm.ro

TEN SA Bucuresti
Bd. Basarabiei nr. 250
Bucuresti, Sector 3, cod 78011
(Manufacturing of Nuclear Components, Complex Products, Iron Constructions)

Tel: +4021 628 64 80
Fax: +40 21 312 81 00
Telex: 011464 R

TMUCB SA Cernavoda
Cernavoda, cod 8625
judetul Constanta
(Set-up tubes, pipes, metallic builds, large equipment & hangers)

Tel: +40241 23 84 10
Telex: 14529

TRAFO ELECTROPUTERE SA Craiova
Calea Bucuresti nr.144
(Transformer for Low and High Voltage, Transformer Plant, Transformer Balanced)

Tel: +40251 14 20 77
Telex: 41331

TURBOMECANICA SA Bucuresti
B-dul Pacii, nr 244
Sector 6, Bucuresti, cod 77826
(Mechanical Damper Devices for Earthquakes)

Tel: +4021 760 78 48
Telex: 10151

UMEB SA Bucuresti
Str General Vasile Milea
nr 4, cod 77035
Sector 6, Bucuresti
(Electric Engine Asynchrony for Low Voltage)

Tel: +4021 631 25 01
Telex: 10652

UNIFY SRL Cernavoda
Cernavoda, cod 8625
judetul Constanta
(Anticorrosive protection by insulated paint)

Tel: +0421 237 581

UPET SA Tirgoviste
Str. Arsenalului, nr.20
cod 0200 Tirgoviste
judetul Dimbovita
(Safety Valves, Flaps)

Tel: +40292 6 31 600
Telex: 17236

UZUC SA Ploiesti
Str. Depoului nr.16
Ploiesti, judetul Prahova
(Chemical Equipment Works)

Tel: +40244 14 36 51
Fax: +40244 12 19 12
Telex: 19337

VENTILATORUL SA Bucuresti
Str. sergent Nutu Ion nr.44
Sector 5, Bucuresti
(Fans)

Tel: +401 410 27 58
Fax: +401 410 27 58
Telex: 10671

VULCAN SA Bucuresti
Str. Sebastian 86-88
Sector 5, 76305-Bucuresti
(Headers & Feeders Frame Assay, Strainers, Fittings, Tanks)

Tel: +4021 410 2061
Fax: +402 1 410 0185; 410 7434

NON GOVERNMENTAL ORGANIZATIONS (NGO)

Asociatia "Forumul Atomic Roman - ROMATOM"
(Romanian Atomic Forum), FORATOM Member
33, Blvd. Magheru, 5th floor, 122 A suite
P.O.BOX 45-106 Bucharest

Tel: +40 21 311 24 31
     +40 21 203 82 02
Fax: +40 21 311 24 43
E-mail: dchirica@snn.rdsnet.ro
Web: http://www.romatom.ro

Asociatia Romana "Energia Nucleara" - AREN
P.O.BOX MG-53
76900 Bucharest - Magurele

Tel: +40 21 310 28 52
Fax: +40 21 311 24 34
E-mail: mstiopol@snn.rdsnet.ro

Societatea Romana de Radioprotectie (SRRp)
Str. Dr. Leonte, Nr. 1-3,
76256, Bucuresti, Sector 5

Tel: +4021 7330/292
Fax: +4021 312 7780

_______________________________________

1. The statistical tables in this profile have been updated with data as of the end of 2007 from IAEA databases, namely the Power Reactor Information System (PRIS) and Energy and Economic Data Bank (EEDB), and the World Bank's World Development Indicators (WDI).