TABLE 16. AVERAGE FULL OUTAGE STATISTICS FOR NON-PROTOTYPE REACTORS DURING 2003


Reactor Type

Number of Units

Full Outage Hours
per Operating
Experience Year

%
Planned
Outages

%
Unplanned
Outages

In the World

Reporting Outage to IAEA PRIS

PHWR 100-599 MWE

19

19

2507

72.9

27.1

PHWR >= 600 MWE

19

12

1203

72.3

27.7

AGR

14

 

 

 

 

GCR 100-599 MWE

8

 

 

 

 

PWR 100-599 MWE

24

23

1036

85.4

14.6

PWR >= 600 MWE

187

177

1253

75.4

24.6

WWER 100-599 MWE

27

27

1655

78.1

21.9

WWER >=600 MWE

23

22

1623

94.5

5.5

BWR 100-599 MWE

14

14

2829

56.7

43.3

BWR >= 600 MWE

78

77

2388

54.3

45.7

LWGR >= 600 MWE

13

13

1895

97.3

2.7

 

 

 

 

 

 

ALL REACTORS

426

384

 

 

 

Note: 2003 is the latest year for which outage information is currently available to the IAEA.

- Reactors shut down during 2003 are not considered.


SUMMARY TABLES