ROMANIA


1. ENERGY, ECONOMIC AND ELECTRICITY INFORMATION

1.1 General Overview

Romania is a unitary republic in southeastern of Central Europe, in the northern part of the Balkan Peninsula, halfway between the Atlantic Ocean and the Ural Mountains, being placed at a distance ranging between 1050 km (south) and 2800 km against the continent extremities. Romanian territory is unfolding on around 4.5 degrees latitude and 9.5 degrees longitude, being placed at the crossing of the parallel 45° N with the meridian 25° E (at 17 km north of town Fagaras). The country is bordered by Hungary (west), Serbia (south-west), Bulgaria (south), Ukraine (north), Moldavia (north-east) and the Black Sea (east), along 245 km of coastline. The country covers an area of 238,391 square kilometers and is the continent's 13th largest country in area.

http://robam.com/harta.htm

Romania's topography is dominated by the great arch of the Carpathian Mountains, which enter northern Romania via Ukraine and take a curving course, first southeastward and then westward across the central part of the country. The Carpathians then turn south again and cross the lower course of the Danube River, which forms Romania's southern boundary with Serbia and Bulgaria. The southern and eastern portions of Romania consist of fertile plains that are drained by the Danube and its tributaries. The Carpathians in Romania may be divided into the Eastern Carpathians, the Southern Carpathians (or the Transylvanian Alps), and the Western Carpathians. The highest point in Romania is the peak Moldoveanu (2,544 m) in the Southern Carpathians. Main features of relief units are:

· proportionality (31% mountains, 36% Sub-Carpathians, hills and plateaus, 33% plains, meadows and Danube Delta).
· concentric display, in amphitheatre (The three ranges, the major levels, with an average elevation of 800 m, form a semicircle, open to the west through structural depressions ("gates"), that shelters the tableland of the Transylvanian Basin in the central part of the country. On the outer fringe of the Carpathians' great arc are the Sub-Carpathians, reaching elevations between 400 and 1,000 m. The eastern and southern plains occupy one-third of the country's total area and formed the populated cores of historic Moldavia and Walachia, respectively.

http://www.turism.ro/harta.php

Stretching for approximately 480 km from north to south and about 680 km at its widest extent from west to east, it contains no desert, no too high mountains, or other difficult environments that limit the extent of human occupancy. Romania's climate is intermediate between temperate and continental types, with lower oceanic influences from the west, Mediterranean ones from southwest and stronger continental-excessive ones from the north-east. Average annual temperatures range latitudinal from 11°C in the south to 7 °C in the north and altitudinal with values of -2.5° C in the mountain areas (Omu Peak - Bucegi Massif) and 11.6°C in the southern plain (Zimnicea town - Teleorman county); average yearly rainfall decreases in intensity from west to east, with ranges from 400 mm in the south-east to 1,400 mm in the Carpathian Mountains. Romanian running waters are radially displayed, most of them having the springs in the Carpathians. Their main collector is the Danube River, which crosses the country in the south on 1075 km length (about 40 % of the entire course) and flows into the Black Sea through a large delta. Its basin area is 33,250 km2, excluding the tributaries, which form the first-degree basins. In the mountains areas there are numerous glacial lakes and recently, anthropic lakes which turn into account the rivers hydro-energetic potential.

The vegetation is determined by the relief and by pedo-climatic elements, being displayed in floors. Mountain areas are covered by coniferous forests (especially spruce fir), mixture forests (beech, fir-tree, spruce fir) and beech forests. Higher peaks are covered by alpine lawns and bushes of dwarf pine, juniper, bilberry etc. In the hills and plateaus, there are broad-leaved forests, prevailing beech, common oak or durmast oak; the main forest species often met on low hills and high plains are Quercus cerris and Quercus frainetto. Forests cover about one-fourth of the land. The typical steppe and silvosteppe vegetation, which covered the areas of low humidity in Dobrogea Plateau, Romanian Plain, Moldova Plateau and Western Plain, has been mostly replaced by agricultural crops.

The territory of the country is devised in 41 counties, with 265 towns (of which 93 municipalities) and 2,687 communes (consisting of 13,285 villages), and Bucharest Municipality. The population of Romania, as following the last Census of population, March 27, 2002, was of 21,680,974 inhabitants - with a density of about 90.9 people per km2. These data show a decreasing by more than 1.1 million persons from the previous census, ten years ago. Only 7 cities have a population of over 300,000 plus other 12 cities have a population of over 100,000. Bucharest, the capital city, has about 2.3 million inhabitants. Table 1 shows the historical statistics concerning population information.

TABLE 1. POPULATION INFORMATION

 

 

 

 

 

 

 

 

 

 

 

Growth

 

 

 

 

 

 

 

 

 

 

 

rate (%)

 

 

 

 

 

 

 

 

 

 

 

1980

 

1960

1970

1980

1990

1996

1997

1998

1999

2000

2001*

to

 

 

 

 

 

 

 

 

 

 

 

2000

 Population (millions)

18.4

20.2

22.2

23.2

22.6

22.5

22.4

22.4

22.3

21.7

- 6.5

 Population density (inhabitants/km˛)

77.5

85.3

93.5

97.7

95.1

94.8

94.6

94.6

94.3

90.9

- 3.2

 Urban population as percent of total

33

36.9

45.8

54.3

54.9

55

55.1

55.9

54.6

52.7

1.15

Area (1000 km˛)                       238.4

 

 

 

 

 

 

 

 

 

 

 

Source: IAEA Energy and Economic Database; Data & Statistics/the World Bank; National Institute of Statistics of Romania (http://www.insse.ro), Romanian Statistical Yearbook 2001; Institute of Geography Bucharest; UN Statistics Division.
* Census of population and dwellings, March 18-27, 2002.

1.1.1. Economic Indicators

Table 2 shows the historical GDP data.

TABLE 2. GROSS DOMESTIC PRODUCT (GDP)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Growth

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rate (%)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1990

 

1980

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2001

 GDP (1)

34,272

38,244

28,851

19,579

26,361

30,073

35,686

35,508

34,904

38,158

31,293

35,493

39,750

42,400

-0.03

 GDP (2)

35,767

38,244

33,305

28,720

29,007

30,025

32,097

33,363

N/A

N/A

28,689

29,262

30,324

 

-

 GDP (3) per capita

1,544

1,648

1,245

848

1,148

1,316

1,570

1,569

1,550

1,697

1,647

1,677

1,772

1,910

7.1

 GDP by sector (%):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

          -Agriculture

N/A

20

18

18

21

20

21

20

20

15

16

13

15

13

-5.0

             -Industry

N/A

50

45

44

42

46

43

44

45

36

31

36

34

38

-16.0

             -Services

N/A

30

37

38

37

34

37

36

36

48

53

51

51

49

21

(1) Millions of current US$.
(2) Millions of constant 1990 US$.
(3) Current US$ per capita.
Source: IAEA Energy and Economic Data Base; INSSE Romanian Statistical Yearbook 2001; Data & Statistics/the World Bank; PriceWaterhouse Coopers, FiFoOst, Romanian Commercial Bank.

 

1.1.2. Energy Situation


Among the various main useful minerals we can mention: crude oil, with old exploitation traditions; natural gas; coal, especially cocking pit coal, lignite and brown coal; ferrous and non-ferrous ores, gold, silver and bauxite ore deposits; great reserves of salt as well as numerous non-metalliferrous resources. Table 3 shows the energy reserves, and Table 4 the historical energy statistics.

1.2. Energy Policy

Since 2001, Romania's macroeconomic environment and business climate have improved. Social and political factors are related today to the trend of transition from fossil energy resources, expendable by definition, to new reliable sources and to a sustainable development, in order to prevent a crisis. The country is facing today the factors above and the Government is trying to cope with difficult economic circumstances. The economic context is characterized by deregulation and competition, supported by the industry that is now under a full restructuring with concerning an increased demand of energy and more clear requirements for a clean and safe environment.

Table 5 illustrates the energy independence degree, as ratio between primary energy production and quantity available.

There are not yet estimations referring to climate change. The consequences of global warming in Romania include in particular changes in the severity and frequency of extreme weather events (temperatures in winter and summer, storms, flooding etc.).

The impact of the Kyoto Protocol in the current energy policy has no a large significance due to the very large decrease by almost 50% of emissions of carbon dioxide during the 1990s. It is to be pointed out that there are efforts to mitigate emissions and to suitably modernize the industry but the emissions decay is mainly as a result of the severe economic recession by the end of 20th century.

1.3 The Electricity System

With a Romanian electricity history that goes back to 1862 when electric lighting was for the first time used in Bucharest. An electric power plant fitted with steam boilers and Brush dynamos supplying direct current through a 2 kV line (underground cable) was commissioned in the downtown.

TABLE 3. ESTIMATED ENERGY RESERVES

 

Estimated energy reserves in

 

(Exajoules)

 

 

 

 

 

 

 

 

Solid

Liquid

Gas

Uranium

Hydro

Total

 

 

 

 

(1)

(2)

 

 

 

 

 

 

 

 

 Total amount in place

10.28

4.54

13.74

3.77

5.40

37.72

 

 

 

 

 

 

 

(1) This total represents essentially recoverable reserves.

 

 

 

 

(2) For comparison purposes a rough attempt is made to convert hydro capacity to energy by multiplying

      the gross theoretical annual capability (World Energy Council - 2002) by a factor of 10.

 

Source: IAEA Energy and Economic Database.

The first European city endowed with electric street lighting was Timisoara, an exquisite town located in the western side of the country. This dates back to 1884. In 1906, the General Society for Gas and Electricity of Bucharest was set up. It was a joint-stock company, with French shareholders, running according to the Romanian Commercial Code. The country's First Energy Law was passed in 1924. It specified explicitly that the installations for production, transmission and distribution of energy were state property. This law was amended and extended in 1930 and 1934, but not fundamentally altered. In 1938, the law for organizing the communal exploitation was enacted. After periods of amazing developments early 20th century, in-between the two world wars, the electricity sector knew a moderate development (an installed capacity of 501 MW and a production of 1.13 TWh in 1938).

TABLE 4. ENERGY STATISTICS(*)

 

 

 

 

 

 

 

Average annual

 

 

 

 

 

 

 

growth rate (%)

 

 

 

 

 

 

 

1970

1990

 

1970

1980

1990

2000

2001

2002

To

To

 

 

 

 

 

 

 

1990

2002

 

 

 

 

 

 

 

 

 

 Energy consumption

 

 

 

 

 

 

 

 

       - Total (1)

1.91

3.10

2.59

1.72

1.72

1.79

1.53

-3.02

       - Solids (2)

0.42

0.62

0.55

0.48

0.45

0.47

1.39

-1.38

       - Liquids

0.46

0.79

0.64

0.42

0.44

0.46

1.60

-2.72

       - Gases

1.00

1.56

1.20

0.64

0.64

0.68

0.92

-4.70

       - Primary electricity (3)

0.03

0.13

0.20

0.18

0.19

0.19

10.46

-0.23

 Energy production

 

 

 

 

 

 

 

 

       - Total

1.94

2.58

1.76

1.36

1.35

1.38

-0.49

-2.00

       - Solids

0.33

0.47

0.37

0.40

0.42

0.44

0.51

1.52

       - Liquids

0.58

0.48

0.33

0.26

0.26

0.25

-2.73

-2.25

       - Gases

1.01

1.51

0.96

0.51

0.48

0.50

-0.25

-5.34

       - Primary electricity (3)

0.03

0.12

0.11

0.19

0.19

0.19

7.12

5.21

 Net import (Import - Export)

 

 

 

 

 

 

 

 

       - Total

-0.04

0.51

0.75

0.36

0.32

0.27

-15.98

-8.27

       - Solids

0.08

0.15

0.19

0.08

0.08

0.08

4.26

-7.41

       - Liquids

-0.11

0.31

0.31

0.15

0.13

0.10

-5.19

-9.43

       - Gases

-0.01

0.05

0.24

0.13

0.11

0.09

-18.97

-7.60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1) Energy consumption = Primary energy consumption + Net import (Import - Export) of secondary energy.

 

 

(2) Solid fuels include coal, lignite and commercial wood.

 

 

 

 

 

 

(3) Primary electricity = Hydro + Geothermal + Nuclear + Wind.

 

 

 

 

 

(*) Energy values are in Exajoules except where indicated.

 

 

 

 

 

 

Source: IAEA Energy and Economic Database.

TABLE 5. ENERGY INDEPENDENCE DEGREE                                                               

(%)

1992

1993

1994

1995

1996

1997

1998

1999

2000

Total

72.0

71.8

73.0

70.0

69.8

69.0

70.3

75.9

77.3

Coal

68.7

74.8

75.7

72.7

75.1

67.8

64.4

69.0

74.9

Crude oil

51.3

47.3

45.2

43.7

48.6

51.4

51.8

59.4

57.0

Natural gas

82.9

82.0

79.9

75.1

70.9

74.7

74.8

81.5

80.2

Source: National Institute of Statistics of Romania, Romanian Statistics Yearbook 2001

In 1948, the energy industry, like all other industries, was nationalized. The legal framework in the country became that of a centralized state economy. In 1949, the Ministry of electric energy and Power Engineering were founded. All local companies and enterprises were co-coordinated by this newly created structure.

In 1958, the National Power System was created through the interconnection of the local systems. In 1963, the completion of the first parallel - synchronous interconnection of the National Power System with the East European interconnected power system, through commissioning of the 220 kV overhead electric grid.

Electrification of the first railway section (i.e. Ploiesti - Brasov) in the country took place in 1966. In 1968, the Territorial Power Dispatching Centers was set up. From 1980 to 1989, the National Electricity System was confronted with severe difficulties. It operated in isolation, disconnected from the neighboring countries; the system frequency often dropped from 50 Hz to 47 Hz and operated at the failure margin, due to the very high industrial consumption dictated by the forced industrialization of the country and also to the inefficient energy consumption, the pressure of the natural gas in the distribution networks often below normal, particularly in the cold Romanian winters; the industrial plants operated below their design capacities. In the final years of the communist government, the energy sector was additionally corseted by regulations imposing military control; however this legal framework could not even make the energy sector function properly, much less enhance the efficiency of the energy use.

After this period, the electricity sector has embarked in a deep and total restructuring process, with efforts directed towards the marked economy. At the same time, a great decrease in the demand and a steady reduction of the available domestic primary energy resources were recorded between 1990 and 1995.

1.3.1. Structure of the Electricity Sector

A new restructuring programme started in July 1998 when RENEL has been split and reorganized. By Government Decision No. 365 / 02.07.1998, all nuclear activities were completely separated and the National Electricity Company (CONEL - S.A.) was founded as a joint stock company performing the tasks of transmission, system and market operator. It owned 100% shares in three affiliates:
· S.C.TERMOELECTRICA S.A., for electricity and heating generation in thermal power plants;
· S.C.HIDROELECTRICA S.A., for hydro power generation;
· S.C.ELECTRICA S.A., for power distribution and supply.

Also created was the state owned Autonomous Company for Nuclear Activities (RAAN).

The separation of the former Nuclear Power Group and the setting up of the National Nuclear Company S.N. NUCLEARELECTRICA S.A. had been an explicit commitment assumed by Romania when it ratified the Guarantee Agreement with the International Bank for Reconstruction and Development (BIRD) (Government Ordinance No. 41 / 29.08.1995) and the European Bank for Reconstruction and Development (BERD) (Government Ordinance No. 6 / 16.01.1996), which provides that the Romanian side will create an independent public institution for the nuclear activity.

The next stage of this reform process, lasting 12 months, started with the promotion of the new Electricity and Heat Law as Government Emergency Ordinance No. 63 / 28.12.1998, becoming effective in March 1999.

The major targets approached by the law have been:
· unbundling the main activities: electricity and heat generation, transmission, distribution and supply;
· competition in generation and supply activities;
· free access to the transmission and distribution networks;
· the legal framework to set up the National Electricity and Heat Regulatory Authority, i.e. the National Agency for Power Regulation (ANRE);
· the need for privatization, together with guarantees for non-discrimination by ownership and technological criteria.

The whole economic and technical operation and development of the electricity sector will be regulated, ruled, supervised and monitored by the ANRE created according to the new Electricity Law, set up by a Government Emergency Ordinance, in October 1998, as a public institution, independent and autonomous.

The national power company CONEL, as well as NUCLEARELECTRICA, are set as stock companies. The relationship among basic activities - generation, transmission and distribution are based on commercial contracts. Accordingly, between ELECTRICA, the national distributor of electricity, and NUCLEARELECTRICA a power purchase agreement was signed in December 1999. The Electricity Law grants the third part access to the grid.

Contractualization of the power sector main activities is thus achieved and various prices can be settled for each activity and services: (i.e. regulated supply tariffs, regulated distribution tariffs, regulated transmission tariffs, the power purchase price, the system services tariffs, regulated purchase price from the NPP).

The subsequent restructuring stage settled the electricity wholesale market rules. The needed infrastructure for this market is also in process to be designed, achieved and commissioned (hardware, software, and telecommunication links, metering). ANRE is creating and approving the requested issuing prescriptions and rules to set-up the Electrical Power Market (secondary legislation i.e.: Grid Code, Commercial Code, Distribution Code, Supply Code, Metering Code, Licensing procedures and tariffs methodologies).

The electricity wholesale market will be determined by the activity of several producers and buyers, which are being kept in relation through market mechanisms. These mechanisms are supposed to balance the offer with the demand and to settle the market price.

The final restructuring stage will result in exercising the wholesale market functioning and further on, in spinning off the thermal power generating subsidiaries and the distribution subsidiaries. A number of independent companies are thus set up (by Government of Romania Decision No. 627/2000, former CONEL's branches becoming independent companies) and there will be considered for privatization as soon as possible; creating such a competitive structure for the Romanian electricity sector will provide enough incentives for private investors to set up independent power producers either by building new generating capacities or by buying or getting concessions for the existing capacities; private investors will be also encouraged to invest in the power sector.

With this Government Decision No. 627, the power sector has been technically, legally and commercially unbundled. There is a clear separation of generation, transmission/dispatch, and distribution and supply activities. The Romanian electricity market is still in a nutshell, together with the set up of TRANSELECTRICA S.A., as transmission system operator of the entire Romanian power system and administrating the specific market through its subsidiary - the power market (commercial) operator named OPCOM.

The readiness of Transelectrica is mainly based on the transmission fee, fully regulated by ANRE and on the revenues from system services. Transelectrica buys the system services from producers and uses its for the power system needs.

The Romanian electricity market is now mainly based on bilateral contracts:
- regulated contracts (85% of the market) of main producers, suppliers and captive consumers;
- negotiated contracts, representing the competitive segment and the first pillar of the market, with generators, suppliers and contestable consumers.

This level of 15% of market competitiveness has been gradually increased. The regulated contracts of the wholesale electricity market offer a guarantee to the suppliers that are obliged to deliver electricity at regulated prices to the captive consumers. One of the most conspicuous features of the Romanian wholesale market, an inheritance of the past, is the fact that hydro generation is 4 times cheaper than the thermal one. This very large difference in prices on the wholesale market is expected to steadily disappear, by increasing the competitive component of the market. The regulated market will finally turn into a competitive market. The Romanian power sector has the regulatory framework for trade arrangements on the electricity market and is prepared for the next natural steps of the restructuring process: distribution privatization in parallel with the privatization of a number of power plants.

ANRE continued the regulatory activity in 2002 as per its lawful competencies and tasks while undergoing an internal reorganization based on Government Decision (GD) 581/2002 regarding ANRE organization and operation rules.

Electricity and heat generation was the sector restructuring focal point. Externalization of TERMOELECTRICA's thermal power plants has continued leading to the subsequent reorganization of the company, through the setting up of three new subsidiaries. Within HIDROELECTRICA, whose activity will be fully regulated several subsidiaries for maintenance and repair works were established. At the same time, the micro-hydropower plants that were assets belonging to TERMOELECTRICA, ELECTRICA and NUCLEARELECTRICA were assigned to HIDROELECTRICA.

With the establishment in 2001 of ELECTRICA's eight new territorial subsidiaries added to the aforementioned changes in the electricity generation sector, we obtain a much more complex image of the participants in the electricity wholesale market. Although different from 2001, this picture nears the concept of competition associated to the electricity market.

The reorganisation of TERMOELECTRICA and the setting up of the following subsidiaries
· S.C. "Electrocentrale Rovinari" S.A.,
· S.C."Electrocentrale Turceni" S.A.
· S.C. "Electrocentrale Bucuresti" S.A.
were put into practice through GD 1524/2002. On the grounds of the same GD, HIDROELECTRICA will operate under a fully regulated regime in order to ensure protection of captive consumers through impartial allocation of hydro rent. Thus, the energy quantity traded in the wholesale market will be optimised centrally by the market operator.

HIDROELECTRICA has also reorganised its activity by establishing maintenance and repair subsidiaries while hydropower plants that were assets belonging to TERMOELECTRICA, ELECTRICA and NUCLEARELECTRICA were assigned to HIDROELECTRICA. The national strategy for nuclear development in Romania and the Action Plan for its implementation were approved through GD 1259/2002. The design of an efficient electricity market should take into consideration the development trends of the nuclear sector, the more so as investments in this sector are substantial, the surplus of power in the Romanian Power System (SEN) being significant even with only one newly emerged unit.

TRANSELECTRICA continued its restructuring process with a view to increasing efficiency of its basic activities by setting up the following auxiliary service subsidiaries:
· OMEPA - the metering operator of electricity transacted on the wholesale market;
· TELETRANS - telecommunication and information technology services using the electricity transmission grid and FORMENERG - a training company for power engineers.

In 2002, ANRE objectives were concentrated on sustaining the reform and competition in the electricity and heat sector, on increasing the electricity market efficiency and on the integration into the regional and European market. Special attention was given to consumer protection, efficient use of resources and environment protection.

Increased objectivity has been achieved as regards the regulatory process with the creation of the Regulatory Committee made up of the president, vice-president and three regulators. Under the new organization structure, ANRE has issued technical and commercial regulations in harmony with the changes occurring upon generation, distribution and supply and encouraged the development of the competitive market in consonance with the market opening degree of 33%.

Electricity and heat tariffs and prices were adjusted as well, so that they may cover the justified costs of the large sector companies, in compliance with the agreements signed by the Government with the international organisations and institutions. Monitoring of regulated sector companies was also improved.

At international level, ANRE participation in co-operation projects has continued, as for instance the partnership with MPUC (Maine Public Utilities Commission US) and exchange of experience with regulators in Central and East European countries within the Energy Regulators Regional Association (ERRA).

The co-operation projects benefited from the support of the National Association of Regulatory Utility Commissioners (NARUC) as well as of the US Agency for International Development (USAID) and US Energy Association (USEA).

Romania has officially requested for the integration of its power system to the Union for the Co-ordination of the Transport of Electricity of Western Power Systems (UCTE).

Main milestones for interconnection:

05.04.1994

Romanian Power System joined the second UCTE synchronous zone (Serbia, FYROM, Montenegro, Greece) for a trial parallel operation with the UCTE rules and recommendations observance

10.03.1997

Official application for the integration in the UCTE synchronous zone

17.07.1997

Technical Committee UCTE/Bulgaria/Romania to supervise the admission procedure is established

08.01 – 30.03.2001

Winter interconnection tests successfully performed

09.07 – 20.09.2001

Summer interconnection tests in progress

2002 - 01.02.2003

Interconnected operational tests

2003

Final Report submission and approval on definitive Interconnection

 

 

A remarkable event in 2002 was the start up of the project regarding the creation of the regional Southeast European energy market following the Memorandum of Understanding and the establishment of Athens Forum.

The successful completion of the extended tests for interconnection to UCTE transmission system represented an extraordinary accomplishment for the Romanian energy sector as this allow our country achieve full UCTE membership in the first half of 2003 and therefore develop commercial trades with European partners.

1.3.2. Decision Making Process and Future Trends


Considering the strategic importance of the energy sector in developing the national economy on sustainable basis, the sector evolution has to be outlined through prognosis and strategies on different horizons of time, so that the development perspectives and the energy supply to be correctly estimated. This necessity is emphasized in the Governmental Programme of the present administration, which takes into consideration "Romania's Economic Strategy on medium term" and also "The Government Action Plan on 2000 - 2004", agreed with the European Commission.

In order to implement the Governmental Programme, the Ministry of Industries and Resources appreciated that it is necessary to elaborate a National Energy Strategy, which to emphasize conditionalities, possible options, related policies and correspondent impacts during the process of taking decisions and establishing directions to operate. This document has as starting point the sustainable development of Romania in the context of further country's admission to EU, and takes into consideration the main objectives and priorities of the long-term National Energy Strategy. The principles laying at the basis of this document are the following:

· Romania's admission in EU cannot be undertaken without an accelerate, long-term and stable economic growth - at a higher rate than that of the European Community one;
· The economic expansion should be of a main priority, it is not just a wish, but a core necessity;
· The further integration of the national industry in the European structures imposes to be achieved through the sustainable development of the energy sector;
· The change and restructuring process of the energy sector is of an extreme importance in the process of national economy reform;
· Accelerating the privatization in the energy sector will lead to the creation of new real competitive structures;
· The intensification of the investment efforts represents a vital necessity for the Romanian industry;
· The results of the measures implemented towards the fulfillment of European standards will depend of the competitive capability developed in the conditions of a fully opened electricity market.
To accomplish the energy strategy and the energy policies that will be applied to the sector in the next 4 years, a number of decisions must be taken:

· Accept a maximum import of 40% energy resources, considering security of supply reasons;
· Taking into consideration the previous decision, the decision-makers must decide how much of the electricity market will be opened; the same for the gas market;
· Choose the best solution regarding the restructuring process in electricity and heat sector, in gas and oil areas;
· Choose specific privatization options for each of the energy sub-sectors;
· Establish the most advantageous situation between the case of using imported gas and the case of using domestic coal and oil fuel, considering also the enhancement of environmental protection requirements;
· Maintain the same tariffs for all the country consumers, because of social cohesion reasons;
· Intensify the investment efforts, for energy resources and for the whole production-transport-distribution chain.


1.3.3. Main Indicators


At the end of the year 2002, the total installed capacity of the Romanian power sector was 18,932 MW: 7,029 MW in coal (37.1%) and 5,164 MW in oil and gas (27.3%), 6,032 MW in hydro (31.9%), 706.5 MW in nuclear (3.7%). It seems to be a very large capacity, largely depassing the demand but we have to keep in mind the age, the availability, the technological level and the intrinsic efficiency of the majority of facilities.


The average production costs, in USD/MWh, for different power sources are:
· hydro < 10;
· nuclear 12-13;
· gas 25-30;
· coal 40-45.

The electricity tariff for nuclear power, of about 30 USD/MWh, covers SNN SA overall investment, production cost and financial expenses. The average selling price of electricity was in 2002 of about 50 USD/MWh.

TABLE 6. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY

 

 

 

 

 

 

 

Average annual

 

 

 

 

 

 

 

growth rate (%)

 

 

 

 

 

 

 

1970

1990

 

1970

1980

1990

2000

2001

2002

To

To

 

 

 

 

 

 

 

1990

2002

 

 

 

 

 

 

 

 

 

 Electricity production (TWh)

 

 

 

 

 

 

 

 

       - Total (4)

35.09

67.49

64.31

51.53

51.57

53.05

3.08

-1.59

       - Thermal

32.32

54.85

53.33

31.70

31.87

32.85

2.54

-3.96

       - Hydro

2.77

12.64

10.98

14.78

14.65

15.09

7.12

2.69

       - Nuclear

 

 

 

5.05

5.05

5.11

 

 

       - Geothermal

 

 

 

 

 

 

 

 

 Capacity of electrical plants (GWe)

 

 

 

 

 

 

 

 

       - Total

7.35

16.11

22.48

21.85

22.33

22.65

5.75

0.06

       - Thermal

6.15

12.65

16.81

15.08

15.53

15.84

5.16

-0.49

       - Hydro

1.20

3.46

5.67

6.12

6.14

6.16

8.07

0.70

       - Nuclear

 

 

 

0.66

0.66

0.66

 

 

       - Geothermal

 

 

 

 

 

 

 

 

       - Wind

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1) Electricity losses are not deducted.

 

 

 

 

 

 

 

(*) Energy values are in Exajoules except where indicated.

 

 

 

 

 

 

Source: IAEA Energy and Economic Database.

FIG. 1. Power Generation Structure-Romania 2002

Generally, the electricity consumption after 1989 followed the evolution of the whole national economy, mainly of the industrial activity, implying decrease periods, followed by growth periods. Between 1997 and 1999, the energy resources, electricity and heat consumption diminished according to national economy tightening. The decrease of energy consumption induced crisis phenomena in the
energy sector, manifested by a supplementary deterioration of the financial situation, slow down of the investment and maintenance programmes, unemployment. Compared to 1999, in 2000 the consumption registered an increase of 2.7%, due to the small recovering of national economy and more evident in 2001. The trend of redressing status is obvious. In 2002, the maximum of consumption load was 8410 MW. It represents only 44% of the total installed capacity. As we already mentioned, this does not mean Romania has large reserves and a real excess of capacity; the issue consists of the low availability of the thermal power units (overall using factor recorded in 2002: 31.5%), mainly because of the advanced age and poor maintenance of these plants. In the last decade, a capacity of more than 3,500 MW in thermal units was closed, as aged and obsolete. Currently, within TERMOELECTRICA, the main operator of thermal power plants, around 82% of the installed capacity is more than 20 years old.

Figure 1 shows the share of the electricity generation in 2002. Tables 6 and 7 show the main indicators of electricity and energy.


TABLE 7. ENERGY RELATED RATIOS

 

 

 

1970

1980

1990

2000

2001

2002

 

 

 

 

 

 

 

 

 

 Energy consumption per capita (GJ/capita)

94

140

111

76

77

80

 Electricity per capita (kWh/capita)

 

1,630

2,860

2,966

2,114

2,139

2,196

 Electricity production/Energy production (%)

17

25

35

37

37

37

 Nuclear/Total electricity (%)

 

 

 

 

 

10

10

10

 Ratio of external dependency (%) (1)

 

-2

16

29

21

18

15

 Load factor of electricity plants

 

 

 

 

 

 

 

       - Total (%)

 

 

55

48

33

27

26

27

       - Thermal

 

 

60

49

36

24

23

24

       - Hydro

 

 

26

42

22

28

27

28

       - Nuclear

 

 

 

 

 

88

88

89

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1) Net import / Total energy consumption.

 

 

 

 

 

 

 

Source: IAEA Energy and Economic Database.

2. NUCLEAR POWER STATUS

2.1. Historical Development and current nuclear power organizational structure

2.1.1 Overview

From the details on the history of nuclear power in Romania, emphasized in the previous Nuclear Power Country Profile, we are re-iterating here only some aspects. A total of 5 nuclear power reactors were initially intended to be built in Romania on Cernavoda site, on the Danube river, selected in the late '70s and fully complying with the requirements of the national and international standards related to nuclear power plants.

The works on the Cernavoda NPP site started in 1980 for Unit 1 and in 1982 for the other 4 units. To spare the financial efforts and to focus on Unit 1, in 1991 it was decided to proceed with the works on Unit 1 only and to stop temporarily the works on the other units. The project management activities on Unit 1 were assumed by AECL - ANSALDO Consortium (AAC) through a contract concluded in June 1991. Unit 1 has been completed in 1996.

The main actor in nuclear power is Societatea Nationala "NUCLEARELECTRICA" (SNN) S.A., a state 100% owned stock company, established in July 1998, following the first stage of restructuring in the power sector, splitted from the former centralized Romanian utility RENEL. "Nuclearelectrica" has three main branches:

- "CNE PROD", operating Cernavoda NPP Unit 1;
- "CNE INVEST", including Units 2 to 5, actually in charge with the completion of Unit 2;
- "FCN Pitesti", the nuclear fuel factory.

Cernavoda NPP Project is based on technology transfer process from Canada, Italy and United States. The transfer of a technology recognized as Western safe design covers mainly nuclear island, secondary cycle and turbo-generator.

Pitesti Fuel Plant supplies the whole nuclear fuel for Cernavoda Unit 1 (consumption of 105 tonnes of natural uranium per year, with loading/unloading of about 5300 fuel bundles, at an average discharge burnup of 170 MWh/kg U). The factory has been upgraded in co-operation with Canadian partner Zircatec and is certified as a qualified supplier of CANDU 6 fuel and was extended at double of its capacity with minor changes.


The quality of the fuel bundles manufactured at Pitesti is very good: in the last four years, the number of fuel bundles which experienced failure in the reactor (or were suspected of failure) did not exceed 1.

Between 2 December 1996 and the end of 2002, Cernavoda Unit 1 has delivered around 30 million MWh of electricity. It reached a capacity factor of 89.3%, which is good by international standards (see Figure 2). Only Romanian specialists professionally manage Cernavoda Unit 1, their efficiency earning praise from foreign experts. It provides more than 10 % of Romania's electricity consumption, making superfluous an import of about 1.4 million tonnes of liquid fuels per year, leading to annual savings of over 110 million USD.


The first reactor started commercial activity under a trial authorization. The final two-year authorization license was granted by the National Commission for Nuclear Activity Control (CNCAN) in 1999 and renewed in 2001. The license can be revoked at anytime if the work force, population or environment is considered to be in danger. However, no radioactive emissions have ever been reported from the plant.


FIG. 3. CANDU 6 NPP Gross Capacity Factor

 

2.1.2 Current Organizational Chart(s)

The "NUCLEARELECTRICA" Company has three levels of coordination as follows:
o General Assembly of Shareholders Representatives,the highest level of coordination
that analyses and approves the strategy and policy of the company.
o Board of Administration (level 2) that has the responsability of supervising of the
current activities and of taking decision at a high competence level;
o Board of Directors (level 1) whose main objective is reviewing and analysing the
current activities;

At the level of SNN SA headquarters, there are four main divisions:
o Nuclear Operations;
o Projects Development;
o Business Development, Trade & Communication;
o Financial and Assets.

 

2.2. Nuclear Power Plants: Status and Operations

First of all we have to underline the commitment of the Romanian authorities to complete Cernavoda Unit 2. The Ordinance No. 126 / 2000, issued on 31 August 2000 by the former Government of Romania, represents an important decision in favor of Unit 2. This one defines the completion of Cernavoda Unit 2 as a project of national interest and priority for Romania and defines the financing sources of the project (SNN own sources, external loans based on sovereign guarantee, public funds from the Government). It also offers a set of financial incentives for the project (profit tax exemption for SNN, exemption from any import taxes due in Romania; Romanian income taxes exemption for foreign contractual partners; the payment of the accounts payable which SNN registers at 30 June 2000 towards ministry of Finance, in respect of the sovereign guarantee for the external loans, contracted for the completion of Unit 1, were postponed until 31 December 2006 and the related penalties were cancelled).

A further preliminary evaluation of the influence of the Ordinance No. 126 / 2000 pointed out the tariff for delivered electricity maintaining the project efficiency decreased to about 30 US dollars/MWh, compared with previous results.

The new Government, installed in November 2000, re-iterated from the beginning that public funds from the state budget, SNN own resources, foreign loans for import and a EURATOM loan for the local portion of the contract, guaranteed by the Romanian Government, could be potential financing sources for the project.

The resulted input is reflected in the financing of activities for 2001, providing 1690 billion lei (equivalent of about 60 million US dollars) granted from budgetary funds, by Law No. 216 / 2001. Through the Government Decision No. 270 / 2001 it was established an inter-ministerial Committee for the co-ordination of commercial negotiations, providing the financing and for the follow-up of the works progress. We would like to emphasize some arguments sustaining the importance, within the specific condition of Romania, of completing the Cernavoda Nuclear Power Plant - Unit 2:

1. The necessity of increasing the power production in Romania results from the following arguments:

- Considering the standard scenario for the development at a constant pace (Competitiveness Scenario)", from the 'National Sustainable Development Strategy of Romania", characterized by a GDP/capita average annual growth rate of 6.5%, which would allow Romania to reach in 2020 about 50% of the EU countries GDP/capita, selected as a realistic case by the Romanian Government, an increase of the electricity production of 4% arises, consistent with 2.5% increase of the final energy consumption for the interval 2001-2004;

i. This scenario considers a decrease of 'energointensitivity' with 3% per year and a set of realistic measures for saving energy;

ii, The GDP growth in 2001 was 5.3%, with an annual growth rate of the electricity demand of 2.1%, more than in the Government forecasting;

- Over than 50% of the installed capacity has more than 20 years of lifetime, characterized with poor maintenance and high pollution; some of this capacity will be rehabilitated, but about 4,500 MW capacities of obsolete conventional power plants will be retired from operation by 2004;

- The Government of Romania limits the import of primary resources at 40%, from Security in Energy Supply reasons;

The main power projects considered by the National Strategy for the Development of the Romanian Energy Sector for the next future are the following:

1. Completion of the 700 MW capacity of the Cernavoda NPP-Unit 2 by 2005;
2. Rehabilitation of 1280 MW of the existing thermal power plants within 2001-2004;
3. Concluding contracts for other 410 MW of the existing thermal power plants, to be completed after 2004;
4. Rehabilitation of about 2,200 MW of the existing hydro plants, projects completed after 2004;
5. Completion of 183 MW in hydro plants projects in progress;
6. Re-evaluation of about 900 MW in hydro plants, in different stages of progress, including relatively high investment costs;
7. New combined cycle capacities of about 300-400 MW, among them 100 MW are considered for the next future.

2. Cernavoda NPP - Unit 2 Project represents the main priority of the above mentioned programme, considering the following arguments:

This Project represents a least cost option in accordance with the" Least Cost Development Study of the Romanian electricity and heat generation capacities" which was completed in April 1998 by an international consulting consortium TRACTEBEL-Belgium, SEP-Holland and EDF-France, financed by the European Commission with PHARE funds;

Cernavoda NPP - UNIT 2 is considered by the National Strategy for the Development of Romanian Energy Sector, through its technological features and economical performance indicators, the best solution to fulfill the power demand considering the sustainable development of the country;

After 7 years of commercial operation of the Cernavoda NPP - Unit 1, the technological and economical performance indicators, combined with the low environment impact, have proven that the decision to complete Unit 2 is a right one.

3. The necessity of EURATOM loan, as part of Cernavoda NPP - Unit 2 financing:

- Considering the Council Decision of 21 March 1994, amending the Decision 77/27O/EURATOM, to authorize the Commission to contract EURATOM borrowings in order to contribute to the financing required for improving the safety degree and efficiency of nuclear power stations in certain non-member countries (94/179/EURATOM), Romania is included on the list of eligible non-members countries. The Cernavoda NPP - Unit 2 Project is eligible for EURATOM loan considering the following:
- The project is under construction;
- A set of 156 design changes and 166 minor design modifications/ improvements are necessary for compliance with new licensing requirements applicable to Unit 2; they are confirmed by the by the Independent Consultants selected by the EC (Consortiums NNC-British Energy-INGENCO for Nuclear Safety and HPCAquatest for Environment Impact);
- There are advantages of the EURATOM loan for the Cernavoda NPP-Unit 2 Project, also considering the accession process of Romania to the European Union.

We are listing some of these advantages:
· The Cernavoda NPP - Unit 2 is already started, and the Government of Romania has a strong commitment to complete this project; any delay in releasing the EURATOM credit will result in delays in completing the full finance of the project, and will increase the pressure over the State Budget, leading to the lack of funds allocated to sensitive sectors as culture, health, education, social programmes, etc; to replace these funds, Romania will request increased non-refundable grants from EU in order to fulfill the requirements of the acquis communautaire; EURATOM Loan will reduce the 'pressure' on the Romanian State Budget and consequently, funds could be re-directed to help satisfy the EU integration requirements;
· Cernavoda #2 will increase the contribution of 'clean energy' to electricity production In Romania, reducing CO2 and other polluting emissions, as well as the volume of solid waste resulting from burning coal;
· Cernavoda #2 will reduce the dependence of Romania on external suppliers of primary resources, mainly natural gas and oil, geographically sited outside Europe, thus contributing to the increase of the 'Security of Energy Supply" of Romania and Europe;
· Cernavoda #2 represents an economic and competitive source of base-load electricity compared with burning fossil fuels, even though the price of fossil-fuel electricity does not include the internalization of ail costs, consolidating the internal Electricity Market, subject to future integration UCTE, and finally in the single EU power market;
· Increasing of technical and safety standard of the Romanian Grid, facilitating the connection to the European Grid (UCTE);
· The extension of the Western style managerial approach implemented inside "Nuclearelectrica" represents a good example to be extended to the Romanian industry;
· Extension of QA approach to the Romanian contractors, improving their performances and possibility of access on international markets.

The delays in Unit 2 commissioning will affect the Security of Energy supply, obliging Romania to increase the oil imports with about 1.4 million tonnes per year; the stability of the Romanian electrical grid, in process of interconnection with UCTE, could be also affected.

The traditional Canadian and Italian partners are now focused on securing financing to complete the project by 2005. When Unit 2 goes commercial, Cernavoda will cover almost 20% of domestic consumption, also enhancing Romania's chances to become a major electricity exporter. Certain nuclear equipment will be bought from Canada and Italy. The Romanian industry will receive about 400 million USD to complete Unit 2 and thousands of jobs will be created. Needless to say, the project will have a significant impact on Romania's economy over the next few years. Table 8 shows the actual status of the NPPs at Cernavoda site.

TABLE 8. STATUS OF NUCLEAR POWER PLANTS IN ROMANIA

Station

Type

Capacity

Operator

Status

Reactor

 

 

 

 

 

Supplier

CERNAVODA-1

PHWR

650

SNN

Operational

AECL

CERNAVODA-2

PHWR

650

SNN

Under Construction

AECL

Station

Construction

Criticality

Grid

Commercial

Shutdown

 

Date

Date

Date

Date

Date

CERNAVODA-1

01-Jul-1982

16-Apr-1996

11-Jul-1996

02-Dec-1996

 

CERNAVODA-2

01-Jul-1983

31-Mar-2006

31-Jun-2006

31-Dec-2006

 

Source: IAEA Power Reactor Information System as of 31 December 2001.

2.2.1. Cernavoda NPP Unit #2 Project Status

Preservation works were performed on Unit 2 between 1992 and 1995. Starting with the second half of 1996, remedy works were initiated especially in the construction area, and since 1 January 1998 a small progress work programme started inside the reactor building and the service building. Over that period important equipment and materials manufactured by the national industry were brought on site: feeders, heat exchangers, pumps etc. All this activities were performed under the project management of AECL - ANSALDO, based on addenda to the contract for Unit 1 concluded in 1991. Cernavoda Units 3 to 5 are under preservation for a final decision with respect to their future.

Briefly, the Unit #2 project status is being now the following:
· the amount of procured equipment and materials either installed or stored represents about 545 million USD out of which 255 million USD from import and 290 million USD from domestic suppliers. Those from import were procured from Canada (122 million USD for the nuclear part), from Italy (84 million USD for the balance of the plant) and from USA (49 million USD for the turbine - generator);
· construction-erection progress of the Unit #2 Project is evaluated to 42.8%;
· overall project completion is estimated at 56% as value.

Most of the procured mechanical equipment is under preservation in Unit #2 buildings or warehouses. The main erected equipment is in the following areas: in the reactor building - calandria (reactor vessel), steam generators, pressurizer, deaerator - condenser, cranes and hoists; in the service building - equipment airlock, water tanks; in the turbines building - steam turbine cylinders, de-aerator, condensate storage tank, draining pumps, heat exchangers of the intermediate cooling circuit, main cranes.

A Construction All Risk (CAR) Insurance is in force for Unit #2 starting from April 1995. Nuclear All Risk - Material Damage and Nuclear Liability insurance policies are placed to the international nuclear "pools" from February 1995.

The time schedule to perform the works necessary for Unit #2 completion, from the full financing available up to the commercial operation of Unit #2, is estimated at about 54 months. This is subject of further possible reduction considering the type of contract and project organization.

2.2.2. Project value, evaluation of the remaining works, works schedule for the Unit #2 completion

The overall cost amount related to Unit #2 Project has been estimated at about 1,400 mil. USD and comprises the following:

· Total cost of the already performed activities, is estimated at about 700 million USD;
· Value of the investment to complete the Project, is estimated at about 600 million USD;
· Value of heavy water and nuclear fuel is estimated at about 130 million USD. The heavy water and fuel required are produced in Romania.

In accordance with the AECL - ANSALDO proposal concerning the Unit #2 completion, estimated costs are shown in Table 9.

TABLE 9. ESTIMATED COSTS FOR UNIT #2 COMPLETION

No

Category

Estimated costs,
million USD

Out of which imported

1.

Design & engineering works

15

10

2.

Equipment, materials and components procurement

290

150

3.

Construction – erection (manpower)

75

0

4.

Works management + technical assistance

160

140

5.

Commissioning

40

30

6.

Complementary works

20

10

7.

Miscellaneous and contingencies

20

20

 

TOTAL

620

350

 

Nuclear fuel and heavy water procurement (First Load)

130

-

Source: Nuclearelectrica SA.

The estimation was performed considering, in order to implement the Unit #2 project, an organization (Project Management Team-PMT) capable to ensure an integrated system of engineering and project management has been set up, similar with Unit 1 approach. Other foreign companies may participate in the Project, together with AECL-Canada and ANSALDO-Italy, in case their resources and facilities can be used to its benefit, accordingly with the principles for the new commercial contract, discussed by the end of 1999 with the traditional partners from Canada and Italy.

The contribution of the national industry in supplying equipment, materials and technical services was identified based on the actual capabilities of the domestic suppliers qualified for the Cernavoda project. Considering the uncertainty characteristic of the transition economy and the industry restructuring, it is possible that the predicted domestic supply level may change, increasing the cost of imported components and services. The costs for the first nuclear fuel load and heavy water inventory were considered at the level of the international market. The estimated cash flow of the capital cost is shown in Table 10.

2.2.3. National participation

The completion of the Unit #2, a replica of the Unit 1, will benefit from the existing infrastructures and technical facilities developed over the completion process of Unit 1, as well as of the Romanian staff (customer, contractors, suppliers and designers) properly qualified and organized. An important number of contractors, with qualified personnel and technology for nuclear power plant construction, is committed in works performance on site. Part of them were established before the year 1990 dedicated to support the nuclear programme, another part, private organizations now, were created after 1990 as a result of a natural restructuring process and of the economy reform.

TABLE 10. CAPITAL COST CASH FLOW

 

Value

Year

% of the total value to be fulfilled

million USD

1

21

157

2

24

180

3

22

165

4

19

145

5

14

103

TOTAL

100

750

Source: Nuclearelectrica SA.

Within former RENEL was developed an industrial support structure for the Cernavoda Project, represented by the Nuclear Fuel Plant in Pitesti, and the Heavy Water Plant, located in the southwest of Romania, near Drobeta-Turnu Severin. The "brain" support for the Romanian Nuclear Programme was provided by the Nuclear Research Institute - ICN for specific Research and Development (R&D) activities and by the Center for Nuclear Projects Engineering and Technologies - CITON for design-engineering activities.

Romania also implemented a dedicated nuclear infrastructure, beginning with an educational system to industry and research-engineering capabilities. From the industrial sector can be mentioned: General Turbo Bucuresti, Petrotub Roman, Electroputere Craiova, Titan Nuclear Equipment TEN Bucuresti, FECNE Bucuresti, SCN Pitesti, ICN Pitesti, Aversa Bucuresti, UZUC Ploiesti, ARIO Bistrita, CONDEM Bucuresti, Ductil Buzau, TEPRO Iasi, Sarma Campia Turzii, Ventilatorul Bucuresti, Vulcan Bucuresti, CASTUMAG, Automatica, etc. from construction-erection sector: Nuclear Montaj, Trustul de Montaj Utilaj Chimic, CNE SA (Nuclear Civil Works Company), etc. from design-erection sector: Power Studies and Design Institute, EUROTEST, Institute for Thermopower Components Research and Design, etc. One can further mention players operating in international business, such as ROMENERGO, and in the financial sector banks or the specialized insuring market one finds in the Romanian Atomic Pool. Specialized industries such as uranium mining, milling and concentrating in Compania Nationala a Uraniului (CNU) were also developed.

There are key local on-site actors for Unit 2 completion as: CNE - S.A., Cernavoda, STIZO S.A., Cernavoda, UNIFY CO LTD., S.R.L. Cernavoda, HIDROCORA, S.R.L., Cernavoda (for civil works), NUCLEARMONTAJ S.A. Cernavoda, TMUCB S.A., Cernavoda (for equipment, piping, HVAC, structural steel), R&M NIMB S.A. Cernavoda, KATON EX-IM S.R.L., Cernavoda, AMEA S.A., Cernavoda, SIEA S.A., Cernavoda, ELCOMEX-I.E.A. S.A., Cernavoda, ELECTROCONSID S.A., Cernavoda (for electrical, control and instrumentation).

This attests to the breadth of the Romanian nuclear industry. This industry will play a greater role on completing Unit 2 than it did on Unit 1. If one looks at the Korean experience with CANDU 6 reactors, the future points to a growing role for Romania's nuclear industry in the completion of Units 3 and 4. It should be mentioned that the Romanian suppliers for Unit #2 were qualified from the point of view of the technical capabilities, quality assurance programme and of the manufacturing procedures in compliance with a methodology similar to that used by AECL and ANSALDO Energia to qualify its traditional suppliers.

2.2.4. Radioactive Waste Management and Plant Decommissioning

Each unit of Cernavoda NPP can accommodate spent fuel for ten years of full operation. Furthermore, Romania is developing radioactive waste management programmes and adopting concepts recognized world-wide (interim dry storage, near surface repository for low and medium level waste). Figure 4 shows the radwaste generation in Cernavoda NPP.

FIG. 4. Solid Radwaste Generation

A dry spent fuel intermediate storage facility project (DICA) is in progress; the contract was awarded by AECL, after an international competition. It is based on MACSTOR system designed by AECL, consisting in 27 concrete modules with a capacity of 12,000 fuel bundles each, protected in metal cylinders and stored in baskets. The first capacity will be commissioned in 2003 on the plant's site. All the facility will assure the storage of 300,000 fuel bundles coming from 2 units for a period of 50 years. Next step will be the decision related to the final disposal of low and medium level waste. The storage is envisaged to be sited at the Cernavoda area, and the commissioning is considered for 2005-2006. Site studies are advanced, and a decision will be taken considering the implementation of the process. For the final repository of spent nuclear fuel, generic survey studies are performed and the Romanian experts are looking for solutions consistent with international practice.

Based on the experience of decommissioning of older CANDU nuclear plants, i.e. Douglas Point 220 MW(e) and Gentilly 1,250 MW(e), decommissioning of the Cernavoda project has also been evaluated.

2.2.5. Environmental impact

Aside from some hydro-electric plants, most of Romania's conventional electricity generating capacity consists of obsolete thermal plants, close to the end of their design lifetime, with low availability, of which 40% burn coal, with high releases of CO2, SO2, NOx, dust and ash. Table 11 shows a comparison between one unit CANDU from Cernavoda and a lignite fuelled thermal power unit of same output.

TABLE 11. COMPARISON BETWEEN A CANDU 600 NPP AND A LIGNITE FUELLED POWER PLANT

 

Waste

Lignite fuelled thermal power

CANDU 600 NPP

Output (MW(e))

 

700

700

Annual fuel consumption (tonnes)

 

6,000,000

90

Annual waste amount (tonnes), out of which:

Ashes

Fly ash

1,500,000

(20,000)

-

-

 

CO2

3 – 4,500,000

-

 

SO2

88,000

-

 

NOx

8,800

-

Nuclear spent fuel (tonnes/year)

 

-

90

Low and medium nuclear wastes m3/year

 

-

30-50

Source: Nuclearelectrica SA.


To produce the equivalent yearly electrical power of Cernavoda Unit 1, a lignite coal power plant requires about 6,000,000 tonnes of lignite and "produces" 1,500,000 tonnes of ash, of which 20,000 tonnes is fly-ash, about 4.5 millions tonnes of CO2 and significant quantities of SO2 and NOx. The nuclear option represents a good opportunity for Romania to reduce polluting emissions, within the United Nations Framework on Climate Change and agreed at the Conference in Kyoto, Japan.

It is also still a quite unknown fact that the radiological impact on the population of a nuclear power plant, such as the CANDU station at Cernavoda, is comparable, or less, than that associated with some other alternatives of electrical generation, such as coal (coal contains radioactive elements which are released into the atmosphere when it is burned).

2.2.6. Fulfillment of the Nuclear Safety Regulatory Authority requirements

The Cernavoda site fully complies to the requirements of international standards concerning nuclear power plants seismicity, geological characteristics, flooding capacity, meteorological phenomena, other events caused by human actions, dispersion in water and air, demographic distribution, the emergency programme, land usage means, cooling water supply under normal and failure conditions, the connection to the national grid, the access to site, industrial centers approaching, the environment protection as well as social-economic aspects. Unit #2 site is already licensed by CNCAN. The nuclear safety standards applicable to Cernavoda NPP Units 1&2 siting, construction and operation comply with all safety principles included in IAEA guideline and regulations.

CNCAN also issued partial authorizations/permits for some mechanical erection activities, based on the Preliminary Safety Report and of other specific documents. The activities carried out up to now, on Unit #2, were based on these certificates. The licensing process for Unit #2 can take benefits from the experience acquired with Unit #1.

2.2.7. Economic data

The necessity of proceeding with the Cernavoda Unit #2 project was pertinently demonstrated by studies for the electric power sector development. The last of these studies was a "Least cost power and heat generation capacity development study, Romania", prepared by SEP (Holland), Tractebel (Belgium) and EdF (France) under the PHARE Energy Programme Management Unit. This study reviewed the electric power sector development over the period between 1996 - 2020.

In arriving at the optimum plan, a three stage analytical process was used: firstly, a screening analysis was performed to select an initial expansion plan. Secondly, the initial expansion plan together with variations were evaluated, using a sequential analytical model of the system operation imposing a few external constraints. Production costs were combined with the capital costs associated with a given expansion plan in order to determine the present value of the annual cost of system operation over the duration of the study. In the third stage, constraints such as fuel availability were considered in order to develop a practical optimum plan.

The initial expansion plan model used allowed a large number of alternative generating candidates to be considered with the most economical options selected. New projects were added in economic sequences as needed to maintain the desired level of electrical system reliability, or in excess when the fuel cost savings were higher than the additional capital cost induced by the construction of a new unit. The optimum solution was identified by a probabilistic production cost optimization approach incorporated in the models, which allowed a detailed production costing analyses.

The initial expansion strategy was varied to examine the impact of different sets of resources on production cost. New capacity was added to the system to replace units that had reached the end of their useful lives, to replace more expensive existing generation, or to provide for increased demand. It is to be noted that as of today 47% of the electric power stations have an operation life time longer than 20 years, and 84% longer than 10 years, as shown in Figure 5

FIG. 5. Share of the Installed Capacity According to the Equipment Age in 1998

 

The resulting production cost overall value of each of the alternative strategies has been combined with the associated capital cost required for investment, in the present value of the total system cost over the simulation horizon. This allowed a fast and comprehensive comparison of the alternative expansion strategies. To arrive at a comprehensive optimum strategy, decisions had to be made regarding five different aspects:

· the number of nuclear units to be completed;
· which, if any, new hydroelectric projects should be completed;
· which, if any, existing units should be rehabilitated;
· which, if any, existing units should be converted to hard coal;
· which new generating projects should be constructed and when a decision in one area affects the relative value of other decisions.

An iterative approach was used to reach conclusions. The reference expansion plan is revised, based on the outcome of the first round of individual studies, to incorporate those changes found to have beneficial effect. The individual studies are then repeated to confirm that they are still worthwhile when compared with the new reference plan. This process is repeated, with data improvements being made during each step, until a preliminary unconstrained optimum strategy is derived. The results of unconstrained expansion alternatives was used as the initial reference case for performing more detailed production costing analyses to obtain optimum strategy conclusions. In addition, constraints were imposed, most notably the obligation to avoid cyclic consumption of lignite, and the optimum strategy conclusion were again examined to produce a constrained optimum strategy.


The forecast of the electric power demand for 2000 - 2020 consider three scenarios with average annual growth rates for electricity of 2%, 2.8% and 3.8%. It is to be mentioned that the demand in 1997 was about 10% higher than in 1996.

As shown in the Least Cost "Executive Summary", the completion of the Cernavoda Unit #2 is part of the optimum strategy for both constrained and unconstrained strategies. This conclusion remains valid "even if Cernavoda 2 is assumed to have a higher than expected forced outage rate (15% versus the expected 8%) or if Cernavoda 2 is assumed to have a higher than expected capital cost (20% above the expected cost)". Accordingly the completion of Cernavoda Unit #2 represents a priority of the development of the electric power sector in our country, as stipulated in the Government Decision No. 35/1997.

2.2.8. Financing Plan of the Project

Up to 1998, the construction of Unit #2 was financed from public funds. The decreasing of available cash from state budget and the pressure to put the project in the market framework required new financing approaches.

This consists in financing from foreign loans, mainly from Canadian and Italian Export Credit Agencies, guaranteed by the Government or through other means, public funds and "Nuclearelectrica" Company's own sources, resulting from electricity export or various commercial arrangements, as counter-trading. Multilateral credit agencies borrowings could contribute to the financing package of the project. In addition, equity participation from some investors groups could be considered.

The basic idea of this approach is to reduce Government's level of risk for the foreign loans guarantee point of view. Table 12 below shows the designed financial scheme, mentioning the financing sources and the guarantee means, where necessary.

TABLE 12. FINANCIAL STRUCTURE

 

Million USD

Destination

TOTAL FINANCING

750

 

Out of which:

 

 

- Public funds (State Budget)

210

Local portion, including heavy water and nuclear fuel

- External Loans

485

Import & local portion

- Other sources (electricity delivery and commercial arrangements)

55

Import

Source: Nuclearelectrica S.A., 2000

 

2.3 Supply of NPPs

The heavy water plant ROMAG is situated at 7 km north-east of Drobeta Turnu Severin town, on the national road DN67, in the south-western area of Romania, on the left side of the Danube River. ROMAG was projected to produce heavy water in two stages of development: 360 tonnes/year in the 1st stage, with 4 modules (90 tonnes/module), and 360 tonnes/year in the 2nd stage, with another 4 modules, an unfinished investment.


The factory produces heavy water of nuclear quality and it has the greatest capacity of Europe and the second in the world. The project was put into operation between 1980 and 1988. The first quantities of heavy water were produced on 17 July 1988.


The process is based on the isotopic change between H2O and H2S in a biterm system in Girdler-Sulphide installations, in which a primary concentration of deuterium oxide of 4 - 12 % is obtained. The raw material for the deuterium is taken from the Danube. The final concentration till at least 99.78 % D2O is obtained by vacuum distillation.


The production had been halted for three years (1990 - 1992), when the technological installation, the production systems and those of environmental protection were modernized. Three modules of the 1st stage of development worked as follows: two were operating and one was overhauled; work on the fourth module was interrupted (at 92 % of completion).

2.4 Operation of NPPs

Indicating owners/operators if relevant, operation and maintenance service suppliers and operator training. National Company "NUCLEARELECTRICA" S.A. (SNN), which is the owner and operator of Cernavoda NPP, was founded by the Romanian Government Decision no. 365 in July 1998. CNE PROD Cernavoda, a subsidiary of SNN, has the responsibility for operating the Cernavoda Unit 1, and CNE INVEST Cernavoda, another subsidiary of SNN, for completion of the Cernavoda Unit 2 and preservation of the Units 3-5. There is another subsidiary of SNN, the Nuclear Fuel Plant in Pitesti - Mioveni, the local manufacturer of CANDU type nuclear fuel for the Cernavoda Unit 1. CNE PROD has its own maintenance division and a Training Center with a full scope simulator.

2.5 Fuel Cycle and Waste Management

Nuclear Fuel Production

The nuclear fuel needed for the Cernavoda NPP -Unit 1 operation is supplied by the Nuclear Fuel Plant from Pitesti. Fabrication of CANDU nuclear fuel started in 1980, through the commissioning of a CANDU type Fuel Pilot Plant as a pilot department of the Nuclear Research institute (ICN). The separation of the Nuclear Fuel facility from ICN, as a distinct company, took place in 1992. In 1994, the Nuclear Fuel Plant was qualified by AECL and ZPI-Canada as a CANDU 6 nuclear fuel supplier.

The capacity of the plant is 90 tonnes per year, respectively 23 bundles per day. At present, FCN provides the annual amount of the fuel necessary for the Unit 1 operation, being able, with small investment to extend its production capacity in order to assure the operation of two units. The high quality of the domestic nuclear fuel is confirmed by the most severe test, so-called " fire test", that is directly into operation. No fuel bundle manufactured at FCN and used at Cernavoda NPP failed under the extremely tough conditions inside the core during the nuclear reactor operation. The average burnup factor achieved by the nuclear fuel bundles in 1998 was of 170.85 MWh/kg U.


2.6 Research and Development

Table 13 shows the actual status of some nuclear facilities other than NPPs.

Nuclear Facilities

Type

Gross Capacity

Status

VVR-S

Nuclear Research Reactor

2 MW(th)

 

Shutdown state with nuclear fuel out of the core

TRIGA

Nuclear Research Reactor

14 MW(th) (Steady State Core) 20.000 MW(th) per pulse (Pulsating Core)

Operating

Nuclear Fuel Plant

CANDU-6 Nuclear Fuel

Nuclear Fuel needs for Cernavoda 1 NPP operation

Operating

Natural Uranium Concentration Plant

Natural Uranium

Uranium for Nuclear Fuel Plant

Operating

Heavy Water Plant

-

Heavy water needs for Cernavoda NPP

Operating

National final repository

LL & IL Radwaste

20,000 Standard (200 l) drums capacity

Operating

 

2.6.1. Competent Authorities for Promotion of Nuclear Activities

In the new Governmental organization, the Ministry of Education and Research took the responsibilities of the former National Agency for Science, Technology and Innovation (ANSTI) and is in charge, on one hand, with co-ordination of the overall nuclear programme, formulation, application, monitoring and assessment of policies in the area of research, development and innovation, and, on the other hand, with co-ordination of the formulation, application, monitoring and assessment of policies for development of quality infrastructures in accordance with the governmental strategy and programme in order to extend the national and international heritage in the area of science, technology and innovation with valuable contributions, to secure a sustainable economic development, access to the domestic, European and global markets, to finally develop a knowledge-based information society while meeting people's needs and increasing welfare. The Ministry of Education and Research is also in charge with the whole national education system. The ministry includes a specialized general division - the National Agency for Atomic Energy (ANEA) - through which it fulfils the following tasks related to the peaceful applications of atomic and nuclear phenomena and processes:

· formulation and monitoring of governmental strategy, policies and programmes for peaceful uses of atomic and nuclear phenomena and processes; in this respect, the Agency discusses the proposals by the specialized bodies of the central public administration, businesses, academic institutions and R & D units, which are in charge with the promotion and application of atomic and nuclear energy;
· devising, implementation and monitoring of governmental R & D and innovation strategy, policies and programmes;
· incentives for human resources development;
· stimulation of technical and scientific information communication and dissemination, in comply with the regulations in force, as well as information of citizens about the advantages and risks of nuclear applications and inducement of appropriate behaviour and feed-back;
· development of international partnerships; co-operation with the International Atomic Energy Agency of Vienna and other specialized international, regional or national organizations as well as Romania's representation in the relations with them; to this end, the Agency concludes regional or bilateral agreements and contracts for R & D, technical assistance, expertise, personnel information and/or training, or participates in promotional or other actions;
· monitoring or, if need be, co-ordination or control of specialized R & D units or R & D units involved in specific programmes;
· ensures the necessary environment for correlation of industrial policies and programmes, which are relevant for the considered area, with specific R & D and innovation policies and programmes.

The Ministry of Industry and Resources (MIR) is the responsible authority for definition of national participation policies and strategies, for planning and co-ordination of the national nuclear industry activity, representing the State as shareholder of nuclear assets and for co-ordination of part of major R&D and engineering facilities. It has also primary responsibility for the safety of its nuclear installations through the following organizations:

National Company "NUCLEARELECTRICA" S.A. (SNN), already presented. The stockholders assembly (100% by the state) representatives and the members of Administration Board of the society are appointed by the Ministry of Industry and Resources of Romania.

Autonomous Reggie for Nuclear Activities (RAAN) through the Nuclear Research Subsidiary (ICN) Pitesti is the operator of the TRIGA type research reactor, the hot cell facility, the radioactive waste treatment facility on Pitesti - Colibasi site. RAAN, through the Technology and Engineering for Nuclear Projects Subsidiary (CITON), is also in charge with support design activities in the nuclear field and, through the Heavy Water Plant (ROMAG) located in Drobeta Turnu-Severin, in charge of covering the heavy water needs for the Cernavoda NPP.

2.6.2. Research Establishment

Nuclear Research Subsidiary (SCN) Pitesti - within the Autonomous Reggie for Nuclear Activities (RAAN)

The Nuclear Research Subsidiary (SCN) is consistently involved in the work associated with the national nuclear safety programmes: nuclear fuel, reactor physics, radiation protection, generic CANDU technologies, and management of radioactive wastes, TRIGA reactor conversion. Almost all activities of the Institute were oriented to provide a scientific and technical support for the Nuclear Power Programme in Romania. The major SCN R&D Programmes are focused on:

nuclear safety to ensure technical and scientific support needed for the safety assessment of Cernavoda NPP during its lifetime;

nuclear fuel to elaborate technology and new methods to optimize fuel utilization in Cernavoda NPP;

radiation protection to integrate all aspects regarding ecological impact of nuclear power and to develop techniques for operating nuclear installations based on ALARA principles;

CANDU technologies intended to ensure an optimized maintenance of NPP systems and components;

radioactive waste management to solve the problem of radioactive wastes generated by nuclear facilities, in accordance with national legislation and international standards;

radioisotopes, irradiation techniques and conversion of TRIGA - INR reactor for LEU fuel is intended to ensure, together with the fuel supplier (General Atomic, USA), the conversion of the ICN reactor to low-enriched fuel utilization.

Institute of Physics and Nuclear Engineering (IFIN-HH) Bucuresti-Magurele

The Institute for Physics and Nuclear Engineering performs research activities in the nuclear field and on radioactive waste treatment and is the owner of the research reactor type VVR-S and the national LL and IL radwaste repository. It will also operate the multi-purpose irradiation facility. Its main activities focus on:

· Nuclear technologies;
· Technological irradiation using neutrons, gamma rays and charged particles;
· Neutron activation analysis; X-ray fluorescence;
· Industrial defectoscopy;
· Magnetic resonance and tomography;
· Methods, instruments and devices using radioactive sources;
· Tracer applications to hydrology and geology;
· Radiochemistry; polymerization in radiation fields;
· Radio-pharmaceutical production;
· Nuclear radiation metrology;
· Primary and secondary standards;
· Etalons for users in field of nuclear radiation research and applications;
· Quality assurance and control;.
· Neutron metrology;
· Radiation biophysics and biochemistry;
· Low dose irradiation effects on biological systems;
· Interaction of nonionising radiation with living systems;
· Cytotoxic effects due to internal contamination with tritium;
· Non conventional biochemical techniques: RIA, EIA, ELISA, biosensors;
· Pharmacology of labeled components of medical use and of U and Th compounds;
· Metallic pollutants in biological structures;
· Biokinetics of radionuclides and whole body monitoring;
· Radioecology;
· Development of a decision support system for nuclear emergency;
· Techniques and procedures for radioactive and chemical pollutants;
· Transfer mechanisms and ecological life time of radionuclides;
· Models for radionuclides transfer and dose prediction;
· Use of radioactive tracers in agriculture and environment;
· Environmental transfer and conversion of tritium from CANDU reactor;
· Nuclear risk assessment on public and environment;
· Nuclear medicine;
· Computerized tomography;
· Automatic systems for medical diagnosis;
· Apparatuses and devices for nuclear medicine and environment monitoring;
· Software for nuclear medicine and environment applications;
· Nuclear energy;
· Nuclear instruments;
· Non-fuel cycle radioactive waste collection, treatment, conditioning, interim, storage and disposal;
· Nuclear data;
· Computation methods;
· Decontamination and decommissioning of nuclear facilities;
· Instrumentation for nuclear research and technologies;
· Gas detectors for applications in industry and medicine;
· Detectors for radiation dosimetry and environmental radioactivity;
· Data acquisition systems;
· Modular electronic equipment for research and application in industry;
· NMR and EPR methods and instrumentation;
· Magnetometers for space applications:

Institute for Isotopic and Molecular Technology (ITIM) Bucuresti-Magurele

The research activity of the Institute for Isotopic and Molecular Technology is pointed to several significant directions.

· Stable isotope physics;
· Selective excitation in laser radiation field;
· Low temperature distillation (-196°C, liquid nitrogen) to the separation of oxygen, carbon and boron isotopes;
· Chemical isotopic exchange
· Thermal diffusion;
· Synthesis of stable isotopes labeled;
· Analytical methods and instrumentation;
· Stables isotopes separation and labeled compounds;
· Separation of oxygen and carbon isotopes by cryogenic distillation;
· 15N Labeled compounds;
· Environment survey and protection;
· Separation of uranium from the radioactive contaminated waters;
· Methods for geological characterization of the rocks with stable isotopes;
· Determination of high sensitive counting technique for long life radionuclides determination applied in radioecology and dating.

National Institute of Cryogenics and Isotope Separations (ICSI) Ramnicu Valcea

ICSI is an institution of scientific research and technological development in co-ordination of the Romanian Agency of Science, Technology and Innovation. It was founded in the aim of researching and verifying the technologies for heavy water separation and further of tritium. The principal directions of the activities are:

· Research of equilibrium and hydrogen isotopes (tritium, deuterium) separation processes inclusive at industrial pilot plant level;
· Research and development of cryogenic process, equipment and specifically technologies, experimental stands;
· Research of equilibrium and gases separation process of purification and forward recovery technology;
· Achievement and development of advanced materials as adsorbents, catalysts, composite and fullereness;
· Development of methods, apparatus and equipment for isotopic separation processes control and for cryogenic temperatures achievement;
· Development of static and dynamic equipment specifically for isotopic separation processes;
· Direct utilization of own researches in production (ultra pure gases and gases and gases mixtures, equipment, sodium sulphide, analysis apparatus, risk studies, expertise's);
· Technology transfer.

National Institute for Laser, Plasma and Radiation Physics (INFLPR) Bucuresti-Magurele

The National Institute for Laser, Plasma and Radiation Physics performs research activities in laser physics, plasma physics, and physics of electron beams. The main research and development activities are focused on:

· Fusion plasma physics, theoretical studies and numerical simulations of the plasma evolution in tokamak devices;
· Physics and technology of plasma produced by high power particle beams and X-radiation in ultra fast transient plasmas;
· Plasma surface engineering;
· Crystal growth by plasma methods.

National Institute of Research and Development for Technical Physics (IFT) Iasi

The research activity of the National Institute of Research and Development for Technical Physics is pointed to several significant directions:

· Magnetic Materials and Devices;
· Special Alloys and Hard Magnetic Materials;
· Magnetic Separation and High Tc Superconductivity;
· Magnetometry and Magnetic Detection;
· Non-destructive Control.

Technology and Engineering for Nuclear Objectives, RAAN Subsidiary (CITON) Bucuresti-Magurele

CITON supports the nuclear programme in Romania with a large range of services under quality assurance regime by using codes and standards internationally recognized (ASTM, ASME, IEEE, ISI, IEC, CSA series and IAEA guidelines etc.). SITON services cover the following:

detail design for process and support systems associated to a CANDU-600 NPP, as well as civil design for the reactor building, the turbine hall, the service building, spent fuel and waste management; detail design for adjacent installations and support systems for nuclear research reactors and labs;

reliability and probabilistic assessment studies;

nuclear safety analyses, including environmental impact analyses in case of accidents, fires, earthquakes, flooding etc.;

thermohydraulic calculations and stress analyses for various working regimes using specialized computer programmes;

methodologies for computation and computer assisted design;

technical and economical studies for siting as well as cost estimates for new designs, operational design modifications for NPP systems and components;

technical assistance for equipment fabrication, their installation, testing and commissioning as well as testing and commissioning of process systems;

land registering and requirements for area classification;

analyses and optimizations of power consumption;

prognoses regarding the national power system development especially nuclear power trends.

2.7 International Co-operation and Initiatives

Romania became a member State of the Agency of Vienna in 1957. From the mid-1960s to the mid-1970s, its technical co-operation program with IAEA covered mainly research in nuclear physics and some medical and other applications of radiation and isotopes. Since 1976, when Romania n nuclear power program was developed, the Agency has supported in particular the activities related to Cernavoda NPP. The assistance was dedicated to nuclear safety (44%), nuclear engineering and technology (15%). However, application nuclear techniques in other fields received also substantial support, as industry and hydrology (14%), medicine (9.5%) and agriculture (4.5%)

Since September 2001, Romania has become a member of the Board of Governors for the term 2001-2003 and contributed to the Secretariat activities related to safeguards, nuclear safety, technical co-operation, as well as to budgetary policy issues.

CNCAN empowered by the nuclear act, ensures implementation of agreements concluded.
Also CNCAN cooperates with the European Union working groups in the field of nuclear safety. In this context, it participates in meetings of the Nuclear Regulatory Working Group (NRWG), European Nuclear Installations Safety Group (ENISG), CONCERT Group, WENRA and NEA/OECD in legislative domain.

BILATERAL AGREEMENTS

 

 

 

·         Agreement between Governments of Romania

In force:

27 November 1990

and Argentina for co-operation in the peaceful

 

 

uses of nuclear energy

 

 

 

 

 

·         Agreement between Governments of

In force:

23 March 1995

Romania and the Hellenic Republic on

 

 

early notification of a nuclear accident

 

 

and information exchange on nuclear

 

 

facilities – Athens, 10 March 1995

 

 

 

 

 

·         Agreement between CNCAN of Romania

In force:

25 May 1998

and Greek Commission for Atomic Energy

 

 

on early notification of a nuclear accident

 

 

and on information exchange about nuclear

 

 

facilities –Bucharest, 22 December 1997

 

 

 

 

 

·         Protocol of understanding on co-operation in

In force:

11 November 1996

the nuclear safety domain between CNCAN

 

 

of Romania and the Institute for Nuclear

 

 

Safety of Republic of Korea (KINS)

 

 

– Bucharest, 21 September 1996

 

 

 

 

 

·         Protocol of understanding on co-operation in

In force:

25 May 1998

the nuclear safety domain between CNCAN

 

 

of Romania and Atomic Energy Control Board

 

 

(AECB) of Canada – Ottawa, 23 June 1997

 

 

 

 

 

·         Agreement between Governments of Romania

In force:

3 October 1997

and Hungarian Republic on early notification

 

 

of nuclear accidents– Bucharest, 26 May 1997

 

 

 

 

 

·         Protocol on co-operation and information

In force:

25 May 1998

exchange in the nuclear safety domain

 

 

between CNCAN and Hungarian Authority

 

 

for Atomic Energy – Budapest, 12 June 1997

 

 

 

 

 

·         Agreement between Governments of Romania

In force:

25 June 1999

and USA on peaceful applications of nuclear

 

 

energy – Washington D.C., 15 July 1998

 

 

 

 

 

·         Agreement of co-operation and information

In force:

23 February 1999

exchange in the nuclear safety domain

 

 

between CNCAN of Romania and the

 

 

Society for Nuclear Safety of Facilities

 

 

and Reactors of Germany

 

 

– Berlin,

 

10 November 1998

 

 

 

·         Memorandum of Understanding for co-operation

In force:

8 May 2000

between CNCAN of Romania and the National

 

 

Atomic Energy Commission (CNEA) of

 

 

Argentina

 

 

 

 

 

·         Administrative Understanding between Canadian

In force:

29 May 2000

Nuclear Safety Commission and CNCAN

 

 

implementing the Agreement for Co-operation

 

 

in the Development and Application

 

 

of Atomic Energy for Peaceful Purposes

 

 

 

Brief description of research and development activities carried out jointly with other countries and/or within the framework of international projects, technical and industrial co-operation, and transfer of know-how and technology.

 

2.8 Human Resources Development

Seven months after the start of commercial operation of Cernavoda NPP Unit #1 (1997), the whole responsibility for the plant's operation was turned-over from the hands of the international western consortium to the Romanian personnel of NUCLEARELECTRICA company.

This decision became effective with one year earlier than in the contract terms, as probation that training acquired by the Romanian personnel was good and as proven by the achieved operation results.

A full-scope simulator was commissioned in The Training Center at Cernavoda in 1998 for improving the operation crews training.

The efficiency of SNN SA activity increased starting with 1999 by implementing a restructuring program. So, the Company's total number of executive staff and employees, including the three branches, decreased from 2,767 in 1999 to 2419 in 2002. The last figure includes the new personnel hired for the Unit 2 Project completion process.


The company is permanently paying attention to improving the skills and know-how for assuring the employment stability of the highly specialised personnel.


The Cernavoda Training Center full scope simulator has been proved a permanent and very efficient training for the operators and personnel working in different sectors of the plant.


In preparation of Unit 2 commissioning, about 250 persons have been hired and at present they are being trained at the Cernavoda Training Center and Unit 1 facilities.


A new recruiting system of the future technical graduates has been implemented by a number of 30 scholarships awarded to students in their last education year.


The personnel of the Nuclear Fuel Plant benefited by training a the supplier for the equipments purchased for the modernization of the technological process.


3. NATIONAL LAWS AND REGULATIONS

3.1. Safety Authority and the Licensing Process

The National Commission for Nuclear Activities Control (CNCAN) is the national competent authority in the nuclear field exercising the regulation, authorization and control powers provided under the Law 111/1996, on the safe deployment of nuclear activities, republished. Since December 2000, CNCAN is an independent governmental body reporting only administratively to the Ministry of Waters and Environmental Protection. Actually, the president of CNCAN is a Secretary of State and the minister can not interfere in CNCAN president's decisions. CNCAN is responsible for full surveillance and control in all issues relevant to nuclear safety regarding siting, construction, commissioning, operation of nuclear plants, research reactors and all nuclear facilities in Romania. In addition, CNCAN is in charge with full surveillance and control in all issues relevant to quality assurance, radiation safety, safeguards, export/import control, physical protection and emergency preparedness and monitoring the radioactivity of the environment. CNCAN is the National Counterpart to the IAEA for nuclear safety, radiation safety, safeguards, physical protection, emergency preparedness, illicit trafficking events reporting, IRS and INES reporting systems and Safety Convention reporting activities. CNCAN plays the role of regulatory body integrator in the licensing process of nuclear installations.

The main tasks of CNCAN in the near future represent the completion of the reviewing process for the regulation system by the end of 2001, in order to accelerate actions for EU access and integration process. The credibility of CNCAN is increasing through work transparency, personnel competence, motivation and flexibility, management by projects, internal audits, self assessment, reduced response time, set-up of mobile units, closer involvement with utilities and applicants, etc.

The Ministry of Water and Environmental Protection is responsible for environmental protection legislation and regulations and for the licensing process from the environmental protection point of view. The MIR co-ordinates the Pressure Vessel Authority (ISCIR), which is responsible for licensing and control of pressure vessels, boilers and other pressure installations, including those from the nuclear field. The Ministry of Health is the responsible authority to organize the monitoring network of contamination with radioactive materials of food products over the whole food chain, inclusive drinking water as well as other goods designated to be used by the population, according to the law. Also, the epidemiological surveillance system of the health condition of personnel professionally exposed, and of the hygiene conditions in units in which nuclear activities are deployed, are under its responsibility. The Ministry of Interior is responsible for control of fire protection at nuclear installations and for supervision of physical protection of nuclear installations and nuclear material. The Ministry of Public Finance is the authority in charge of providing and controlling the financial support from Governmental budgetary funds, sovereign guarantees, etc.

3.2. Main National Laws and Regulations in Nuclear Power

Romania has had laws in place governing the regulation of nuclear activities since 1974. They remained in force until 1996, when a new legislation was issued. In January 1998, important amendments to the Law 111/1996 on the safe deployment of nuclear activities have been approved. Under the umbrella of this new Nuclear Act, all related rules, practices and regulations in nuclear field were started to be assessed for compliance with applicable IAEA guides and standards. The licensing experience gained during construction, commissioning and initial operation of the Cernavoda NPP Unit 1 was also carefully assessed and incorporated in the new legislative framework being now created in Romania.

A comprehensive set of technical instructions, directives, regulations, procedures, industrial standards, nuclear design and safety guides, concerning the quality assurance and safe operation of nuclear facilities and NPPs, cover activities such as project management, procurement, design, manufacturing, civil works, installation, commissioning and operation.

All AECL design guides and safety design guides were endorsed by CNCAN. The IAEA Safety Series are also used as a basis for the CNCAN regulations. Most of the applicable industrial standards have been used during the licensing process of the Cernavoda NPP Unit 1. As of today, technical standards, such as ASME, ASTM, IEEE etc., have been endorsed in Romania.

 

4. CURRENT ISSUES AND DEVELOPMENTS ON NUCLEAR POWER

4.1 Energy Policy

The annual production of a CANDU 700 MWe nuclear unit has a steady output and amounts to about 5.2 - 5.4 TWh (gross). This leads to yearly 1.4 million tonnes oil equivalent reduction - representing more than 100 millions USD - and associated decrease of the noxious emissions.

In November 2002, the Romanian government approved "The national strategy for the development of the nuclear sector in Romania". It provides for the increase of the nuclear share of electricity generation from 10% up to 20-40%, observing the requirements of sustainable development, price competitiveness and nuclear safety.


The "Strategy" states that, for the present conditions in Romania, taking into account the cost of the energy from the nuclear plant versus the cost from the fossil fuel power plants, the investment should continue for the next units of Cernavoda NPP. Thus, the completion of Units 3, 4 and 5 is foreseen in the period 2009-2020.


Modern types of contract should be promoted, as BOT (Build-Operate-Transfer), implying the financing by foreign partners, without State guarantees; the Romanian contribution will be based on a public-private partnership. The civil work at these units is mostly completed but, unlike the Unit 2, the equipment is not procured. A large part of the electricity produced at these units will be available for export. At the present time, many political and business contacts are taking place for establishing the framework for continuation of the construction activities at Unit 3 of Cernavoda NPP.


4.2 Privatization and deregulation

General description of open market issues shows also its influence in the nuclear sector reorganization. There are mentioned de-regulation, competition, privatization mergers and acquisitions affected or may affect the electricity and nuclear sector.


The year 2001 was a reference for the energy sector, as it was rich in outstanding events with direct impact on the evolution of the regulatory activity. It started under the sign of the Californian energy crisis, went on with the suspension of deregulation in that state and ended with the collapse of Enron, until recently the incontestable leader on the electricity and natural gas markets. At European level, proposals to amending the directives on the internal markets for gas and electricity continued to stir many debates where legislative issues referring to the electricity transit played an important role.

 

Considering the above, Romania's Government adopted a package of legislative acts focusing on the energy sector strategy with a view to attracting investment and ensuring the necessary financial resources in order to increase performance and efficiency of the electricity and heat sector. Therefore, the restructuring of transmission and distribution continued more actively as well as the externalization of certain capacities owned by Termoelectrica SA while the market opening degree was enhanced to 33%.


The Romanian wholesale electricity market was established and developed as per the regulatory principles stated in ANRE Commercial Code of the Wholesale Electricity Market, issued in 1999 and derived from the European Directive 96/92/EC and the national secondary legislation of the sector.

 

Commercial regulation


Commercial regulation activities in 2002 were oriented towards the monitoring of sector companies and the complementing of the regulatory framework with new commercial regulations in line with the structural changes upon generation, distribution and supply, with the electricity market gradual opening and the experience gained by sector companies. Such undertaking requested series of talks with sector companies' representatives not to mention meetings held to accommodate market disputes.

In 2002, commercial regulations were issued with a view to encouraging competition, improving market efficiency and avoiding discrimination, and referred mainly to the:
· functioning of the electricity wholesale market;
· contracting of electricity generated by Termoelectrica's externalized district-heating plants;
· regulation of transmission, ancillary services and market administration;
· electricity import, export and transit activities;
· modification of penalties in the electricity supply contracts.

In order to minimise risks upon transactions at the System Marginal Price, the obligation to conclude bilateral contracts with negotiated prices and maximal quantities between Termoelectrica, Hidroelectrica, Electrocentrale Deva and Electrica was introduced.

Aspects related to the wholesale electricity market, portfolio contracts, available capacities offer, purchase price variation risk for captive consumers are detailed in the Decision regarding the functioning of the electricity wholesale market.

Commercial relations between the electricity wholesale market participants unfolded according to rules laid down by ANRE Order 34/2002 on the functioning of the electricity wholesale market following the reorganization of the Electricity Distribution and Supply Company (Electrica). The order was issued with a view to ensure stability of the electricity tariff for captive consumers as well as to provide revenues for the electricity producers operating on the regulated market as well as for the electricity distribution and transmission operators in order to properly develop their activity.

The Code of Conduct for the electricity wholesale market participants approved by Order 26/2002 sets out:

· conduct principles and norms to be observed by electricity wholesale market participants;
· tasks and competencies for code administration;
· responsibilities in case of code infringement.

The Code of Conduct pertains to the relations operating between electricity market participants as well as between the latter and ANRE.

The Ethic Council was created and functions according to a regulation approved by ANRE decision. The Ethic Council takes notice of the deceitful behaviour of market participants and applies appropriate penalties.

Through several successive president orders, 20 electricity end-users were accredited as eligible customers within the market opening degree limit of 33%. The Guide for Electricity Sale to Eligible Customers was issued in order to help the producers/suppliers whose offer on the competition market for eligible customers exceeds the demand.

ANRE Order 36/2002 to approve the Contracting procedure to purchasing electricity generated by energy capacities under commissioning - sets out the:
· conditions in which electricity generated by energy capacities under commissioning can be purchased until the conditions for a full commercial use of the capacities are met;
· conditions for sector companies participation on the electricity wholesale market until they obtain the license for the commercial use of the capacities or until the license is modified;

ANRE Decision 279/2002 specifies the obligation of captive consumer suppliers to purchase, at regulated prices approved by ANRE the quantity of electricity associated to the restriction of the co-generation produced by these plants. The decision takes into consideration the externalization of some of Termoelectrica district-heating plants as well as their specific technical characteristics, namely the small flexibility of electricity generated by own units whose cost-efficient operation is imposed by the heat load demand to co-generation.

The Framework-contracts for the purchase of electricity from an independent power producer, respectively an auto-producer were reviewed by ANRE Order 32/2002.

The Framework-contract for electricity transmission, ancillary services and wholesale market administration between Transelectrica and the beneficiaries was under review as well. Thus, the electricity transmission service will be contracted:
· with the producer or the importing producer/supplier - for the electricity introduced in the electricity transmission network (the introduction factor);
· with the supplier or exporting producer - for electricity extracted from the electricity transmission network (the extraction factor);
· with the eligible customer for electricity imports (the introduction and extraction factors),
while ancillary services will be contracted with the supplier or exporting supplier/producer, for the whole electricity quantity used.

According to its tasks and competencies regarding the monitoring of the electricity import-export activities, ANRE approved the Electricity Foreign Trade Monitoring Procedure. The procedure sets out the rules controlling the energy foreign trade and the associated information flow between sector companies and ANRE; the rules pertain to all electricity sector companies which, in compliance with the conditions in the license can be involved in electricity commerce activities directly or through intermediate suppliers.

The Regulation regarding the commercial arrangements for non-scheduled electricity exchanges with other national power systems was amended. According to the amendments, Transelectrica will administrate the quantity of electricity associated to the non-scheduled exchanges with the interconnection partners in the process of purchasing electricity with a view to covering the transmission network losses.

Electricity market functioning

In accordance with the international evolution and with the progress of the Romanian electricity sector legislation, ANRE laid out the principles for the development of a two-component electricity market: the regulated and the competitive. According to this market, commercial arrangements between participants are based, for most of their part on the framework contracts issued by ANRE. The option for the two components was sought to encourage long-term commercial arrangements with guaranteed prices and quantities and, by facilitating the conclusion of bilateral contracts and the sale/purchase on the spot market to enable producers and suppliers acquire proper managerial abilities for a competitive electricity market (Figure 5).

By the end of 2002, there were 36 electricity generation licensees, 49 electricity supply licensees and 49 accredited eligible customers. 53% of the producers, 15% of the suppliers and 23% of the eligible customers operated on the electricity wholesale market (Figure 6).

Figure 5

THE ELECTRICITY WHOLESALE MARKET

Figure 6

EVOLUTION OF ELIGIBLE CUSTOMERS, PRODUCERS AND SUPPLIERS - LICENSE HOLDERS

 

Privatization


At present, a very important objective the privatization of the electricity distribution and supply sector, to be implemented by S.C. ELECTRICA S.A. is. The cooperation with the French consultant of BNP Paribas started in 2000, within Phare Project RO9805-01-03 "Privatization in electricity distribution sector". The activity with the consultant consisted in the assessment of two areas: Timisoara (at present FDFEE Banat) and Constanta (at present FDFEE Dobrogea) and two distinct modules have been stipulated: "Preparation of Constanta and Timisoara Regional Distribution Companies for privatization" and "Concluding the transaction for the privatization of electricity distribution companies".


Module 1 comprises of the following activities, as main tasks of the consultant:
o Analysis of the sector structure and utilization of the revenues from privatization.
o Analysis of laws and regulations.
o Settlement of distribution service cost and settlement of prices on economic bases.
o Preparation of companies for privatization (including: assessment of the condition of networks, setting of the investment requirement, assessment of the permanent funds, the debit book and the book for other financial liabilities, receipts book and the book for current permanent funds, assessment of legal problems, assessment of staff problems, environment report, financial statements, financial analysis and financial management).


Module 2 comprises two main tasks:
o Preparation of the privatization transaction
o Assistance for the privatization transaction.
The objective is the privatization of Electrica SA branches with strategic investors, namely distribution and supply operators, who can prove that they have enough technical and managerial abilities and who have the financial capacity to support the development of the companies they took over.

4.3. Role of the government in the nuclear R& D

For the continuing support of specific activities in nuclear field, there were promoted and approved the Strategy for the Development of Nuclear Field, the Law regarding the promotion of use in peaceful aims of nuclear energy and the Law regarding the management of spent nuclear fuel and radioactive waste, including the final disposal.


Today, the workings engaged for the R&D programs respond both to the problems regarding the nuclear safety and physics of nuclear reactors, testing of nuclear materials and equipment, development of new concepts of nuclear fuel cycles and to those regarding the decommissioning (nowadays the VVR-S research reactor from the '50s from Bucharest-Magurele is in the decommissioning process), management of nuclear waste, protection of environment.

4.4. Nuclear Energy and Climate Change

Due to its technology the Cernavoda Unit 1 NPP prevents the release into the atmosphere of about 4 million tonnes of CO2 annualy.


During the first five years of operation, the quality of air, soil or water in the surrounding area was not influenced by the Unit 1 NPP operation.


Non - radioactive discharges into water (Danube River and Danube Black Sea Canal) were below the authorized limits. The monitoring of specific pollutants, as hydrazine, morpholine and cyclohexylamine has indicated that the concentration of these chemicals is below detectable limits.


A non-radioactive chemical waste management program has been implemented for Unit 1NPP since start-up. It is continuously updated according to the Romanian legislation regarding waste management. The program includes collection, temporary storage and disposal of chemical wastes. CNE-PROD policy in this area takes care of on-site adequate management of wastes in order to prevent an impact on the environment.


4.5 Safety and waste management issues

The Cernavoda NPP has been operating safely throughout a period of six years. The events reported in 2002 according to INES scale were rated 17 (2 out of scale, 14 level 0 and 1 level 1). During the six years of operations, only 1 event occured in 1999 rated 2 on the INES scale.

In 2002, the average dose received by workers was of 1.12 mSv, and the maximum dose was of 9.23 mSv. The legal limit for exposed workers is 20 mSv/yr.

The evolution of the annual average dose value for exposed workers (mSv/yr) for the
last six year is as follows:

1996

1997

1998

1999

2000

2001

2002

0.40

3.81

0.76

1.29

1.25

1.26

1.12

Taking into account the collective radiation exposure (man x Sv), in 2002 Cernavoda Unit 1 NPP was placed on the 5th position out of 27 PHWR units in service.

SNN SA has permantly implemented a safety policy. Its major objective is to guarantee safety and healthy workplaces for each employee and contractor. Consequently, no professional illness has occured during these years.

In 2002 there were 6 individual work-related accidents at Cernavoda NPP and 1 at
Pitesti Fuel Factory. No professional illness has been reported.

THE NUMBER OF WORK - RELATED ACCIDENTS WITHIN SNN SA BRANCHES

1997

1998

1999

2000

2001

2002

5

1

4

2

10

7

Over the years, the operation has strictly met the environment requirements. The environmental monitoring results have proved the conformity with the company's environmental policy and the environmental authorization.

Radiological Environmental Impact

Radioactive discharges into water and air were well below the authorized levels. The annual effective dose received by a member of the public pertaining to a critical group (the most exposed) from radioactive emissions into the environment was of 0.0083mSv in 2002 while the annual average dose received by a member of the public from the natural background is 2.4 mSv.


More detailed information on the radiological impact is provided by the SNN SA report presenting the results of the radioactive environmental monitoring program which is implemented by the Environmental Monitoring Laboratory (located at 2 km from NPP site).


In 2002, the volume of low and intermediate level solid waste was 30.93 m3 (except spent resins). The total volume, since in service (December 2, 1996) is of 121.18 m3.


They are stored in a special concrete storage facility located within the fence of the plant.
The annual quantity of spent fuel was of about 99 tU. Since the commissioning, the entire cumulative quantity of spent fuel received was 573 tU. The spent fuel is stored for at least six years in the spent fuel bay of the Unit 1 NPP.

Impact on people & environment. Cummulated releases of radioactive effluents (µSv):
Legal dose for population: 1000µSv - in 2002, the average annual dose was only 0,83% from the legal dose.

Volume of radioactive waste (m3):
Total in 6 years of operation: 121,18 m3
Average annual design value: 30 m3

The Intermediate Nuclear Spent Fuel Storage Facility

The Intermediate Nuclear Spent Fuel Storage Facility is based on the MACSTOR system
designed by AECL-Canada. The facility assures the storage of 3000,000 spent fuel
bundles coming from the Units 1&2, for a period of 50 years.


In 2002 the first module was built and the foundation of second one was poured.


4.6 Other issues

Cernavoda Unit 3 Project

Providing the material resources necessary for developing the construction works from the Romanian authorized suppliers was an important objective of the year 2002. The procurment of heavy water from RAAN-ROMAG continued as well.


On March 7, 2002, an Interministerial Commission to resume the works at Cernavoda Unit 3 NPP bz 2004 and Unit 4 in the future was set up.


At the same it was decided to organize a joint "team" made up of institutes and national companies in the field to: update general site studies, organize expert inspections of the existing structures and of their conservation until works are resumed, carry out studies relating to Romania's energy balance and equilibrum of the National


Power System, in the event of NPP Cernavoda Unit 3 and 4 reactors commissioning.


For the finalization of Cernavoda NPP Unit 3 that is 16% completed the Government indents to attract more partners and set up joint ventures instead of utilizing an external credit with government guarantees that would involve the Romanian state. Until now, besides SN "Nuclearelectrica" SA, companies from other four countries expressed their intention to participate in the development of a feasibility study and the reactor completion, respectively.

Local Community Support

The Local Community Support Act for Improving the living conditions in the town of Cernavoda started in 1991, including a number of 21 objectives related to the project of the Cernavoda NPP: urbanistic, social, cultural buildings for the town, as well as dwellings for the operation and executive staff of the nuclear power plant.


By the end of the year 2002, 6 objectives were completed and other 6 were under different stages of completion.


In 2002, two important objectives were completed and inaugurated:
o On April 15, 2002, Mr. Ion Iliescu President of Romania cutted the ribbon of the Cernavoda Town Hospital. The 100 bed hospital will provide medical assistence for the NPP's personnel.
o On August 9, 2003 - The Prime Minister, Mr. Adrian Nastase - inaugurated the "Saint Mary" bridge over the Danube - Black Sea Canal. The new bridge represents the link between the town and the Cernavoda railway - station, as well as a direct access way to the Felesti - Cernavoda motorway. It is also designed as a supplementary way for the evacuation of the population in this area, in case of a nuclear accident.

Other social & economic effects of Cernavoda NPP Unit 1:
o Provides over 1300 jobs
o Provides activities for 15 contractor companies (12 from Cernavoda) having over
350 jobs
o Provides accommodation for over 500 plant employees
o Provides heating for more than 60% of Cernavoda habitants at the lowest price in
the country
o An important financial contribution to the community and to the state budgets in
2002: 284 000 USD, respectively 9 440 000 USD

 

REFERENCES

[1] "Overview of Nuclear Legislation in Central and Eastern Europe and the NIS", NEA/OECD, 1998.
[2] Least Cost power and Heat Generation Capacity Development Study, Romania, SEP, Tractebel and EdF, 1997.
[3] "Impuls", Information Bulletin of CONEL (in Romanian) 1997-2000.
[4] National Electricity Company S.A. - CONEL, Annual Report 1998.
[5] "Politici energetice ale Romaniei" (in Romanian), IEA. OECD, 1994.
[6] Statistics Year Book of Romania 1998-2001, Statistics National Commission (CNS).
[7] "Statistical Bulletin - Industry", CNS, 1999-2001.
[8] "Encyclopaedia Britannica", 1996.
[9] "Core Issues" The Journal of Uranium Institute, London, No. 1, 1999.
[10] "Larousse, Mica Enciclopedie de Geografie" (in Romanian), Editura Lider, Bucuresti, 1999.
[11] "Monitorul Oficial al Romaniei" (in Romanian), 1996-2001.
[12] Data & Statistics/The World Bank, www.worldbank.org/data.
[13] IAEA Energy and Economic Data Base (EEDB).
[14] IAEA Power Reactor Information System (PRIS).
[15] TRANSELECTRICA S.A. - Annual Report 2001.
[16] Ministry of Industry and Resources, The National Strategy for the Development of Romanian Energy sector on Medium Term 2001-2004 (Synthesis), 2001.
[17] Government of Romania, Romania's Economic Strategy on medium term, 2001.
[18] Government of Romania, Action Plan on 2001-2004, 2001, www.guv.ro
[19] Nuclearelectrica S.A. - Semnal "N" (in Romanian), 2000 -2002.
[20] Nuclear Energy and the Kyoto Protocol, OECD/NEA, 2002.
[21] AREN, "Nuclear Energy" Magazine, vol. 13, 2002.
[22] Romanian Atomic Forum - ROMATOM Yearbook 2002.
[23] Price Waterhouse Coopers, Romania - Fact Sheet, April 2002

 

 

Appendix 1.
International, Multilateral and Bilateral Agreements

 

AGREEMENTS WITH THE IAEA

 

·       Amendments to Articles VI and XIV of the

·       2001

Ratified:

 

22 February

 

Agency statute

 

 

 

 

 

·       Agreement on Privileges and Immunities

Entry into force:

7 October 1970

 

 

 

·       NPT related safeguards agreement

Entry into force:

27 October 19

INFCIRC No: 180 82

 

 

 

 

 

·       Additional protocol

Entry into force:

7 July 2000

 

 

 

·       Supplementary agreement on provision

Entry into force:

28 October 1981

of technical assistance by the IAEA

 

 

 

 

 

·       Agreement on the Agency's assistance for

Entry into force:

30 March 1973

establishment of a research reactor project

 

 

INFCIRC No: 206

 

 

 

 

 

·       Agreement on assistance for the transfer

Entry into force:

1 July 1983

of enriched uranium for irradiation studies

 

 

in a research reactor; INFCIRC No: 307

 

 

 

MAIN INTERNATIONAL TREATIES

·       NPT

Entry into force:

4 February 1970

 

 

 

·       Convention on the physical protection

Entry into force:

23 December 1993

of nuclear material

 

 

 

 

 

·       Convention on early notification

Entry into force:

13 July 1990

of a nuclear accident

 

 

 

 

 

·       Convention on assistance in the case of a

Entry into force:

13 July 1990

nuclear accident or radiological emergency

 

 

 

 

 

·       Vienna convention on civil liability for

Entry into force:

29 March 1993

nuclear damage

 

 

 

 

 

·       Joint protocol relating to the application of

Entry into force:

29 March 1993

Vienna and Paris conventions

 

 

 

 

 

·       Protocol to amend the Vienna convention

Ratification:

29 December 1998

on civil liability for nuclear damage

 

 

 

 

 

·       Convention on supplementary

Ratification:

2 March 1999

compensation for nuclear damage

 

 

 

 

 

·       Convention on nuclear safety

Entry into force:

24 October 1996

 

 

 

 

 

 

·       Joint convention on the safety of spent

Entry into force:

18 June 2001

fuel management and on the safety

 

 

of radioactive waste management

 

 

 

 

 

OTHER RELEVANT INTERNATIONAL TREATIES etc.

·       EURATOM

Non-Member

 

 

 

 

·       Agreement on trading and commercial

Entry into force:

15 March 1991

and economical co-operation

 

 

– Luxembourg, 22 October 1990

 

 

 

 

 

·       Treaty on ban of nuclear weapon tests in the

Entry into force:

23 December 1963

atmosphere, in outer space and under water

 

 

 

 

 

·       Treaty on the prohibition of the emplacement of

Entry into force:

10 July 1972

nuclear weapons and other weapons of mass

 

 

destruction in depth of seas, oceans and their

 

 

underground

 

 

 

 

 

·       Comprehensive nuclear test ban treaty

Entry into force:

4 October 1999

(CTBT)

 

 

 

 

 

·         The Convention on the Physical Protection

Entry in force:

8 February 1987

of Nuclear material                                           

 

 

·       Improved procedures for designation

Accepted on 22 February 1990 in

    of safeguards inspectors

statement to Board of Governors

 

 

·       Zangger Committee

Member (1974)

·       Wassenaar Arrangement

Member (1996)

·       Australia Group

Member (2000)

 

 

·       Nuclear Suppliers Group

Member

 

 

·       Nuclear Export Guidelines

Agreed

 

 

·       Acceptance of NUSS Codes suitable

Summary: Revised codes considered

 

for preparing and applying NPP's safety

Body

standards. In 1987 used by Regulatory

safety

as minimum requirement for adequate

 

of NPP's operation. (21 March 1990)

 

 

·       Unified Institute for Nuclear Research,

Member – under the Modified Statute (1992)

Doubna, Russian Federation

Ratification:

21 July 1994

 

 

 

 

Appendix 2.
DIRECTORY OF THE MAIN ORGANIZATIONS, INSTITUTIONS AND COMPANIES INVOLVED IN NUCLEAR POWER RELATED ACTIVITIES

 

MINISTRIES

 

Ministry of Industry and Resources                                           Tel:  +(40-21) 650 48 60

Energy General Division                                                           Fax:  +(40-21) 2129409

Calea Victoriei No. 152, Sector 1

70034 Bucharest                                                                      Web: http://www.mincom.ro

 

Ministry of Public Finances                                                       Tel: +(40-21) 410 11 89

Apolodor str., No. 17, Sector 5                                                  Fax: +(40-21) 312 16 30

Bucharest                                                                                Web: http://www.mfinante.ro

 

Ministry of Education And Research                                         Tel: +(40-21) 212 85 59

- Research Department                                                            Fax: +(40-21) 312 14 10

Mendeleev Str. No. 21-25, Sector 1 70168 Bucharest                 E-mail: programe@mct.ro

                                                                                               Web: http://www.mct.ro

 

NATIONAL ATOMIC ENERGY AND POWER AUTHORITIES

 

National Atomic Energy Agency                                               Tel:  (40-21) 3128707

Ministry of Education and Research                                          Fax:  (40-21) 6503175

Mendeleev Str. No. 21-25, Sector 1

70168 Bucharest

 

National Commission for Nuclear Activities                               Tel: +(40-21) 410 05 72

Control (CNCAN) (Nuclear Regulatory Body)                          Fax: +(40-21)  337 3887

B-dul Libertatii nr. 14, P.O.Box 42-4                                         E-mail: lucian.biro@cncan.ro

Sector 5, Bucuresti,

 

National Agency For Power Regulation                                     Tel. +(40-21) 311 22 44

(ANRE) (Electricity Regulatory Body)                                      Fax +(40-21) 312 43 65

Constantin Nacu nr. 3                         E-mail: anre@anre.ro

Sector 2, 70219 - Bucharest                                                      Web: http://www.anre.ro

 

 

OTHER NUCLEAR ORGANIZATIONS

 

Institute of Geotechnical & Geophysical Studies                         Tel:  (40-21) 6148551

(GEOTEC SA Bucuresti)                                                         Fax:  (40-21) 3127689

Romanian Electricity Authority                                                 Telex:  11443 ISPH R

5 –7 Galati Str. 70211, Sector 2                                                

Bucharest                                                                               

 

Institute for Nuclear Research & Engineering                            Tel:  (40-248) 6148551

P.O. Box 11-2                                                                         Fax:  (40-248) 262 449

RO 72400, Bucharest                                                              

 

Horia Hulubei National Institute of Physics                                Tel:+40 21 7807040

and Nuclear Engineering                                                          Fax:+40 21 4231701

Str. Atomistilor no. 407                                                             Email: ifin.nipne.ro

P.O.Box: MG-6                                                                       Web: http://www.nipne.ro

RO 76900 Bucharest

 

Republican Commandment for Intervention

In case of Nuclear Accident (CANCOC)                                  Fax:  (40-21) 3110265

19 Ceasornicului Str. Sector 1

Bucharest

 

NUCLEAR ELECTRICITY PRODUCER

 

CNE-PROD Cernavoda                                                           Tel: +(40 241) 238 610

(Branch of SNN-S.A.)                                                             Fax: +(40 241) 239 679

8625 Cernavoda str.                                                                 E-mail: ibucur@cne.ro

Medgidiei nr. 1 P.O.BOX 42

(Electricity producer, Cernavoda NPP Unit #1, in commercial operation since 1996)

 

TRANSMISSION SYSTEM OPERATOR

 

TRANSELECTRICA SA                                                        Tel. +(40-21) 303 58 21

Blvd. Magheru #33, Sector 1

70164 - Bucharest                                                                    Web: http://portal.transelectrica.ro

 

POWER MARKET OPERATOR

 

OPCOM S.A.                                                                         Tel. +(40-21) 307 14 10

Blvd. Magheru #33, Sector 1                                                    Fax +(40-21) 307 14 00

70164 - Bucharest                                                                    Web: http://www.oper.ro

 

ELECTRICITY DISTRIBUTION

 

ELECTRICA S.A.                                                                   Tel: + (4021) 208 5999

9, Grigore Alexandrescu Street, 1 Bucharest                              Fax: + (4021) 208 5998
e-mail: office@electrica.ro

                                                                                               Web: http://www.electrica.ro

NUCLEAR INDUSTRY

 

AMEA SA Cernavoda                                                             Tel: +40 241237857

8625 Cernavoda,                                                                      Fax: +40 241237857

 jud. Constanta                                                                        

(Procurement of services and products)

 

ASA HOLDING SA Bucuresti                                                Tel.: +(40 21)211-8454; 211-7770

str. Luca Stroici Nr. 15, Sector 2                                               Fax: +(40 21)210-1588

Cod 70224 Bucuresti                                                                doina@asa.ro, http://www.asa.ro

 

AUTOMATICA SA Bucuresti                                                 Tel: +(4021)230 8364

Calea Floreasca 159, Sector 1                                                   Fax: +(4021)230 2841

(Power Panels, Annunciation Equipment, Interconnecting           autom@automation.ipa.ro

Component, Regulating System/Reactivity Logic Cabinets)

 

AVERSA SA Bucuresti                                                           Tel: +4021 252 50 00

Str. Ziduri Mosi 25                                                                   Fax: +4021 252 07 69

(Cooling Pumps, Misc.Centrifugal Pumps,                                 E-mail: aversa@fx.ro

Nuclear & Non-nuclear Sump Pumps)                                      Web: http://www.aversa.ro

 

CNE-INVEST Cernavoda                                                        Tel: +40 241 239 962

(Branch of SNN-S.A.)                                                             Fax: +40 241 239 266

8625 str. Medgidiei nr. 3                                                           E-mail: marculescunv@impromex.ro

P.O.BOX 1

(Projects: Cernavoda NPP Units #2 <under construction>, #3-5<cancelled, in conservation>)

 

CITON Bucuresti – Magurele                                                  Tel/Fax:  +4021457 44 31

P.O.Box 52(MG)                                                                     E-mail: panaita@router.citon.ro

04   74554  Bucuresti – Magurele

(Design Services for Technology and Engineering for Nuclear Projects)

 

ELCOMEX srl  Cernavoda

Cernavoda cod 8625                                                                Tel: +40 241 237 169

Constanta

(Works for electric montage, actuators and electric facility for elevators)

 

ENERGOMONTAJ SA - GSE - IEA Bucuresti                        Tel: +4021 321 33 54

Str.Ilioara nr.54                                                                        Fax:   +40 21 212 22 10

Sector 3, Bucuresti,                                                                  Telex: 10320

CP 74592                                                                               

(Electric & Automatic Facilities)

 

ENERGOMONTAJ SIEA SA Bucuresti                                 

Str. Ilioara nr.54                                                                       Tel: +4021 321 33 54

Sector 3 Bucuresti                                                                   Telex: 10320 R

Cod 74592

(Supports for Electric Aparata & AMC, Piping for Insulated, Services & Tests for Relays & AMC)

 

EUROTEST SA Bucuresti                                                       Tel:  +4021 6206136

Str. Splaiul Unirii nr.313                                                            Fax: +4021 3232628

cod 73204 sect.3

(Tray for thermal olding, tray for ante & post irradiation, tray for LOCA & earth)

 

FCN Pitesti                                                                             Tel: +40 248 260 160

(Branch of SNN-S.A.)                                                             Fax: +40 248 262 499

Str. Cimpului nr. 1                                                                    Telex: 18251 R

0402 Mioveni Pitesti, CP 1                                                        E-mail: fcn@fcn.ro

Judetul Arges

(Fuel Fabrication for Reactors CANDU)

 

FEA Bucuresti                                                                         Tel: +4021 633 39 74

Calea Floreasca nr.242-246                                                      Fax: +4021 312 76 33

Bucuresti, Sector 1

(Current Alarm Units, Function Generators & Signal Selectors, Resistance To Current Converters)

 

FECNE SA Bucuresti                                                              Tel: +4021 683 60 05

Sos.Berceni nr.104                                                                   Fax: +4021 330 34 04

Sector 4, 75632 Bucuresti,                                                        Telex: 10243

(ECC System Tanks, Components Mechanic Welded & Non-destructive Controls)

 

FEPA SA Birlad                                                                      Tel: +40235 415 990

Str. Republicii nr.316 6400                                                        Fax: 40236 467 977

Birlad                                                                                      Telex: 21723

jud. Vaslui

(Electro Pneumatic Apparata for Automation)

 

GENERAL TURBO SA Bucuresti                                           Tel: +40 21 334 92 74

Sos. Berceni nr. 104                                                                 Fax: + 40 21 334 92 83

Bucuresti, sector 4

(Turbogenerators, Asynchrony Engine)

 

HESPER SA Bucuresti                                                            Tel: +4021 623 19 10

Str. Dr. Constantin Istrati nr. 1 75213                                        Fax: +4021 4237687 / 3372460

Bucuresti Sector 4                                                                   Telex: 11633 

(Air Control Panels Closure Plug Installation, Valve Station, Cold Test Facility)

 

IAICA SA Alexandria                                                             Tel: +40 247 312 145

Str. Dunarii nr. 372                                                                  Telex: 16133

Alexandria                                                                              

judetul Teleorman, CP. 0700

(Pneumatic & Electric Dampers Diffuser, Air Handling Units)

 

IAMSAT Bucuresti                                                                 Tel: +4021 63 77 855

Soseaua Orhideelor nr.27-29                                                     Telex: 10576

Sector 4, Bucuresti, CP 77139

(Mounting for Electric & Automatic Equipment)

 

IAR SA Brasov                                                                       Tel: 40921 50 014 or 61266

Str. Aeroportului, nr.1

Brasov, CP 2200

(Special Fire-resistant Doors)

 

ICIM Bucuresti

Bucuresti                                                                                 Tel: +40 21 637 30 20

Splaiul Independentei nr.294

(Environment engineering research)

 

ICN Pitesti

Pitesti, Colibasi                                                                        Tel: +40 248 213 535

Judetul Arges                                                                          Fax: +4021 312 58 96

(Exploitation for Radwaste Treatment Station)

 

ICPAIUC SA Bucuresti                                                           Tel: +40 21 64130 00

Bucuresti str. Fabrica de Chibrituri nr.48                                   Fax: +40 21 337 32 29

(Design & research institute for HVAC equipment)

 

ICPET SA Bucuresti                                                               Tel: +40 21 683 20 70

Sos Berceni nr. 104.                                                                 Fax: +40 21 683 27 47

cod 75632, sector 4

Bucuresti

 

PEROM SA Bacau

str. Republicii nr. 166                                                               Tel.: +40234 174344; +4034 175 376

cod 5500, Bacau                                                                      Fax: +40234 173 548

Judetul Bacau

 

PROMT SA Timisoara

Aleea CFR nr 7                                                                       Tel:  +40256 194 880

cod 1900, Timisoara                                                                 Fax: +40256 194 880

Judetul Timis

(Overhead Travelling Cranes, Boiler Room Cranes, New Fuel Handling Cranes, Monorails and Hoists)

 

IFIN Bucuresti                                                                        Tel:  +4021 780 70 40

Str.Atomistilor, nr.1                                                                  Fax: +4021 312 22 45

Magurele, Bucuresti                                                                 Telex: 1291

(Portable and Fixed Contamination  Monitors, Personal Monitors, Dosimetry Laboratory/Body Counters)

 

Kvaerner SA Bucuresti                                                            Tel:  +4021 684 10 20

Sos.Berceni nr.104                                                                   Fax: +4021 684 69 30

Sector 4, Bucuresti                                                                  

(Sample Cabinets Canisters, Nuclear Pressure Reducing Devices, Ion Exchange Columns)

 

INDES SA Sibiu                                                                     

Str. Ocnei, nr. 33                                                                     Tel:  + 40292 434 100

Cod 2400, Sibiu                                                                        Telex: 69341

Judetul Sibiu

(Channel Closure Installation Equipment, Spent Fuel Storage Tray Supports)

 

IUG SA Craiova                                                                      Tel: +40251 144 100

Str. Tehnicii, nr.1                                                                     Telex: 41323

Craiova                                                                                  

Judetul Dolj, CP 1100

(Head Transport Carriage, Bridge & Maintenance Lock Tracks)

 

MECANICA FINA SA Bucuresti                                            Tel: +4021 635 00 00

Str. Popa Lazar                                                                       Telex: 11583

nr. 5-25, Sector 2                                                                    

Bucuresti, CP 73334

(Pressure Gauges, Liquid Injection System Pressure Switches/Differential, Thermometers, Thermo-couples, Instrument Isolating Valves & Manifolds, Filter Regulators, Electric Pneumatic Transducers)

       

 

NIMB SA  Cernavoda                                                             Tel: +40241 238 488

Cernavoda                                                                               Fax: +40241 238 890

cod 8625, judetul Constanta                                                     

(Metallic build & facility for NPP)

NUCLEAR & VACUUM SA Bucuresti                                  Tel: +4021  807 365

Com. Magurele 76900                                                              Fax: +4021 807 365

Str.Atomistilor 1, Sector 5                                                         Telex: 11350; 11397

CP 52-06                                                                                

(Nuclear Apparatus, Vacuum Pumps)

 

NUCLEAR MONTAJ SA Bucuresti                                        Tel: +4094 344 233; 4095 114 590

str. Caransebes nr. 1                                                                Fax: +4094 734 211; 4095 734 580

sector 6                                                                                   E-mail: nuclearb@fx.ro

Bucuresti                                                                                 Web Site: www.nuclear.ro

(Mounting and Repairing of Mechanical Parts of Nuclear and Classic Power Plant Inclusive Auxiliaries) 

 

PETROTUB SA Roman                                                          Tel: +4033 731 201

Sos. Roman – Iasi                                                                    Telex: 25263

km. 333, Roman                                                                      

judetul Neamt, CP 5550                                                           

(Rolled Pipes on Hot & Cold)

 

REGIA AUTONOMA PENTRU                                             Tel: +40252 323  848

ACTIVITATI NUCLEARE (RAAN)                                      Fax: +40252 322 335; +4052 323 685

Calea Tg. Jiu km 7                                                                   E-mail: raan@expert.ro

Drobeta Turnu Severin                                                            

jud. Caras-Severin                                                                  

 

REPUBLICA SA Bucuresti                                                     Tel: +4021 627 59 45

Bd. Basarabiei nr. 256                                                              Fax: +4021 627 45 70

Sector 3, Bucuresti                                                                   Telex: 10862

(C.S. & S.S. Pipe for Small Diameters)

 

RETROM SA Pascani                                                             Tel.: +40232 762 092

str. Moldovei nr. 17 bis                                                             Fax: +40232 765 044

cod 5725 Pascani                                                                    

jud. Iasi                                                                                  

 

ROMENERGO SA Bucuresti                                                  Tel: +4021 659 47 20

Calea Victoriei nr. 91 – 93                                                        Fax: +4021 312 06 34

Sector 1  P.O.BOX 1 - 736 Bucharest                                      Telex: 011525

(Procurement for products and services for nuclear projects)

 

ROMAG Drobeta  Turnu Severin                                             Tel:++40 (0)252 322  397

Calea Tg. Jiu km 7                                                                         ++40 (0)252 321 561

Drobeta Turnu Severin                                                             Fax:++40 (0)52 317908

jud. Caras-Severin                                                                   Telex: 42270

Bucharest                                                                                E-mail: romag@intelsev.ro

(Heavy Water)                                                                        web: www.romag.ro

 

SACRO SA Bucuresti                                                             Tel: +4021 682 59 80

Soseaua Berceni nr 104                                                            Fax: +4021 312 24 69 

Sector 4, Bucharest                                                                  Telex: 11892

 

Societatea Nationala “NUCLEARELECTRICA” S.A.              Tel: +40 21 203 82 00

Boulevard General Gheorghe Magheru nr. 33                            Fax: +40 21 311 24 33

6th floor, Sector 1, 70164-Bucharest                                          E-mail: irotaru@snn.rdsnet.ro

P.O.BOX 22-102 Bucharest                                                     web: http://www.nuclearelectrica.ro

(National company for nuclear fuel and nuclear electricity production)

 

STIZO SA Bucuresti                                                               Tel: + 4021 614 43 60

Calea Mosilor nr.36                                                                  Telex: 11568 R

Sector 3, 75443-Bucharest                                                       

(Works for Technological Insulated, Insulating material on side of NPP)

 

TEHNOMET SA Timisoara                                                     Tel.: +40256 222 055;

Calea Buziasului nr. 5A                                                                    +40256 222 097;

Cod 1500 Timisoara                                                                 Fax: +40256 190 800;

Judetul Timis                                                                           E-mail: tehnomet@mail.dnttm.ro

 

TEN SA Bucuresti                                                                   Tel.: +4021 628 64 80

Bd. Basarabiei nr. 250                                                              Fax: +40 21 312 81 00

Bucuresti, Sector 3, cod 78011                                                  Telex:  011464 R

(Manufacturing of Nuclear Components, Complex Products, Iron Constructions)

 

TMUCB SA Cernavoda                                                           Tel: + 40241 23 84 10

Cernavoda, cod 8625                                                                Telex: 14529

judetul Constanta                                                                    

(Set-up tubes, pipes, metallic builds, large equipment & hangers)

 

TRAFO ELECTROPUTERE SA Craiova                                Tel: +40251 14 20 77

Calea Bucuresti nr.144                                                             Telex: 41331

(Transformer for Low and High Voltage, Transformer Plant, Transformer Balanced)

 

TURBOMECANICA SA Bucuresti                                         Tel: +4021 760 78 48

B-dul Pacii, nr 244                                                                   Telex: 10151

Sector 6, Bucuresti, cod 77826

(Mechanical Damper Devices for Earthquakes)

 

UMEB SA Bucuresti                                                               Tel: +4021 631 25 01

Str General Vasile Milea                                                          Telex: 10652

nr 4, cod 77035

Sector 6, Bucuresti

(Electric Engine Asynchrony for Low Voltage)

 

UNIFY SRL Cernavoda                                                          Tel: + 0421 237 581

Cernavoda, cod 8625

judetul Constanta

(Anticorrosive protection by insulated paint)

 

UPET SA Tirgoviste                                                                Tel: +40292 6 31 600

Str. Arsenalului, nr.20                                                               Telex: 17236

cod 0200 Tirgoviste

judetul Dimbovita

(Safety Valves, Flaps)

 

UZUC SA Ploiesti                                                                   Tel: +40244 14 36 51

Str. Depoului nr.16                                                                   Fax: +40244 12 19 12

Ploiesti, judetul Prahova                                                            Telex: 19337

(Chemical Equipment Works)

 

VENTILATORUL SA Bucuresti                                             Tel: +401 410 27 58

Str. sergent Nutu Ion nr.44                                                       Fax: +401 410 27 58

Sector 5, Bucuresti                                                                   Telex: 10671

(Fans)

 

VULCAN SA Bucuresti                                                          Tel: +4021 410 2061

Str. Sebastian 86-88                                                                 Fax: +402 1 410 0185; 410 7434

Sector 5, 76305-Bucuresti

(Headers & Feeders Frame Assay, Strainers, Fittings, Tanks)

 

NON GOVERNMENTAL ORGANIZATIONS (NGO)

 

Asociatia "Forumul Atomic Roman - ROMATOM                     Tel:     + 40 21 311 24 31

(Romanian Atomic Forum), FORATOM Member                      + 40 21 203 82 02

33, Blvd. Magheru, 5th floor, 122 A suite                                    Fax:    + 40 21 311 24 43

P.O.BOX 45-106 Bucharest                                                     e-mail: dchirica@snn.rdsnet.ro

                                                                                               Web: http://www.romatom.ro

 

Asociatia Romana "Energia Nucleara" - AREN                         Tel.:    +40 21 310 28 52

P.O.BOX MG-53                                                                    Fax:    +40 21 311 24 34

76900 Bucharest - Magurele                                                     e-mail: mstiopol@snn.rdsnet.ro

 

Societatea Romana de Radioprotectie (SRRp)                            Tel.: +4021 7330/292

Str. Dr. Leonte, Nr. 1-3,                                                           Fax: +4021 312 7780

76256, Bucuresti, Sector 5