Ukraine

TABLE 1. POPULATION INFORMATION

Average annual growth rate (%)
Year 1980 1990 2000 2005 2010 2013 2000 to 2013
Population (millions) 50 51.9 49.2 47.1 45.9 45.5 -0.60
Population density (inhabitants/km2) 86.4 85.9 81.5 78.0 76.0 75.4 -0.60
Urban population (% of total) 61.7 66.8 67.1 67.8 68.9 69.3 0.25
Area(1000 km2) 579.4

TABLE 2. GROSS DOMESTIC PRODUCT (GDP)

Average Annual
Growth Rate (%)
1990* 2000 2010 2012 2013 2000 to 2013
GDP (millions of constant 2005 US$) 71,953 59,536 90,577 95,477 97,269 3.85
GDP per capita (thousand US$/capita) 1.39 0.64 2.97 3.87 4 15.14
GDP current (million US$) - 31,262 136,419 176,603 182,026 14.51
GDP per capita (PPP** thousand US$/capita) 8.51 3.82 7.7 8.48 8.79 6.62

TABLE 3. ESTIMATED ENERGY RESERVES

Estimated available energy sources
Fossil Fuels Nuclear Renewables
Solid Liquid Gas Uranium Hydro Other Reneables Total
Total amount in Exajoule (EJ) 965.89 7.44 30.53 44.23 4.34 1 052.41
Total amount in specific units* 33,873 151 787 86,800 22,000

TABLE 4. ENERGY STATISTICS

(Energy values are in Exajoule exept where indicated) Annual Average
Growth Rate (%)
Total Energy Requirements 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 5.87 6.28 4.93 .. -1.93
Solids .. .. 1.61 1.55 1.50 .. -0.83
Liquids .. .. 0.45 0.58 0.55 .. 2.16
Gases .. .. 2.90 3.13 1.93 .. -4.43
Hydro .. .. 0.04 0.05 0.04 .. 0.46
Nuclear .. .. 0.84 0.97 0.90 .. 0.78
Combustible Renewables and Waste .. .. 0.04 0.04 0.02 .. -4.84
Other Renewables .. .. -0.01 -0.03 -0.01 .. 0.56
Final Energy Consumption 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 3.31 3.49 3.21 .. -0.33
Solids .. .. 1.53 1.45 1.31 .. -1.71
Liquids .. .. 0.16 0.19 0.17 .. 0.76
Gases .. .. 0.70 0.81 0.75 .. 0.83
Hydro .. .. 0.04 0.05 0.04 .. 0.46
Nuclear .. .. 0.84 0.97 0.90 .. 0.78
Combustible Renewables and Waste .. .. 0.04 0.03 0.03 .. -1.70
Other Renewables .. .. < 0.01 < 0.01 < 0.01 .. 24.46
Net Import (Export-Import) 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 2.59 2.71 1.85 .. -3.64
Solids .. .. 0.08 0.10 0.06 .. -4.26
Liquids .. .. 0.32 0.38 0.37 .. 1.65
Gases .. .. 2.20 2.25 1.45 .. -4.52
Combustible Renewables and Waste .. .. < 0.01 0.01 > -0.01 ..

TABLE 5. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY

Annual Average
Growth Rate (%)
Electricity Generation 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 171.45 186.06 173.62 .. 0.14
Nuclear .. .. 77.34 88.76 82.92 .. 0.78
Hydro .. .. 11.45 12.51 11.94 .. 0.46
Geothermal .. .. < 0.01 0.04 0.04 .. 24.46
Thermal .. .. 82.65 84.76 78.72 .. -0.54
Installed Capacity 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 52.85 52.56 54.38 .. 0.32
Nuclear .. .. 11.84 12.84 13.84 .. 1.75
Hydro .. .. 4.72 4.74 5.42 .. 1.55
Geothermal .. .. .. .. .. .. ..
Thermal .. .. 36.28 34.92 35.04 .. -0.38

TABLE 6. ENERGY RELATED RATIOS

Annual Average
Growth Rate (%)
1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Energy consumption per capita (GJ/capita) .. .. 119.4 133.4 107.1 .. -1.20
Electricity per capita (KW.h/capita) .. .. 3,486.4 3,952.3 3,773.5 .. 0.88
Nuclear/Total electricity (%) .. .. 45.1 47.7 47.8 .. 0.64
Annual capacity factor - Total (%) .. .. 37.0 40.4 36.4 .. -0.18
Annual capacity factor - Thermal (%) .. .. 26.0 27.7 25.6 .. -0.16
Annual capacity factor - Hydro (%) .. .. 27.7 30.1 25.1 .. -1.07
Annual capacity factor - Nuclear (%) .. .. 74.6 78.9 68.4 .. -0.96

TABLE 7: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2014

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2014
KHMELNITSKI-1 PWR 950 Operational NNEGC PAIP 1981-11-01 1987-12-10 1987-12-31 1988-08-13 48.6
KHMELNITSKI-2 PWR 950 Operational NNEGC PAIP 1985-02-01 2004-08-01 2004-08-07 2005-12-15 80.7
ROVNO-1 PWR 381 Operational NNEGC PAIP 1973-08-01 1980-12-17 1980-12-22 1981-09-22 96.9
ROVNO-2 PWR 376 Operational NNEGC PAIP 1973-10-01 1981-12-19 1981-12-22 1982-07-29 81.4
ROVNO-3 PWR 950 Operational NNEGC PAIP 1980-02-01 1986-11-11 1986-12-21 1987-05-16 72.1
ROVNO-4 PWR 950 Operational NNEGC PAA 1986-08-01 2004-09-26 2004-10-10 2006-04-06 81.4
SOUTH UKRAINE-1 PWR 950 Operational NNEGC PAA 1976-08-01 1982-12-09 1982-12-31 1983-12-02 82.5
SOUTH UKRAINE-2 PWR 950 Operational NNEGC PAA 1981-07-01 1984-12-30 1985-01-06 1985-04-06 76.2
SOUTH UKRAINE-3 PWR 950 Operational NNEGC PAA 1984-11-01 1989-09-02 1989-09-20 1989-12-29 92.5
ZAPOROZHYE-1 PWR 950 Operational NNEGC PAIP 1980-04-01 1984-12-07 1984-12-10 1985-12-25 72.0
ZAPOROZHYE-2 PWR 950 Operational NNEGC PAIP 1981-01-01 1985-06-28 1985-07-22 1986-02-15 75.7
ZAPOROZHYE-3 PWR 950 Operational NNEGC PAIP 1982-04-01 1986-12-04 1986-12-10 1987-03-05 80.9
ZAPOROZHYE-4 PWR 950 Operational NNEGC PAIP 1983-04-01 1987-12-15 1987-12-18 1988-04-14 82.6
ZAPOROZHYE-5 PWR 950 Operational NNEGC PAIP 1985-11-01 1989-07-20 1989-08-14 1989-10-27 97.0
ZAPOROZHYE-6 PWR 950 Operational NNEGC PAIP 1986-06-01 1995-10-06 1995-10-19 1996-09-17 81.5
KHMELNITSKI-3 PWR 950 Under Construction NNEGC ASE 1986-03-01 2021-01-01
KHMELNITSKI-4 PWR 950 Under Construction NNEGC ASE 1987-02-01 2021-01-01
CHERNOBYL-1 LWGR 740 Permanent Shutdown MTE FAEA 1970-03-01 1977-08-02 1977-09-26 1978-05-27 1996-11-30
CHERNOBYL-2 LWGR 925 Permanent Shutdown MTE FAEA 1973-02-01 1978-11-17 1978-12-21 1979-05-28 1991-10-11
CHERNOBYL-3 LWGR 925 Permanent Shutdown MTE FAEA 1976-03-01 1981-06-02 1981-12-03 1982-06-08 2000-12-15
CHERNOBYL-4 LWGR 925 Permanent Shutdown MTE FAEA 1979-04-01 1983-11-26 1983-12-22 1984-03-26 1986-04-26
SOUTH UKRAINE-4 PWR 950 Suspended Constr. NNEGC 1987-01-01
CHERNOBYL-5 LWGR 950 Cancelled Constr. MINENERG 1981-01-01 1988-01-01
CHERNOBYL-6 LWGR 950 Cancelled Constr. MINENERG 1983-01-01 1988-01-01
CRIMEA-1 PWR 0 Cancelled Constr. MINENERG 1982-12-01 1989-01-01
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table 7 is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Station/Project Name Type Net Capacity Expected Connection to the Grid Expected Commercial Date
KhNPP - 3 WWER 950 2016 2017
KhNPP - 4 WWER 950 2016 2017

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Items 2006-2010 2011-2020 2021-2030 Total
Installed capacity, GW 13,84 21,84 29,5
Capacity Factor (CF) % 82,8 85 85
Electric power generation, Wh (by periods) 488,3 1 185,7 1 837,0 3 511,0
Spendings breakdown* for new construction**, UAH mln 4 525 61 955 103 024 169 504

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Periods Average investment requirement per annum,
UAH mln
Total, UAH mln
2006 – 2010 807 4 037
2011 – 2015 1862 9 314
2016 – 2020 792 3 964
2021 – 2025 660 3 303
2026 – 2030 213 1 065
Total for the period of 2006 to 2030 21 700