Sweden

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

 Fossil fuels Nuclear  Renewables
Solid Liquid Gas Uranium Hydro Other
renewable
Total amount in specific units* 1)  —1)  —1) 49002) 16.33)
Total amount in exajoules (EJ)  —1)  —1)  —1)

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 1 502 1 473 1 488 1 373 1 353 -0.52
Coal, Lignate and Peat 57 68 59 53 48 -0.89
Oil 592 540 476 397 328 -2.92
Natural gas 20 23 28 28 35 2.92
Bioenergy and Waste 221 198 238 271 328 2.00
Electricity 463 470 472 449 443 -0.22
Heat 149 175 215 176 171 0.71

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 145 266 158 435 148 548 162 112 163 833 0.60
Coal, Lignate and Peat 2 536 1 926 2 675 1 261 659 -6.52
Oil 1 533 1 379 1 774 252 141 -11.25
Natural gas 462 585 2 877 425 97 -7.51
Bioenergy and Waste 4 342 8 357 13 397 11 968 12 721 5.52
Hydro 78 619 72 874 66 501 75 439 72 440 -0.41
Nuclear 57 316 72 377 57 828 56 348 49 198 -0.76
Wind 457 935 3 487 16 322 27 526 22.74
Solar 1 2 9 97 1 051 41.61

TABLE 4. ENERGY RELATED RATIOS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 2021*
Nulcear/total electricity(%) 39 44.9 38.1 34.3 29.8 30.8

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2021

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
FORSMARK-1 BWR 990 Operational FKA ABB ATOM 01/06/1973 23/04/1980 06/06/1980 10/12/1980 92.3
FORSMARK-2 BWR 1121 Operational FKA ABB ATOM 01/01/1975 16/11/1980 26/01/1981 07/07/1981 88.5
FORSMARK-3 BWR 1172 Operational FKA ABB ATOM 01/01/1979 28/10/1984 05/03/1985 18/08/1985 88.5
OSKARSHAMN-3 BWR 1400 Operational OKG ABB ATOM 01/05/1980 29/12/1984 03/03/1985 15/08/1985 91.8
RINGHALS-3 PWR 1072 Operational RAB WH 01/09/1972 29/07/1980 07/09/1980 09/09/1981 70.3
RINGHALS-4 PWR 1130 Operational RAB WH 01/11/1973 19/05/1982 23/06/1982 21/11/1983 84.6
AGESTA PHWR 10 Permanent Shutdown SVAFO ABB ATOM 01/12/1957 17/07/1963 01/05/1964 01/05/1964 02/06/1974
BARSEBACK-1 BWR 600 Permanent Shutdown BKAB ASEASTAL 01/02/1971 18/01/1975 15/05/1975 01/07/1975 30/11/1999
BARSEBACK-2 BWR 600 Permanent Shutdown BKAB ABB ATOM 01/01/1973 20/02/1977 21/03/1977 01/07/1977 31/05/2005
OSKARSHAMN-1 BWR 473 Permanent Shutdown OKG ABB ATOM 01/08/1966 12/12/1970 19/08/1971 06/02/1972 19/06/2017
OSKARSHAMN-2 BWR 638 Permanent Shutdown OKG ABB ATOM 01/09/1969 06/03/1974 02/10/1974 01/01/1975 22/12/2016
RINGHALS-1 BWR 881 Permanent Shutdown RAB ABB ATOM 01/02/1969 20/08/1973 14/10/1974 01/01/1976 31/12/2020
RINGHALS-2 PWR 852 Permanent Shutdown RAB WH 01/10/1970 19/06/1974 17/08/1974 01/05/1975 31/12/2019
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor unit Shutdown reason Decommission strategy Current decommissioning phase Current fuel management phase Decommissioning licensee Licence terminated year
Ågesta Economic Dismantling after a care and maintenance phase Large scale dismantling activities ongoing Off-site storage Vattenfall AB ~2023 (free-release of the remaining building structures)
Oskarshamn 1 Economic Immediate dismantling Large scale dismantling activities (systems in the containment) ongoing; turbines and generators dismantled; RPV dismantling in 2023-2024 Off-site storage OKG AB After the permanent shutdown of unit 31)
Oskarshamn 2 Economic Immediate dismantling Large scale dismantling activities (dismantling of systems in the reactor building) ongoing; turbines and generators, systems in containment dismantled; RPV dismantling in 2022-2023 Off-site storage OKG AB After the permanent shutdown of unit 31)
Barsebäck 1 Political Dismantling after a care and maintenance phase Large scale dismantling activities (dismantling of systems in the containment) ongoing; RPV, turbines and generator dismantled Off-site storage Barsebäck Kraft AB 20452)
Barsebäck 2 Political Dismantling after a care and maintenance phase Large scale dismantling activities (RPV dismantling) ongoing; turbines and generator dismantled Off-site storage Barsebäck Kraft AB 20452)
Ringhals 1 Economic Immediate dismantling Transport of spent nuclear fuel off-site completed by mid-2022; preparatory activities ongoing; dismantling planned to commence in 2023 Off-site storage Ringhals AB ~20453)
Ringhals 2 Economic Immediate dismantling Transport of spent nuclear fuel off-site completed by mid-2022; preparatory activities ongoing; dismantling planned to commence in 2023 Off-site storage Ringhals AB ~20453)