China
TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES
Fossil fuels | Nuclear | Renewables | ||||
Coal (1) | Crude Oil (2) | Natural Gas (3) | Uranium (4) | Hydro (5) | Wind (6) | |
Total amount in specific units*) | 1622.88 | 36.19 | 7.00 | 34.4 | 5.42 | 9.5 |
TABLE 2. ENERGY CONSUMPTION
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 34 706 | 55 192 | 73 265 | 86 941 | 95 326 | 5.18 |
Coal, Lignate and Peat | 12 432 | 25 274 | 34 121 | 36 317 | 28 634 | 4.26 |
Oil | 8 488 | 12 379 | 15 425 | 20 082 | 23 865 | 5.30 |
Natural gas | 661 | 1 402 | 3 200 | 4 518 | 8 270 | 13.47 |
Bioenergy and Waste | 8 229 | 6 944 | 5 038 | 3 774 | 3 594 | -4.06 |
Electricity | 3 726 | 7 170 | 12 405 | 17 529 | 24 175 | 9.80 |
Heat | 1 170 | 2 023 | 3 076 | 4 721 | 6 788 | 9.19 |
TABLE 3. ELECTRICITY PRODUCTION
Electricity production (GWh) | 2000 | 2005 | 2010 | 2015 | 2020 | Compound annual growth rate 2000–2020 (%) |
Total | 1 355 738 | 2 500 466 | 4 207 993 | 5 859 515 | 7 781 726 | 9.13 |
Coal, Lignate and Peat | 1 060 372 | 1 980 272 | 3 239 704 | 4 108 994 | 4 966 309 | 8.03 |
Oil | 47 268 | 50 513 | 14 856 | 9 679 | 10 724 | -7.15 |
Natural gas | 5 773 | 12 142 | 78 063 | 145 346 | 216 297 | 19.86 |
Bioenergy and Waste | 2 421 | 5 200 | 33 863 | 63 729 | 123 387 | 21.72 |
Hydro | 222 414 | 397 017 | 722 172 | 1 130 270 | 1 355 311 | 9.46 |
Nuclear | 16 737 | 53 088 | 73 880 | 170 789 | 366 121 | 16.68 |
Wind | 615 | 2 028 | 44 622 | 185 766 | 470 568 | 39.38 |
Solar | 22 | 84 | 701 | 44 809 | 272 871 | 60.21 |
Geothermal | 109 | 115 | 125 | 125 | 125 | 0.70 |
Tidal | 7 | 7 | 7 | 8 | 13 | 3.16 |
TABLE 4. ENERGY RELATED RATIOS
Final Energy consumption [PJ] | 2000 | 2005 | 2010 | 2015 | 2020 | 2021* |
Nuclear/total electricity (%) | 1.2 | 2 | 1.8 | 3 | 4.9 | 5 |
TABLE 5. STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS
Reactor Unit | Type | Net Capacity [MW(e)] |
Status | Operator | Reactor Supplier |
Construction date |
First Criticality Date |
First Grid Date |
Commercial Date |
Shutdown Date |
UCF for 2021 |
BAMAOSHAN | PWR | 900 | Planned | Not Available | 0 | ||||||
CEFR | FBR | 20 | Operational | CIAE | AVR | 2000-05-10 | 2010-07-21 | 2011-07-21 | 0 | ||
CHANGJIANG-1 | PWR | 601 | Operational | HNPC | PE | 2010-04-25 | 2015-10-12 | 2015-11-07 | 2015-12-25 | 84.9 | |
CHANGJIANG-2 | PWR | 601 | Operational | HNPC | PE | 2010-11-21 | 2016-06-09 | 2016-06-20 | 2016-08-12 | 86.9 | |
CHANGJIANG-3 | PWR | 1000 | Under Construction | CHG | Not Available | 2021-03-31 | 0 | ||||
CHANGJIANG-4 | PWR | 1000 | Under Construction | CHG | Not Available | 2021-12-28 | 0 | ||||
DAYA BAY-1 | PWR | 944 | Operational | DNMC | CYAPC | 1987-08-07 | 1993-07-28 | 1993-08-31 | 1994-02-01 | 89.8 | |
DAYA BAY-2 | PWR | 944 | Operational | DNMC | CYAPC | 1988-04-07 | 1994-01-21 | 1994-02-07 | 1994-05-06 | 100.6 | |
FANGCHENGGANG-1 | PWR | 1000 | Operational | GFNPC | PE | 2010-07-30 | 2015-10-13 | 2015-10-25 | 2016-01-01 | 93.3 | |
FANGCHENGGANG-2 | PWR | 1000 | Operational | GFNPC | PE | 2010-12-23 | 2016-06-29 | 2016-07-15 | 2016-10-01 | 101.5 | |
FANGCHENGGANG-3 | PWR | 1000 | Under Construction | GFNPC | Not Available | 2015-12-24 | 0 | ||||
FANGCHENGGANG-4 | PWR | 1000 | Under Construction | GFNPC | Not Available | 2016-12-23 | 0 | ||||
FANGCHENGGANG-5 | PWR | 1000 | Planned | Not Available | 0 | ||||||
FANGCHENGGANG-6 | PWR | 1000 | Planned | Not Available | 0 | ||||||
FANGJIASHAN-1 | PWR | 1012 | Operational | QNPC | Not Available | 2008-12-26 | 2014-10-21 | 2014-11-04 | 2014-12-15 | 100 | |
FANGJIASHAN-2 | PWR | 1012 | Operational | QNPC | Not Available | 2009-07-17 | 2014-12-25 | 2015-01-12 | 2015-02-12 | 86.5 | |
FUQING-1 | PWR | 1000 | Operational | FQNP | Not Available | 2008-11-21 | 2014-07-24 | 2014-08-20 | 2014-11-22 | 91 | |
FUQING-2 | PWR | 1000 | Operational | FQNP | Not Available | 2009-06-17 | 2015-07-22 | 2015-08-06 | 2015-10-16 | 85.4 | |
FUQING-3 | PWR | 1000 | Operational | FQNP | Not Available | 2010-12-31 | 2016-07-03 | 2016-09-07 | 2016-10-24 | 82 | |
FUQING-4 | PWR | 1000 | Operational | FQNP | Not Available | 2012-11-17 | 2017-07-16 | 2017-07-29 | 2017-09-17 | 94.7 | |
FUQING-5 | PWR | 1075 | Operational | FQNP | Not Available | 2015-05-07 | 2020-10-21 | 2020-11-27 | 2021-01-29 | 89 | |
FUQING-6 | PWR | 1075 | Operational | FQNP | Not Available | 2015-12-22 | 2021-12-11 | 2022-01-01 | 2022-03-25 | 0 | |
HAIYANG-1 | PWR | 1170 | Operational | SDNPC | Not Available | 2009-09-24 | 2018-08-08 | 2018-08-17 | 2018-10-22 | 89.1 | |
HAIYANG-2 | PWR | 1170 | Operational | SDNPC | Not Available | 2010-06-20 | 2018-09-29 | 2018-10-13 | 2019-01-09 | 90.6 | |
HAIYANG-3 | PWR | 1161 | Under Construction | SDNPC | Not Available | 2022-07-07 | 0 | ||||
HAIYANG-4 | PWR | 1170 | Planned | SDNPC | Not Available | 0 | |||||
HONGSHIDING-1 | PWR | 0 | Planned | Not Available | 0 | ||||||
HONGSHIDING-2 | PWR | 0 | Planned | HSDNPC | PE | 0 | |||||
HONGYANHE-1 | PWR | 1061 | Operational | LHNPC | PE | 2007-08-18 | 2013-01-16 | 2013-02-17 | 2013-06-06 | 96.6 | |
HONGYANHE-2 | PWR | 1061 | Operational | LHNPC | PE | 2008-03-28 | 2013-10-24 | 2013-11-23 | 2014-05-13 | 88.2 | |
HONGYANHE-3 | PWR | 1061 | Operational | LHNPC | PE | 2009-03-07 | 2014-10-27 | 2015-03-23 | 2015-08-16 | 85.5 | |
HONGYANHE-4 | PWR | 1061 | Operational | LHNPC | PE | 2009-08-15 | 2016-03-05 | 2016-04-01 | 2016-06-08 | 89.6 | |
HONGYANHE-5 | PWR | 1061 | Operational | LHNPC | PE | 2015-03-29 | 2021-06-13 | 2021-06-25 | 2021-07-31 | 96.9 | |
HONGYANHE-6 | PWR | 1061 | Operational | LHNPC | PE | 2015-07-24 | 2022-04-21 | 2022-05-02 | 2022-06-23 | 0 | |
JIYANG-1 | PWR | 1000 | Planned | Not Available | 0 | ||||||
JIYANG-2 | PWR | 1000 | Planned | Not Available | 0 | ||||||
JIYANG-3 | PWR | 1000 | Planned | Not Available | 0 | ||||||
JIYANG-4 | PWR | 1000 | Planned | Not Available | 0 | ||||||
LING AO-1 | PWR | 950 | Operational | DNMC | CYAPC | 1997-05-15 | 2002-02-04 | 2002-02-26 | 2002-05-28 | 89.4 | |
LING AO-2 | PWR | 950 | Operational | DNMC | CYAPC | 1997-11-28 | 2002-08-27 | 2002-09-14 | 2003-01-08 | 97.9 | |
LING AO-3 | PWR | 1007 | Operational | DNMC | PE | 2005-12-15 | 2010-06-09 | 2010-07-15 | 2010-09-15 | 82.9 | |
LING AO-4 | PWR | 1007 | Operational | DNMC | PE | 2006-06-15 | 2011-02-25 | 2011-05-03 | 2011-08-07 | 83.5 | |
LINGLONG-1 | PWR | 100 | Under Construction | HNPC | Not Available | 2021-07-13 | 0 | ||||
LUFENG-1 | PWR | 1000 | Planned | LFNPC | Not Available | 0 | |||||
LUFENG-2 | PWR | 1000 | Planned | LFNPC | Not Available | 0 | |||||
NINGDE-1 | PWR | 1018 | Operational | NDNP | PE | 2008-02-18 | 2012-11-24 | 2012-12-28 | 2013-04-15 | 92.1 | |
NINGDE-2 | PWR | 1018 | Operational | NDNP | Not Available | 2008-11-12 | 2013-12-20 | 2014-01-04 | 2014-05-04 | 90.2 | |
NINGDE-3 | PWR | 1018 | Operational | NDNP | Not Available | 2010-01-08 | 2015-03-08 | 2015-03-21 | 2015-06-10 | 94.4 | |
NINGDE-4 | PWR | 1018 | Operational | NDNP | Not Available | 2010-09-29 | 2016-03-16 | 2016-03-29 | 2016-07-21 | 100 | |
PENGZE-1 | PWR | 1250 | Planned | Not Available | 0 | ||||||
PENGZE-2 | PWR | 1250 | Planned | Not Available | 0 | ||||||
PENGZE-3 | PWR | 1250 | Planned | Not Available | 0 | ||||||
PENGZE-4 | PWR | 1250 | Planned | Not Available | 0 | ||||||
QINSHAN 2-1 | PWR | 610 | Operational | NPQJVC | COGEMA | 1996-06-02 | 2001-11-15 | 2002-02-06 | 2002-04-15 | 94 | |
QINSHAN 2-2 | PWR | 610 | Operational | NPQJVC | COGEMA | 1997-04-01 | 2004-02-25 | 2004-03-11 | 2004-05-03 | 101.2 | |
QINSHAN 2-3 | PWR | 619 | Operational | NPQJVC | COGEMA | 2006-04-28 | 2010-07-13 | 2010-08-01 | 2010-10-05 | 88.3 | |
QINSHAN 2-4 | PWR | 619 | Operational | NPQJVC | COGEMA | 2007-01-28 | 2011-11-17 | 2011-11-25 | 2011-12-30 | 90.1 | |
QINSHAN 3-1 | PHWR | 677 | Operational | TQNPC | Not Available | 1998-06-08 | 2002-09-21 | 2002-11-19 | 2002-12-31 | 85.6 | |
QINSHAN 3-2 | PHWR | 677 | Operational | TQNPC | Not Available | 1998-09-25 | 2003-01-18 | 2003-06-12 | 2003-07-24 | 94.6 | |
QINSHAN-1 | PWR | 308 | Operational | CNNO | COGEMA | 1985-03-20 | 1991-10-31 | 1991-12-15 | 1994-04-01 | 94.9 | |
SANAOCUN-1 | PWR | 1117 | Under Construction | CGCNP | Not Available | 2020-12-31 | 0 | ||||
SANAOCUN-2 | PWR | 1117 | Under Construction | CGCNP | Not Available | 2021-12-30 | 0 | ||||
SANMEN-1 | PWR | 1157 | Operational | SMNPC | RPNPC | 2009-04-19 | 2018-06-21 | 2018-06-30 | 2018-09-21 | 92.6 | |
SANMEN-2 | PWR | 1157 | Operational | SMNPC | RPNPC | 2009-12-15 | 2018-08-17 | 2018-08-24 | 2018-11-05 | 90.2 | |
SANMEN-3 | PWR | 1163 | Under Construction | SMNPC | NDA | 2022-06-28 | 0 | ||||
SANMEN-4 | PWR | 1157 | Planned | SMNPC | RPNPC | 0 | |||||
SANMING-1 | FBR | 800 | Planned | FSNPC | Not Available | 0 | |||||
SANMING-2 | FBR | 800 | Planned | FSNPC | Not Available | 0 | |||||
SHIDAO BAY-1 | HTGR | 200 | Operational | HSNPC | MINATOM | 2012-12-09 | 2021-09-12 | 2021-12-14 | 0 | ||
SN-1 | PWR | 1534 | Planned | SNPDP | Not Available | 0 | |||||
SN-2 | PWR | 1534 | Planned | SNPDP | Not Available | 0 | |||||
TAIPINGLING-1 | PWR | 1116 | Under Construction | HZNP | PE | 2019-12-26 | 0 | ||||
TAIPINGLING-2 | PWR | 1116 | Under Construction | HZNP | Not Available | 2020-10-15 | 0 | ||||
TAISHAN-1 | PWR | 1660 | Operational | TNPJVC | UE | 2009-11-18 | 2018-06-06 | 2018-06-29 | 2018-12-13 | 52.4 | |
TAISHAN-2 | PWR | 1660 | Operational | TNPJVC | UE | 2010-04-15 | 2019-05-28 | 2019-06-23 | 2019-09-07 | 74.8 | |
TAOHUAJIANG-1 | PWR | 0 | Planned | Not Available | 0 | ||||||
TAOHUAJIANG-2 | PWR | 0 | Planned | Not Available | 0 | ||||||
TIANWAN-1 | PWR | 1000 | Operational | JNPC | AVR | 1999-10-20 | 2005-12-20 | 2006-05-12 | 2007-05-17 | 86 | |
TIANWAN-2 | PWR | 1000 | Operational | JNPC | AVR | 2000-09-20 | 2007-05-01 | 2007-05-14 | 2007-08-16 | 91 | |
TIANWAN-3 | PWR | 1060 | Operational | JNPC | AVR | 2012-12-27 | 2017-09-29 | 2017-12-30 | 2018-02-14 | 85.3 | |
TIANWAN-4 | PWR | 1060 | Operational | JNPC | AVR | 2013-09-27 | 2018-09-30 | 2018-10-27 | 2018-12-22 | 92.7 | |
TIANWAN-5 | PWR | 1060 | Operational | JNPC | Not Available | 2015-12-27 | 2020-07-27 | 2020-08-08 | 2020-09-08 | 81.2 | |
TIANWAN-6 | PWR | 1060 | Operational | JNPC | Not Available | 2016-09-07 | 2021-05-04 | 2021-05-11 | 2021-06-02 | 96.5 | |
TIANWAN-7 | PWR | 1171 | Under Construction | JNPC | RWE/E.ON | 2021-05-19 | 0 | ||||
TIANWAN-8 | PWR | 1171 | Under Construction | JNPC | RWE/E.ON | 2022-02-25 | 0 | ||||
XIANNING-1 | PWR | 0 | Planned | Not Available | 0 | ||||||
XIANNING-2 | PWR | 0 | Planned | Not Available | 0 | ||||||
XIAPU-1 | FBR | 642 | Under Construction | CNNC | Not Available | 2017-12-29 | 0 | ||||
XUDABU-1 | PWR | 1000 | Planned | LNPC | PE | 0 | |||||
XUDABU-2 | PWR | 1000 | Planned | LNPC | PE | 0 | |||||
XUDABU-3 | PWR | 1200 | Under Construction | LNPC | Not Available | 2021-07-28 | 0 | ||||
XUDABU-4 | PWR | 1200 | Under Construction | LNPC | RWE/E.ON | 2022-05-19 | 0 | ||||
YANGJIANG-1 | PWR | 1000 | Operational | YJNPC | Not Available | 2008-12-16 | 2013-12-23 | 2013-12-31 | 2014-03-25 | 90.5 | |
YANGJIANG-2 | PWR | 1000 | Operational | YJNPC | Not Available | 2009-06-04 | 2015-03-02 | 2015-03-10 | 2015-06-05 | 100.3 | |
YANGJIANG-3 | PWR | 1000 | Operational | YJNPC | Not Available | 2010-11-15 | 2015-10-11 | 2015-10-18 | 2016-01-01 | 89.1 | |
YANGJIANG-4 | PWR | 1000 | Operational | YJNPC | Not Available | 2012-11-17 | 2016-12-30 | 2017-01-08 | 2017-03-15 | 91.1 | |
YANGJIANG-5 | PWR | 1000 | Operational | YJNPC | Not Available | 2013-09-18 | 2018-05-16 | 2018-05-23 | 2018-07-12 | 93.6 | |
YANGJIANG-6 | PWR | 1000 | Operational | YJNPC | Not Available | 2013-12-23 | 2019-06-22 | 2019-06-29 | 2019-07-24 | 97.3 | |
ZHANGZHOU-1 | PWR | 1126 | Under Construction | ZGZEC | Not Available | 2019-10-16 | 0 | ||||
ZHANGZHOU-2 | PWR | 1126 | Under Construction | ZGZEC | Not Available | 2020-09-04 | 0 |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
Nuclear Power Plant | Owner | Operator |
Qinshan NPP | Qinshan Nuclear Power Co., Ltd. | CNNC Nuclear Power Operation and Management Co., Ltd. |
Qinshan Phase II NPP | Nuclear Power Qinshan Joint Venture Co., Ltd. | CNNC Nuclear Power Operation and Management Co., Ltd. |
Third Qinshan NPP | Third Qinshan Nuclear Power Co., Ltd. | CNNC Nuclear Power Operation and Management Co., Ltd. |
Fangjiashan NPP | Qinshan Nuclear Power Co., Ltd. | CNNC Nuclear Power Operation and Management Co., Ltd. |
Daya Bay NPP | Guangdong Nuclear Power Joint Venture Co., Ltd. | Daya Bay Nuclear Power Operations and Management Co., Ltd. |
Ling'ao NPP Phase I | Ling'ao Nuclear Power Co., Ltd. | Daya Bay Nuclear Power Operations and Management Co., Ltd. |
Ling'ao NPP Phase II | Lingdong Nuclear Power Co., Ltd. | Daya Bay Nuclear Power Operations and Management Co., Ltd. |
Tianwan NPP | Jiangsu Nuclear Power Co., Ltd. | Jiangsu Nuclear Power Co., Ltd. |
Hongyanhe NPP | Liaoning Hongyanhe Nuclear Power Co., Ltd.; | Liaoning Hongyanhe Nuclear Power Co., Ltd.; |
Ningde NPP | Fujian Ningde Nuclear Power Co., Ltd.; | Fujian Ningde Nuclear Power Co., Ltd.; |
Fuqing NPP | Fujian Fuqing Nuclear Power Co., Ltd.; | Fujian Fuqing Nuclear Power Co., Ltd.; |
Yangjiang NPP | Yangjiang Nuclear Power Co., Ltd. | Yangjiang Nuclear Power Co., Ltd. |
Changjiang NPP | Hainan Nuclear Power Co., Ltd. | Hainan Nuclear Power Co., Ltd. |
Fangchenggang NPP | Guangxi Fangchenggang Nuclear Power Co., Ltd.; | Guangxi Fangchenggang Nuclear Power Co., Ltd.; |
Sanmen NPP | Sanmen Nuclear Power Co., Ltd. | Sanmen Nuclear Power Co., Ltd. |
Haiyang NPP | Shandong Nuclear Power Co., Ltd. | Shandong Nuclear Power Co., Ltd. |
Taishan NPP | Taishan Nuclear Power Joint Venture Co., Ltd. | Taishan Nuclear Power Joint Venture Co., Ltd. |
Zhangzhou NPP | CNNC Zhangzhou Energy Co., Ltd. | CNNC Zhangzhou Energy Co., Ltd. |
Xudapu NPP | CNNC Liaoning Nuclear Power Co., Ltd. | CNNC Liaoning Nuclear Power Co., Ltd. |
Taipingling NPP | CGN Huizhou Nuclear Power Co., Ltd. | CGN Huizhou Nuclear Power Co., Ltd. |
San'ao NPP | CGN Cangnan Nuclear Power Co., Ltd. | CGN Cangnan Nuclear Power Co., Ltd. |
State Nuclear Power Demonstration Plant | State Nuclear Power Demonstration Plant Co., Ltd. | State Nuclear Power Demonstration Plant Co., Ltd. |
Huaneng Changjiang NPP | Huaneng Hainan Changjiang Nuclear Power Co., Ltd. | Huaneng Hainan Changjiang Nuclear Power Co., Ltd. |
Shidao Bay NPP | Huaneng Shandong Shidao Bay Nuclear Power Co., Ltd.; | Huaneng Shandong Shidao Bay Nuclear Power Co., Ltd.; |
Xiapu NPP | CNNC Xiapu Nuclear Power Co., Ltd. | CNNC Xiapu Nuclear Power Co., Ltd. |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
Reactor unit | Owner | Type | Capacity MW(e) | Construction start year | Expected commercial year |
FANGCHENGGANG-5 | PWR | 1000 | |||
FANGCHENGGANG-6 | PWR | 1000 | |||
HAIYANG-4 | CPIC | PWR | 1170 | ||
HONGSHIDING-1 | PWR | ||||
HONGSHIDING-2 | CNNC | PWR | |||
JIYANG-1 | PWR | 1000 | |||
JIYANG-2 | PWR | 1000 | |||
JIYANG-3 | PWR | 1000 | |||
JIYANG-4 | PWR | 1000 | |||
LUFENG-1 | GNP | PWR | 1000 | ||
LUFENG-2 | GNP | PWR | 1000 | ||
PENGZE-1 | PWR | 1250 | |||
PENGZE-2 | PWR | 1250 | |||
PENGZE-3 | PWR | 1250 | |||
PENGZE-4 | PWR | 1250 | |||
SANMEN-4 | CNNC | PWR | 1157 | ||
SANMING-1 | CNNC | FBR | 800 | ||
SANMING-2 | CNNC | FBR | 800 | ||
SN-1 | SNPDP | PWR | 1534 | ||
SN-2 | SNPDP | PWR | 1534 | ||
TAOHUAJIANG-1 | PWR | ||||
TAOHUAJIANG-2 | PWR | ||||
BAMAOSHAN | CGNPG | PWR | 900 | ||
XIANNING-1 | PWR | ||||
XIANNING-2 | PWR | ||||
XUDABU-1 | CNNC | PWR | 1000 | ||
XUDABU-2 | CNNC | PWR | 1000 |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
International Treaties | commencement date |
Treaty on the Non-Proliferation of Nuclear Weapons | 11 March 1992 |
Convention on the Physical Protection of Nuclear Material | 9 February 1989 |
Convention on Early Notification of a Nuclear Accident | 11 October 1987 |
Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency | 11 October 1987 |
Convention on Nuclear Safety | 8 July 1996 |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
Organization | Adress | Postcode | Telephone | Fax | Website |
National Atomic Energy Agency (CAEA) | A-8, Fucheng Road, Haidian District, Beijing, China | 100048 | +86-10-8858-1381 /+86-10-8858-1286 |
+86-10-8858-1516 | http://www.caea.gov.cn/english/ |
National Energy Administration(NEA) | 38 Yuetan South Street, Xicheng District, Beijing, China | 100824 | +86-10-6855-5875 | +86-10-6855-5848 | http://www.nea.gov.cn/ |
National Nuclear Safety Administration (NNSA) (Under the Ministry of Ecology and Environment) |
115 Xizhimennei Nanxiaojie, Xicheng District, Beijing, China | 100035 | +86-10-6655-6006 /+86-10-6655-6114 |
+86-10-6655-6010 | http://nnsa.mep.gov.cn |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
Nuclear Power Group | Adress | Postcode | Telephone | Fax | Website |
China National Nuclear Corporation | No. 1, Nansanxiang, Sanlihe, Xicheng District, Beijing, China | 100822 | +86-10-6851-2211 | +86-10-6853-3989 | http://www.cnnc.com.cn |
China General Nuclear Power Corporation | CGN Building, 2002 Shennan Road, Shenzhen, Guangdong, China | 518028 | +86-755-8443-1555 | +86-755-8369-9900 | http://www.cgnpc.com.cn |
State Power Investment Corporation Limited | Building 3, Yard 28, Jinrong Street, Xicheng District, Beijing, China | 100033 | +86-10-6629-8000 /+86-10-6621-6666 |
+86-10-6629-8095 | http://www.spic.com.cn |
China Huaneng Group Co., Ltd. | No. 6, Fuxingmennei Street, Xicheng District, Beijing, China | 100031 | +86-10-6322-8800 | +86-10-6322-8866 | http://www.chng.com.cn/ |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
Research and Design Institute | Adress | Postcode | Telephone | Fax | Website |
Nuclear Power Institute of China | No. 328, Section 1, Huayang Changshun Avenue, Shuangliu County, Chengdu City, Sichuan Province, China | 610000 | +86-28-8590-3138 /+028-8590-0214 |
/ | http://www.npic.ac.cn |
Shanghai Nuclear Engineering Research and Design Institute | No. 29, Hongcao Road, Shanghai, China | 200233 | +86-21-6186-0000 | +86-21-6186-0728 | https://www.snerdi.com.cn |
China Nuclear Power Engineering Co., Ltd. | No. 117, Third Ring North Road, Haidian District, Beijing, China | 100840 | +86-10-6841-5086 | / | http://www.cnpe.cc |
China Institute of Atomic Energy | Beifang Village, Xinzhen, Fangshan District, Beijing, China | 102413 | +86-10-6935-7493 | +86-10-6935-7008 | http://www.ciae.ac.cn |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
Related Company | Adress | Postcode | Telephone | Fax | Website |
Hualong Nuclear Power Technology Co., Ltd. | 6/F, CNECC Building, 12 Chegongzhuang Street, Xicheng District, Beijing, China | 100037 | / | / | www.hpr.com.cn |
China Zhongyuan Engineering Corp. | CICG Financial Center, 140 Xizhimenwai Street, Xicheng District, Beijing | 100044 | 0086-10-62355635 | 0086-10-62355640 | http://www.czec.com.cn |
CNNC 404 Co., Ltd. | A-4, PO Box 508, Lanzhou City, Gansu Province, China | 735112 | 0937-6769113 | 09376764984 | http://www.zh404.cn |
China National Uranium Co., Ltd. | Building 14, Hepingli 7th Block, Dongcheng District, Beijing | 100010 | 010-64271870 | 010-64211783 | http://www.cnncgm.cn/ |
CGNPC Uranium Resources Co., Ltd. | A-22 Shiao International Center, No. 101, Shaoyaoju Beili, Chaoyang District, Beijing | 100029 | 010-57321990 | 010-57321991 | http://www.cgnurc.com.cn/ |
SPIC Uranium Development Co., Ltd. | No. 65, Zhichun Road, Haidian District, Beijing | 100089 | 010-53910000 | 01053910004 | / |
China Nuclear Energy Industry Corp. | No. 9, Huayuan Street, Jinrongjie Subdistrict, Xicheng District, Beijing, China | 100037 | +86-10-6629-7033 | +86-10-6801-0445 | http://www.cneic.com.cn |
CNNC Lanzhou Uranium Enrichment Co., Ltd. | No. 1, Xin'an Road, Xigu District, Lanzhou City, Gansu Province | 730000 | 0931-7917017 | 0931-7917304 | / |
CNNC Shaanxi Uranium Enrichment Co., Ltd. | Apartments 6-11, Unit 3, Building 70, Chunhui Residential Quarter, Yangxian County, Hanzhong City, Shaanxi Province | 723000 | 0916-8506000 | 0916-8506000 | |
CNNC North Nuclear Fuel Components Co., Ltd. | East side of the intersection of Jingyin Line and Jianhua Road, Qingshan District, Baotou City, Inner Mongolia | 014000 | +86-0472-3139805 | / | / |
CNNC Jianzhong Nuclear Fuel Co., Ltd. | No. 1, Yingbin Street, Baixi Town, Xuzhou District, Yibin City, Sichuan Province | 644000 | +86-0831-8279911 | +86-831-8278981 | http://www.cjnf.com.cn |
TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.
Education Institutions | Adress | Postcode | Telephone | Fax | Website |
Institute of Nuclear and New Energy Technology, Tsinghua University | No. 30, Shuangqing Road, Haidian District, Beijing, China | 100084 | +86-10-6259-4533 | +86-10-6256-4177 | http://www.inet.tsinghua.edu.cn/ |
School of Nuclear Science and Engineering, Shanghai Jiaotong University | No. 800, Dongchuan Road, Minhang District, Shanghai, China | 200240 | +86-21-3420-5182 | +86-21-3420-5182 | http://nsse.sjtu.edu.cn |
School of Energy and Power Engineering, Xi'an Jiaotong University | No. 28, Xianning West Road, Xi'an City, Shaanxi Province, China | 710049 | +86-29-8266-8721 | / | http://epe.xjtu.edu.cn/ |
School of Nuclear Science and Technology, Harbin Engineering University | Building 31, Harbin Engineering University, 145 Nantong Street, Nangang District, Harbin, Heilongjiang Province, China | 150001 | +86-451-8256-8070 | http://cnst.hrbeu.edu.cn/main.htm |