China

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

Fossil fuels Nuclear Renewables
Coal (1) Crude Oil (2) Natural Gas (3) Uranium (4) Hydro (5) Wind (6)
Total amount in specific units*) 1622.88 36.19 7.00 34.4 5.42 9.5

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 34 706 55 192 73 265 86 941 95 326 5.18
Coal, Lignate and Peat 12 432 25 274 34 121 36 317 28 634 4.26
Oil 8 488 12 379 15 425 20 082 23 865 5.30
Natural gas 661 1 402 3 200 4 518 8 270 13.47
Bioenergy and Waste 8 229 6 944 5 038 3 774 3 594 -4.06
Electricity 3 726 7 170 12 405 17 529 24 175 9.80
Heat 1 170 2 023 3 076 4 721 6 788 9.19

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2020 Compound
annual growth
rate 2000–2020 (%)
Total 1 355 738 2 500 466 4 207 993 5 859 515 7 781 726 9.13
Coal, Lignate and Peat 1 060 372 1 980 272 3 239 704 4 108 994 4 966 309 8.03
Oil 47 268 50 513 14 856 9 679 10 724 -7.15
Natural gas 5 773 12 142 78 063 145 346 216 297 19.86
Bioenergy and Waste 2 421 5 200 33 863 63 729 123 387 21.72
Hydro 222 414 397 017 722 172 1 130 270 1 355 311 9.46
Nuclear 16 737 53 088 73 880 170 789 366 121 16.68
Wind 615 2 028 44 622 185 766 470 568 39.38
Solar 22 84 701 44 809 272 871 60.21
Geothermal 109 115 125 125 125 0.70
Tidal 7 7 7 8 13 3.16

TABLE 4. ENERGY RELATED RATIOS

Final Energy consumption [PJ] 2000 2005 2010 2015 2020 2021*
Nuclear/total electricity (%) 1.2 2 1.8 3 4.9 5

TABLE 5. STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2021
BAMAOSHAN PWR 900 Planned Not Available 0
CEFR FBR 20 Operational CIAE AVR 2000-05-10 2010-07-21 2011-07-21 0
CHANGJIANG-1 PWR 601 Operational HNPC PE 2010-04-25 2015-10-12 2015-11-07 2015-12-25 84.9
CHANGJIANG-2 PWR 601 Operational HNPC PE 2010-11-21 2016-06-09 2016-06-20 2016-08-12 86.9
CHANGJIANG-3 PWR 1000 Under Construction CHG Not Available 2021-03-31 0
CHANGJIANG-4 PWR 1000 Under Construction CHG Not Available 2021-12-28 0
DAYA BAY-1 PWR 944 Operational DNMC CYAPC 1987-08-07 1993-07-28 1993-08-31 1994-02-01 89.8
DAYA BAY-2 PWR 944 Operational DNMC CYAPC 1988-04-07 1994-01-21 1994-02-07 1994-05-06 100.6
FANGCHENGGANG-1 PWR 1000 Operational GFNPC PE 2010-07-30 2015-10-13 2015-10-25 2016-01-01 93.3
FANGCHENGGANG-2 PWR 1000 Operational GFNPC PE 2010-12-23 2016-06-29 2016-07-15 2016-10-01 101.5
FANGCHENGGANG-3 PWR 1000 Under Construction GFNPC Not Available 2015-12-24 0
FANGCHENGGANG-4 PWR 1000 Under Construction GFNPC Not Available 2016-12-23 0
FANGCHENGGANG-5 PWR 1000 Planned Not Available 0
FANGCHENGGANG-6 PWR 1000 Planned Not Available 0
FANGJIASHAN-1 PWR 1012 Operational QNPC Not Available 2008-12-26 2014-10-21 2014-11-04 2014-12-15 100
FANGJIASHAN-2 PWR 1012 Operational QNPC Not Available 2009-07-17 2014-12-25 2015-01-12 2015-02-12 86.5
FUQING-1 PWR 1000 Operational FQNP Not Available 2008-11-21 2014-07-24 2014-08-20 2014-11-22 91
FUQING-2 PWR 1000 Operational FQNP Not Available 2009-06-17 2015-07-22 2015-08-06 2015-10-16 85.4
FUQING-3 PWR 1000 Operational FQNP Not Available 2010-12-31 2016-07-03 2016-09-07 2016-10-24 82
FUQING-4 PWR 1000 Operational FQNP Not Available 2012-11-17 2017-07-16 2017-07-29 2017-09-17 94.7
FUQING-5 PWR 1075 Operational FQNP Not Available 2015-05-07 2020-10-21 2020-11-27 2021-01-29 89
FUQING-6 PWR 1075 Operational FQNP Not Available 2015-12-22 2021-12-11 2022-01-01 2022-03-25 0
HAIYANG-1 PWR 1170 Operational SDNPC Not Available 2009-09-24 2018-08-08 2018-08-17 2018-10-22 89.1
HAIYANG-2 PWR 1170 Operational SDNPC Not Available 2010-06-20 2018-09-29 2018-10-13 2019-01-09 90.6
HAIYANG-3 PWR 1161 Under Construction SDNPC Not Available 2022-07-07 0
HAIYANG-4 PWR 1170 Planned SDNPC Not Available 0
HONGSHIDING-1 PWR 0 Planned Not Available 0
HONGSHIDING-2 PWR 0 Planned HSDNPC PE 0
HONGYANHE-1 PWR 1061 Operational LHNPC PE 2007-08-18 2013-01-16 2013-02-17 2013-06-06 96.6
HONGYANHE-2 PWR 1061 Operational LHNPC PE 2008-03-28 2013-10-24 2013-11-23 2014-05-13 88.2
HONGYANHE-3 PWR 1061 Operational LHNPC PE 2009-03-07 2014-10-27 2015-03-23 2015-08-16 85.5
HONGYANHE-4 PWR 1061 Operational LHNPC PE 2009-08-15 2016-03-05 2016-04-01 2016-06-08 89.6
HONGYANHE-5 PWR 1061 Operational LHNPC PE 2015-03-29 2021-06-13 2021-06-25 2021-07-31 96.9
HONGYANHE-6 PWR 1061 Operational LHNPC PE 2015-07-24 2022-04-21 2022-05-02 2022-06-23 0
JIYANG-1 PWR 1000 Planned Not Available 0
JIYANG-2 PWR 1000 Planned Not Available 0
JIYANG-3 PWR 1000 Planned Not Available 0
JIYANG-4 PWR 1000 Planned Not Available 0
LING AO-1 PWR 950 Operational DNMC CYAPC 1997-05-15 2002-02-04 2002-02-26 2002-05-28 89.4
LING AO-2 PWR 950 Operational DNMC CYAPC 1997-11-28 2002-08-27 2002-09-14 2003-01-08 97.9
LING AO-3 PWR 1007 Operational DNMC PE 2005-12-15 2010-06-09 2010-07-15 2010-09-15 82.9
LING AO-4 PWR 1007 Operational DNMC PE 2006-06-15 2011-02-25 2011-05-03 2011-08-07 83.5
LINGLONG-1 PWR 100 Under Construction HNPC Not Available 2021-07-13 0
LUFENG-1 PWR 1000 Planned LFNPC Not Available 0
LUFENG-2 PWR 1000 Planned LFNPC Not Available 0
NINGDE-1 PWR 1018 Operational NDNP PE 2008-02-18 2012-11-24 2012-12-28 2013-04-15 92.1
NINGDE-2 PWR 1018 Operational NDNP Not Available 2008-11-12 2013-12-20 2014-01-04 2014-05-04 90.2
NINGDE-3 PWR 1018 Operational NDNP Not Available 2010-01-08 2015-03-08 2015-03-21 2015-06-10 94.4
NINGDE-4 PWR 1018 Operational NDNP Not Available 2010-09-29 2016-03-16 2016-03-29 2016-07-21 100
PENGZE-1 PWR 1250 Planned Not Available 0
PENGZE-2 PWR 1250 Planned Not Available 0
PENGZE-3 PWR 1250 Planned Not Available 0
PENGZE-4 PWR 1250 Planned Not Available 0
QINSHAN 2-1 PWR 610 Operational NPQJVC COGEMA 1996-06-02 2001-11-15 2002-02-06 2002-04-15 94
QINSHAN 2-2 PWR 610 Operational NPQJVC COGEMA 1997-04-01 2004-02-25 2004-03-11 2004-05-03 101.2
QINSHAN 2-3 PWR 619 Operational NPQJVC COGEMA 2006-04-28 2010-07-13 2010-08-01 2010-10-05 88.3
QINSHAN 2-4 PWR 619 Operational NPQJVC COGEMA 2007-01-28 2011-11-17 2011-11-25 2011-12-30 90.1
QINSHAN 3-1 PHWR 677 Operational TQNPC Not Available 1998-06-08 2002-09-21 2002-11-19 2002-12-31 85.6
QINSHAN 3-2 PHWR 677 Operational TQNPC Not Available 1998-09-25 2003-01-18 2003-06-12 2003-07-24 94.6
QINSHAN-1 PWR 308 Operational CNNO COGEMA 1985-03-20 1991-10-31 1991-12-15 1994-04-01 94.9
SANAOCUN-1 PWR 1117 Under Construction CGCNP Not Available 2020-12-31 0
SANAOCUN-2 PWR 1117 Under Construction CGCNP Not Available 2021-12-30 0
SANMEN-1 PWR 1157 Operational SMNPC RPNPC 2009-04-19 2018-06-21 2018-06-30 2018-09-21 92.6
SANMEN-2 PWR 1157 Operational SMNPC RPNPC 2009-12-15 2018-08-17 2018-08-24 2018-11-05 90.2
SANMEN-3 PWR 1163 Under Construction SMNPC NDA 2022-06-28 0
SANMEN-4 PWR 1157 Planned SMNPC RPNPC 0
SANMING-1 FBR 800 Planned FSNPC Not Available 0
SANMING-2 FBR 800 Planned FSNPC Not Available 0
SHIDAO BAY-1 HTGR 200 Operational HSNPC MINATOM 2012-12-09 2021-09-12 2021-12-14 0
SN-1 PWR 1534 Planned SNPDP Not Available 0
SN-2 PWR 1534 Planned SNPDP Not Available 0
TAIPINGLING-1 PWR 1116 Under Construction HZNP PE 2019-12-26 0
TAIPINGLING-2 PWR 1116 Under Construction HZNP Not Available 2020-10-15 0
TAISHAN-1 PWR 1660 Operational TNPJVC UE 2009-11-18 2018-06-06 2018-06-29 2018-12-13 52.4
TAISHAN-2 PWR 1660 Operational TNPJVC UE 2010-04-15 2019-05-28 2019-06-23 2019-09-07 74.8
TAOHUAJIANG-1 PWR 0 Planned Not Available 0
TAOHUAJIANG-2 PWR 0 Planned Not Available 0
TIANWAN-1 PWR 1000 Operational JNPC AVR 1999-10-20 2005-12-20 2006-05-12 2007-05-17 86
TIANWAN-2 PWR 1000 Operational JNPC AVR 2000-09-20 2007-05-01 2007-05-14 2007-08-16 91
TIANWAN-3 PWR 1060 Operational JNPC AVR 2012-12-27 2017-09-29 2017-12-30 2018-02-14 85.3
TIANWAN-4 PWR 1060 Operational JNPC AVR 2013-09-27 2018-09-30 2018-10-27 2018-12-22 92.7
TIANWAN-5 PWR 1060 Operational JNPC Not Available 2015-12-27 2020-07-27 2020-08-08 2020-09-08 81.2
TIANWAN-6 PWR 1060 Operational JNPC Not Available 2016-09-07 2021-05-04 2021-05-11 2021-06-02 96.5
TIANWAN-7 PWR 1171 Under Construction JNPC RWE/E.ON 2021-05-19 0
TIANWAN-8 PWR 1171 Under Construction JNPC RWE/E.ON 2022-02-25 0
XIANNING-1 PWR 0 Planned Not Available 0
XIANNING-2 PWR 0 Planned Not Available 0
XIAPU-1 FBR 642 Under Construction CNNC Not Available 2017-12-29 0
XUDABU-1 PWR 1000 Planned LNPC PE 0
XUDABU-2 PWR 1000 Planned LNPC PE 0
XUDABU-3 PWR 1200 Under Construction LNPC Not Available 2021-07-28 0
XUDABU-4 PWR 1200 Under Construction LNPC RWE/E.ON 2022-05-19 0
YANGJIANG-1 PWR 1000 Operational YJNPC Not Available 2008-12-16 2013-12-23 2013-12-31 2014-03-25 90.5
YANGJIANG-2 PWR 1000 Operational YJNPC Not Available 2009-06-04 2015-03-02 2015-03-10 2015-06-05 100.3
YANGJIANG-3 PWR 1000 Operational YJNPC Not Available 2010-11-15 2015-10-11 2015-10-18 2016-01-01 89.1
YANGJIANG-4 PWR 1000 Operational YJNPC Not Available 2012-11-17 2016-12-30 2017-01-08 2017-03-15 91.1
YANGJIANG-5 PWR 1000 Operational YJNPC Not Available 2013-09-18 2018-05-16 2018-05-23 2018-07-12 93.6
YANGJIANG-6 PWR 1000 Operational YJNPC Not Available 2013-12-23 2019-06-22 2019-06-29 2019-07-24 97.3
ZHANGZHOU-1 PWR 1126 Under Construction ZGZEC Not Available 2019-10-16 0
ZHANGZHOU-2 PWR 1126 Under Construction ZGZEC Not Available 2020-09-04 0

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

Nuclear Power Plant Owner Operator
Qinshan NPP Qinshan Nuclear Power Co., Ltd. CNNC Nuclear Power Operation and Management Co., Ltd.
Qinshan Phase II NPP Nuclear Power Qinshan Joint Venture Co., Ltd. CNNC Nuclear Power Operation and Management Co., Ltd.
Third Qinshan NPP Third Qinshan Nuclear Power Co., Ltd. CNNC Nuclear Power Operation and Management Co., Ltd.
Fangjiashan NPP Qinshan Nuclear Power Co., Ltd. CNNC Nuclear Power Operation and Management Co., Ltd.
Daya Bay NPP Guangdong Nuclear Power Joint Venture Co., Ltd. Daya Bay Nuclear Power Operations and Management Co., Ltd.
Ling'ao NPP Phase I Ling'ao Nuclear Power Co., Ltd. Daya Bay Nuclear Power Operations and Management Co., Ltd.
Ling'ao NPP Phase II Lingdong Nuclear Power Co., Ltd. Daya Bay Nuclear Power Operations and Management Co., Ltd.
Tianwan NPP Jiangsu Nuclear Power Co., Ltd. Jiangsu Nuclear Power Co., Ltd.
Hongyanhe NPP Liaoning Hongyanhe Nuclear Power Co., Ltd.; Liaoning Hongyanhe Nuclear Power Co., Ltd.;
Ningde NPP Fujian Ningde Nuclear Power Co., Ltd.; Fujian Ningde Nuclear Power Co., Ltd.;
Fuqing NPP Fujian Fuqing Nuclear Power Co., Ltd.; Fujian Fuqing Nuclear Power Co., Ltd.;
Yangjiang NPP Yangjiang Nuclear Power Co., Ltd. Yangjiang Nuclear Power Co., Ltd.
Changjiang NPP Hainan Nuclear Power Co., Ltd. Hainan Nuclear Power Co., Ltd.
Fangchenggang NPP Guangxi Fangchenggang Nuclear Power Co., Ltd.; Guangxi Fangchenggang Nuclear Power Co., Ltd.;
Sanmen NPP Sanmen Nuclear Power Co., Ltd. Sanmen Nuclear Power Co., Ltd.
Haiyang NPP Shandong Nuclear Power Co., Ltd. Shandong Nuclear Power Co., Ltd.
Taishan NPP Taishan Nuclear Power Joint Venture Co., Ltd. Taishan Nuclear Power Joint Venture Co., Ltd.
Zhangzhou NPP CNNC Zhangzhou Energy Co., Ltd. CNNC Zhangzhou Energy Co., Ltd.
Xudapu NPP CNNC Liaoning Nuclear Power Co., Ltd. CNNC Liaoning Nuclear Power Co., Ltd.
Taipingling NPP CGN Huizhou Nuclear Power Co., Ltd. CGN Huizhou Nuclear Power Co., Ltd.
San'ao NPP CGN Cangnan Nuclear Power Co., Ltd. CGN Cangnan Nuclear Power Co., Ltd.
State Nuclear Power Demonstration Plant State Nuclear Power Demonstration Plant Co., Ltd. State Nuclear Power Demonstration Plant Co., Ltd.
Huaneng Changjiang NPP Huaneng Hainan Changjiang Nuclear Power Co., Ltd. Huaneng Hainan Changjiang Nuclear Power Co., Ltd.
Shidao Bay NPP Huaneng Shandong Shidao Bay Nuclear Power Co., Ltd.; Huaneng Shandong Shidao Bay Nuclear Power Co., Ltd.;
Xiapu NPP CNNC Xiapu Nuclear Power Co., Ltd. CNNC Xiapu Nuclear Power Co., Ltd.

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

Reactor unit Owner Type Capacity MW(e) Construction start year Expected commercial year
FANGCHENGGANG-5 PWR 1000
FANGCHENGGANG-6 PWR 1000
HAIYANG-4 CPIC PWR 1170
HONGSHIDING-1 PWR
HONGSHIDING-2 CNNC PWR
JIYANG-1 PWR 1000
JIYANG-2 PWR 1000
JIYANG-3 PWR 1000
JIYANG-4 PWR 1000
LUFENG-1 GNP PWR 1000
LUFENG-2 GNP PWR 1000
PENGZE-1 PWR 1250
PENGZE-2 PWR 1250
PENGZE-3 PWR 1250
PENGZE-4 PWR 1250
SANMEN-4 CNNC PWR 1157
SANMING-1 CNNC FBR 800
SANMING-2 CNNC FBR 800
SN-1 SNPDP PWR 1534
SN-2 SNPDP PWR 1534
TAOHUAJIANG-1 PWR
TAOHUAJIANG-2 PWR
BAMAOSHAN CGNPG PWR 900
XIANNING-1 PWR
XIANNING-2 PWR
XUDABU-1 CNNC PWR 1000
XUDABU-2 CNNC PWR 1000

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

International Treaties commencement date
Treaty on the Non-Proliferation of Nuclear Weapons 11 March 1992
Convention on the Physical Protection of Nuclear Material 9 February 1989
Convention on Early Notification of a Nuclear Accident 11 October 1987
Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency 11 October 1987
Convention on Nuclear Safety 8 July 1996

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

Organization Adress Postcode Telephone Fax Website
National Atomic Energy Agency (CAEA) A-8, Fucheng Road, Haidian District, Beijing, China 100048 +86-10-8858-1381
/+86-10-8858-1286
+86-10-8858-1516 http://www.caea.gov.cn/english/
National Energy Administration(NEA) 38 Yuetan South Street, Xicheng District, Beijing, China 100824 +86-10-6855-5875 +86-10-6855-5848 http://www.nea.gov.cn/
National Nuclear Safety Administration (NNSA)
(Under the Ministry of Ecology and Environment)
115 Xizhimennei Nanxiaojie, Xicheng District, Beijing, China 100035 +86-10-6655-6006
/+86-10-6655-6114
+86-10-6655-6010 http://nnsa.mep.gov.cn

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

Nuclear Power Group Adress Postcode Telephone Fax Website
China National Nuclear Corporation No. 1, Nansanxiang, Sanlihe, Xicheng District, Beijing, China 100822 +86-10-6851-2211 +86-10-6853-3989 http://www.cnnc.com.cn
China General Nuclear Power Corporation CGN Building, 2002 Shennan Road, Shenzhen, Guangdong, China 518028 +86-755-8443-1555 +86-755-8369-9900 http://www.cgnpc.com.cn
State Power Investment Corporation Limited Building 3, Yard 28, Jinrong Street, Xicheng District, Beijing, China 100033 +86-10-6629-8000
/+86-10-6621-6666
+86-10-6629-8095 http://www.spic.com.cn
China Huaneng Group Co., Ltd. No. 6, Fuxingmennei Street, Xicheng District, Beijing, China 100031 +86-10-6322-8800 +86-10-6322-8866 http://www.chng.com.cn/

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

Research and Design Institute Adress Postcode Telephone Fax Website
Nuclear Power Institute of China No. 328, Section 1, Huayang Changshun Avenue, Shuangliu County, Chengdu City, Sichuan Province, China 610000 +86-28-8590-3138
/+028-8590-0214
/ http://www.npic.ac.cn
Shanghai Nuclear Engineering Research and Design Institute No. 29, Hongcao Road, Shanghai, China 200233 +86-21-6186-0000 +86-21-6186-0728 https://www.snerdi.com.cn
China Nuclear Power Engineering Co., Ltd. No. 117, Third Ring North Road, Haidian District, Beijing, China 100840 +86-10-6841-5086 / http://www.cnpe.cc
China Institute of Atomic Energy Beifang Village, Xinzhen, Fangshan District, Beijing, China 102413 +86-10-6935-7493 +86-10-6935-7008 http://www.ciae.ac.cn

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

Related Company Adress Postcode Telephone Fax Website
Hualong Nuclear Power Technology Co., Ltd. 6/F, CNECC Building, 12 Chegongzhuang Street, Xicheng District, Beijing, China 100037 / / www.hpr.com.cn
China Zhongyuan Engineering Corp. CICG Financial Center, 140 Xizhimenwai Street, Xicheng District, Beijing 100044 0086-10-62355635 0086-10-62355640 http://www.czec.com.cn
CNNC 404 Co., Ltd. A-4, PO Box 508, Lanzhou City, Gansu Province, China 735112 0937-6769113 09376764984 http://www.zh404.cn
China National Uranium Co., Ltd. Building 14, Hepingli 7th Block, Dongcheng District, Beijing 100010 010-64271870 010-64211783 http://www.cnncgm.cn/
CGNPC Uranium Resources Co., Ltd. A-22 Shiao International Center, No. 101, Shaoyaoju Beili, Chaoyang District, Beijing 100029 010-57321990 010-57321991 http://www.cgnurc.com.cn/
SPIC Uranium Development Co., Ltd. No. 65, Zhichun Road, Haidian District, Beijing 100089 010-53910000 01053910004 /
China Nuclear Energy Industry Corp. No. 9, Huayuan Street, Jinrongjie Subdistrict, Xicheng District, Beijing, China 100037 +86-10-6629-7033 +86-10-6801-0445 http://www.cneic.com.cn
CNNC Lanzhou Uranium Enrichment Co., Ltd. No. 1, Xin'an Road, Xigu District, Lanzhou City, Gansu Province 730000 0931-7917017 0931-7917304 /
CNNC Shaanxi Uranium Enrichment Co., Ltd. Apartments 6-11, Unit 3, Building 70, Chunhui Residential Quarter, Yangxian County, Hanzhong City, Shaanxi Province 723000 0916-8506000 0916-8506000
CNNC North Nuclear Fuel Components Co., Ltd. East side of the intersection of Jingyin Line and Jianhua Road, Qingshan District, Baotou City, Inner Mongolia 014000 +86-0472-3139805 / /
CNNC Jianzhong Nuclear Fuel Co., Ltd. No. 1, Yingbin Street, Baixi Town, Xuzhou District, Yibin City, Sichuan Province 644000 +86-0831-8279911 +86-831-8278981 http://www.cjnf.com.cn

TABLE CONSTRUCTION PACE, AND RATIONALLY DEPLOYING NEW COASTAL NUCLEAR POWER PROJECTS UNDER THE PREMISE OF ENSURING SAFETY. THE PLAN ALSO EMPHASIZES CARRYING OUT DEMONSTRATIONS OF COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY, ACTIVELY PROMOTING DEMONSTRATION PROJECTS OF ADVANCED REACTOR TYPES SUCH AS HIGH TEMPERATURE REACTORS, FAST BREEDER REACTORS, MODULAR SMALL REACTORS, AND OFFSHORE FLOATING REACTORS, AND PROMOTING THE COMPREHENSIVE UTILIZATION OF NUCLEAR ENERGY IN FIELDS SUCH AS CLEAN HEATING, INDUSTRIAL HEATING, AND SEAWATER DESALINATION. FURTHERMORE, THE PLAN HIGHLIGHTS EFFECTIVELY PROTECTING THE RESOURCES OF NPP SITES. BY 2025, THE INSTALLED CAPACITY OF NUCLEAR POWER OPERATION WILL REACH APPROXIMATELY 70 GW.

Education Institutions Adress Postcode Telephone Fax Website
Institute of Nuclear and New Energy Technology, Tsinghua University No. 30, Shuangqing Road, Haidian District, Beijing, China 100084 +86-10-6259-4533 +86-10-6256-4177 http://www.inet.tsinghua.edu.cn/
School of Nuclear Science and Engineering, Shanghai Jiaotong University No. 800, Dongchuan Road, Minhang District, Shanghai, China 200240 +86-21-3420-5182 +86-21-3420-5182 http://nsse.sjtu.edu.cn
School of Energy and Power Engineering, Xi'an Jiaotong University No. 28, Xianning West Road, Xi'an City, Shaanxi Province, China 710049 +86-29-8266-8721 / http://epe.xjtu.edu.cn/
School of Nuclear Science and Technology, Harbin Engineering University Building 31, Harbin Engineering University, 145 Nantong Street, Nangang District, Harbin, Heilongjiang Province, China 150001 +86-451-8256-8070 http://cnst.hrbeu.edu.cn/main.htm