United Arab Emirates

TABLE 1: ESTIMATED AVAILABLE ENERGY SOURCES

UAE Energy Reserves (as of 2019)
  Fossil Fuels Nuclear Renewable
Solid Liquid Gas Uranium Hydro Solar PV Solar CSP Landfill
Unit Ton Billion Barrel Trillion Cubic Meter     Installed Capacity (MW) Installed Capacity (MW) Installed Capacity (MW)
Total amount in specific units 0 97.8 6.091 Sweihan Solar PV Plant, Abu Dhabi (1,177 MW);
Sheikh Rashid Solar Park, Dubai (413 MW); Masdar City (10 MW); Distributed Solar PV Estimated (50 MW)
Shams 1 (100 MW) 1 MW (Al Qusais Landfill)
Total amount in exajoules (EJ) 0 623.2 204.4
                 
Liquid consists of crude only. It has been converted to energy at 44.2 GJ/tonne. Natural gas has been converted to energy at 950 GJ/million cubic feet.

TABLE 2: ENERGY STATISTICS

UAE Energy Consumption and Production
Energy Consumption 1971 1980 1990 2000 2005 2010 2015 Compound Annual Growth Rate (2015-1971)
Total 0.04 0.23 0.66 1.04 1.10 1.89 2.22 10%
Solids 0.00 0.00 0.00 0.00 0.00 0.03 0.07 21%
Liquids 0.01 0.12 0.24 0.28 0.35 0.53 0.63 10%
Gases 0.03 0.08 0.37 0.62 0.56 1.02 1.12 9%
Primary Electricity 0.00 0.02 0.05 0.13 0.19 0.30 0.40 9%
                 
Energy Production                
Total 2.21 3.78 4.61 6.38 7.12 7.44 9.61 3%
Solids 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
Liquids 2.18 3.51 3.91 4.98 5.30 5.70 7.57 3%
Gases 0.03 0.27 0.70 1.40 1.82 1.74 2.04 10%
Primary Electricity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
                 
Net Import                
Total -2.17 -3.39 -3.40 -4.44 -4.46 -4.10 -5.56 2%
Solids 0.00 0.00 0.00 0.00 0.00 0.03 0.07 21%
Liquids -2.17 -3.30 -3.28 -4.19 -3.93 -4.46 -6.00 2%
Gases 0.00 -0.09 -0.12 -0.25 -0.53 0.33 0.36 -204%

TABLE 3: ELECTRICITY PRODUCTION, CONSUMPTION AND CAPACITY

UAE Electricity Production and Consumption (1971-2017)
                  Cumulative Annual Growth Rate
Electricity Production (TWh) 1971 1980 1990 2000 2005 2010 2015 2017 1971-2000 2000-2015
Total 0.20 6.31 17.08 39.94 60.70 93.90 127.39 134.55 20.04% 8.04%
Thermal 0.20 6.31 17.08 39.94 60.70 93.90 127.07 133.85 20.04% 8.02%
Nuclear 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00    
Solar 0.00 0.00 0.00 0.00 0.00 0.00 0.32 0.70    
Coal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00    
                     
Electricity Consumption (TWh) 1971 1980 1990 2000 2005 2010 2015 2017 1971-2000 2000-2015
Total (TWh) 0.19 5.87 15.54 38.59 56.26 89.59 126.58 129.53 20.11% 8.24%

TABLE 4: ENERGY RELATED RATIOS

Energy Related Ratios 1971 1980 1990 2000 2005 2010 2015 2017 1971-2000 2000-2015
Electricity Consumption Per GDP (kWh per kUSD) 172.73 134.64 306.42 369.86 311.52 309.05 353.63 338.35 2.66% -0.30%
Per Population (MWh per Capita) 0.81 5.63 8.35 12.23 13.70 10.83 13.83 13.78 9.83% 0.82%
Energy Consumption Per Capita (GJ/Capita) 169.85 220.65 354.84 329.64 267.87 228.45 242.91 NA 2.31% -2.01%
Electricity Consumption per capita (kWh/capita) 806.80 5631.32 8354.84 12231.67 13700.47 10831.87 13827.49 13779.79 9.83% 0.82%
Electricity Production per Energy Production (%) 0.03% 0.60% 1.33% 2.25% 3.07% 4.54% 4.77% NA 15.73% 5.13%
Nuclear/Total Electricity (%) 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
                     
Socio Economic Parameters 1971 1980 1990 2000 2005 2010 2015 2017 1971-2000 2000-2015
Population, total 235,499 1,042,384 1,860,000 3,154,925 4,106,427 8,270,684 9,154,302 9,400,000 9.36% 7.36%
GDP (current US$) 1,100,000,000 43,598,748,449 50,715,000,000 104,337,372,362 180,600,000,000 289,880,430,197 357,949,199,755 382,830,000,000 17.00% 8.57%
References                    
The GDP and Population numbers were obtained from UAE Federal Statistics Authority and World Data Bank.
The latest electricity production and consumption have been obtained from Ministry of Energy and Industry Annual Statistics Report.

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Comm-ercial
Date
Shut-down
Date
UCF
for
2016
BARAKAH-1 PWR 1400 Construction Completed NAWAH KEPCO 19-07-2012 1 August 2020 Not Announced
BARAKAH-2 PWR 1400 Construction Completed NAWAH KEPCO 16-04-2013 Not Announced
BARAKAH-3 PWR 1400 Under Construction NAWAH KEPCO 24-09-2014 Not Announced
BARAKAH-4 PWR 1400 Under Construction NAWAH KEPCO 30-07-2015 Not Announced

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Reactor Unit/ Project Name Owner Type Capacity (MWe) Expected Construction Start Year Expected Commercial Year
BARAKAH 1-4 ENEC/Nawah PWR 5,600 Construction started in July 2012 Not announced