Sweden

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

 Fossil fuels Nuclear  Renewables
Solid Liquid Gas Uranium Hydro Other
renewable
Total amount in specific units*     49001) 16.32)
Total amount in exajoules (EJ)            

TABLE 2. ENERGY CONSUMPTION

Years Compound annual growth rate (%) 
Source 2000 2005 2010 2015 2018 2000 to 2018
Coal, Lignite and Peat 57 262 68 232 58 903 53 144 51 801 -0.56%
Oil 593 227 542 168 470 452 391 925 421 701 -1.88%
Natural gas 19 990 22 817 28 459 28 076 29 440 2.17%
Bioenergy and Waste 221 397 197 835 237 732 271 106 290 317 1.52%
Electricity 463 405 470 508 472 376 449 487 461 146 -0.03%
Heat 148 833 174 972 215 656 175 981 186 593 1.26%
1 504 113 1 476 532 1 483 579 1 369 721 1 440 998

TABLE 3. ELECTRICITY PRODUCTION

Years Compound annual growth rate (%) 
Source 2000 2005 2010 2015 2018 2000 to 2018
Coal, Lignite and Peat 2 536 1 926 2 675 1 261 1 221 -3.98%
Oil 1 533 1 379 1 774 252 379 -7.47%
Natural gas 462 585 2 877 425 564 1.11%
Bioenergy and Waste 4 342 8 357 13 397 11 968 13 234 6.39%
Hydro 78 619 72 874 66 501 75 439 62 151 -1.30%
Nuclear 57 316 72 377 57 828 56 348 68 603 1.00%
Wind 457 935 3 487 16 322 16 734 22.14%
Solar 1 2 9 97 404 39.57%
Other 0 0 0 0 0
145 266 158 435 148 548 162 112 163 291

TABLE 4. ENERGY RELATED RATIOS

2000 2005 2010 2015 2019
Nuclear/total electricity (%)  39 46  38 34  34

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2019

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2019
FORSMARK-1 BWR 990 Operational FKA ABBATOM 1973-06-01 1980-04-23 1980-06-06 1980-12-10 86.4
FORSMARK-2 BWR 1118 Operational FKA ABBATOM 1975-01-01 1980-11-16 1981-01-26 1981-07-07 87.3
FORSMARK-3 BWR 1172 Operational FKA ABBATOM 1979-01-01 1984-10-28 1985-03-05 1985-08-18 92.6
OSKARSHAMN-3 BWR 1400 Operational OKG ABBATOM 1980-05-01 1984-12-29 1985-03-03 1985-08-15 91.8
RINGHALS-1 BWR 881 Operational RAB ABBATOM 1969-02-01 1973-08-20 1974-10-14 1976-01-01 89.6
RINGHALS-2 PWR 852 Operational RAB WH 1970-10-01 1974-06-19 1974-08-17 1975-05-01 2019-12-31 80.2
RINGHALS-3 PWR 1062 Operational RAB WH 1972-09-01 1980-07-29 1980-09-07 1981-09-09 91.1
RINGHALS-4 PWR 1117 Operational RAB WH 1973-11-01 1982-05-19 1982-06-23 1983-11-21 86.2
AGESTA PHWR 10 Permanent Shutdown SVAFO ABBATOM 1957-12-01 1963-07-17 1964-05-01 1964-05-01 1974-06-02
BARSEBACK-1 BWR 600 Permanent Shutdown BKAB ASEASTAL 1971-02-01 1975-01-18 1975-05-15 1975-07-01 1999-11-30
BARSEBACK-2 BWR 600 Permanent Shutdown BKAB ABBATOM 1973-01-01 1977-02-20 1977-03-21 1977-07-01 2005-05-31
OSKARSHAMN-1 BWR 473 Permanent Shutdown OKG ABBATOM 1966-08-01 1970-12-12 1971-08-19 1972-02-06 2017-06-19
OSKARSHAMN-2 BWR 638 Permanent Shutdown OKG ABBATOM 1969-09-01 1974-03-06 1974-10-02 1975-01-01 2016-12-22
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor unit Shutdown reason Decommission strategy Current decommissioning phase Current fuel management phase Decommissioning licensee Licence terminated year
Ågesta Economic Dismantling after a care and maintenance phase Preparation for large scale dismantling activities which are planned to start in 2020 Off-site storage Vattenfall AB 2023
Oskarshamn-1 Economic Immediate dismantling Large scale dismantling activities (turbine, RPV) Off-site storage OKG AB After the permanent shutdown of unit 31)
Oskarshamn-2 Economic Immediate dismantling Large scale dismantling activities (turbine, RPV) Off-site storage OKG AB After the permanent shutdown of unit 31)
Barsebäck-1 Political Dismantling after a care and maintenance phase Large scale dismantling activities (turbine, RPV) Off-site storage Barsebäck Kraft AB 20452)
Barsebäck-2 Political Dismantling after a care and maintenance phase Large scale dismantling activities (turbine, RPV) Off-site storage Barsebäck Kraft AB 20452)
Ringhals-2 Economic Immediate dismantling Planning for D&D and preparatory activities On-site storage Ringhals AB -