Spain

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

 Fossil fuels Nuclear  Renewables
Solid Liquid Gas Uranium Hydro Other
renewable
Total amount in specific units* 530  19 2.5 33 000 65.6 n.a.

TABLE 2. ENERGY STATISTICS

1980 1990 2000 2010 2015 2016* Compound annual growth rate** (%)
2000 to 2016*
Energy consumption [PJ]***            
- Total 3 030 3 710 5 222 5 570 5 159 5 170 –0.06
- Solids**** 560 850 906 354 573 437 –4.45
- Liquids 2 070 1 880 2 707 2 618 2 226 2 287 –1.05
- Gases 80 230 637 1 310 1 027 1 048 3.16
- Nuclear 320 750 679 676 625 639 –0.38
- Hydro 106 138 100 131 1.33
- Other renewables 187 473 608 627 7.87
Energy production [PJ]
- Total 850 1 400 1 336 1 443 1 394 1 378 0.19
- Solids**** 450 540 349 144 50 29 –14.42
- Liquids 70 50 9 5 10 6 –3.27
- Gases 330 60 6 2 2 1 –8.97
- Nuclear 750 679 676 625 639 –0.37
- Hydro 106 142 100 131 1.32
- Other renewables 187 473 607 572 7.25
Net import (Import-Export) [PJ]
- Total 2 180 2 310 3 886 4 128 3 765 3 792 –0.15

TABLE 3. INSTALLED CAPACITY, ELECTRICITY PRODUCTION AND CONSUMPTION

1980 1990 2000 2010 2015 2016* Compound annual growth rate** (%)
2000 to 2016*
Capacity of electrical plants (GW(e)) G/N              
- Thermal*** G 13.48 17.502 27.526 51.659 46.356 45.809 3.23
- Nuclear G 12.83 7.33 7.799 7.777 7.573 7.573 –0.18
- Hydro G 1.09 16.815 17.866 19.552 20.353 20.353 0.82
- Wind G  —  —  — 20.203 23.02 23.057  —
- Geothermal**** G  — —  — — — —  —
- Other renewables G  — 0.163 2.372 5.502 8.945 8.487 8.29
- Total G 27.40 41.81 55.563 104.693 106.247 105.279 4.08
Electricity production (TWh) G/N              
- Thermal*** G 74.49 73.68 124.20 138.258 123.184 107.710 –0.89
- Nuclear G 29.53 26.18 62.21 61.991 57.305 58.619 –0.37
- Hydro G 5.19 51.90 31.81 45.446 31.368 39.855 1.42
- Wind G  —  — 43.784 49.325 48.914  —
- Geothermal**** G  — —  — — — —  —
- Other renewables G  — — 6.94 11.297 19.839 19.533 6.68
- Total***** G 109.21 151.76 225.16 300.776 281.021 274.631 1.25
Total electricity consumption (TWh)   — 134.559 214.75 277.996 265.097 267.158 4.08

TABLE 4. ENERGY RELATED RATIOS

1980 1990 2000 2010 2015 2016*
Energy consumption per capita (GJ/capita)** — — 91.95 88.57 76.30 77.27
Electricity consumption per capita (kWh/capita) — — 4 612.76 5 278.42 4 997.51 5 027.78
Electricity production/Energy production (%)*** — — 57.53 75.05 72.41 71.67
Nuclear/Total electricity (%) — — 27.63 20.61 20.43 21.38
Ratio of external dependency (%)**** — — 73.10 73.96 72.97 73.36

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2018

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2018
ALMARAZ-1 PWR 1011 Operational CNAT WH 1973-07-03 1981-04-05 1981-05-01 1983-09-01 90.0
ALMARAZ-2 PWR 1006 Operational CNAT WH 1973-07-03 1983-09-19 1983-10-08 1984-07-01 90.4
ASCO-1 PWR 995 Operational ANAV WH 1974-05-16 1983-06-16 1983-08-13 1984-12-10 87.2
ASCO-2 PWR 997 Operational ANAV WH 1975-03-07 1985-09-11 1985-10-23 1986-03-31 97.7
COFRENTES BWR 1064 Operational ID GE 1975-09-09 1984-08-23 1984-10-14 1985-03-11 94.9
TRILLO-1 PWR 1003 Operational CNAT KWU 1979-08-17 1988-05-14 1988-05-23 1988-08-06 88.8
VANDELLOS-2 PWR 1045 Operational ANAV WH 1980-12-29 1987-11-14 1987-12-12 1988-03-08 55.6
JOSE CABRERA-1 PWR 141 Permanent Shutdown UFG WH 1964-06-24 1968-06-30 1968-07-14 1969-08-13 2006-04-30
SANTA MARIA DE GARONA BWR 446 Permanent Shutdown NUCLENOR GE 1966-09-01 1970-11-05 1971-03-02 1971-05-11 2017-08-02
VANDELLOS-1 GCR 480 Permanent Shutdown HIFRENSA CEA 1968-06-21 1972-02-11 1972-05-06 1972-08-02 1990-07-31
LEMONIZ-1 PWR 883 Cancelled Constr. ID WH 1974-03-14 1984-04-01
LEMONIZ-2 PWR 883 Cancelled Constr. ID WH 1974-03-14 1984-04-01
VALDECABALLEROS-1 BWR 939 Cancelled Constr. ID/CSE GE 1979-08-17 1984-04-01
VALDECABALLEROS-2 BWR 939 Cancelled Constr. ID/CSE GE 1979-08-17 1984-04-01
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 7. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor unit Shutdown reason Decommission strategy Current decommissioning phase Current fuel management phase Decommissioning licensee Licence terminated year
Vandellσs I After an operation incident Deferred dismantling, including partial dismantling and placing remaining radiological areas into safe enclosure Passive safe enclosure period Shipment to a reprocessing plant ENRESA —
Josι Cabrera Other Immediate dismantling and removal of all radioactive materials Final dismantling Dry storage period ENRESA —