Romania

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES (OPTIONAL, N.A.)

 Fossil fuels Nuclear  Renewables
Solid Liquid Gas Uranium Hydro Other
renewable
Total amount in specific units* n.a. n.a. n.a. n.a. n.a. n.a.
Total amount in exajoules (EJ) n.a. n.a. n.a. n.a. n.a. n.a.

TABLE 2. ENERGY CONSUMPTION


GROSS INLAND
GROSS INLAND

2000
2000

2005

2005

2010

2010

2015

2015

2018*
2018
year*
Compound annual growth rate (%)
2000 to year*

2000 to year*
Final Energy consumption [EJ]


- Total 1.52 1.59 1.46 1.33 1.40 -0.005
- Heat 0.06 0.06 0.12 0.12 0.12 0.042
-Electricity,hydro+wind+ photovoltaic 0.05 0.06 0.07 0.07 0.09 0.029
- Natural Gas 0.57 0.58 0.46 0.38 0.42 -0.018
- Coal/Lignite/Peat 0.31 0.37 0.29 0.25 0.21 -0.021
- Oil 0.41 0.38 0.35 0.36 0.40 -0.001
- Other/Renewables 0.12 0.14 0.17 0.16 0.17 0.019

TABLE 3. ELECTRICITY PRODUCTION



2000


2005


2010


2015


2018*
Compound annual growth rate (%)
2000 to year*

Electricity production (TWh)

G
- Nuclear G 5.4 5.6 11.6 11.6 11.4 -0.002
- Hydro G 14.8 20.2 20.2 17.0 18.1 -0.014
- Geothermal G  
- Wind G 0 0 0.3 7 6.3 0.463
- Solar G 0 0 0 2 1.8 -0.035
- Natural Gas G - - - - -  
- Coal/Lignite/Peat G - - - - -  
- Oil G - - - - -  
- Bioenergy and Waste G - - - - -  
- Thermal G 31.7 33.6 28.9 28.7 27.3 -0.007
- Total** G 51.9 59.4 61 66.3 64.9 0.008

TABLE 4. ENERGY RELATED RATIOS


2000

2005

2010

2015
2018
year*
Nuclear/total electricity (%) 10 8 19 18 18

TABLE 5. STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS

Reactor unit Type Net capacity
[MW(e)]
Operator Status Reactor supplier Construction date Grid
date
Commercial date Shutdown/
Cancellation date
UCF
for year 2019
Cernavoda 1 PHWR 650 SNN Operational AECL 01.07.1982 11.07.1996 02.12.1996 n.a. 93.86%
Cernavoda 2 PHWR 650 SNN Operational AECL 01.07.1983 07.08.2007 31.10.2007 n.a. 89.18%

TABLE 6. STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS

Reactor unit Shutdown reason Decommission strategy Current decommissioning phase Current fuel management phase Decommissioning licensee Licence termination year
n.a. n.a. n.a. n.a. n.a. n.a. n.a.
n.a. n.a. n.a. n.a. n.a. n.a. n.a.

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Reactor unit/Project name Owner Type Gross capacity in MW(e) Expected construction start year Expected commercial year
Cernavoda 3 IPP CANDU 6 720 2024 2030
Cernavoda 4 IPP CANDU 6 720 2024 2031