Canada
TABLE 1: ESTIMATED AVAILABLE ENERGY RESOURCES
Estimated available energy sources | ||||||||
Fossil fuels | Nuclear | |||||||
Solid | Liquid | Gas | Uranium | Hydro | ||||
Total amount in specific units* | 8.9 | 27.01 | 1 982.2 | 509 000 | 160 |
TABLE 2: ENERGY STATISTICS
Year | 1980 | 1990 | 2000 | 2005 | 2010 | 2015 | Compound annual growth rate (%) 20002015 |
|
Energy consumption** | ||||||||
- Total | 6.1 | 6.3 | 7.4 | 7.8 | 7.3 | 9.0 | 1.3 | |
- Solids*** | 0.2 | 0.1 | 0.1 | 0.2 | 0.1 | 0.1 | 0.0 | |
- Liquids | 3.3 | 2.9 | 3.4 | 3.8 | 3.7 | 3.9 | 0.6 | |
- Gases | 1.5 | 1.8 | 2.2 | 2.0 | 1.8 | 2.9 | 1.3 | |
- Primary electricity**** | 1.1 | 1.5 | 1.7 | 1.8 | 1.7 | 2.1 | 1.4 | |
Energy production | ||||||||
- Total | 8.6 | 11.5 | 15.7 | 15.6 | 16.2 | 18.0 | 1.2 | |
- Solids*** | 0.8 | 1.6 | 1.4 | 1.4 | 1.4 | 1.3 | 1.4 | |
- Liquids | 3.5 | 3.9 | 5.4 | 6.1 | 7.0 | 8.5 | 5.3 | |
- Gases | 2.7 | 3.7 | 6.2 | 6.5 | 5.5 | 6.5 | 3.8 | |
- Primary electricity**** | 1.3 | 1.9 | 2.1 | 2.3 | 2.3 | 1.7 | 0.9 .7 | |
Net import (ImportExport) | ||||||||
- Total | 1.0 | 2.0 | 4.0 | 3.9 | 3.4 | 8.3 | 5.0 |
TABLE 3: INSTALLED CAPACITY, ELECTRICITY PRODUCTION AND CONSUMPTION
Year | 1980 | 1990 | 2000 | 2005 | 2010 | 2016 | Compound annual growth rate (%) 20002016 |
Capacity of electrical plants (GW(e)) | |||||||
- Thermal | 28.4 | 31.2 | 31.6 | 33.8 | 38.3 | 33.5 | 0.4 |
- Hydro | 47.8 | 59.4 | 67.4 | 72.0 | 75.1 | 80.9 | 1.1 |
- Nuclear | 5.9 | 13.5 | 10.6 | 13.4 | 13.3 | 14.0 | 1.8 |
- Wind | 0.0 | 0.0 | 0.1 | 0.7 | 4.0 | 12.0 | 34.9 |
- Biomass | | | 1.5 | 1.7 | 1.7 | 2.5 | 3.2 |
- Other renewable | | | | | | 2.7 | |
- Total | 82.0 | 104.2 | 111.3 | 121.5 | 132.6 | 140.2 | 1.5 |
Electricity production (TWh) | |||||||
- Thermal | 85.9 | 102.6 | 156.0 | 150.3 | 138.6 | 124.6 | 1.4 |
- Hydro | 253.1 | 296.9 | 354.6 | 358.5 | 372.1 | 383.4 | 0.5 |
- Nuclear | 38.5 | 73.0 | 68.7 | 86.8 | 88.3 | 95.4 | 2.1 |
- Wind | | 0.0 | 0.3 | 1.7 | 10.1 | 30.5 | 33.5 |
- Biomass | | 2.3 | 6.4 | 7.2 | 8.5 | 11.3 | 3.6 |
- other renewable | | | | | | 3.0 | |
- Total** | 377.5 | 474.8 | 585.8 | 604.4 | 617.9 | 648.4 | 0.6 |
Total electricity consumption (TWh) | 340.1 | 465.4 | 550.2 | 580.5 | 570.4 | 584.2 | 0.4 |
TABLE 4: ENERGY RELATED RATIOS
Year | 1980 | 1990 | 2000 | 2005 | 2010 | 2014 |
Energy consumption per capita (GJ/capita) | 334 | 309 | 335 | 338 | 293 | 300 |
Electricity consumption per capita (kWh/capita) | 13 823 | 16 736 | 17 873 | 17 943 | 16 712 | 16 621 (2016) |
Electricity production/Energy production (%) | 12 | 11 | 10 | 10 | 10 | 9 |
Nuclear/Total electricity (%) | 10 | 15 | 12 | 14 | 16 | 15 |
Ratio of external dependency (%)* | 4 | 34 | 52 | 52 | 62 | 75 |
TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2017
Reactor Unit | Type | Net Capacity [MW(e)] |
Status | Operator | Reactor Supplier |
Construction Date |
First Criticality Date |
First Grid Date |
Commercial Date |
Shutdown Date |
UCF for 2017 |
BRUCE-1 | PHWR | 760 | Operational | BRUCEPOW | OH/AECL | 1971-06-01 | 1976-12-17 | 1977-01-14 | 1977-09-01 | 95.4 | |
BRUCE-2 | PHWR | 760 | Operational | BRUCEPOW | OH/AECL | 1970-12-01 | 1976-07-27 | 1976-09-04 | 1977-09-01 | 97.4 | |
BRUCE-3 | PHWR | 750 | Operational | BRUCEPOW | OH/AECL | 1972-07-01 | 1977-11-28 | 1977-12-12 | 1978-02-01 | 83.2 | |
BRUCE-4 | PHWR | 750 | Operational | BRUCEPOW | OH/AECL | 1972-09-01 | 1978-12-10 | 1978-12-21 | 1979-01-18 | 93.8 | |
BRUCE-5 | PHWR | 817 | Operational | BRUCEPOW | OH/AECL | 1978-06-01 | 1984-11-15 | 1984-12-02 | 1985-03-01 | 72.8 | |
BRUCE-6 | PHWR | 817 | Operational | BRUCEPOW | OH/AECL | 1978-01-01 | 1984-05-29 | 1984-06-26 | 1984-09-14 | 81.1 | |
BRUCE-7 | PHWR | 817 | Operational | BRUCEPOW | OH/AECL | 1979-05-01 | 1986-01-07 | 1986-02-22 | 1986-04-10 | 96.5 | |
BRUCE-8 | PHWR | 817 | Operational | BRUCEPOW | OH/AECL | 1979-08-01 | 1987-02-15 | 1987-03-09 | 1987-05-22 | 100.0 | |
DARLINGTON-1 | PHWR | 878 | Operational | OPG | OH/AECL | 1982-04-01 | 1990-10-29 | 1990-12-19 | 1992-11-14 | 60.9 | |
DARLINGTON-2 | PHWR | 878 | Operational | OPG | OH/AECL | 1981-09-01 | 1989-11-05 | 1990-01-15 | 1990-10-09 | 0.0 | |
DARLINGTON-3 | PHWR | 878 | Operational | OPG | OH/AECL | 1984-09-01 | 1992-11-09 | 1992-12-07 | 1993-02-14 | 95.2 | |
DARLINGTON-4 | PHWR | 878 | Operational | OPG | OH/AECL | 1985-07-01 | 1993-03-13 | 1993-04-17 | 1993-06-14 | 98.8 | |
PICKERING-1 | PHWR | 515 | Operational | OPG | OH/AECL | 1966-06-01 | 1971-02-25 | 1971-04-04 | 1971-07-29 | 58.1 | |
PICKERING-4 | PHWR | 515 | Operational | OPG | OH/AECL | 1968-05-01 | 1973-05-16 | 1973-05-21 | 1973-06-17 | 88.2 | |
PICKERING-5 | PHWR | 516 | Operational | OPG | OH/AECL | 1974-11-01 | 1982-10-23 | 1982-12-19 | 1983-05-10 | 64.8 | |
PICKERING-6 | PHWR | 516 | Operational | OPG | OH/AECL | 1975-10-01 | 1983-10-15 | 1983-11-08 | 1984-02-01 | 98.6 | |
PICKERING-7 | PHWR | 516 | Operational | OPG | OH/AECL | 1976-03-01 | 1984-10-22 | 1984-11-17 | 1985-01-01 | 83.3 | |
PICKERING-8 | PHWR | 516 | Operational | OPG | OH/AECL | 1976-09-01 | 1985-12-17 | 1986-01-21 | 1986-02-28 | 86.0 | |
POINT LEPREAU | PHWR | 660 | Operational | NBEPC | AECL | 1975-05-01 | 1982-07-25 | 1982-09-11 | 1983-02-01 | 89.3 | |
DOUGLAS POINT | PHWR | 206 | Permanent Shutdown | OH | AECL | 1960-02-01 | 1966-11-15 | 1967-01-07 | 1968-09-26 | 1984-05-04 | |
GENTILLY-1 | HWLWR | 250 | Permanent Shutdown | HQ | AECL | 1966-09-01 | 1970-11-12 | 1971-04-05 | 1972-05-01 | 1977-06-01 | |
GENTILLY-2 | PHWR | 635 | Permanent Shutdown | HQ | AECL | 1974-04-01 | 1982-09-11 | 1982-12-04 | 1983-10-01 | 2012-12-28 | |
PICKERING-2 | PHWR | 515 | Permanent Shutdown | OPG | OH/AECL | 1966-09-01 | 1971-09-15 | 1971-10-06 | 1971-12-30 | 2007-05-28 | |
PICKERING-3 | PHWR | 515 | Permanent Shutdown | OPG | OH/AECL | 1967-12-01 | 1972-04-24 | 1972-05-03 | 1972-06-01 | 2008-10-31 | |
ROLPHTON NPD | PHWR | 22 | Permanent Shutdown | OH | CGE | 1958-01-01 | 1962-04-11 | 1962-06-04 | 1962-10-01 | 1987-08-01 |
Data source: IAEA - Power Reactor Information System (PRIS). | |||||||||||
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report. |
TABLE 6: STATUS OF DECOMMISSIONING PROCESS OF NUCLEAR POWER PLANTS
Reactor unit | Shutdown reason | Decommission strategy | Current decommis-sioning phase | Current fuel manage-ment phase | Decommissioning licensee | Licence termination year |
Gentilly-2 | End of life | 1. Controlled reactor shutdown (completed) 2. Defuel reactor core (wet storage, completed) 3. De-water and vacuum dry the primary heat transport system and moderator system (completed) 4. Drain all station systems (completed) 5. Move fuel from wet storage to dry storage (by 2020) 6. Dismantle reactor components (to be completed 20592064) |
Currently transferring fuel from wet storage to dry storage | Wet and dry storage | Hydro-Quιbec | Decommis-sioning licence: 2026 |