RUSSIA

TABLE 1. POPULATION INFORMATION

Average annual growth rate (%)
Year 1970 1980 1990 2000 2005 2012 2000 to 2012
Population (millions) N.A. 137.4 148 145.9 143.5 143.4 -0.14
Population density (inhabitants/km˛) N.A. 8.0 8.7 8.5 8.4 8.4 -0.1
Urban Population** as % of total N.A. 69 74 73 72.9 73.9 0.1
Area (1000 km˛) 17,075.4

TABLE 2. GROSS DOMESTIC PRODUCT (GDP)

Average annual growth rate (%)
2000 2005 2011 2000 to 2011
GDP (billions of current US$) 973.0 1371 1858.0 8.3
GDP (billions of constant 2000 US$) 259.6 349.7 433.6 5.59
GDP per capita (thousands PPP* US$/capita) 8.807 12.123 16.620 7.39
GDP per capita (thousands of current US$/capita) 6.849 9.650 12.956 7.43

TABLE 3. ESTIMATED ENERGY RESERVES

Estimated available energy sources
Fossil Fuels Nuclear Renewable Total
Solid Liquid Gas Uranium Hydro
Total amount in specific units* 157.01 10.8 33,1 1,000,000 16,000
Total amount in Exajoule (EJ) 4,789 503.3 1,274.1 157.6 57.6 6,781

TABLE 4. ENERGY STATISTICS (EJ)

Average annual
growth rate (%)
2000
1992 2000 2005 2006 2012 To
2012
 
Energy consumption1
- Total 34.4 27.8 31.2 32.5 33.27 1.64
- Solids2 7.7 5.24
5.32
5.32 4.92 -0.51
- Liquids 9.5 7.53 9.18 9.64
11.66
4.57
- Gases 14.5 13.19 14.63 15.38 15.50 1.46
- Nuclear 0.42 0.46 0.54 0.55 0.63 3.08
- Hydro 0.6 0.595 0.63 0.63 0.56 -0.49
- Other
Renewables
Energy production
- Total 48.2
40.74
49.87 51.16 52.74 2.45
- Solids 7.8
5.6
6.5 6.74 7.70 3.13
- Liquids 16.7 13.6 19.7 20.11 21.70 4.96
- Gases 20.9 19.7 21.6 22.18 22.15 1.04
- Nuclear 0.42 0.46 0.54 0.55 0.63 3.08
- Hydro 0.6 0.595 0.63 0.63 0.56 -0.49
- Other
Renewables
Net import (Import - Export)
- Total -13.5 -13 -18.69 -18.7 -19.47 -3.23

TABLE 5. ELECTRICITY PRODUCTION, CONSUMPTION AND CAPACITY

Average annual growth rate (%)
1970 1980 1990 2000 2005 2006 2012 2000
to
2012
 Capacity of electrical plants (GWe)                
- Thermal 81.3 121.1 149.7 138.9 149.2 149.2 151.9 0.78
- Hydro 23.0 35.1 43.4 44.4 46.1 46.1 45.9 0.29
- Nuclear 0.8 9.2 20.2 21.2 23.2 23.2 25.2 1.57
- Wind
- Geothermal
- Other renewable
- Total 105.1 165.4 213.3 204.5 219 219 223.0 0.75
Electricity production (TW.h)
- Thermal 373 622 797 568.5 629.2 664.1 700 1.92
- Hydro 94 129 167 165.4 174.4 175 155 -0.52
- Nuclear 4 54 118 129 149.5 154.7 177 3.10
- Wind
- Geothermal
- Other renewable
- Total (1) 470 805 1082 877.8 953.1 995.6 1,032 1.46
Total Electricity consumption (TW.h) N/A N/A 1073.8 863.7 939 962.5 1,017 1.48
(1) Electricity transmission losses are not deducted.

TABLE 6. ENERGY RELATED RATIOS

1970 1980 1990 2000 2005 2006 2012
Energy consumption per capita (GJ/capita) 160 250 260 190 214 228 233
Electricity consumption per capita (kWh/capita) N/A N/A 7311 5915 6544 6740 7112
Electricity production/Energy production (%) N/A N/A N/A 7.75 6.87 7.01 10.99
Nuclear/Total electricity (%) 0.74 6.71 10.91 15 15.7 15.7 17.2
Ratio of external dependency (%) (1) N/A N/A N/A -48.1 -60 -58 -58

TABLE 7: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2012

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2012
BALAKOVO-1 PWR 950 Operational REA ROSATOM 1980-12-01 1985-12-12 1985-12-28 1986-05-23 73.0
BALAKOVO-2 PWR 950 Operational REA ROSATOM 1981-08-01 1987-10-02 1987-10-08 1988-01-18 89.0
BALAKOVO-3 PWR 950 Operational REA ROSATOM 1982-11-01 1988-12-16 1988-12-25 1989-04-08 89.3
BALAKOVO-4 PWR 950 Operational REA ROSATOM 1984-04-01 1993-03-24 1993-04-11 1993-12-22 97.7
BELOYARSK-3 FBR 560 Operational REA ROSATOM 1969-01-01 1980-02-26 1980-04-08 1981-11-01 78.8
BILIBINO-1 LWGR 11 Operational REA ROSATOM 1970-01-01 1973-12-11 1974-01-12 1974-04-01 86.4
BILIBINO-2 LWGR 11 Operational REA ROSATOM 1970-01-01 1974-12-07 1974-12-30 1975-02-01 72.7
BILIBINO-3 LWGR 11 Operational REA ROSATOM 1970-01-01 1975-12-06 1975-12-22 1976-02-01 86.7
BILIBINO-4 LWGR 11 Operational REA ROSATOM 1970-01-01 1976-12-12 1976-12-27 1977-01-01 86.7
KALININ-1 PWR 950 Operational REA ROSATOM 1977-02-01 1984-04-10 1984-05-09 1985-06-12 77.5
KALININ-2 PWR 950 Operational REA ROSATOM 1982-02-01 1986-11-25 1986-12-03 1987-03-03 84.5
KALININ-3 PWR 950 Operational REA ROSATOM 1985-10-01 2004-11-25 2004-12-16 2005-11-08 91.8
KALININ-4 PWR 950 Operational REA ROSATOM 1986-08-01 2011-11-08 2011-11-24 2012-12-25 0.0
KOLA-1 PWR 411 Operational REA ROSATOM 1970-05-01 1973-06-26 1973-06-29 1973-12-28 82.2
KOLA-2 PWR 411 Operational REA ROSATOM 1970-05-01 1974-11-30 1974-12-09 1975-02-21 81.9
KOLA-3 PWR 411 Operational REA ROSATOM 1977-04-01 1981-02-07 1981-03-24 1982-12-03 78.1
KOLA-4 PWR 411 Operational REA ROSATOM 1976-08-01 1984-10-07 1984-10-11 1984-12-06 84.7
KURSK-1 LWGR 925 Operational REA ROSATOM 1972-06-01 1976-10-25 1976-12-19 1977-10-12 71.7
KURSK-2 LWGR 925 Operational REA ROSATOM 1973-01-01 1978-12-16 1979-01-28 1979-08-17 88.0
KURSK-3 LWGR 925 Operational REA ROSATOM 1978-04-01 1983-08-09 1983-10-17 1984-03-30 75.4
KURSK-4 LWGR 925 Operational REA ROSATOM 1981-05-01 1985-10-31 1985-12-02 1986-02-05 89.4
LENINGRAD-1 LWGR 925 Operational REA ROSATOM 1970-03-01 1973-09-12 1973-12-21 1974-11-01 27.5
LENINGRAD-2 LWGR 925 Operational REA ROSATOM 1970-06-01 1975-05-06 1975-07-11 1976-02-11 65.5
LENINGRAD-3 LWGR 925 Operational REA ROSATOM 1973-12-01 1979-09-17 1979-12-07 1980-06-29 91.7
LENINGRAD-4 LWGR 925 Operational REA ROSATOM 1975-02-01 1980-12-29 1981-02-09 1981-08-29 92.3
NOVOVORONEZH-3 PWR 385 Operational REA ROSATOM 1967-07-01 1971-12-22 1971-12-27 1972-06-29 72.8
NOVOVORONEZH-4 PWR 385 Operational REA ROSATOM 1967-07-01 1972-12-25 1972-12-28 1973-03-24 87.9
NOVOVORONEZH-5 PWR 950 Operational REA ROSATOM 1974-03-01 1980-04-30 1980-05-31 1981-02-20 83.7
ROSTOV-1 PWR 950 Operational REA ROSATOM 1981-09-01 2001-02-23 2001-03-30 2001-12-25 86.5
ROSTOV-2 PWR 950 Operational REA ROSATOM 1983-05-01 2010-01-22 2010-03-18 2010-12-10 87.8
SMOLENSK-1 LWGR 925 Operational REA ROSATOM 1975-10-01 1982-09-10 1982-12-09 1983-09-30 76.3
SMOLENSK-2 LWGR 925 Operational REA ROSATOM 1976-06-01 1985-04-09 1985-05-31 1985-07-02 86.3
SMOLENSK-3 LWGR 925 Operational REA ROSATOM 1984-05-01 1989-12-29 1990-01-17 1990-10-12 70.6
AKADEMIK LOMONOSOV 1 PWR 32 Under Construction REA ROSATOM 2007-04-15 2019-12-31
AKADEMIK LOMONOSOV 2 PWR 32 Under Construction REA ROSATOM 2007-04-15 2019-12-01
BALTIC-1 PWR 1109 Under Construction REA ROSATOM 2012-02-22 2016-01-01 2016-12-01
BELOYARSK-4 FBR 789 Under Construction REA ROSATOM 2006-07-18
LENINGRAD 2-1 PWR 1085 Under Construction REA ROSATOM 2008-10-25
LENINGRAD 2-2 PWR 1085 Under Construction REA ROSATOM 2010-04-15
NOVOVORONEZH 2-1 PWR 1114 Under Construction REA ROSATOM 2008-06-24 2014-12-31
NOVOVORONEZH 2-2 PWR 1114 Under Construction REA ROSATOM 2009-07-12
ROSTOV-3 PWR 1011 Under Construction REA ROSATOM 2009-09-15
ROSTOV-4 PWR 1011 Under Construction REA ROSATOM 2010-06-16
APS-1 OBNINSK LWGR 5 Permanent Shutdown REA MSM 1951-01-01 1954-05-06 1954-06-27 1954-12-01 2002-04-29
BELOYARSK-1 LWGR 102 Permanent Shutdown REA MSM 1958-06-01 1963-09-01 1964-04-26 1964-04-26 1983-01-01
BELOYARSK-2 LWGR 146 Permanent Shutdown REA MSM 1962-01-01 1967-10-10 1967-12-29 1969-12-01 1990-01-01
NOVOVORONEZH-1 PWR 197 Permanent Shutdown REA MSM 1957-07-01 1963-12-17 1964-09-30 1964-12-31 1988-02-16
NOVOVORONEZH-2 PWR 336 Permanent Shutdown REA MSM 1964-06-01 1969-12-23 1969-12-27 1970-04-14 1990-08-29
BALAKOVO-5 PWR 950 Suspended Constr. REA 1987-04-01
BALAKOVO-6 PWR 950 Suspended Constr. REA 1988-05-01
SOUTH URALSK 1 FBR 750 Suspended Constr. REA ROSATOM 1986-01-01
SOUTH URALSK 2 FBR 750 Suspended Constr. REA ROSATOM 1986-01-01
VORONEZH (HEAT ONLY)-1 BWR 0 Suspended Constr. REA 1983-09-01
VORONEZH (HEAT ONLY)-2 BWR 0 Suspended Constr. REA 1985-05-01
BASHKIRSK-1 PWR 950 Cancelled Constr. REA 1983-01-01 1993-12-01
BASHKIRSK-2 PWR 950 Cancelled Constr. REA 1983-12-01 1993-12-01
GORKIY (HEAT ONLY) BWR 0 Cancelled Constr. REA 1982-01-01 1993-12-01
KURSK-5 LWGR 915 Cancelled Constr. REA ROSATOM 1985-12-01 2012-08-15
KURSK-6 LWGR 925 Cancelled Constr. REA 1986-08-01 1993-12-01
SMOLENSK-4 LWGR 925 Cancelled Constr. REA 1984-10-01 1993-12-01
TATAR-1 (KAMA) PWR 950 Cancelled Constr. REA 1987-04-01 1993-12-01
TATAR-2 (KAMA) PWR 950 Cancelled Constr. REA 1988-05-01 1993-12-01
Data source: IAEA - Power Reactor Information System

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Station/Project Name Type Capacity MWe Expected Construction Start Year Expected Commercial Year
Vilyuchinsk KLT-40S 40 x 2 Const 5/09 Late 2016
Beloyarsk 4 BN-800 FBR 880 Const 2014
Novovoronezh II -1 VVER 1200/ V-392M 1200 Const 6/08 2014
Leningrad II-1 VVER 1200/ V-491 1200 Const 10/08 2013
Novovoronezh II -2 VVER 1200/ V-392M 1200 Const 7/09 2016
Rostov 3 VVER 1000/ V-320 1100 Planned 2009 2014
Leningrad II -2 VVER 1200 1200 Planned 2009 2016
Rostov 4 VVER 1000/ V-320 1100 Planned 2010 2017
Baltic 1 (Kaliningrad) VVER 1200 1200 Planned 2010 2017
Leningrad II -3 VVER 1200 1200 Planned 2011 2017
Leningrad II -4 VVER 1200 1200 Planned 2014 2019
Baltic 2 (Kaliningrad) VVER 1200 1200 Planned 2012 2018