UKRAINE

TABLE 1. POPULATION INFORMATION

Average annual growth rate (%)
Year 1970 1980 1990 2000 2005 2009 2000 to 2009
Population (millions) 47.3 50 51.9 49.2 47.1 46.0 -0.74
Population density (inhabitants/km2) 81.7 86.4 85.9 81.5 78.0 76.2 -0.74
Urban population (% of total) 54.8 61.7 66.8 67.1 67.8
Area(1000 km2) 579.4

TABLE 2. GROSS DOMESTIC PRODUCT (GDP)

Annual Average
Growth Rate (%)
1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
GDP (millions of constant 2000 US$) .. 71,953 31,262 45,188 45,390 .. 4.23
GDP per capita (2000 US$/capita) .. 1,388 636 960 987 .. 5.00
PPP (millions of constant 2000 int$) .. 441,014 202,054 286,730 288,250 .. 4.03
PPP per capita (2000 int$/capita) .. 8,508 4,109 6,091 6,265 .. 4.80

TABLE 3. ESTIMATED ENERGY RESERVES

Estimated available energy sources
Fossil Fuels Nuclear Renewables
Solid Liquid Gas Uranium Hydro Other Reneables Total
Total amount in Exajoule (EJ) 965.89 7.44 30.53 44.23 4.34 1 052.41
Total amount in specific units* 33,873 151 787 86,800 22,000

TABLE 4. ENERGY STATISTICS

(Energy values are in Exajoule exept where indicated) Annual Average
Growth Rate (%)
Total Energy Requirements 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 5.87 6.28 4.93 .. -1.93
Solids .. .. 1.61 1.55 1.50 .. -0.83
Liquids .. .. 0.45 0.58 0.55 .. 2.16
Gases .. .. 2.90 3.13 1.93 .. -4.43
Hydro .. .. 0.04 0.05 0.04 .. 0.46
Nuclear .. .. 0.84 0.97 0.90 .. 0.78
Combustible Renewables and Waste .. .. 0.04 0.04 0.02 .. -4.84
Other Renewables .. .. -0.01 -0.03 -0.01 .. 0.56
Final Energy Consumption 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 3.31 3.49 3.21 .. -0.33
Solids .. .. 1.53 1.45 1.31 .. -1.71
Liquids .. .. 0.16 0.19 0.17 .. 0.76
Gases .. .. 0.70 0.81 0.75 .. 0.83
Hydro .. .. 0.04 0.05 0.04 .. 0.46
Nuclear .. .. 0.84 0.97 0.90 .. 0.78
Combustible Renewables and Waste .. .. 0.04 0.03 0.03 .. -1.70
Other Renewables .. .. < 0.01 < 0.01 < 0.01 .. 24.46
Net Import (Export-Import) 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 2.59 2.71 1.85 .. -3.64
Solids .. .. 0.08 0.10 0.06 .. -4.26
Liquids .. .. 0.32 0.38 0.37 .. 1.65
Gases .. .. 2.20 2.25 1.45 .. -4.52
Combustible Renewables and Waste .. .. < 0.01 0.01 > -0.01 .. ?

TABLE OPERATION AND SUSTAINABLE DEVELOPMENT OF THE FEC COMPANIES.

Name 2010 2015 2020 2030
Electricity supply, total 210 200 251 000 307 000 420 100
Electricity generation, total 210 200 251 000 307 000 420 100
1). General-purpose power plants, including: 200 290 239 450 294 100 404 600
A).Thermal and Combined Heat-and-Power Plants (TPP and CHPP), percentage in total generation 86 590 114 350 118 600 167 000
percentage in total generation 41,2% 45,6% 38,6% 39,8%
B). Hydropower Plants (HPP), 10 300 11 400 12 700 14 100
percentage in total generation 4,9% 4,5% 4,1% 3,4%
C). Hydroelectric Pumped Sstorage Plants (HPSP), 2 200 3 200 3 900 4 500
1,0% 1,3% 1,3% 1,1%
D). Nuclear Power Plants (NPP), 101 200 110 500 158 900 219 000
percentage in total generation 48,1% 44,0% 51,8% 52,1%
2). Local Power Plants and other sources, 9 910 11 550 12 900 15 500
percentage in total generation 4,8% 4,6% 4,2% 3,6%
Electricity demand, total 210 200 251 000 307 000 420 100
Gross electricity consumption 198 850 231 000 287 000 395 100

TABLE 5. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY

Annual Average
Growth Rate (%)
Electricity Generation 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 171.45 186.06 173.62 .. 0.14
Nuclear .. .. 77.34 88.76 82.92 .. 0.78
Hydro .. .. 11.45 12.51 11.94 .. 0.46
Geothermal .. .. < 0.01 0.04 0.04 .. 24.46
Thermal .. .. 82.65 84.76 78.72 .. -0.54
Installed Capacity 1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Total .. .. 52.85 52.56 54.38 .. 0.32
Nuclear .. .. 11.84 12.84 13.84 .. 1.75
Hydro .. .. 4.72 4.74 5.42 .. 1.55
Geothermal .. .. .. .. .. .. ..
Thermal .. .. 36.28 34.92 35.04 .. -0.38

TABLE 6. ENERGY RELATED RATIOS

Annual Average
Growth Rate (%)
1980 1990 2000 2005 2009 1980 to 2000 2000 to 2009
Energy consumption per capita (GJ/capita) .. .. 119.4 133.4 107.1 .. -1.20
Electricity per capita (KW.h/capita) .. .. 3,486.4 3,952.3 3,773.5 .. 0.88
Nuclear/Total electricity (%) .. .. 45.1 47.7 47.8 .. 0.64
Annual capacity factor - Total (%) .. .. 37.0 40.4 36.4 .. -0.18
Annual capacity factor - Thermal (%) .. .. 26.0 27.7 25.6 .. -0.16
Annual capacity factor - Hydro (%) .. .. 27.7 30.1 25.1 .. -1.07
Annual capacity factor - Nuclear (%) .. .. 74.6 78.9 68.4 .. -0.96

TABLE 7. STATUS OF NUCLEAR POWER PLANTS

Station Types Net
Capacity
Operator Status Reactor
Supplier
Criticality Construction
Date
Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
year
2011
KHMELNITSKI-1 PWR 950 Operational NNEGC PAIP 1981-11-01 1987-12-10 1987-12-31 1988-08-13 82.6
KHMELNITSKI-2 PWR 950 Operational NNEGC PAIP 1985-02-01 2004-08-01 2004-08-07 2005-12-15 83.5
ROVNO-1 PWR 381 Operational NNEGC PAIP 1973-08-01 1980-12-17 1980-12-31 1981-09-21 81.9
ROVNO-2 PWR 376 Operational NNEGC PAIP 1973-10-01 1981-12-19 1981-12-30 1982-07-30 78.7
ROVNO-3 PWR 950 Operational NNEGC PAIP 1980-02-01 1986-11-11 1986-12-21 1987-05-16 75.7
ROVNO-4 PWR 950 Operational NNEGC PAA 1986-08-01 2004-09-26 2004-10-10 2006-04-06 77.1
SOUTH UKRAINE-1 PWR 950 Operational NNEGC PAA 1977-03-01 1982-12-09 1982-12-31 1983-10-18 72.0
SOUTH UKRAINE-2 PWR 950 Operational NNEGC PAA 1979-10-01 1984-12-30 1985-01-06 1985-04-06 77.0
SOUTH UKRAINE-3 PWR 950 Operational NNEGC PAA 1985-02-01 1989-09-01 1989-09-20 1989-12-29 72.0
ZAPOROZHE-1 PWR 950 Operational NNEGC PAIP 1980-04-01 1984-12-07 1984-12-10 1985-12-25 75.3
ZAPOROZHE-2 PWR 950 Operational NNEGC PAIP 1981-01-01 1985-06-28 1985-07-22 1986-02-15 77.4
ZAPOROZHE-3 PWR 950 Operational NNEGC PAIP 1982-04-01 1986-12-04 1986-12-10 1987-03-05 84.7
ZAPOROZHE-4 PWR 950 Operational NNEGC PAIP 1983-04-01 1987-12-15 1987-12-18 1988-04-14 77.6
ZAPOROZHE-5 PWR 950 Operational NNEGC PAIP 1985-11-01 1989-07-20 1989-08-14 1989-10-27 77.7
ZAPOROZHE-6 PWR 950 Operational NNEGC PAIP 1986-06-01 1995-10-06 1995-10-19 1996-09-16 82.1
KHMELNITSKI-3 PWR 950 Under Construction NNEGC ASE 1986-03-01 2015-01-01
KHMELNITSKI-4 PWR 950 Under Construction NNEGC ASE 1987-02-01 2016-01-01
CHERNOBYL-1 LWGR 740 Permanent Shutdown MTE FAEA 1970-03-01 1977-08-02 1977-09-26 1978-05-27 1996-11-30
CHERNOBYL-2 LWGR 925 Permanent Shutdown MTE FAEA 1973-02-01 1978-11-17 1978-12-21 1979-05-28 1991-10-11
CHERNOBYL-3 LWGR 925 Permanent Shutdown MTE FAEA 1976-03-01 1981-06-02 1981-12-03 1982-06-08 2000-12-15
CHERNOBYL-4 LWGR 925 Permanent Shutdown MTE FAEA 1979-04-01 1983-11-26 1983-12-22 1984-03-26 1986-04-26
SOUTH UKRAINE-4 PWR 950 Suspended Constr. NNEGC 1987-01-01
CHERNOBYL-5 LWGR 950 Cancelled Constr. MINENERG 1981-01-01 1988-01-01
CHERNOBYL-6 LWGR 950 Cancelled Constr. MINENERG 1983-01-01 1988-01-01
CRIMEA-1 PWR 0 Cancelled Constr. MINENERG 1982-12-01 1989-01-01

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Station/Project Name Type Net Capacity Expected Connection to the Grid Expected Commercial Date
KhNPP - 3 WWER 950 2016 2017
KhNPP - 4 WWER 950 2016 2017

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Items 2006-2010 2011-2020 2021-2030 Total
Installed capacity, GW 13,84 21,84 29,5
Capacity Factor (CF) % 82,8 85 85
Electric power generation, ?Wh (by periods) 488,3 1 185,7 1 837,0 3 511,0
Spendings breakdown* for new construction**, UAH mln 4 525 61 955 103 024 169 504

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Periods Average investment requirement per annum,
UAH mln
Total, UAH mln
2006 – 2010 807 4 037
2011 – 2015 1862 9 314
2016 – 2020 792 3 964
2021 – 2025 660 3 303
2026 – 2030 213 1 065
Total for the period of 2006 to 2030 21 700