Romania

TABLE 1. ESTIMATED AVAILABLE ENERGY SOURCES

 Fossil fuels Nuclear  Renewables
Solid Liquid Gas Uranium Hydro Other
renewable
Total amount in specific units* n.a. n.a. n.a. n.a. n.a. n.a.
Total amount in exajoules (EJ) n.a. n.a. n.a. n.a. n.a. n.a.

TABLE 2. ENERGY CONSUMPTION

Final Energy consumption [PJ] 2000 2005 2010 2015 2019 Compound
annual growth
rate 2000–2019 (%)
Total 1 019 1 118 991 954 1 037 0.09
Coal, Lignate and Peat 59 87 44 41 37 -2.43
Oil 269 324 275 318 377 1.79
Natural gas 303 343 283 235 250 -1.01
Bioenergy and Waste 117 135 170 151 162 1.73
Electricity 122 140 148 155 164 1.57
Heat 150 90 70 54 47 -5.93

TABLE 3. ELECTRICITY PRODUCTION

Electricity production (GWh) 2000 2005 2010 2015 2019 Compound
annual growth
rate 2000–2019 (%)
Total 51 934 59 413 60 979 66 296 59 623 0.73
Coal, Lignate and Peat 19 300 22 138 20 742 18 220 14 018 -1.67
Oil 3 399 1 894 692 474 598 -8.74
Natural gas 9 001 9 612 7 262 9 386 8 788 -0.13
Bioenergy and Waste 0 7 111 524 476
Hydro 14 778 20 207 20 243 17 007 15 915 0.39
Nuclear 5 456 5 555 11 623 11 640 11 280 3.90
Wind 0 0 306 7 063 6 771
Solar 0 0 0 1 982 1 777
Geothermal 0 0 0 0 0

TABLE 4. ENERGY RELATED RATIOS


2000

2005

2010

2015

2019*
Nuclear/total electricity (%) 10 8 19 18 19

TABLE 5: STATUS AND PERFORMANCE OF NUCLEAR POWER PLANTS AS OF 31 DECEMBER 2020

Reactor Unit Type Net
Capacity
[MW(e)]
Status Operator Reactor
Supplier
Construction
Date
First
Criticality
Date
First Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
2020
CERNAVODA-1 PHWR 650 Operational SNN AECL 3/31/1983 4/16/1996 7/11/1996 12/2/1996 86.5
CERNAVODA-2 PHWR 650 Operational SNN AECL 7/1/1983 5/6/2007 8/7/2007 11/1/2007 99.0
CERNAVODA-3 PHWR 655 Suspended Constr. SNN AECL 2/9/1984
CERNAVODA-4 PHWR 655 Suspended Constr. SNN AECL 8/15/1985
CERNAVODA-5 PHWR 655 Cancelled Constr. SNN AECL 5/12/1987 3/11/2014
Data source: IAEA - Power Reactor Information System (PRIS).
Note: Table is completely generated from PRIS data to reflect the latest available information and may be more up to date than the text of the report.

TABLE 7. PLANNED NUCLEAR POWER PLANTS

Reactor unit/Project name Owner Type Gross capacity in MW(e) Expected construction start year Expected commercial year
Cernavoda 3 IPP CANDU 6 720 2024 2030
Cernavoda 4 IPP CANDU 6 720 2024 2031