• English
  • العربية
  • 中文
  • Français
  • Русский
  • Español

You are here

Staffing Requirements for Future Small and Medium Reactors (SMRs) Based on Operating Experience and Projections

IAEA-TECDOC-1193

English IAEA-TECDOC-1193

130 pages ¦ € 15.00 ¦ Date published: 2001

Download PDF (1.1 MB)

Description

This publication is intended to evaluate the estimated staffing size of various SMRs, the staff qualification and training required for the operation of future SMRs, and the key issues which impact the staffing requirements that should be considered in the development and deployment of future SMRs.

More Information on reusing IAEA copyright material.

Stay in touch

Newsletter