ARGENTINA
(updated on Dec. 2004 1)
1. ENERGY, ECONOMIC AND ELECTRICITY INFORMATION
1.1. General Overview
1.1.1. General geographic information
Main territory of Argentina is located in continental South America, bounded by Bolivia and Paraguay on the north; by Brazil, Uruguay, and the South Atlantic Ocean on the east; by the South Atlantic Ocean and Chile on the south; and by Chile on the west. Another significant territory has been historically claimed by Argentina on several island groups in the South Atlantic Ocean, including the "Malvinas" (Falkland), and in Antartica, representing a total of approx. 970.000 km2. Considering only the continental territory in South America stretching between the Bolivian border (at 21° South Lat.) and the extreme south of Tierra del Fuego (at 55° South Lat.), the north to south length of Argentina is 3 799 km; its extreme width is 1 423 km; and its area is 2.791.810 km2. Argentina is the second largest South American country; its borders with other countries amount to 9 376 km and its total coastline on the South Atlantic Ocean (including islands) measures 4 725 km in length.
Argentina has a diverse territory of mountains, upland areas, and large plains. The western boundary of the country is within the Andes mountain system. Eastward from the base of the Andean system, the terrain of Argentina is almost entirely flat or gently undulating plain. The Pampas, originally treeless plains that include the most productive agricultural sections of the country, extend nearly 1,600 km south from Chaco (northern forests) and north from Patagonia. In Patagonia, southern territory of continental Argentina with nearly one million km2, the terrain is largely arid, with desolate steppes. Sources for geographic data : "Instituto Nacional de Estadísticas y Censos" (INDEC, Federal Institute for Statistics and Census. www.indec.gov.ar), "Instituto Geográfico Militar" (IGM, Geographic Institute of the Army. www.igm.gov.ar), "Servicio de Hidrografía Naval" (SHN, Hydrographic Service of the Navy. www.hidro.gov.ar). Additional information on geographic data can be obtained at their sites.
Temperate weather conditions prevail throughout most of Argentina, except for a small tropical area in the north-east and the subtropical Chaco region in the north, as well as colder areas in southern Patagonia including Tierra del Fuego and other islands in the South Atlantic Ocean. Near Buenos Aires the average annual temperature is a mild 16.1 °C. January and July averages for this area are 23.3 °C and 9.4 °C, respectively. Considerably higher temperatures prevail near the tropic of Capricorn in the north. The annual average temperature in this region is 23.3 °C with extremes as high as 45 °C. Weather is generally cold in Patagonia and Tierra del Fuego. In the western section of Patagonia, corresponding to the Patagonian Andes, winter temperatures average about 0 °C. In most coastal areas, however, the ocean exerts a moderating influence on temperatures.
Precipitation in Argentina has wide regional variations: south and west are semiarid, but the extreme north gets more than 152 cm of rainfall annually. Near Buenos Aires annual rainfall is about 102 cm. Additional information on climate data can be obtained at the site of the "Servicio Meteorologico Nacional" (SMN, National Meteorological Service), www.meteonet.gov.ar
1.1.2. Population
Argentina is constituted by 23 provinces and the self-governing Federal District of Buenos Aires. According to the Federal Constitution (amended in 1994), Argentina is a federal republic headed by a president, assisted by ministers and secretaries, which constitute the "Executive" branch of the Federal Government. The other two branches of it are the "Legislative" one (or "National Congress" comprising two chambers, namely the Senate and the Chamber of Representatives) and the "Justice" branch, headed by the Nation's Supreme Court.
In 2004, Argentina's population was estimated at approx. 38,226,000; the annual growth rate is now 9.7 o/oo, the life expectancy at birth is 74.7 years and the infant mortality rate is 14.2 o/oo. Around 90 % of the total population live in urban areas, see Table 1 for the historical population data. More than one-third of the population lives in or around Buenos Aires, the capital and the largest city, with a population of 11,500,000 including its suburban area. Other important cities are Córdoba (metropolitan area population of 1,200,000), a major manufacturing and university city; the river port of Rosario (metropolitan area population of 1 160 000); Mendoza (metropolitan area population of 780 000); Tucumán (population 625 000); Mar del Plata (520 000)
Source of population data: "Instituto Nacional de Estadísticas y Censos" (INDEC, Federal Institute for Statistics and Census). Additional information on population data can be obtained at its site: www.indec.gov.ar
TABLE 1. POPULATION INFORMATION
|
|
|
|
|
|
|
Average annual growth rate(%) |
|
1970 |
1980 |
1990 |
2000 |
2005 |
2006 |
2000 to 2006 |
Population (millions) |
24 |
28.1 |
32.6 |
36.9 |
38.7 |
39.1 |
1 |
Population density (inhabitants/km2) |
8.8 |
10.3 |
11.9 |
13.5 |
14.2 |
14.3 |
|
Urban population (% of total) |
78.9 |
82.9 |
87 |
89.2 |
90.1 |
90.3 |
|
Area(1000 km2) |
|
|
|
|
|
2736.7 |
|
Source: World Bank World Development Indicators
1.1.3. Economic Indicators
Table 2 shows the Gross Domestic Product (GDP), GDP per capita, their growth rates and the GDP by sector.
TABLE 2. GROSS DOMESTIC PRODUCT (GDP)
|
|
|
|
|
|
|
Average annual growth rate(%) |
|
1970 |
1980 |
1990 |
2000 |
2005 |
2006 |
2000 to 2006 |
GDP (millions of current US$) |
31 584.2 |
76 961.9 |
141 352.4 |
284 203.7 |
183 193.4 |
214 057.7 |
-4.6 |
GDP (millions of constant 2000 US$) |
158 559.6 |
212 127.3 |
182 208.9 |
284 203.7 |
313 626.0 |
340 145.6 |
3 |
GDP per capita (current US$) |
1 318.1 |
2 739.5 |
4 338.5 |
7 702.9 |
4 727.9 |
5 471.8 |
-5.5 |
Source: World Bank World Development Indicators
1.1.4. Primary Energy Situation
Most rivers and waterfalls with potential energy are far from the industrial centres, but despite these limitations water resources have been widely developed in Argentina (hydraulic resource potential is 1,926,000 TJ). Major hydroelectric projects undertaken in the 1970's and 1980's are in the northern Patagonia (Chocon, Cerros Colorados, Piedra del Aguila, etc.), on the Paraná River (Yacireta, a joint project with Paraguay), and on the Uruguay River (Salto Grande, in co-operation with Uruguay).
Although the country has a variety of mineral deposits (only one fifth of the country has been surveyed), mining has been relatively unimportant, contributing only 0.2% to Gross Domestic Product (GDP). Since the gas and petroleum sector privatization, exploration for hydrocarbons has increased significantly. Proven natural gas reserves amount to 579 million metric tons. Coal reserves in Argentina are limited: lignite deposits are estimated at 195 million t and peat at 90 million t.
Argentina has moderate uranium resources (proven reserves of 5 240 tn and additional estimated resources of 2400 tn). Source : National Atomic Energy Commission (CNEA).
Table 3 shows total energy resources. Table 4 shows the energy statistics.TABLE 3. ESTIMATED ENERGY RESERVES
Estimated energy reserves in (*) (Solid and Liquid in million tons, Uranium in metric tons, Gas in billion cubic metres, Hydro in TWhr per year) | ||||||||
Solid (1) | Liquid (2) | Gas (3) | Uranium (4) | Hydro (5) | ||||
---|---|---|---|---|---|---|---|---|
Amount | 424 | 379,000 | 664 | 7,080 | 130,000 | |||
(*) Sources: 20th WEC Survey of Energy
Resources, 2004 and Uranium 2005: Resources, Production and Demand ("Red
Book")
(1) Coal including Lignite: proved recoverable reserves, the tonnage
within the proved amount in place that can be recovered in the future under
present and expected local economic conditions with existing available
technology
(2) Crude oil and natural gas liquids (Oil
Shale, Natural Bitumen and Extra-Heavy Oil are not included): proved recoverable
reserves, the quantity within the proved amount in place that can be recovered
in the future under present and expected local economic conditions with existing
available technology
(3) Natural gas: proved recoverable reserves,
the volume within the proved amount in place that can be recovered in the future
under present and expected local economic conditions with existing available
technology
(4) Reasonably Assured Resources (RAR) under
< USD 130/kgU
(5) Hydropower: technically exploitable
capability, the amount of the gross theoretical capability that can be exploited
within the limits of current technology
Source: IAEA Energy and Economic Database
(Energy values are in Exajoule exept where indicated) | Annual Average Growth Rate (%) |
|||||||
Total Energy Requirements | 1970 | 1980 | 1990 | 2000 | 2003 | 2004 | 1980 to 2000 | 2000 to 2004 |
---|---|---|---|---|---|---|---|---|
Total | 1.24 | 1.69 | 2.00 | 2.69 | 2.66 | 2.80 | 2.34 | 1.05 |
Solids | 0.04 | 0.03 | 0.03 | 0.02 | 0.02 | 0.02 | -2.70 | 1.46 |
Liquids | 0.94 | 1.10 | 0.84 | 1.01 | 0.92 | 0.97 | -0.43 | -0.95 |
Gases | 0.21 | 0.40 | 0.88 | 1.41 | 1.41 | 1.51 | 6.54 | 1.70 |
Hydro | < 0.01 | 0.05 | 0.07 | 0.10 | 0.12 | 0.11 | 3.27 | 1.43 |
Nuclear | 0.00 | 0.03 | 0.07 | 0.06 | 0.08 | 0.08 | 4.58 | 6.28 |
Other Renewables and Waste | 0.06 | 0.08 | 0.11 | 0.08 | 0.12 | 0.11 | -0.09 | 7.85 |
Final Energy Consumption | 1970 | 1980 | 1990 | 2000 | 2003 | 2004 | 1980 to 2000 | 2000 to 2004 |
Total | 0.82 | 0.99 | 0.93 | 1.91 | 1.75 | 1.84 | 3.32 | -0.97 |
Solids | 0.08 | 0.11 | 0.05 | 0.08 | 0.10 | 0.08 | -1.38 | -0.75 |
Liquids | 0.55 | 0.69 | 0.53 | 0.73 | 0.55 | 0.61 | 0.25 | -4.44 |
Gases | 0.16 | 0.14 | 0.28 | 0.83 | 0.81 | 0.84 | 9.28 | 0.35 |
Electricity | 0.03 | 0.05 | 0.07 | 0.27 | 0.29 | 0.31 | 8.39 | 3.42 |
Other | .. | .. | .. | .. | .. | .. | .. | .. |
Net Energy Balance (Export-Import) | 1970 | 1980 | 1990 | 2000 | 2003 | 2004 | 1980 to 2000 | 2000 to 2004 |
Total | 0.123 | 0.140 | -0.106 | -0.852 | -1.010 | -0.931 | ? | 2.26 |
Solids | 0.022 | 0.022 | 0.025 | 0.011 | 0.015 | 0.017 | -3.29 | 11.70 |
Liquids | 0.101 | 0.047 | -0.220 | -0.702 | -0.788 | -0.650 | ? | -1.89 |
Gases | 0.000 | 0.071 | 0.085 | -0.164 | -0.255 | -0.310 | ? | 17.22 |
Other Renewables and Waste | > -0.001 | < 0.001 | 0.003 | 0.003 | 0.017 | 0.011 | 20.21 | 38.12 |
Source: IAEA Energy and Economic Database
1.2. Energy Policy
As a result of governmental policies during the three decades of 1960's, 70's and 80's the electricity sector has been characterized by:
As a result, and accompanying an average annual growth in the total electricity generation of around 7 % in the period 1991-1997 and a progressive decline in the following years 1998-2001 (Argentina's economic depression and crisis), the thermal share increased again during the last decade with a normal value of around 52 - 55%. The main exception occurred in 2001 when the combination of extensive heavy rains and electricity demand reduction led to an unsual hydro-power share of 55 % together with a thermal share of only 37 %.
It is important to underline that during the three decades of 1960's, 70's and 80's the overall energy policy was almost exclusively dictated by the Federal Government, with emphasis on planning, diversification and balanced / optimal use of the various types of national energy resources both in the short and long term.
At the opposite, during the 1990's decade a fully deregulated market was designed and implemented in all the energy activities. This led in particular to a concentration and increasing use of natural gas, especially for electricity generation through new CCGT plants, that is the present cheapest option.
In the first case, special cares and rules were established in order to avoid a rather fast extinction of national oil and gas resources, giving maximum priority to the construction of all major hydraulic power stations feasible to be built both in plain and mountain rivers. In the second case, there was a fast expansion both in demand and capacities, though all the capacity expansions were no more subject to a coordinated planning and balanced use of the different national resources, but led to a systematic market-profit selection of the cheapest option : the sustained use of the national natural gas. In the very last period, 2001-2002, the economic recession and financial crisis, paralyzed any new project for expanding the generation capacity.
The large national reserves of oil and gas, together with the operating large hydro-power stations provide the country with a substantial capability for energy exports, mainly in the form of gas pipe-lines and electricity HV lines. With different accents this capability has been developed during the last decade towards the neighbouring countries, namely Brazil and Chile.
Finally, it must be mentioned that the effects of GHG emissions and climate change, including the Kyoto Agreement, had up to now no effects on the overall energy policies. This is a result of the combination of the fully deregulated energy markets presently ruling in the country, and the rather low population spread on a very large territory.
1.3. The Electricity System
1.3.1. Background and Structure of the Electricity Sector
In the forties Argentina began establishing state-owned energy companies, nationalizing foreign owned energy utilities and defining energy plans to fully integrate the national planning scheme. The plans used advanced planning methodologies and considered the integration of electricity within the global energy system. Plans were mainly promulgated by the Secretary of Energy and agencies in charge of global economic planning with the participation of national public energy companies.
Despite the political instability and the successive changes in the economic and institutional policies, the plans designed by the state owned energy companies transformed the electricity system. The electricity system expanded significantly since 1970 when it covered 54% of the population to today's 90% of the population. An interconnected electrical grid system now supplies 90% of the country's requirements. Domestic energy resources are utilized, particularly renewable sources, thus diversifying the mix of primary energy sources.
In 1980's the country's economical crisis, together with a burdensome foreign debt, resulted in critical conditions for the electricity system. At the same time, institutional decentralization led to the proliferation of many provincial electricity distribution and production companies, and to the dispersion of tariffs and economic regulations within the electricity system. Later, due to State reform initiated in 1990, the institutional structure and regulation of all energy-related activities underwent substantial modifications. The energy policy was based on a free market economy bolstered by private sector investments in the energy system.
Materialization of this policy began with privatization of Servicios Eléctricos Gran Buenos Aires (SEGBA), along with Agua y Energía's hydro and fossil fuel stations, hydropower stations owned by Hidronor, and the Sistema Interconectado Nacional (high voltage transmission network).
From the organizational point of view, Argentina's electricity sector shows a historical development similar to that of most European and Latin American countries. Since its origins until after the World War II, electricity supply was in private hands, subject to the control of local authorities who granted operation licenses and developed franchises within their respective jurisdictions.
State companies involved in the supply of electricity have grown since 1945 and in 1990 they owned 84% of Argentina's generating capacity.
In the mid 1960's a decentralization process began with the creation of state-owned generating companies. Decentralization was further intensified in 1980 with the transfer of distribution networks from one of the state companies, Agua y Energía, to the provincial governments. This decision from central administration encouraged the creation of new provincial agencies and made regulation more complex.
The federal government kept the primary responsibility for planning expansions in electricity generation and high voltage transmission. Six state agencies were responsible for the construction and operation of the facilities. Decentralized power generation led to a significant wholesale electricity market regulated by the federal government through the Load Dispatching Centre (Despacho Nacional de Cargas).
Electricity distribution to end-users was carried out by more than 600 organizations: two state companies (supplying 55% of electricity consumption nation-wide), 21 provincial companies (34% of consumption) and some 580 co-operatives (11% of consumption). Provincial companies can only operate within the boundaries of their respective provinces, while co-operatives can provide services in municipal areas. The right of provincial and municipal regulators to determine the end-users' electricity tariffs and their independence to fix taxes on electricity consumption within their jurisdictions led to a great price discrepancy among users with similar consumption patterns.
Institutional changes and a stiff regulatory framework impaired the performance of the electricity sector before the sector reform. Efficiency of state-owned utilities was affected by politically fixed low tariffs and indebtedness in recent years, which lead to supply crisis. The most noticeable signs in the technical phase were the unavailability of thermal generating equipment which necessitated streamlined electricity consumption in 1988/89 under conditions of low water inflows; increase in distribution losses up to 23% of sales; and construction delays which increased average fuel consumption through expanded use of gas turbines.
At the beginning of the 1990's the new Federal Government introduced sustantial changes to the organization, regulation, and the ownership of electricity companies including the privatization of most facilities owned by SEGBA, Hidronor and Agua y Energía. Before the reform, electricity was supplied by a number of utilities with different legal standings and functional dependencies, although state agencies controlled 99% of the installed generating capacity.
Reorganization of Argentina's electricity sector, both on institutional and regulatory levels, was realized upon the approval of Law 24,065 of January 1992, which sanctioned the transfer of facilities to private hands through the privatization process begun in May 1992.
The new legal framework has organizational and regulatory impacts on the activities that are carried out under national jurisdiction, since the provinces have only partially joined the national framework. Despite of the diversity of regulatory jurisdictions, the fact that the state companies dominated electricity generation and transmission systems before the reform has assured national jurisdiction over these industry segments that are central to the wholesale electricity market. Between April 1992 and April 1995, 9830 MW(e) of installed capacity held by SEGBA (2,480 MW(e)), Agua y Energía (2,800 MW(e)) and Hidronor (4,290 MW(e)) were transferred to private operators. Of the above capacity, 37% is fossil fuel fired steam turbines; 15% gas turbines and the remaining 48% hydro stations.
Provincial jurisdiction covers primarily electricity distribution, which is carried out largely by provincial companies who buy electricity at the wholesale market. Provincial companies who own power stations are subject to national rules for the operation of the system if they use transmission lines or sell their excess generation in the wholesale market. The new regulatory regime covers the electricity industry where institutional organization and ownership patterns differ from regulations that were in effect until the late 1991. Horizontal and vertical partitioning of national companies was assumed to encourage competition and to promote efficiency. The objectives of these changes, inspired to a large extent by the reforms in Great Britain, are to protect users' rights; promote market competitiveness; encourage private investment for long term supply; promote reliable operation and free access to service; regulate transmission and distribution and assure reasonable tariffs.
Participants in the electricity sector are:
Participants in each class are semi-autonomous, that is, they have limited influence outside their individual areas. The independence of transmission companies ensures free electrical grid access to third parties. Distributors have to provide for the excess electricity if they have spare capacity. Any party authorized by the Secretary of Energy to participate in the wholesale electricity market must abide by the prescribed market rules. Because of their monopolistic characteristics, power transmission and distribution systems are regulated and require granted concessions. Grid expansions are subject to market mechanisms.
Producers are subject to concessions only if they operate hydroelectric power stations. Installation of thermal power stations requires authorization for grid connection and compliance with applicable public safety and environmental protection regulations. CAMMESA supervises the whole production system that works in a Fully Deregulated Market. In so doing, CAMMESA selects and authorizes at any moment every new additional input to the national grid among the different producers according to the plant "marginal cost" (additional cost while in operation, i.e. mainly the fuel cost) : that non-operating but available plant having the lowest marginal cost is selected for providing any new required additional capacity to the national grid. Accordingly, excess capacity is removed from the grid selecting that plant having the highest marginal cost. In this way, minimization of total and average electricity generation cost is assured.
Distribution is largely in the hands of provincial utilities and co-operatives (65%) due to privatization of Agua y Energía and the transfer of its services. Of the distribution systems held by state companies, only the service in the concession area of the former SEGBA is in private hands, where now three private distribution companies are supplying 35% of the retail electricity market.
Prior to April 1995 only one provincial distribution company Empresa de Distribucion de Energia de Salta (EDESAL), had been privatized, although several provinces had announced interest to privatize their services and were in process of adjusting the provincial regulatory framework to allow private electricity operators inside their jurisdictions. The role of CAMMESA is that of a wholesale electricity market administrator in commercial agreements between parties (forward contracts).
General supervision and regulation of the industry under national jurisdiction is in the hands of ENRE (Ente Nacional Regulador de la Electricidad), chartered as an independent agency within the Secretary of Energy. ENRE's main duties are:
ENRE supervises national distribution companies and settles disputes between parties as long as they operate under the national jurisdiction. The office of the Energy Secretary is the national agency, which interacts with provincial governments in matters relating to the electricity supply industry.
All electricity supplied to the interconnected electrical system is commercialized through the wholesale electricity market. This market includes a contract market and a spot market.
The end user market is also divided into a regulated and a non-regulated segment. The non-regulated segment is open to competition among bidders, particularly large consumers. The minimum consumption threshold to access the wholesale electricity market was initially 5 MW(e), but it has now been reduced to 1 MW(e). Access thresholds must be authorized by ENRE.
Differences between outlays that state owned producers should have invoiced according to prevailing spot prices and the receipts actually received are assigned to Unified Fund for debt servicing and to fund investments for the completion of any construction in progress at the time of the reform.
1.3.2. Policy and Decision Making Process
Privatisation of state companies was implemented to encourage market competition. For this purpose, separation of generation, transmission, and distribution systems was established. Within this framework, the Energy Secretary is responsible for:
In order to attend to the technical management of the system and to administer the wholesale electricity market, Load Dispatching Centre became a stock corporation, CAMMESA, with an equity interest held by the Secretary of Energy and by different utilities in the wholesale market. The Secretary of Energy may reduce its capital share in CAMMESA to 10%, and still retain the power of veto to Board decisions. CAMMESA is the electricity system's technical authority.
Presently, Argentina plans to develop an integrated resource planning and decision-making process aimed at co-ordinating the functions of its diverse institutional system and assuring thorough participation of all sectors, public and private. Mechanisms related to the electrical system expansion, economic management and regulation with mitigating impact on the environment have not been defined.
In accordance with constitutional principles, riverside provinces own the water resources utilized by the hydroelectric companies. The provinces grant licenses for commercial operation, even though existing facilities belong to the Federal State, and collect generation royalties. Provincial governments also authorize the construction of new projects in their respective territories, provided that the new companies do not join the wholesale electricity market through business transactions or through transmission or distribution networks under national jurisdiction.
In the regulated segment, a distributor is assured a monopoly and has to meet the required electrical demand pursuant to the terms of the concession contract. If no private investors are interested in distributing electricity to certain areas, then the State has the obligation to supply the service there.
Concession contracts specify technical and commercial quality of service which concession holders are obligated to provide. The obligations of the company are not subject to electricity availability in the wholesale market, and the State takes no commitment to solve potential power shortages.
The tariffs in this market segment cover all distribution costs (network expansion, operation and maintenance, marketing and the cost of purchasing electricity in the wholesale market) including a rate of return fixed by ENRE. In the future, wholesale spot price variations will be passed by distributors directly to customers.
Everyone in the wholesale electricity market participates directly or indirectly in the spot market. The operation of this market is managed by CAMMESA. The operation of interconnected generating units is scheduled by CAMMESA for six month seasonal periods to cover demand forecasts with the reserve agreed between the parties (economic load dispatching). The average seasonal marginal cost is the base price from which the price to the distributors is calculated. Distributors pay a differential price depending on their location in the system, which reflects their contribution to transmission losses.
Distributors also pay a fixed charge for their average estimated demand for power over the next five years. The risk associated with this estimate is borne by the distributors who must assume the payments in the event of overestimation of demand and are penalized in the event of underestimation. In addition, distributors contribute toward CAMMESA's expenses by paying a fixed connection charge and a transmission capacity charge to transmission companies. Electricity suppliers are compensated for:
The price for power supplied by bi-national producers is determined in the terms of their contracts. Foreign interconnected utility companies have to apply for authorization from the Secretary of Energy to participate in the wholesale electricity market. In this way they are assured of their reserve and do not resort to sell at dumping prices.
Payment to transmission companies includes a connection charge, a fixed charge for transmission capacity and a variable charge for the energy actually transmitted. The variable charge is proportional to the transmission losses. Distributors and large users may enter into supply contracts with producers at the prices defined in their contracts. State companies are excluded from this market. ENRE does not intervene in the supervision of these contracts or in any contractual disputes.
Entering into forward contracts does not prevent distributors from power purchases in the spot market at stabilized prices unless they have contracted more than 60% of their demand, in which case they are considered to be occasional users and their transactions are subject to availability determined at the hourly price paid to generators. Large users, on the contrary, must be supplied by the local distributor unless supply is contracted with a producer for at least 50% of their demand.
The operation in real time is carried out irrespective of any forward contracts signed with producers with the premise that any departure from contract volumes and the actual operation will be channelled through the spot market. A similar criterion applies for demand departures pertaining to the large users under contract. These are subject to penalties similar to those applied to distributors in the event of forecasting errors in their own demand.
1.3.3. Main Indicators of the Electric Market
Argentina's electricity consumption grew at an average annual rate of almost 8% between 1970 and 1980, levelling off to 2.5% average rate during 1980-1991, and increasing again to around 7 % in the period 1991-1997 with a progressive decline in the following years 1998-2001 (present recession). This was initially due in part to production increases in the metallurgy, which is an energy intensive industry. Energy consumption in residential and commercial sectors, however, suffered the most due to the imposed rationing system during the energy crisis in the 80's, although the number of customers grew and electricity billed per customer during the 1980-1987 amounted to 4,000 kWh/year. In 1993, per capita electricity consumption was 1,903 kW·h, a figure slightly above the Latin American average and increased to 2,278 kW·h in 2000. Table 5 shows the historical energy production and the installed capacity and Table 6 the energy related ratios.
TABLE 5. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY
Annual Average Growth Rate (%) |
||||||||
Electricity Generation (TW.h) |
1970 | 1980 | 1990 | 2000 | 2003 | 2004 | 1980 to 2000 | 2000 to 2004 |
---|---|---|---|---|---|---|---|---|
Total | 21.73 | 39.68 | 50.25 | 88.75 | 92.07 | 99.70 | 4.11 | 2.95 |
Nuclear | 0.00 | 2.34 | 6.62 | 5.73 | 7.02 | 7.31 | 4.58 | 6.28 |
Hydro | 1.56 | 15.15 | 18.13 | 28.84 | 33.84 | 30.52 | 3.27 | 1.43 |
Geothermal | .. | .. | .. | .. | .. | .. | .. | .. |
Wind | .. | .. | .. | 0.04 | 0.08 | 0.07 | .. | 19.76 |
Other renewables | .. | .. | .. | .. | .. | .. | .. | .. |
Thermal | 20.17 | 22.19 | 25.49 | 54.15 | 51.12 | 61.79 | 4.56 | 3.36 |
Installed Capacity(GWe) |
1970 | 1980 | 1990 | 2000 | 2003 | 2004 | 1980 to 2000 | 2000 to 2004 |
Total | 6.69 | 11.95 | 17.12 | 26.27 | 27.98 | 30.60 | 4.01 | 3.89 |
Nuclear | 0.00 | 0.34 | 0.93 | 0.94 | 0.94 | 0.93 | 5.27 | > -0.01 |
Hydro | 0.61 | 3.63 | 6.62 | 9.60 | 9.80 | 9.87 | 4.99 | 0.70 |
Geothermal | .. | .. | .. | < 0.01 | < 0.01 | < 0.01 | .. | 0.00 |
Wind | .. | .. | .. | 0.01 | 0.03 | 0.03 | .. | 16.74 |
Other renewables | .. | .. | .. | .. | .. | .. | .. | .. |
Thermal | 6.08 | 7.99 | 9.57 | 15.71 | 17.22 | 19.77 | 3.44 | 5.90 |
Source: IAEA Energy and Economic Database
Total electricity generation in 2000 was 78.95 TW·h. Total net installed capacity of electricity generating plants in 2000 was 25.2 GW, of which thermal accounted for 14.1 GW, hydro 10.1 GW and nuclear 935 MW. Of the total electricity generated, 33.8% came from hydroelectric power stations, thermal energy sources accounted for 58.9% and nuclear 7.3%. Total electricity exports were 4.7 million MW·h. Conditions during 2001 were quite different and exceptional, as indicated before : the combination of extensive heavy rains and electricity demand reduction led to an unusual hydro-power share of 55 % together with a thermal share of only 37 %.
Electricity consumption is frequently viewed as an indicator of the level of economic activity. Thus, an increase in electricity consumption is immediately associated to an increase in economic production. However, a few comparisons conflict with this view: in the 1970-1991 period per capita electricity consumption grew at an average annual rate of 3.4% whereas per capita GDP grew by 1.2%. Moreover, during the 1980-1991 period, if the same figures are considered, as GDP decreased 0.77%, per capita electricity consumption grew to almost 1% per annum. In 1975, 1978 and 1982, while GDP decreased, electricity consumption did not follow the same trend.
Electricity consumption can also be regarded as an indicator of trends in the informal economy, where electricity is used for production, but is not recorded as an economic activity in formal statistical surveys or considered in GDP measurements.
TABLE 6. ENERGY RELATED RATIOS
Derived Indicators | Annual Average Growth Rate (%) |
||||||
1970 | 1980 | 1990 | 2000 | 2003 | 1970 to 2000 | 2000 to 2003 | |
---|---|---|---|---|---|---|---|
Energy consumption per capita (GJ/capita) | 51.9 | 60.3 | 61.4 | 73.1 | 69.4 | 1.15 | -1.72 |
Electricity per capita (KW.h/capita) | 906.7 | 1,412.3 | 1,542.3 | 2,405.5 | 2,226.7 | 3.31 | -2.54 |
Nuclear/Total electricity (%) | 0.0 | 5.9 | 13.2 | 6.5 | 8.3 | .. | 8.73 |
Annual capacity factor - Totall (%) | 37.1 | 37.9 | 33.5 | 38.6 | 34.5 | 0.13 | -3.63 |
Annual capacity factor - Thermal (%) | 37.9 | 31.7 | 30.4 | 39.3 | 33.9 | 0.13 | -4.84 |
Annual capacity factor - Hydro (%) | 29.1 | 47.7 | 31.3 | 34.3 | 39.4 | 0.54 | 4.75 |
Annual capacity factor - Nuclear (%) | .. | 79.7 | 80.9 | 70.0 | 85.8 | .. | 7.02 |
Source: IAEA Energy and Economic Database |
2.1. Historical Development and current nuclear power organizational structure
2.1.1. Overview
A few years after the nuclear explosions of 1945 that brought worldwide awareness of nuclear energy, the first steps were taken to create the Comisión Nacional de Energía Atomica (CNEA), Argentina's Atomic Energy Commission in charge of all national nuclear activities.
Since the creation of CNEA in 1950, several distinct periods of activity have occurred. The first period saw the organization of the first research and development teams; staff nuclear training primarily in more advanced countries; training of physicists through the creation of the Balseiro Institute of Physics; prospects for uranium exploration in Argentina; and the construction of the first experimental 10 kW(t) Argonaut type reactor including its fuel elements, designated RA-1 Reactor.
During the second period, Argentina designed and constructed a 5 MW(th) irradiation and research reactor designated RA-3 Reactor; promoted metal research and development; and, manufactured the fuel elements required by that reactor. The first uranium concentrate production plant was built in Malargüe (Province of Mendoza) and a battery leachate plant in Don Otto (Province of Salta). Radioisotope production and application techniques in the field of medicine, biology, industry and agriculture were developed.
In the third period, Argentina began nuclear power activities. In 1964, CNEA was considering the construction of a nuclear power station for the Greater Buenos Aires-Litoral electrical system. A feasibility study was authorized by a national commission for the co-ordination of large electrical works. Within fourteen months, the Commission completed the study with the recommendation to build a 300-500 MW(e) nuclear power station within the Greater Buenos Aires-Litoral electric power system. The study concluded that such a station could commence operation by 1971, and that the project would be technically feasible, economically convenient, and financially sound. Furthermore, Argentinean industry would be able to contribute an estimated 40 to 50 percent toward the construction and operation of the station. Sufficient deposits of indigenous uranium added to the appeal of nuclear power together with its expected stimulation to scientific and technological activities.
With the prospects of the nuclear energy generation in Argentina, CNEA had to first decide whether to purchase a light water or a heavy water reactor. British and US suppliers offered enriched uranium reactors. Despite of the strong preference for independence CNEA entertained bids for these reactors for two reasons. First, light water reactors were less expensive than heavy water reactors, and were dominating the markets in the United States, Europe, and Japan. The second reason was tactical, for it was perceived that encouraging more bids would spike up the competition, and better terms would be offered by firms eager to gain foothold in a new market.
However, the Canadian and German offers were most attractive. The German offer was for a natural uranium reactor, with 100 percent financing, 35 percent local participation, and the shortest delivery time. The bid by the electrical giant, Siemens AG, of Germany was chosen for its superior financing terms, construction time, and local participation rate.
Nearly two years behind the schedule, the Atucha I nuclear power station was commissioned and began commercial operation in 1974.
Also in 1967 a feasibility study for a second station was undertaken by the provincial utility in Cordoba. CNEA was authorized to call for bids for a 600 MW(e) station, nearly double the size of the 317 MW(e) Atucha reactor in 1972. Natural uranium was selected as fuel and the contract was awarded to CANDU, a consortium of Atomic Energy of Canada Ltd (AECL) and the Italian construction company, Italimpianti.
The second nuclear power station was built in Embalse, on the Rio Tercero Reservoir in the province of Cordoba. It was commissioned in 1983 and went into commercial operation in January 1984. A prime attraction of the Canadian offer had been the Technology Transfer Agreement, which CNEA considered valuable for independent nuclear power production.
In late 1979 a third nuclear power station was scheduled to be built at the same site as Atucha I. Problems with the construction of the Embalse nuclear power plant (NPP) convinced the authorities to award the contract to ENACE, a joint venture of Kraftwerk Union (KWU) and CNEA, for a 700 MW(e) Siemens heavy water cooled and moderated pressurized reactor power station (same design as Atucha I). Construction started in 1981.
2.1.2. Current Organizational Chart(s)
Institutional Relationships
Financial Relationships: Fund movements
Technical and Supply Relationships with NASA
2.2. Nuclear Power Plants: Status and Operations
2.2.1. General
At present only around or less than 10 percent of electricity consumed in Argentina is produced by nuclear plants. Since beginning of 1984 there are two nuclear power plants (Atucha I and Embalse) in operation with a total net capacity of 935 MW(e), producing around 15 % of the total electricity generated in the period 1984-1990, a figure that later steadily decreased because of new expansions of the total national capacity (see Table 7) and it was reduced to only 7.5 % in 2001 due to the additional impact of a long shut-down in Atucha-1. In parallel, share of electricity produced by nuclear means was expected to increase during the last decade with the construction and start-up of a third nuclear power plant, Atucha II of 692 MW(e) net capacity, whose completion, however, has been delayed up to now due to lack of funding.
TABLE 7. STATUS OF NUCLEAR POWER PLANTS
Station | Type | Net | Operator | Status | Reactor | Construction | Criticality | Grid | Commercial | Shutdown |
Cpacity (Mwe) | Supplier | Date | Date | Date | Date | Date | ||||
ATUCHA-1 | PHWR | 335 | NASA | Operational | SIEMENS | 01-Jun-68 | 13-Jan-74 | 19-Mar-74 | 24-Jun-74 | |
EMBALSE | PHWR | 600 | NASA | Operational | AECL | 01-Apr-74 | 13-Mar-83 | 25-Apr-83 | 20-Jan-84 | |
ATUCHA-2 | PHWR | 692 | NASA | Under Construction | SIEMENS | 14-Jul-81 |
Source: IAEA Power Reactor Information System as of 31 December 2006. |
2.2.2. Reorganization of the Public Nuclear Sector
On August 30, 1994, a Federal Government Decree was issued to restructure the nuclear sector and CNEA. As a result, the National Nuclear Regulatory Authority (Autoridad Regulatoria Nuclear - or A.R.N.) was founded. The new Agency took over the regulatory responsibilities for nuclear activities that were previously carried out by CNEA. It establishes nuclear and radiological safety standards and formulates regulations related to physical protection and control of the use of nuclear materials. It is responsible for the licensing and regulations of nuclear installations and compliance with international safeguards. In addition, a shareholders company, Nucleoeléctrica Argentina S.A. (NASA) was established. NASA operates Atucha I and Embalse nuclear power stations and oversees the construction of Atucha II nuclear power station. The decree also directed NASA to pay annual royalties to CNEA and to ARN as licensing fees. Ownership has been handed to the Ministry of Economy, as a pre-privatization step.
In parallel, the Federal Government supported works at Atucha-2 NPP Project initiated in 1981, and since the beginning of 1994 the construction activities were significantly reduced or practically stopped, under a privatisation plan that was not accomplished and, in fact, is abandoned at present. This 3rd NPP remains unfinished at 81% completion stage, with several plant systems already operational, the main pending items being: completion of electro-mechanical erection, I&C mounting, heavy water inventory and first core fuel deliveries, and plant commissioning.
The above-mentioned 1994 Decree imposing the partition of former CNEA into 3 separate entities, CNEA, NASA and ARN, and paving the way for a future privatisation of NASA and its 3 NPPs, was later formally replaced by a "Federal Law for the Nuclear Activity" issued by Argentina's National Congress in 1996 and put in force in 1998. This federal law ratified CNEA's partition, and legally allowed privatisation of NASA and completion and start-up of Atucha-2 NPP by private companies through an international call for bids. Nevertheless, firstly due to lengthy elaboration of the legal instruments (federal law, administration decree, texts for the call for bids, etc.) and later due to the Federal Administration take over at the end of 1999, NASA privatisation as well as resumption of works at the long-time paralized Atucha-2 NPP did not happen up to now.
During 2003, the Secretary of Energy required to the new Responsible Organization, namely Nucleo-electrica Argentina S.A. (NA-SA), an updated analysis considering technical, economics and financial aspects in order to provide adequate information to take the decision to resume or not the construction of the plant . In this sense, NA-SA with the support of CNEA, organized an ad-hoc group and such analysis was presented at the end of 2003. The Governmental Authorities that reviewed the analysis concluded that it is reasonable to finalize the construction of the plant.
During 2004, NA-SA started to re-establish the negotiation with the main contractors - Siemens and Framatome ANP - to discuss the technical and financial conditions and establishing a program to resume the construction and completion of the plant. On the other hand, the Regulatory Body prepared a project review considering the current standards and those that the plant was designed under, concluding that there are no objections to completion of the plant from the safety point of view. The Construction license was also reviewed : it would need minor updates before been endorsed again.
2.3. Supply of NPPs
As indicated before, Argentina's NPPs have been designed by foreign suppliers : Siemens for the pressure-vessel-type PHWR Atucha-1 and Atucha-2, and AECL - Italimpianti for the CANDU-6 type Embalse NPP. These companies were also the main contractors in the respective projects, though a large participation of domestic companies was implemented in each case. These participations ranged between around 35 % in the first project (Atucha-1) to around 50 % in the last one (Atucha-2). In the case of Atucha-2 a joint Siemens-CNEA company, ENACE S.A., had been set-up to act as architect-engineer, a company/role that ceased in 1994 with the paralysis of the project.
2.4. Operation of NPPs
As indicated before, the owner and operator of Argentina's NPPs is the state-owned company Nucleoeléctrica Argentina S.A. (NASA), since September 1994.
Main current suppliers including fuel supplier are indicated in sections 3.3 and 3.4. Designer companies, Siemens, AECL, and now Framatome ANP, rank among the main current suppliers for services, repairs and replacements. Some companies from Germany and Canada that participated in the NPP construction and manufacturing activities of each NPP Project are also currently providing assistance services. Other complementary services and supplies are provided by domestic companies.
Fuel assemblies are steadily provided by the domestic company CONUAR S.A., for attending the on-power refuelling of both operating NPPs. Zry-made reactor internals to be replaced are provided by FAESA. Special electronic equipment and special neutron and gamma detectors and chambers are provided by CNEA. Other complementary services in the areas of material behavior, NDT, water chemistry, safety analysis, etc. are also provided by CNEA.
Operator training is provided at basic levels at the NPPs themselves, while post-graduated training is provided by CNEA. Certain additional training is also provided at the plants themselves through limited scope simulators.
Finally, annual re-training is carried out with the utilization of the full scope simulators of:
2.5. Fuel Cycle and Waste Management
In the past a quite intense activity was carried out by CNEA in the areas of uranium and thorium exploration and evaluation. While no significant deposits of thorium were found, U deposits found gave rise to an important and large mining activity also carried out by CNEA, especially in the provinces of Mendoza, Salta and Chubut. Later, changes in the international U market conditions together with the high domestic costs during the '90s, led to a progressive abandon of U mining activities in the Argentine territory.
During the last decade current Uranium supplies came and come from imports in the international market. These imports include : natural, low enriched (around 3.4%) and medium enriched (around 20%) Uranium supplies. These correspond to the main consumer installations: Embalse (Candu-type) plant employees Natural Uranium fuel; Atucha-1 employes Slightly Enriched (0.85%) Uranium obtained from the mixing between natural and 3.4% enriched U; research and production reactors (both domestic and exported) normally employ 20% enriched U.
Since 2002 a new planning is aimed at reinitiating domestic Uranium production from the reserves in the country's territory.
Production of UO2 powder is carried out by CNEA's daughter company DIOXITEK S.A. (100% CNEA owned) presently established at Cordoba city and foreseen to be moved to Mendoza province. Technology development for zirconium sponge production has been carried out at Bariloche, while manufacturing of zircaloy tubes for fuel element cladding and complementary pieces, coolant channels, instrumentation lances and other reactor internals is currently carried out by another CNEA's daughter company, FAESA (55 % CNEA owned), with a production plant installed at Ezeiza Atomic Centre.
Manufacturing of fuel assemblies is carried out by another daughter company of CNEA, CONUAR S.A.(35% CNEA owned), with its plant located close to FAESA's plant in Ezeiza Atomic Centre. CONUAR produces the fuel assemblies currently required by Atucha-1 (SEU fuel), Embalse (natural U fuel) and the research and production reactors either operating in Argentina or exported by CNEA or INVAP S.E. (see section 4.5).
According to the Federal Law for "Radioactive Waste management", CNEA is responsible for supervision of the overall treatment of such wastes coming from any nuclear user in the country, and in particular for assuring the final disposal of low, intermediate and high level radwastes.
High level radwastes of NPPs, namely irradiated fuel assemblies, are up to now stored in each NPP : in both plants they are initially stored at the respective fuel pools and this modality is followed up to the end in Atucha-1 which has a second fuel pool; Embalse has a dry storage facility where irradiated fuel is stored after spending 5-6 years in the fuel pool. Due to a province of Cordoba regulation forbiding transportation of any radioactive waste through this province, where Embalse NPP is located, this plant has to proceed with all such radwastes within the own plant.
For most of all cases CNEA assures radwaste treatment and storage at its Ezeiza Atomic Center. This includes intermediate and low level radwastes from any origin within the country, as well as spent fuel assemblies from Argentina's research and production reactors.
CNEA, according to the same federal law, is responsible for the reception of each Argentine NPP at the end of its lifetime and for all the stages of its decommissioning and decontamination.
According to this law, two separate funds must be provided by each operating NPP in order to afford for radioactive waste treatment by CNEA and for decommissioning by CNEA.
2.6. Research and Development
2.6.1. R&D organizations and institutes
The National Atomic Energy Commission (CNEA) remains as an institute for research and development in the nuclear field, as well as for provision of technical services and assistance to nuclear power plants, other nuclear installations and nuclear and non nuclear application users, both in the domestic and international markets. Most of production activities previously carried out by CNEA, are now handled by private interests, with the main exceptions of radioisotope production and specific instrumentation and electronic equipment.
As a result, CNEA's main areas of activity are:
The main CNEA facilities are concentrated in:
These are complemented by several distributed CNEA delegations in different places of the Argentine territory, providing support for domestic Uranium explorations, mining and conversion activities.
INVAP S.E., in turn, proceeds with its own R&D program mainly covering nuclear, medical and satellite areas. In the nuclear area, activities are carried out in support of research and radioisotope production reactors, that have led to several important exports of such reactors, the last one and most important for Australia, at present under construction. Other set of R&D activities are oriented to the development of the CAREM concept (see below).
2.6.2. Development of advanced and new generation nuclear reactor systems
In the area of new concept development, CNEA and INVAP have carried out up to now a number of R&D and engineering activities within the so-called CAREM Project, a small modular passive PWR with a minimum capacity of 27 MWe, including subsequent studies for its scaling to around 300 MWe. The first module with a minimum power output, represents the prototype of this future line. Additionally, the CAREM concept has been retained as one of the reference designs within IAEA's INPRO Project (see next paragraphs).
2.7. International Co-operation and Initiatives
2.7.1. General
International co-operation in the field of nuclear power development and its implementation is quite extensive between the main entities acting in the Argentine nuclear sector and foreign or international companies, governments and organizations. Such co-operation is first of all promoted and carried out by CNEA, ARN and NASA, and a very special link exists between them and the IAEA.
Specific links exist between CNEA and foreign partners in R&D activities in a wide area, from basic studies and development with first world entities (like US-DOE, France's CEA, Japan's JICA, etc.).
At the other extreme, NASA has a special collaboration agreement with Brazil's Eletronuclear sharing Brazilian / Argentinean man-power during NPP outages in Brazil or Argentina, as well as other topics.
Special links also exist with Latin-american countries, partly promoted by IAEA through the Latin America Area Projects, ARCAL Projects. This includes not only the other countries having NPPs in the region, namely Brazil, Mexico and Cuba, but others having nuclear reactors like Chile and Peru, or having some type of nuclear activity.
Every year CNEA receives a significant number of foreign nuclear graduated people from other countries in the Americas, Africa and Asia, in particular through IAEA granted fellowships, for being trained in a large number of areas.
2.7.2. Exports
Exports from Argentina's nuclear sector mainly include:
2.8. Human Resources Development
General development of Human Resources in the nuclear field is one of CNEA's responsibilities according to the federal law and, in practice, it has become one of the most firmly carried out activities of this agency. This includes:
In the second group of activities some good examples are the following:
In all these cases the activities are carried out by CNEA in association with one or more national universities. Some of these activities also include short or medium term stays at the nuclear power plants.
Frequently, part of the corresponding graduates of these activities enter the staff of nuclear power plants.
In turn, NASA regularly organizes, according to the needs, specific training activities for the new personnel at the different levels of responsibility and specialities, as well as complementary activities for normal plant staff.
This includes specific short courses, on-the-job training for the various operational and maintenance functions, specific training at partial scope simulators and regular annual training and re-training at the full scope simulators. These are Hydro-Quebec's Gentilly simulator (Gentilly-1) in Canada for Embalse NPP staff, and Eletronuclear's Mambucaba simulator (near Angra dos Reis) in Brazil for Atucha-1 NPP staff. Other complementary activities are carried out in order to fully comply in each case with the Nuclear Regulatory Authority (ARN) standards and specific regulations established for each NPP personnel position licensing. The general plan on training and re-training of NPP staff is elaborated each year by NASA and submitted for approval to ARN.
Finally, the Regulatory Body ARN maintains a permanent monitoring, control and approval/denial of all these NASA activities related to personnel training and, in addition, organizes and executes the formal examinations to NASA staff candidates for obtaining or renewing the "post licensing" and / or the "specific authorization" corresponding to each operation or maintenance position in the plant. Complementing these activities, ARN also carries out an annual programme on graduate-level teaching in the areas of radiological protection and nuclear and radiological safety, as indicated in par. 3.1.8. Some of these activities are executed with the support of IAEA and are also open to foreign students.
3. NATIONAL LAWS AND REGULATIONS
3.1. Safety Authority and the Licensing Process
The licensing process for nuclear power stations involves interaction between the Operating Organization and the Regulatory Authority starting at the earliest steps of a projected installation. The regulatory system considers licenses for construction, commissioning, operation and decommissioning, which establish the conditions the Responsible Organization must fulfill at each stage.
The construction license is issued when standards and requirements of sitting, basic design and expected safety operation conditions have been complied prior to the beginning of this stage. It is a document through which the Regulatory Body authorizes the nuclear power plant construction under the established conditions, and shall be fulfilled by the Responsible Organization.
The applicable standards, consistent with international recommendations on the subject, establish the safety criteria to be observed in the design of the installation and define the timetable and type of mandatory documentation that shall be presented together with the application for a construction license (Standard AR 3.7.1). In particular the nuclear power plants design must comply with the radiological criteria related to accidents (Standard AR 3.1.3).
Once the construction license is requested by the Responsible Organization, a continuous interaction between the constructor or operator of the future installation and the Regulatory Body is initiated. It is an iterative process, as complex as the demands involved. It should be emphasized that the Responsible Organization's capability to carry out its responsibilities is evaluated since the construction stage.
Before National Act No 24804 (1997) was passed, the Regulatory Body authorized the commissioning by issuing a specific authorization once the corresponding requirements were fulfilled. The above mentioned Law establishes that the Regulatory Body shall issue a commissioning license.
The commissioning license establishes the conditions for fuel and moderator loading, operation with increasing power up to its nominal value, as well as verifications and tests of the components, equipment and systems to determine whether they comply with the original design basis. To do so the Responsible Organization must appoint an ad hoc Commissioning Committee constituted by acknowledged specialists, who will continuously evaluate the execution of the commissioning program and recommend its prosecution if applicable (Standards AR 3.7.1, AR 3.8.1 and AR 3.8.2).
The operating license is issued when the Regulatory Body verifies that conditions, standards and specific requirements applicable to a particular installation are fulfilled. Such conclusion will be the result of analyzing the submitted documentation and detailed studies, inspection reports carried out during construction and commissioning and the ad hoc Commissioning Committee recommendations.
The operating license is a document by which the Regulatory Body authorizes the commercial operation of a nuclear installation under stipulated conditions, which shall be fulfilled by the Responsible Organization (Standard AR 3.9.1). The non fulfillment of any of the imposed requirements without the corresponding Regulatory Body authorization would imply the application of sanctions, that could lead to the operating license suspension or cancellation.
At the end of its lifetime and under the Responsible Organization's request, the Regulatory Body authorizes the ending of the nuclear power plant commercial operation and issues a decommissioning license. In this document, conditions for the nuclear power plant safe dismantling are established, being the Responsible Organization in charge of planning and providing the necessary means for their fulfillment (Standard AR 3.17.1).
The evaluations performed prior to issuing a nuclear installation license include mainly aspects of quality assurance, construction procedures, operation procedures, previsions for in-service inspections, etc. Besides, emergency plans shall be prepared in co-ordination with corresponding National, Provincial and Municipal bodies (see Sections 16.1 and 16.5).
The regulatory actions that the Regulatory Body may take in relation with a particular installation are originated in three main causes:
In such cases, the Regulatory Body sends a regulatory document to the Responsible Organisation, which takes the form of a requirement, a recommendation or an information request according to the case; in it the Responsible Organisation is urged to carry out the required corrective actions in a certain time period. Such documents have the following scope:
As it has been already mentioned, the validity of a license is subject to the compliance with stipulated conditions, standards and other documents issued by the Regulatory Body; if any of these requirements were not fulfilled, this would be enough reason for the Regulatory Body to cancel or interrupt the validity of the corresponding license.
Procedures for applying for a nuclear power plant license in front of the Regulatory Authority are described in standard AR 3.7.1. These include:
Construction, commissioning and operating license outlines the responsibilities of the Primary Responsible (nuclear power plant manager) and the Operating Organization. License is given for a defined period (about 10 years) and may be cancelled, suspended or modified by the Regulatory Authority in case of non-compliance to the regulations. The license can include temporary requirements. Only licensed staff can operate Nuclear power plants.
The Operating Organization must have a Technical Review Committee (TRC) and an Internal Safety Committee (ISC) which should meet periodically in order to analyze nuclear operations; to asses the likelihood of failures and abnormal events; and, to carry out the evaluation of any modifications to the original design of the installation before these are presented to the Regulatory Authority. The Primary Responsible must be advised by the Internal Safety Committee on any issues related to radiological and nuclear safety.
The "operational limits and conditions" are established in the mandatory documentation and require the previous-approval by the Regulatory Authority for any modifications. The license specifies the requirements for annual exercise of the Emergency Plan Specific and a specific requirement establishes the limits of radioactive effluents to the environment . The license also defines the "mandatory documentation", the documentation that must be sent to the Regulatory Authority as well the corresponding periodicity, the way to communicate to the Regulatory Authority, and the rules applied to the interaction among the resident inspectors and others regulatory authority members.
3.1.1. Regulatory Authority
The Nuclear Regulatory Authority (in Spanish, ARN) was created as an autarchic entity under Act 24,804 known as Nuclear Activity National Act, which came into force on April 25th, 1997, to succeed the National Nuclear Regulatory Board. The Nuclear Regulatory Authority reports directly to the Argentine Presidency and is empowered to regulate and control all nuclear activities with regard to radiological and nuclear safety, physical protection, safeguards and other andnuclear non proliferation aspects.
The objective of the Nuclear Regulatory Authority is to establish, develop and enforce a regulatory system applicable to all nuclear activities within Argentina, as well as, to advise the Executive on issues under its purview. The goals of this regulatory system are:
Act No 24804, "National Law of Nuclear Activity" (1997), sets that the Regulatory Body is in charge of the regulation and control of nuclear activities perform in Argentina concerning radiological and nuclear safety, physical protection and safeguards. It also establishes that the Regulatory Body has autarchy and complete legal capability to act in the field of private and public law . Its resources are basically composed with regulatory fees and State support. According to the provisions in Articles 17 and 18 of Act No 24804, the Regulatory Body is managed and administrated by a Board of Directors constituted by six members, one of them being the President. All members of the Board are appointed by the Executive Power. Additionally, the National Law of Nuclear Activity establishes that all members of the Board of Directors must demonstrate a proven knowledge and background in the nuclear field.In 2001, due to a reorganization of the federal government, the ARN Board of Directors was reduced to three members.
It is important to point out that one Director remains in the same position from the last six years (since 1999) and all of them are recognized senior experts in the nuclear field.
The ARN organizational structure has been approved by its Board of Directors Resolution in accordance with the provisions of Act 24,804. The relevant organization chart is shown in Chapter 1 of the Main Report (The Main Report is only available in Spanish).
3.1.1.1. The Argentine Regulatory System
The ARN, as an autarchic entity within the jurisdiction of the Presidency of the Nation, has full legal power to act in the fields of public and private law, being the successor of the National Board of Nuclear Regulation and previously of the regulatory branch of the National Atomic Energy Commission
Since the 50s, Argentina has established a control infrastructure based on the knowledge of the risk associated with the deleterious effects of ionizing radiation and on the international philosophy for their assessment and limitation. Registration, licensing and control of radioactive sources from "the cradle to the grave" have been essential features of our regulatory system.
As the nuclear regulatory authority with federal competence in radiation protection, nuclear safety, safeguards and physical protection, the Nuclear Regulatory Authority of Argentina (ARN) has established standards and regulatory requirements. It is also responsible for issuing licenses and permits to any activity involving radioactive materials and for controlling and verifying that these activities are performed in full compliance with ARN standards.
The ARN grants authorizations, licenses or permissions, as appropriate, in connection with practices associated with radiation sources, nuclear materials and other radioactive materials. In addition, the ARN performs control activities to ensure that persons responsible for each practice comply with the provisions set forth in the standards and other regulatory documents. From the beginning of the regulatory activities it was recognized that to efficiently play this role an appropriate scientific and technological expertise was needed to assess, based upon an independent criterion, the design, construction, commissioning, operation and decommissioning of the facilities subject to control. Within this framework, the global strategy contained in the Argentine regulatory system has focused in the following basic principles:
3.1.1.2. Radiological and Nuclear Safety
According to the Argentine regulatory system the organization (owner or operator) dealing with the design, construction, commissioning, operation and decommissioning stages of a nuclear facility shall take full responsibility for the radiological and nuclear safety. No event affecting radiological and nuclear safety shall relieve said organization, referred to as Responsible Organization (or Operating Organization), from its responsibility in each stage of the project. The compliance with the regulatory standards and requirements is to be considered as a minimum requirement which does not relieve said organization from the obligation to take any action necessary to ensure the radiological and nuclear safety of the facility.
From the licensing process standpoint, facilities are divided into three groups: class I, II and III facilities, according to the associated radiological risk involved. For class I facilities the ARN grants operating licenses while for class II and III facilities it grants operating authorizations. An application for a license or authorization will be accepted for examination provided that it is accompanied by an appropriate preliminary nuclear safety assessment, the depth of which shall be in accordance with the radiological risk associated with the facilities concerned.
Class I facilities require four types of licenses: construction, commissioning, operating and decommissioning licenses. Licenses shall be granted to the Responsible Organization, that is, the organization liable for the safety of such facilities. The construction license for a given facility shall be granted upon compliance with standards and requirements applicable to location, basic design and expected safety level for future operation.
In order to be issued an operating license, the Responsible Organization shall prove compliance with applicable specific conditions, standards and requirements.
As for the ARN, it performs an independent evaluation of the technical documents and detailed studies field, the reports in connection with inspections conducted during construction, the results of preliminary operation activities, etc.
It should be particularly noted that since the beginning of the construction stage the ARN evaluates the ability of the Responsible Organization to take its responsibilities. Argentina has adopted performance-based nuclear safety regulations. This requires both the Responsible Organization, as regards its proposals, and the ARN, in connection with its independent evaluation, to make a remarkable effort such that a final satisfactory result is attained. Accordingly, the interaction between the Responsible Organization and the ARN shall be carried out on a permanent basis throughout the licensing process.
The evaluations prior to issuance of a license for the operation of a major facility include matters such as quality assurance, methods of construction, provisions for inspections during operation, methods of operation, etc. In addition, if a facility has a potential for accidents which may affect members of the public, it is required that emergency plans be implemented in co-ordination with the relevant federal, provincial and local organizations.
According to the ARN requirements, the whole staff of the Responsible Organization shall be properly trained and qualified and demonstrate an aptitude in accordance with their duties in a major facility. The Responsible Organization must also apply to the ARN for individual licenses for personnel whose activities could substantially affect safety. Applicants for an individual license are nominated by the Responsible Organization and separately subjected to the independent evaluation of the ARN. Training and qualification requirements for staff members generally cover four areas: basic training, specialized training, in-job training and psycho-physical fitness. Every function within the organization chart shall be fulfilled by staff members whose background meets the relevant requirements. Such required qualifications will include, if appropriate, basic university education in accordance with the nature of the responsibility to be taken. Both the specialized and in-job training shall be duly certified. Applicants shall be examined by ad-hoc examination boards.
Two types of regulatory documents are issued for the purpose of certifying the skills of the staff concerned. The first one consists in an individual license certifying that the applicant possesses the basic and specialized training suitable to take up a certain duty in a given type of facility. This document is issued at the applicant's request and has no expire date. It is not, however, enough to certify the ability of an applicant to take up a given duty in a facility. Accordingly, to be accepted for performing a key safety-related responsibility in a given facility, the applicant needs in addition to the individual license a specific authorization, which has to be requested to the ARN by the Responsible Organization. For this purpose, the applicant shall prove a specific knowledge of the facility in question, as well as suitable in- training on the job and an adequate psycho-physical examination. This specific authorization is valid for a period that shall not exceed two years.
As indicated above, for the operation of class II and III facilities the organization liable for any practice involving radioactive material or ionizing radiation is required to apply for an operating authorization. For the operation of class II and III facilities the ARN has the authority to require that the organization liable for any practice involving material or ionizing radiation applies for an operating authorization. This document shall be issued by the ARN in favour of that organization upon assessment of the documents filed and the results of the preliminary operation-related inspections, provided that all applicable standards and prerequisites are met and qualified staff is brought in. Additionally, for the operation of a class II or III facility, individuals involved are required to hold a specific individual permission applicable to a given practice. In order to be granted such a permission, the applicant shall meet several requirements, namely to possess a suitable basic training, an appropriate specialized training and enough training on the job in accordance with the provisions of the relevant specific standards.
All individuals and legal entities desiring to apply for licenses, operating authorizations, specific authorizations and individual permissions or radioactive material transport certificates shall pay a licensing or inspection fee to ARN.
Furthermore, the ARN is empowered to impose sanctions in the event of non-compliance with the radiological safety standards regarding class II and III facilities.
3.1.1.3. Safeguards and Physical Protection
Safeguards and nuclear non-proliferation assurances are an essential aspect in the Argentine regulatory system. They are a group of requirements and procedures applicable to both the nuclear materials and other materials, equipment and information of nuclear interest, aimed at ensuring, with a reasonable degree of certainty, that such elements are not intended for an unauthorized use, and that the international agreements signed in this matter are appropriately respected.
The safeguards may be national or international in nature, with the international safeguards being divided into regional and global. National safeguards are defined by the provisions set forth in the regulatory framework adopted by each State. In the case of Argentina, the ARN has established the guidelines of the Argentine Accountancy and Control System for nuclear materials and other materials, equipment and facilities of nuclear interest. As far as the international safeguards and non-proliferation assurances are concerned, their application proceeds in accordance with the provisions of the agreements on non-proliferation of nuclear weapons ratified by Argentina. In this case, the safeguards may be applied by regional or global international organizations and are aimed at detecting within reasonable time and a reasonable degree of certainty the diversion of "significant amounts" of nuclear materials for purposes banned by the agreements by virtue of which those safeguards are applied.
In this regard, it is worth mentioning the "Bilateral Agreement between the Argentine Republic and the Federative Republic of Brazil for the exclusively peaceful use of nuclear energy" signed in the city of Guadalajara in 1991. By virtue of this agreement an agency was created, designated as "Brazilian-Argentine Agency for Nuclear Material Accountancy and Control" (ABACC) the essential objective of which is the implementation of the "Common System for Accountancy and Control of Nuclear Materials" aimed at ensuring that said materials are not diverted for the manufacturing of nuclear weapons or other nuclear explosive devices.
Immediately after the bilateral agreement came into force, a multilateral agreement was concluded by Argentina, Brazil, the ABACC and the International Atomic Energy Agency (IAEA) for the application of safeguards (referred to as Quadripartite Agreement). This agreement commits the IAEA to applying safeguards in both countries for nuclear materials in connection with all nuclear activities in Argentina and Brazil, based upon the "Common System for Accountancy and Control of Nuclear Materials".
The Argentine regulatory system also contemplates, with special attention focused on the national regulatory function, the physical protection against robbery, removal or unauthorized use of nuclear materials, and sabotage against nuclear facilities. In this respect, the ARN takes full responsibility for requiring the Responsible Entity to implement a complete physical protection system applicable to nuclear facilities and materials in accordance with the regulatory requirements set forth by the ARN. In particular, the "Convention on Physical Protection of Nuclear Material", regarding international transport of these materials, was opened to signature on March 3, 1980, in the IAEA's Vienna headquarters and the United Nation's New York headquarters; Argentina adopted this Convention under Act 23,620 and then ratified it.
3.1.1.4. Transport of Radioactive Material
The transport of nuclear material within Argentina shall be carried out in accordance with the provisions of the IAEA's "Regulations for the Safe Transport of Radioactive Material" which 1985 edition (amended in 1990) came into force on 11 December 1993.
All international, regional and national organizations responsible for regulation of land, air, river and sea transport of hazardous materials have endorsed the safety criteria contained in regulation AR 10.16.1 related to "Radioactive Material Transport", literally in accordance with the aforesaid IAEA Regulations. This regulation provides persons, goods and environment with a suitable safety level during normal transport of radioactive material, as well as in the event of any accident. In order to protect workers and members of the public under normal transport conditions, this regulation sets forth prerequisites which essentially limit the dose rate in the environment of the packages to be transported and the non-fixed contamination in their external surface.
3.1.2. Institutional Relations
Within the context of its regulatory function, the ARN maintains a close and varied interaction with domestic and foreign, governmental and non-governmental organizations, as well as with international agencies. Such an interaction has the following objectives:
Furthermore, the ARN is actively involved in negotiating international instruments in connection with the nuclear regulatory function and also in their subsequent implementation. In addition, the ARN contributes to the definition of Argentine regulatory policies upheld in different international forums.
The negotiation of national and international agreements has always been one of the most important tasks within the framework of the institutional relations. The ARN maintains currently valid agreements with national and foreign universities, public hospitals, the Federal Police and the Coast Guard, as well as with American, Canadian, Spanish and Swiss regulatory authorities, among other countries. During 1998, international agreements were concluded with Germany's "Gesellschaft für Anlagen und Reaktorsicherkeit (GRS) mbH" and France's "Institut de Protection et de Sûreté Nucléaire" (IPSN). In the national sphere, agreements have been signed with the Argentine Border Guard, the University of Buenos Aires' Faculty of Engineering and "Otto Krause" Technical Education School Nº 1.
The ARN attaches great importance to the link with the International Atomic Energy Agency (IAEA). This link can be defined as having three key principles:
The ARN participates in the National Commission for the Control of Sensitive and War Material Exports to provide advice in cases related to nuclear exports. During 1 998, it prepared and issued judgements on the export applications filed, then granting the relevant export authorizations.
The Comprehensive Nuclear Test Ban Treaty (CTBT) adopted by the United Nations General Assemb1y in September 1996, is a matter of permanent work for different sectors in the ARN. In fact, with the purpose of verifying compliance with the essential obligation set forth in the Treaty, an International Surveillance System was established envisaging the intensive use of detection techniques. In the case of radionuclide and infrasound technique, the ARN is the responsible organization.
3.1.3. Regulatory Inspections
In Argentina, there are two nuclear power plants in operation, one under construction, six research reactors, 24 major radioactive facilities and more than 1500 facilities (for medical, industrial, research and teaching purposes) which utilize radioactive materials or sources and radiation-generating systems. Those facilities are devoted to various purposes such as electric power generation, basic and applied research, or the use of ionizing radiation in the field of medicine and industry. Such various facilities are located all around the country and their complexity varies in a very wide range.
The ARN's regulatory functions aimed to controlling those facilities include analyzing design and operation-related documents, permanently assessing safety during operation, and verifying by means of regulatory inspections and audits the compliance with the provisions of the license concerned.
The analysis and assessment functions are performed by specialized staff members in the field of radiological and nuclear safety who use modern information technology for data management and are acquainted with the use of calculation codes, in order to validate documents supplied by the licensee based upon their own independent criteria.
The ARN's regulatory control action aimed at controlling the facilities also includes a programme of routine and non-scheduled inspections for the follow-up of activities related to safety and verification of compliance with the mandatory documentation. Facilities subject to regulatory control are listed in Table 8.
Routine inspections are aimed to a) supervising the facility's normal activities, b) process monitoring and c) verification of compliance with the provisions of mandatory documentation. As far as nuclear power plants are concerned, inspections are basically conducted by ARN's resident inspectors relying on the technical support provided by the ARN analysis and assessment groups or by groups working for the ARN under agreements or contracts.
Non-scheduled inspections are carried out either in the event of specific circumstances or when the need arises to increase the inspection effort. In these cases inspections are conducted by experts in different areas, either from the ARN or other ARN-related institutions.
TABLE 8. FACILITIES SUBJECT TO REGULATORY CONTROL
Facilities |
Number |
Nuclear power plants (one under construction) |
3 |
Research reactors and critical assemblies |
6 |
Particle accelerators |
4 |
Radioisotope or radioactive sources production plants |
5 |
High-dose irradiation plants |
2 |
Fuel cycle facilities |
13 |
CNEA's waste management area |
1 |
CNEA's minor facilities |
26 |
Teletherapy centres |
108 |
Brachytherapy centres |
81 |
Nuclear medicine and radioimmunoassay centres |
605 |
Gammagraphy |
48 |
Nuclear gauges |
266 |
Research and teaching centres and other applications |
433 |
Source: Autoridad Regulatoria Nuclear. |
3.1.4. Occupational Surveillance
Basic criteria supporting radiological safety establish that: all practices involving the use of ionizing radiation shall be adequately justified, radiological protection shall be optimized, dose limits and constraints shall be complied with, and the likelihood of accidents (potential exposure) shall be kept at a minimum level.
The ARN performs assessment of information related to occupational exposure in the most important class I, II and III facilities. This work allows the ARN to define behaviour indicators for radiological protection systems, to identify tendencies, to verify compliance with dose limits, and to compare different practices to each other.
3.1.5. Environmental Surveillance
The ARN performs environmental monitoring in the surroundings of the different nuclear facilities in a manner fully independent from monitoring carried out by the facilities themselves. In 1998, such a monitoring was carried out in Atucha I and Embalse nuclear power plants, Ezeiza Atomic Centre, San Rafael uranium ore mining plant, Cordoba uranium ore milling plant and the following decommissioned plants for mining and milling uranium ores: Malargüe, Pichiñán, Los Gigantes, La Estela, Los Colorados and Tonco.
3.1.6. Scientific and Technological Activities
The ARN carries out various kinds of scientific and technological functions to support its regulatory activity. For this purpose, the ARN relies on appropriate laboratories equipment and skilled personnel whose tasks consist in implementing and validating the corresponding methodologies within different working sectors.
The ARN possesses various laboratories within the Ezeiza Atomic Center, located in Ezeiza, province of Buenos Aires. These laboratories cover an area of 2000 m2 and are devoted to physical dosimetry, radiopathology and biological dosimetry, radiochemical analyses, uranium particle detection, iodine 129 detection, radon measurement, environmental sample processing, and internal contamination assessment. Those facilities also include measurement laboratories (whole body counter, gamma and alpha spectrometry laboratory, gross alpha and beta activity measurement laboratory, and low background activity counter), and electronical support laboratories.
In 1998, supporting activities related to regulatory and development control functions were performed within the following specific areas:
Within the framework of the Comprehensive Nuclear Test Ban Treaty, a gamma spectrometry laboratory was in operation and served as a primary laboratory within the international network set forth in this Treaty.
3.1.7. Radiological Emergencies
The ARN evaluates the radiological and nuclear emergency procedures in case of accidental situations in facilities under its control. Which actions are to be taken, who will take them and how they will be taken are the highlights of the emergency plan on which intervention is based. This plan contains all procedures to be followed in the event of an accident condition. For major facilities, the licensee shall take full responsibility for implementing an emergency plan; for minor practices, emergency procedures are required to contain accidents and minimize their consequences.
In accordance with its duties, the ARN will take steps in a subsequent stage to minimize injury and damage, which may result from any incident, accident or radiological emergency, through its own Radiological Emergency Intervention System (SIER). The SIER is intended to:
The SIER consists of two groups: the Primary Intervention Group and the Support Group. The Primary Intervention Group is on duty in weekly shifts all year round. The Support Group is made up of the rest of the ARN technical staff members who do not work in shifts but may be summoned when necessary. The SIER has the specific equipment and necessary logistic infrastructure to ensure a prompt and efficient intervention in the event of a nuclear accident or a radiological emergency. It works in close relationship and has reached co-operation agreements with other organizations such as federal and provincial Civil Defence Services, the Federal Police, the Coast Guard, the Armed Forces and the Internal Security Department.
The application of Decree 1390 caused a change in the Regulatory body functions, powers and duties related to radiological offsite aspects concerning nuclear emergencies preparedness, training and response. The main changes are: 1) Regulatory Body duty of approving nuclear emergency contingency plans at municipality, state or national level. 2) Regulatory Body role change from advising to leading of the off-site countermeasures implementation to mitigate radiological consequences on public from nuclear accidents.
Special attention has been paid by the Regulatory Body, starting from the changes established in the mentioned Acts and Ordinances to conduct all the civil organizations and Security Forces in the area included in Nuclear Emergency's Plans. In particular the operational capacity of the Regulatory Body in the management of the implementation of actions to protect the members of the public in the surroundings of the nuclear power plants from the radiological consequences is currently checked by carrying out emergency exercises. The Regulatory Body, in addition to its main role as head at the Emergency Control Centre for off-site consequences, performs the nuclear and radiological assessments, the radiological protection of intervening teams and the environmental monitoring. Representatives of all the intervening organizations (as established in the Emergency Plan) integrate such command and the Regulatory Body coordinates the response teams from civil organizations, (Fire fighter brigades, Civil Defense, etc) security forces (Police, Gendarmerie and Coast Guard) and military institutions (Army, Navy and Air Force). These organizations apply the countermeasures with their response teams. All this groups have procedures to deal with nuclear emergencies, under the coordination of the Regulatory Body.
3.1.8. Training and Technical Information
The ARN undertakes as a permanent activity the training of specialists in radiological and nuclear safety, safeguards and physical protection, by means of training courses and the participation in national and international congresses and expert meetings.
The training activity is carried out through the Training Department in charge of defining, organizing and co-ordinating courses, workshops and updating seminars.
The Postgraduate Course on Radiological Safety and Nuclear Safety organized in accordance with the provisions of an agreement with the University of Buenos Aires and the Ministry of Health and Social Welfare under the auspices of the IAEA, has been uninterruptedly given on a yearly basis since its inauguration in 1 980. Since then, a total number of 539 professionals have taken a degree, roughly a half of them being foreigners.
3.1.9. Human and Economic Resources
The organizational structure of the ARN is made up of 215 established posts and 6 posts pertaining to the Board of Directors.
Out of the total regular stall, 67% are university-degree holders. Out of the total regular stall, 85% is devoted to specialized scientific and technical functions within the ARN's sphere of activities, while the remaining 15% is devoted to support and clerical jobs.
The total budget allocation approved for the year 1998 for the ARN was $ 18,622,065, funded by the Treasury Department contributions, Specific Resources and Specific-Allocation Resources.
Personnel expenditures accounted for 64.6% of the total current expenditure, including contributions from the employer, and social security allowances. Consumption expenditure and non-personnel services accounted for 16.9% of the total current expenditure.
3.2. Main National Laws and Regulations in Nuclear Power
In the past, several Federal Government Executive decrees have identified CNEA as the Regulatory Authority on radiological and nuclear safety, including the protection of the workers, public and the environment against the effects of ionizing radiation, and the safety of the installations. During the first years of nuclear activities in Argentina, there was no clear separation of the Regulatory Authority from the main operational safety group, since almost all NPPs operated in CNEA installations. In 1958, the regulations covered the whole country. At the same time research supporting regulatory framework was initiated to establish criteria to limit discharges of radioactive material to the environment and food pathways. The regulatory setting in that time included the licensing activities, the evaluation of design and the operation of nuclear power stations, the analysis of accidents and regulatory inspections.
At present, the regulatory system covers all CNEA and NASA nuclear activities and those of any third party in the country, as well as all uses of radionuclides and radiation, except the use of X-rays, which are controlled by the Ministry of Health. The standards for nuclear power stations established by the Regulatory Authority are the following:
0.0.1 Licensing of Major Installations
0.11.1 Conditions to Obtain Specific Authorisations for Personnel of Major Installations
0.11.2 Requirements of Psychophysical Aptitude for Specific Authorisations
3.1.1 Occupational Exposure in Nuclear Power Plants
3.1.2 Limitation of Radioactive Effluents
3.1.3 Radiological Criteria Related to Accidents in Nuclear Power Plants
3.2.1 General Safety Criteria in the Design
3.2.3 Fire Protection
3.3.1 Reactor Core
3.3.2 Heat Removal Systems
3.3.3 Pressure Primary Circuit
3.3.4 Fuel Element Behaviour in the Reactor
3.4.1 Protection System and Safety Related Instrumentation
3.4.2 Shutdown Systems
3.4.3 Confinement Systems
3.5.1 Emergency Electric Power Supply
3.6.1 Quality System
3.7.1 Documentation to be Presented to the Regulatory Body until the Commercial Operation of a Nuclear Power Plant
3.8.1 Pre-nuclear Commissioning
3.8.2 Nuclear Commissioning
3.9.1 General Safety Criteria in Operation
3.9.2 Communication of Significant Events
3.10.1 Protection against Earthquakes
3.17.1 Nuclear Power Plant Decommissioning
10.1.1 Basic Radiological Safety Standard
10.13.1 Basic Standard of Physical Protection of Materials and Nuclear Installations
10.14.1 Guarantee of Non Deviation of Nuclear Materials and Materials, Installations and Equipment of Nuclear Interest
10.16.1 Transport of Radioactive Materials
In Argentina, the "Operating Organization" is NASA (CNEA for decommissioning), , which is responsible for the radiological and nuclear safety in design, construction, commissioning, operation and decommissioning program of nuclear power plants. It is responsible for making reasonable efforts toward the safety of the nuclear power stations with enforcing the compliance of the standards, stipulations outlined in the Licence, and all the requirements established by the Authority.
The Operating Organization designates a Primary Responsible to each nuclear power station in operation who is directly responsible for the radiological and nuclear safety of the installation. The directors of Atucha I and Embalse nuclear power stations are the Primary Responsibles. The Operating Organization must give all the necessary support to the Primary Responsible and must carry out an adequate supervision in order to insure the correct and safe operation of the plant. The Primary Responsible must make a reasonable effort toward the safety of the plant in order to meet the minimum conditions and the specifications of the License.
4. CURRENT ISSUES AND DEVELOPMENTS ON NUCLEAR POWER
4.1. Energy Policy
The bulk of the nuclear activity in Argentina has been legally formulated and the responsibilities and means specified through the Federal Law Nº 24 804, or "Nuclear Activity Law", complemented by the Federal Law Nº 25 018, or "Radioactive Waste Management Law".
Electricity generation through nuclear power in Argentina has been proceeding, globally, steadily with no significant perturbations, though without any expansion.
Essentially, the two operating NPPs, i.e. Atucha-1 (357 MWe gross) and Embalse (648 MWe gross), are required at every moment for base load operation ranking in the uppermost positions among all kinds of generating stations. However, the most relevant aspect is the non completion of Atucha-2 NPP, a highly completed but long-delayed plant, exclusively due to the lack of financial means of the state-owned utility, NASA.
The two operating NPPs perform very well under the highly competitive rules of Argentina's fully deregulated and open electricity generation market. The resulting prices are comparatively quite low. At the same time, both plants have a good record for safety aspects with no relevant incident or anomaly, as well as doses to the personnel or the public along their plant life up to now. All this leads to a reasonable public acceptance for nuclear power generation in Argentina.
During the last decade, Nuclear power generation has represented annually between 7.5 and 9.% of the total electricity generation (of the order of 75-80 TWh). This implies a good contribution to the national reduction of CO2 emissions.
Privatization of all NPPs including the completion of Atucha-2, all that in a single package, was attempted in 1999 with no positive results. After that, the idea has been abandoned by the federal administrations ruling the country in recent years during the deep economic crisis the country suffered (1998-2003), including the strong devaluation of the national currency (argentine peso) since January 2002.
During the second semester of 2003 the new federal administration ordered a general update of Atucha-2 Project completion feasibility and, particularly, a reassessment of the remaining investment for project completion taking into account the reduction of the argentine peso value to around 1/3 of its former value (equivalent to 1 US$) and the fact that around 3 / 4 of such investment formerly corresponded to domestic expenses (mainly electro-mechanical erection works, and first core fuel and D2O supplies). The study is presently followed by the initiation of discussions with the plant designer, Siemens and at present also Framatome ANP, directed to a reappraisal of actions, works and financing possibilities for project completion.
In the area of radioactive waste management, federal law Nº 25018, assigns to the National Atomic Energy Commission (CNEA) full responsibility for final treatment and disposal, creating a special fund with this purpose to be contributed essentially by operating NPPs.
Two particular points must be outlined with regard to waste management:
All these regulations impose hard challenges to the waste management activities.
In general, most of the nuclear power generation activity is carried out by the state, i.e. the federal government, through:
Joint state-owned / private companies were set-up for the main supplies in the front fuel cycle : CONUAR, FAESA, DIOXITEK.
Applied research, basic engineering development and services to national and foreign customers are provided by the state-owned company INVAP S.E. This especially applies to the design and construction of research and radioisotope production reactors for foreign customers.
All the nuclear activity is under the regulatory system implemented and executed by the National Nuclear Regulatory Authority (ARN).
Concerning future plans related to Nuclear Power, it must be indicated:
At this moment Argentina is not sharing any foreign or international project of new concept and design development of NPPs, though is participating actively in several international technical committees and initiatives, mainly the "Generation IV" initiative of the US-DOE, as well as the "INPRO Project" of IAEA, both related to investigations of long-term innovative reactor concepts. In the short / medium term CNEA's activities in the area are centered in its CAREM Project, a small size (25 to 300 Mwe) innovative and safety-passive PWR.
4.2. Privatisation and deregulation
The main features of the present Deregulated Electricity Market were outlined before. However, a few special aspects will be reviewed.
1) Overall Legal Scheme
In 1992 the Federal Law Nº 24 065 has established:
2) Electricity Generation Market
As a result of these rules, base load requirements are essentially covered by:
The very large hydro-power capacity in the country, together with the very large and cheap domestic gas resources have led to a sustained decrease in generation prices to the utilities and some stabilization at around 25 - 28 US$ / MWh on the average, during the last years up to end 2001. After the dramatic argentine peso devaluation during 2002, its value decreased from 1 US$ to 0.33 US$ at the end of 2003. So, current prices (2004) remain at around 60 A$ / MWh, namely 20 US$ / MWh.
Due to their basically low fuel costs, both NPPs perform very well in this deregulated generation market: both plants are called for providing their 100 % capacity supply at every moment (base load). The fact that their initially foreseen privatization has not occurred up to now, does not modify at all this well ranked position. The owner and operator, Nucleo-eléctrica Argentina S.A. (NASA) is a fully state-owned company, financially independent and dependent only on its own incomes.
This leads NASA to a permanent effort in order to keep the plants on line at their maximum power capacity and to permanently monitoring any expense in fixed and variable costs of any kind : staff, maintenances, services, insurances, repairs, back-fittings, etc. and particularly fuel costs.
In connection with the last point, it must be mentioned the special project, already turning at 100 %, for replacing the use of Natural U by Slightly Enriched U (SEU) at 0.85 %, as fuel in the UO2 pellets of Atucha-1 reactor fuel assemblies (FAs). In this way, the very high manufacturing costs of these FAs (more than 6 m long) are well compensated by the near 100.% increase in their exit burn-up using the SEU fuel. Thus, the final fuel cost per KWh was reduced around 40 % in Atucha-1, allowing this NPP to compete very well with the cheapest CCGT plants.
Excluding the base load hydro-power plants, Embalse NPP remains the "number 1" lowest marginal cost plant of all the generation park, while Atucha-1 is within the 10 cheapest plants due to the above mentioned use of SEU.
Some very long unplanned shutdowns and heavy repairs in Atucha-1 during the last years have imposed a very high challenge to NASA, though staff efforts have, at any time, found solutions to these problems, together with the very good performance of Embalse NPP allowing a reasonable cash-flow for NASA, in spite of the very low average generation prices.
4.3. Role of the government in the nuclear R&D
As indicated before, the Federal Government plays a major or exclusive role in this field, through the activities of the National Atomic Energy Commission (CNEA) covering a large spread from neutron data, material research, and development of new concepts in nuclear fuels and nuclear reactors, either research, radioisotope production reactors or the small size Carem concept of NPP.
In the just-mentioned area of reactor development, this activity is specially promoted by the state-owned company INVAP S.E., an activity that frequently leads to very successfull results, like the exports of research and radioisotope production reactors to various countries.
4.4. Nuclear Energy and Climate Change
As indicated in Section 1, up to now Argentina benefits of a relative small population within a very large territory, with an average population density of around 13.8 inhab./km2.
Combustion of fossil fuels still remains very low. Use of these fuels in the transport activity plus in electricity generation do not pose at present a significant problem. Contamination coming from these emissions is only of some concern in Buenos Aires city and to a lesser extent in the following 2 larger towns, namely Cordoba and Rosario.
In relation to electricity production, and for the long-term, there is a quite general consensus that the nuclear option must remain open on several basis but especially considering international policies and agreements in progress related to the intensive use of emission-free energies like nuclear.
4.5. Safety and waste management issues
Both topics have been addressed previously. However, it must be recalled that according to the Federal Law Nº 24.804, of Nuclear Activity:
[1] | Country Profiles 1995-96. |
[2] | Nuclear Regulatory Authority, Annual Report Synthesis, 1998. |
[3] | Data & Statistics/The World Bank. |
[4] | IAEA Energy and Economic Data Base (EEDB). |
[5] | IAEA Power Reactor Information System (PRIS). |
INTERNATIONAL (MULTILATERAL AND BILATERAL) AGREEMENTS
AGREEMENTS WITH THE IAEA |
||
NPT and/or Tlatelolco related agreement: Sui generis full-scope safeguards agreement (Brazil, Argentina, ABACC, IAEA) |
Signed: |
13 December 1991 |
Additional protocol |
Not Signed |
|
Improved procedures for designation of safeguards |
Prefers to apply the present |
|
Project related safeguards agreement INFCIRC No: 143 |
Entry into force: |
13 March 1970 |
Bilateral safeguards agreement Argentina/USA |
Entry into force: |
25 July 1969 |
Unilateral safeguards submission INFCIRC No: |
Entry into force: |
|
Supplementary agreement on provision of technical assistance by the IAEA |
Entry into force: |
27 February 1991 |
ARCAL |
Entry into force: |
September 1984 |
Agreement on privileges and immunities |
Entry into force: |
15 October 1963 |
OTHER RELEVANT INTERNATIONAL TREATIES etc. |
||
NPT |
Entry into force: |
10 February 1995 |
Tlatelolco |
Entry into force: |
18 January 1994 |
Convention on physical protection of nuclear material |
Entry into force: |
6 May 1989 |
Convention on early notification of a nuclear accident |
Entry into force: |
17 February 1990 |
Convention on assistance in the case of a nuclear accident or radiological emergency |
Entry into force: |
17 February 1990 |
Vienna convention on civil liability for nuclear damage |
Entry into force of: |
12 November 1977 |
Joint protocol |
Signature: |
21 September 1988 |
Protocol to amend the Vienna convention on civil liability for nuclear damage |
Ratification: |
14 November 2000 |
Convention on supplementary compensation for nuclear damage |
14 November 2000 |
14 November 2000 |
Convention on nuclear safety |
Entry into force: |
16 July 1997 |
Joint convention on the safety of spent fuel management and on the safety of radioactive waste management |
Entry into force: |
18 June 2001 |
ZANGGER Committee |
Member |
|
Nuclear Export Guidelines (INFCIRC/254) |
Adopted |
|
Acceptance of NUSS Codes |
Summary: National authorities can use codes as suggested, to complement their rules and regulations. Letter of: |
|
Nuclear Suppliers Group |
Member |
|
DIRECTORY OF THE MAIN ORGANIZATIONS, INSTITUTIONS AND COMPANIES INVOLVED IN NUCLEAR POWER RELATED ACTIVITIES
NATIONAL ATOMIC ENERGY AUTHORITY | |
Comisión Nacional de Energía Atómica (CNEA) |
Tel: +54-11- 4704. 1201 |
Autoridad Regulatoria Nuclear (ARN) |
Tel: +54-11- 4704. 1248 |
OTHER GOVERNMENTAL BODIES |
|
Secretariat for Science and Technology |
|
Brazilian-Argentine Agency for Accounting and |
|
MAIN POWER UTILITIES |
|
Nucleoeléctrica Argentina S.A.(NASA) |
Tel: +54-11- 4701.4651 |
OTHER ORGANISATIONS |
|
INVAP S.E. |
_______________________________________
1. The statistical tables in this profile have been updated with data as of the end of 2007 from IAEA databases, namely the Power Reactor Information System (PRIS) and Energy and Economic Data Bank (EEDB), and the World Bank's World Development Indicators (WDI).