INDIA
1. ENERGY, ECONOMIC AND ELECTRICITY INFORMATION
1.1. General Overview
India occupies a strategic position in Asia with a distinct geographical identity. Bounded by the Great Himalayas in the north, it stretches southwards and from Tropic of Cancer, tapers off into the Indian Ocean between the Bay of Bengal on the east and Arabian Sea on the west. India has seven major physiographic regions: Northern Mountains viz. the Himalayas; The Indo Gangetic Plain; Central Highlands; Peninsular Plateau; East Coast; West Coast; Bordering Seas; and Islands. Major part of the land surface is plateau.
There are a number of rivers flowing in the country i.e. Himalayan rivers, Peninsular rivers, coastal rivers and rivers of Inland Basin. India gets its rains from the south west monsoon during the months of June to September, and north east monsoon during October to December. The rainfall varies in wide degrees in different parts of India. The tropic of cancer passes through the middle part of India. The climate may be broadly described as tropical monsoon type. There are four seasons i.e. (i). Winter (January-February); (ii) Hot weather summer (March-May); (iii) Rainy south west monsoon (June-September) (iv) Post monsoon also known as north east monsoon in the southern peninsula (October-December).
India became an independent nation on the 15th August 1947. It became a Republic on 26th January 1950 and the Constitution of India came into force. India is a Sovereign, Socialist, Secular, Democratic republic with a parliamentary system of Government sustained by a well-developed electoral process. India is a federal polity with a Central Government, 28 State Governments, a National Capital Territory and 6 Union Territories. Ever since its independence till date, the country has achieved significant progress in various sectors such as agriculture, industry, power, science and technology including in the fields of atomic energy and space and services.
According to 2001 census, India's population is 1027 million. The estimated
growth of population from 1991 to 2001 is at an annual rate of about 2 % (see
Table 1). The installed power generating capacity (Power Utilities) as of 31st
January 2003 is 107533.70 MW (e) with about 71% contributed by fossil thermal
power. In order to meet the growing demand for electricity, significant electricity
generation capacity addition is necessary for which various measures are being
taken.
TABLE
1. POPULATION INFORMATION |
|||||||||
|
Growth rate(1) (%/yr) |
||||||||
|
1961 |
1971 |
1981 |
1991 |
2001 |
2002(3) |
2003(3) |
1991 |
|
to |
|||||||||
2001 |
|||||||||
Population (millions) |
439 |
548 |
683 |
843 |
1027 |
1042 |
1058 |
2 |
|
Population density (inh/km2)(2) |
134 |
167 |
208 |
256 |
312 |
317 |
321 |
2 |
|
Urban Population as % of total |
18 |
20 |
23 |
25.7 |
27.8 |
28 |
28.3 |
2.7 |
|
Area (1000 km2) |
3287.3 |
|
|
|
|||||
(1)Calculated approximate annual
growth rate (compound). |
|||||||||
(2)Calculated and rounded off figures. |
|||||||||
(3)The population figures
are for 31st March of the year. The decadal population figures
for 1961 to 2001 are by census. The figures for the years 2002 and 2003
are extrapolated with an estimated average (during the current decade)
annual growth rate of 1.5%/Yr. |
|||||||||
Source: Provisional Population Totals, Paper-1, Census of India, 2001.
The GDP, at factor cost and 1993-94 prices, grew at average compound annual
rate of about 5.4 %/yr during the period 1980 to 2000. During 2000-2001 and
2001-2002 the GDP growth rates were about 4.4% and 5.6% respectively [at factor
cost and at constant 1993-94 prices, Ref. CSO Release 31st Jan. 2003, http://indiabudget.nic.in/es2002-03/chap2003/tab1.1.htm].
Due to wide ranging economic measures the Indian economy is poised to grow significantly.
The confederation of Indian Industry forecasts a GDP growth rate between 6.0%
and 6.4% during 2003-04 factoring in the expected buoyant growth rates in industry
(6.5%) and services (7.5%) [Ref. http://www.indiainfoline.com/nevi/stec03.pdf].
The historical GDP data are given in Table 2.
TABLE 2. GROSS DOMESTIC PRODUCT (GDP)# |
|||||||
|
Growth Rate (%/yr) |
||||||
|
1970 |
1980 |
1990 |
2000 |
2001 |
2002 |
1980 |
to |
|||||||
2000 |
|||||||
GDP(1) |
46,913 |
164,571 |
284,813 |
406,624 |
439,086 |
460,672 |
4.63 |
GDP(2) |
94,446 |
127,870 |
220,871 |
366,082 |
403,379 |
421,007 |
5.40 |
GDP(3) per capita |
86 |
241 |
338 |
402 |
428 |
442 |
2.59 |
GDP by sector (%): |
|
|
|
|
|
|
|
–
Agriculture |
44 |
38 |
32 |
25 |
26 |
25 |
-2.07 |
–
Industry |
24 |
26 |
26 |
27 |
27 |
26 |
0.19 |
–
Services |
32 |
36 |
42 |
48 |
47 |
49 |
1.45 |
# Source 1. Statistical outline of India 2001-2002, Tata
services Limited, Department of Economics and Statistics, 2. India Profile:
overview- Economic Progress: GDP, Sectoral Growth of GDP (http://www.saarcnet.org/newsaarcnet/countryprofile/india/india.htm),
3. Press Information Bureau, GOI (http://mospi.nic.in/t1_26june2002.htm)
and The World Bank Group (http://www.worldbank.org/data/)
and 4. CSO Data Jan31, 2003 (http://indiabudget.nic.in/es2002-03/chapt2003/tab1.1htm) |
|||||||
(1) Million current US$ at factor cost at current prices
|
|||||||
(2) Millions of constant 1995 US$ (at factor cost &
at 1993-94 prices, 1US$ = 31.37 Rs.)
|
|||||||
(3) Current US $ (at factor cost & current prices) |
The energy resources are unevenly distributed in the country and are mainly used for power generation, transport and industrial and domestic uses. Table 3 shows the overall energy reserves and Table 4 the basic energy situation.
Based on a systematic survey carried out, the hydro electric potential in the
country is estimated at 600 billion kilowatt hours annually corresponding to
a name plate capacity of 150,000 MWe. On 31.03.2003 the total installed hydro
power capacity with utilities was 26910 MWe (i.e. about 18% of the total potential).
A capacity addition of 14,393 MWe during the 10th five year plan i.e. during
2002-2007 has been planned. More than 70% of the total hydro potential in the
country is located in the northern and north-eastern regions put together.
Coal, oil, natural gas and lignite are used for thermal power generation. As
on January 1, 2003, the geological reserves of coal are estimated to be about
240.75 billion tonnes out of which the proven reserves are about 90 billion
tonnes. Eastern region accounts for about 70% of the coal resources. Lignite
reserves suitable for power generation are estimated at 27.45 billion tonnes
(proven about 3.7 billion tonnes) and are being exploited for this purpose in
Tamil Nadu and Gujarat. As on January 1, 2003 recoverable reserves of crude
oil are placed at 735 million tonnes and of natural gas at 762 billion cubic
meters.
TABLE 3. ESTIMATED ENERGY RESERVES(1)
Exajoule |
||||||
|
Solid(2) |
Liquid |
Gas |
Nuclear |
Hydro(3) |
Total(4) |
Total proven amount in place (1-1-2003) |
1625 |
31 |
29 |
– |
2.16 (e) |
1685 |
(1) India March 2003, Energy Information Administration (www.eia.doe.gov). Calorific
Value of (i) Coal = 4,200 kcal/kg, (ii) Lignite = 2,800 kcal/kg, (iii) Oil =
10,200 kcal/kg, (iv) Gas = 9,150 kcal/m3
(2) Proven Coal (of the year 2003) and Lignite (of the year 2001) Reserves (Coal-
http://coal.nic.in/reserve2.htm, Lignite- Report of Working Group on Coal &
Lignite for Tenth Five Year Plan, July 2001)
(3) Renewable Source in electricity units
(4) Does not include Hydro (being renewable) and nuclear
Uranium reserves in the country are estimated to be about 95,000 tonnes (metal). It does not include reserves in speculative category. After accounting for various losses in mining, milling and fabrication the net uranium available for power generation is estimated to be about 61,000 tonnes (metal). One of the largest resources of thorium in the world is contained in monazite deposits (about 8 million tonnes) in India mainly along the Indian seacoast. Out of this about 4 million tonnes is considered exploitable of which 70% is considered mineable containing about 2,25,000 tonnes of thorium metal.
The estimated power generation potential from non-conventional renewable energy
resources is about 100,000 MW. This includes 45,000 MW from wind , 15,000 MW
from small hydro, 19,500 MW from bio-mass/biomass-cogeneration, 1,700 MW from
urban and industrial etc. Thermal applications of such resources include solar
thermal systems, biogas plants, improved biomass cooking stoves etc.
TABLE 4. ENERGY STATISTICS
|
||||||||||
Exajoule |
||||||||||
Average annual growth rate
(%) |
||||||||||
|
1960 |
1970 |
1980 |
1990 |
2000(4) |
2001(4) |
2002(5) |
1960 |
1980 |
|
|
|
|
|
to
|
to
|
|||||
|
|
|
|
|
|
|
|
|
1980 |
2000 |
Energy consumption |
|
|
|
|
|
|||||
|
– Total(1) |
1.43 |
4.15 |
6.62 |
11.25 |
16.05 |
16.58 |
16.59 |
7.96 |
4.53 |
|
– Solids(2) |
1.07 |
3.1 |
4.78 |
7.74 |
9.45 |
9.70 |
9.53 |
7.77 |
3.46 |
|
– Liquids |
0.29 |
0.77 |
1.31 |
2.37 |
4.43 |
4.59 |
4.83 |
7.83 |
6.28 |
|
– Gases |
N/A |
0.02 |
0.05 |
0.39 |
1.07 |
1.14 |
1.18 |
– |
16.55 |
|
– Primary electricity(3) |
0.026 |
0.092 |
0.17 |
0.23 |
0.33 |
0.34 |
0.31 |
9.84 |
3.37 |
Energy production |
|
|
|
|
|
|
|
|
|
|
|
– Total |
1.2 |
3.74 |
5.61 |
10.09 |
12.57 |
12.74 |
12.66 |
8.02 |
4.11 |
|
– Solids |
1.1 |
3.17 |
4.69 |
7.53 |
8.96 |
9.09 |
9.03 |
7.52 |
3.29 |
|
– Liquids |
0.02 |
0.29 |
0.39 |
1.43 |
1.38 |
1.37 |
1.41 |
16.01 |
6.52 |
|
– Gases |
N/A |
0.02 |
0.05 |
0.39 |
1.13 |
1.14 |
1.18 |
– |
16.87 |
|
–
Primary electricity(3) |
0.026 |
0.092 |
0.17 |
0.23 |
0.33 |
0.34 |
0.31 |
9.84 |
3.37 |
Net import (import – export) |
|
|
|
|
|
|
|
|
|
|
|
– Total |
0.26 |
0.5 |
0.97 |
1.22 |
3.57 |
3.78 |
3.93 |
6.8 |
6.73 |
|
– Solids |
-0.03 |
-0.01 |
0.01 |
0.15 |
0.41 |
0.55 |
0.51 |
6.57 |
20.4 |
|
– Liquids |
0.29 |
0.51 |
0.96 |
1.07 |
3.16 |
3.23 |
3.42 |
6.17 |
6.13 |
|
– Gases |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
– |
– |
Years represent financial
years from 1st April of the year to 31st March of the next
year. |
||||||||||
(1)Energy consumption
= Primary energy consumption + Net import (Import – Export) of secondary
energy. |
||||||||||
(2)Solid fuels include coal, lignite and estimated commercial
wood. The consumption of the wood is assumed to remain constant at 3.134
EJ (Ref.: S.K. Varma, ‘Coal- A Predominant Option’ Proc. Power in the
New Millennium Plans & Strategies, Indian Nuclear society, Aug 31-
Sept 2, 1999) |
||||||||||
(3)Primary electricity = Hydro + Nuclear + Wind |
||||||||||
(4)Annual Reports 2001-2002 and 2002-03 of Ministries of
Power, Coal, Petroleum & natural Gas, Non-conventional Energy Sources,
Central Electricity Authority and Department of Atomic Energy of Government of India. |
||||||||||
(5) Estimated from the latest results given in the Annual
Reports of the year 2002-03 of various Ministries of Government of India.
Electricity Figures are actual. |
||||||||||
Source: IAEA Energy and Economic
Database |
1.2. Energy Policy
The Energy Policy of the Government of India aims at ensuring in a judicious manner adequate energy supplies at an optimum cost, achieving self-sufficiency in energy supplies and protecting the environment from the adverse impact of utilizing energy resources. The main elements of the Energy Policy are:
· Accelerated exploitation of domestic conventional energy sources,
viz. coal, hydro, oil/gas and nuclear power;
· Energy conservation and Management with a view to increasing energy
productivity;
· Optimizing the utilisation of existing capacity in the country;
· Development and exploitation of renewable sources of energy to meet
the energy requirement of rural communities;
· Intensification of research and development activities in the field
of new and renewable energy sources;
· Organisation of training for the personnel engaged at various levels
in the energy sector.
1.3. Electricity Sector
Electricity is a concurrent subject as per the Constitution of India implying that both the Parliament and the State Legislature have the authority to legislate on the subject. The structure of the electricity sector derives its character and composition from the Indian constitution and till recently was mainly defined by the following Acts:
· Indian Electricity Act of 1910 legislated over the supply and use
of electrical energy in India.
· Indian Electricity (Supply) Act of 1948 enacted in order to secure
a fully coordinated development of electricity on a regional basis.
· Electricity Regulatory Commission Act, 1998 had been enacted with a
view to providing for the establishment of Central Electricity Regulatory Commission
(CERC) and State Electricity Regulatory Commissions (SERC).
For speedy reforms in the power sector with the goal of electrifying all the
villages by 2007 and all the households by 2012 and to modernise the sector,
the Electricity Bill 2003 has been enacted on June 10, 2003.
Electricity Act 2003 (Ref. http://powermin.nic.in/electricity_act_2003/):
This act consolidates all electricity legislations (Central and State) into one comprehensive binding act. It seeks to create a liberal framework of development for the power sector by distancing Government from regulation. The objectives of the Act are "to consolidate the laws relating to generation, transmission, distribution, trading and use of electricity and generally for taking measures conducive to development of electricity industry, promoting competition therein, protecting interest of consumers and supply of electricity to all areas, rationalization of electricity tariff, ensuring transparent policies regarding subsidies, promotion of efficient and environmentally benign policies, constitution of Central Electricity Authority, Regulatory Commissions and establishment of Appellate Tribunal and for matters connected therewith or incidental thereto."
The salient features of the Act are as follows:
i) The Central Government to prepare a National Electricity Policy in consultation
with State Governments. (Section 3)
ii) Thrust to complete the rural electrification and provide for management
of rural distribution by Panchayats (local governing bodies), Cooperative Societies,
non-Government organisations, franchisees etc. (Sections 4, 5 & 6)
iii) Provision for licence free generation and distribution in the rural areas.
(Section 14)
iv) Generation being delicensed and captive generation being freely permitted.
Hydro projects would, however, need clearance from the Central Electricity Authority.
(Sections 7, 8 & 9)
v) Transmission Utility at the Central as well as State level, to be a Government
company - with responsibility for planned and coordinated development of transmission
network. (Sections 38 & 39)
vi) Provision for private licensees in transmission and entry in distribution
through an independent network, (Section 14)
vii) Open access in transmission from the outset. (Sections 38-40)
viii) Open access in distribution to be introduced in phases with surcharge
for current level of cross subsidy to be gradually phased out along with cross
subsidies and obligation to supply. SERCs to frame regulations within one year
regarding phasing of open access. (Section 42)
ix) Distribution licensees would be free to undertake generation and generating
companies would be free to take up distribution businesses. (Sections 7, 12)
x) The State Electricity Regulatory Commission is a mandatory requirement. (Section
82)
xi) Provision for payment of subsidy through budget. (Section 65)
xii) Trading, a distinct activity is being recognised with the safeguard of
the Regulatory Commissions being authorised to fix ceilings on trading margins,
if necessary. (Sections 12, 79 & 86)
xiii) Provision for reorganisation or continuance of SEBs. (Sections 131 &
172)
xiv) Metering of all electricity supplied made mandatory. (Section 55)
xv) An Appellate Tribunal to hear appeals against the decision of the CERC and
SERCs. (Section 111)
xvi) Provisions relating to theft of electricity made more stringent. (Section
135-150)
xvii) Provisions safeguarding consumer interests. (Sections 57-59, 166) Ombudsman
scheme (Section 42) for consumers grievance redressal.
The Ministry of Power, Government of India (GOI), is responsible for the administration of the above act and to undertake such amendments to the Act, as may be necessary from time to time, in conformity with the policy objectives of GOI.
The electricity generating companies in the Central Sector are:
· The National Thermal Power Corporation (NTPC) responsible for construction and operation of fossil thermal power plants in the various power regions under the administrative control of Ministry of Power;
· The National Hydroelectric Power Corporation (NHPC) responsible for establishing and operating regional hydroelectric power plants under the administrative control of Ministry of Power;
· North Eastern Electric Power Corporation (NEEPCO) responsible for establishing and operating thermal and hydro power plants in the North Eastern Region under the administrative control of Ministry of Power;
· Neyveli Lignite Corporation (NLC) responsible for establishing and operating thermal power plants based on lignite reserves at Neyveli in the Southern region, under the administrative control of Ministry of Coal;
· Nuclear Power Corporation of India Ltd. (NPCIL) responsible for nuclear power generation under the administrative control of the Department of Atomic Energy (DAE).
· A new company Bhartiya Nabhikiya Vidyut Nigam Ltd. (BHAVINI) was incorporated to set up fast reactors in October 2003. This is also under the administrative control of the DAE.
The Government of India has also taken up two joint ventures:
· Nathpa-Jhakri Power Corporation (NJPC), responsible for the execution of the Nathpa-Jhakri Hydroelectric Project which is being developed as a joint venture of the Central Government and the Government of Himachal Pradesh.
· Tehri Hydro Development Corporation (THDC), a joint venture of the Central Government and the Government of Uttar Pradesh to execute the Tehri Hydro Power Complex.
Two statutory bodies i.e. the Damodar Valley Corporation (DVC) and the Bhakra Beas Management Board (BBMB) are also under the administrative control of Ministry of Power.
The generation through non-conventional renewable energy sources comes under the administrative control of the Ministry of Non-Conventional Energy Sources, GOI.
There are also non-utilities with captive generating capacities.
The Rural Electrification Corporation (REC) under the administrative control of Ministry of Power, provides financial assistance to the programmes of rural electrification.
The Power Finance Corporation (PFC) provides term finance to projects in the power sector.
The PTC (Power Trading Corporation) is an entity established to serve as a single point of contract for entering into power purchase agreements with independent power producers on the one hand and the consumers or state utilities on the other.
India is divided into five Electricity Regions; namely, Northern, North Eastern, Eastern, Western and Southern. For each region, a Regional Electricity Board is constituted. This is essentially to provide guidelines for operation of the grid, co-ordinate exchanges of power between states and regions. The Regional Electricity Board also reviews progress of schemes and plan generation schedule.
The Power Grid Corporation of India Limited (PGCIL) has been established by the Central Government with the mandate to establish and operate Regional and National Power Grids to facilitate transfer of power within and across the Regions with reliability, security and economy on sound commercial principles. All transmission facilities originally under Central Sector organizations were transferred to PGCIL.
1.4. Electricity Policy and Decision Making Process
The Ministry of Power is concerned with perspective planning, policy formulation, processing of projects for investment decision, monitoring of projects, training and manpower development.
The demand for electricity is assessed periodically at the national level by CEA. Based on the generation expansion planning studies, CEA prepares short, medium and long-term national power plans. Based on this, power schemes are conceived and implemented by the different agencies. Planning of schemes are on the basis of the national five-year plans and annual plans through the national Planning Commission. Expert groups scrutinize the formulation of the five-year plan before it is finalized and approved. In line with the five-year plans, annual plans are implemented.
There are different Ministries involved in the Power Sector such as Ministry of Power (being the main), Department of Atomic Energy, State Power Ministries, Ministry of Non-Conventional Sources of Energy. Matching plans are prepared by these agencies for implementation in line with the national plans. Respective Ministries/Departments exercise administrative control of the functions relating to their areas. Individual power schemes go through the process of techno-economic scrutiny in terms of the procedures of the administrative Ministry before it is approved for implementation.
The Department of Atomic Energy is responsible for setting up nuclear power generation schemes including the techno-economic appraisal. Transmission schemes for nuclear power generation are implemented by PGCIL as per schemes approved by CEA on a regional basis. The overall integration of all the activities is achieved through the planning process in assessment of demands, decision on the expansion planning strategies, energy policy and national five-year/annual plans. Several policy initiatives have been taken and incentives have been provided to widen the scope of private sector participation in the India's electricity sector.
With the enactment of the Electricity Act 2003 the electricity sector is in an evolutionary state. The act itself is subject to modifications. The government is expected to shortly move three amendments to the act. The amendments seek to dilute the anti- theft provisions to avert misuse, set a three to five years time frame for introduction of the 'Open Access' scheme, and clip the powers of the Appellate Court to ensure greater autonomy for the State Power Regulators.
1.5. Main Indicators
The per capita commercial energy consumption has increased from 3 GJ in 1960
to nearly 16 GJ in 2003. During the same period per capita electricity generation
from utilities increased significantly from 45 kWh to 505 kWh. The total installed
electric power capacity of only 5.58 GW(e) in 1960 has made an impressive growth
to about 108 GW (e) in 2002-03. The major contribution of electricity generation
during 2002-03 in energy terms (from utilities) is from thermal power constituting
about 84.4%, followed by hydro about 12% and nuclear about 3.7%. During the
period since 1980 the growth rate of electricity generation in energy terms
was more than the growth rate in capacity addition indicating improved capacity
utilization. Table 5 shows the historical electricity production and installed
capacity and Table 6 the energy related ratios.
TABLE 5. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY
|
|||||||||||
Average Annual growth rate (%) |
|
||||||||||
|
1960 |
1970 |
1980 |
1990 |
2000 |
2001(2) |
2002(2) |
1960 |
1980 |
|
|
to |
to |
|
|||||||||
1980 |
2000 |
|
|||||||||
Electricity production (TWh) |
|
|
|
|
|
|
|
|
|
|
|
|
– Total(1) |
20.12 |
61.21 |
119.26 |
289.44 |
499.45 |
515.25 |
533.74 |
9.31 |
7.42 |
|
|
– Thermal |
12.28 |
33.53 |
69.7 |
212.65 |
408.21 |
421.98 |
448.54 |
9.07 |
9.24 |
|
|
– Hydro |
7.85 |
25.26 |
46.56 |
71.66 |
74.35 |
73.94 |
63.83 |
9.31 |
2.36 |
|
|
– Nuclear |
– |
2.42 |
3 |
5.11 |
16.9 |
19.32 |
19.24 |
– |
9.02 |
|
|
– Wind |
– |
– |
– |
– |
1.58 |
1.97 |
2.13 |
– |
– |
|
Capacity of electrical plants GW(e)) |
|
|
|
|
|
|
|
|
|
|
|
|
– Total |
5.58 |
16.27 |
33.32 |
74.7 |
101.15 |
104.91 |
107.97 |
9.35 |
5.7 |
|
|
– Thermal |
3.73 |
9.47 |
20.66 |
54.82 |
71.91 |
74.42 |
76.61 |
8.93 |
6.43 |
|
|
– Hydro |
1.85 |
6.39 |
11.79 |
18.76 |
25.22 |
26.26 |
26.91 |
9.72 |
3.87 |
|
|
– Nuclear |
– |
0.42 |
0.86 |
1.09 |
2.72 |
2.72 |
2.72 |
– |
5.92 |
|
|
– Wind |
– |
– |
– |
0.03 |
1.27 |
1.51 |
1.74 |
– |
– |
|
Years represent financial years from 1st
April of the year to 31st March of the next year. |
|
||||||||||
(1)Electricity from Utilities only. Losses are not deducted |
|
||||||||||
(2)Capacities as on 31st March of the following
year. Personal Communication, Central Electricity Authority Coordination
Div., R.K. Puram, New Delhi |
|
||||||||||
Source: IAEA Energy and
Economic Database |
|
TABLE 6. ENERGY RELATED RATIOS
|
1960 |
1970 |
1980 |
1990 |
2000 |
2001 |
2002(3) |
|
Energy consumption per capita
(GJ/capita) |
3 |
7 |
10 |
13 |
16 |
16 |
16 |
|
Electricity per capita (kWh/capita)(1) |
45 |
104 |
161 |
315 |
495 |
502 |
505 |
|
Electricity
Production/ Energy Consumption (%) |
13.7 |
15.2 |
18.5 |
30.9 |
37.3 |
37.6 |
38.1 |
|
Nuclear/Total electricity
(%) |
– |
4 |
3 |
2 |
3.4 |
3.7 |
3.6 |
|
Ratio of External dependency
(%) (2) |
18 |
12 |
15 |
11 |
22.4 |
22.8 |
23.7 |
|
Load factor of electricity
plants |
|
|
||||||
|
– Total (%) |
41 |
43 |
41 |
54 |
- |
- |
- |
|
– Thermal |
38 |
40 |
39 |
44 |
69 |
69 |
72 |
|
– Hydro |
49 |
45 |
45 |
44 |
- |
- |
- |
|
– Nuclear |
– |
66 |
40 |
54 |
82 |
83 |
90 |
A year represents a financial year from 1st April of the year to 31st March
of the next year.
(1) Electricity from utilities only. However electricity from captive power
plants is a significant component of the total electricity generation. As per
data published in Power Line Nov. 2001 and extrapolated on the basis of data
in Power Line Dec. 2002, it is estimated at 29 GWe of installed capacity. Assuming
the annual capacity factor of 0.41, as estimated from the captive power data
applicable for the year 2000-01 given in Energy 2003 published by CMIE, it adds
104 B kWh to total electricity generation increasing the per capita consumption
to above 600 kWh.
(2) Net import/Total energy consumption.
(3) Estimated from the provisional data of Table 4.
(4) Between April of the year and January of the next year (Annual Report 2002-2003,
Ministry of Power, GOI).
Source: IAEA Energy and Economic Database
2. NUCLEAR POWER SITUATION
2.1. Historical Development and Current Nuclear Power Organisational Structure
2.1.1. Overview
A major step in the formulation of the Atomic Energy Programme in India was the passing of the Atomic Energy Act in 1948 (subsequently replaced by the Atomic Energy Act of 1962). Under the provisions of the Atomic Energy Act, the Atomic Energy Commission (AEC) was constituted in 1948. Uranium exploration and mining required for the nuclear power programme were some of the initial activities that were undertaken.
The Department of Atomic Energy (DAE) of the Government of India (GOI) was established in August 1954. The Department is responsible for execution of policies laid down by the AEC. It is engaged in research, technology development and commercial operations in the areas of Nuclear Energy, related High Technologies and supports basic research in nuclear science and engineering.
The key policy has been self-reliance. The importance of developing a strong research and development base for the nuclear power programme was recognized early on. Thus, a decision was made, in 1954, to set up a research and development centre, now called Bhabha Atomic Research Centre (BARC) at Trombay. Research reactors APSARA (1956), CIRUS (1960), and DHRUVA (1985) and critical facilities were set up at the Centre. A number of additional facilities and laboratories were built at the Centre to support the nuclear power programme and related nuclear fuel cycle activities. The Centre extends the necessary R&D support to the nuclear power programme and associated fuel cycle activities.
In 1947 when India became independent, its installed electric power capacity was only about 1.5 GW (e), which has now grown to about 107.5 GW (e). Considering the population growth, low per capita electricity consumption and need for increasing the share of commercial energy sources, large-scale production of electric power was necessary. By the late 1950's, AEC had worked out the economics of generating electricity from atomic power reactors. Based on this study, the Government decided to set up a series of nuclear power plants at locations away from coalmines and nearer to load centres. The strategy adopted by the Indian nuclear power programme is to use the country's modest uranium and vast thorium resources. In line with this strategy, a three-stage programme is envisaged. The first stage is based on setting up of pressurized heavy water reactors (PHWRs) using indigenously available natural uranium producing electricity and plutonium and is in commercial domain. This is being followed by the second stage by plutonium fuelled fast breeder reactors (FBRs) producing electricity and more plutonium and uranium233 from thorium. The third stage of reactors will be based on thorium cycle producing electricity and more uranium233.
Table indicating salient milestones of the Indian Atomic Energy Programme is given as Annex-1.
2.1.2 Current Organisational Charts
The Indian Atomic Energy Organisational Structure is shown in Figure 1. Development of nuclear power and related nuclear fuel cycle and research and development activities are carried out in various units under the AEC/DAE. The organisation is broadly divided into research and development sector, industrial sector, public sector, services and support sector and provides for close interaction needed between the production and R&D units.
i. Atomic Energy Regulatory Board (AERB) comes directly under the Atomic Energy Commission as the independent Regulatory Authority. It is independent of DAE.
ii. Research and development sector includes Bhabha Atomic Research Centre (BARC), Indira Gandhi Centre for Atomic Research (IGCAR), Atomic Minerals Directorate for Exploration and Research (AMD), Centre for Advanced Research (CAT), Variable Energy Cyclotron Centre (VECC), and fully aided research institutions like Tata Institute of Fundamental Research (TIFR), Institute for Plasma Research (IPR) and others. It also includes Board of Research for Nuclear Sciences (BRNS) and National Board for Higher Mathematics (NBHM) for providing extra-mural funding to universities and other national laboratories.
iii. Industrial sector includes Government owned units Heavy Water Board (HWB) for the production of heavy water, Nuclear Fuel Complex (NFC) for the manufacture of nuclear fuel, zircaloy components and stainless steel tubes, and Board of Radiation & Isotope Technology (BRIT) for processing and sale of radioisotopes.
iv. Public Sector Enterprises under the control of DAE and their activities are as follows:
· Nuclear Power Corporation of India Limited (NPCIL) engaged in the design, construction, commissioning and operation the nuclear power plants based on thermal reactors;
· Uranium Corporation of India Limited (UCIL) engaged in mining, milling and processing of uranium ore;
· Indian Rare Earths Limited (IRE) engaged in mining and processing mineral sands containing thorium and rare earth minerals and producing minerals such as ilmenite, rutile, monazite, zircon and garnet;
· Electronics Corporation of India Limited (ECIL) engaged in design and manufacture of reactor control and instrumentation equipment related to atomic energy and also to other sectors;
· Bhartiya Nabhikiya Vidyut Nigam Limited (BHAVINI) for setting up fast reactors.
v. Directorate of Construction Services and Estate Management is responsible for construction and maintenance of residential housing/office buildings and other related facilities; Directorate of Purchase and Stores is responsible for centralised purchases and stores.
Nuclear power projects have been set up and operated directly under the Government of India since the late 1960's, when the construction of the first nuclear power station was commenced, until September 1987, when Nuclear Power Corporation of India Limited (NPCIL), a wholly owned company of Government of India, was formed. Formation of NPCIL was a step to give the required degree of operational freedom and to mobilise funds from the Indian capital market to finance new nuclear power projects. NPCIL is responsible to design, construct, commission and operate the nuclear power plants of the first stage nuclear power programme.
Development of FBR is being pursued at IGCAR. The first 500 MWe PFBR is to be constructed by a separate company, BHAVINI, set up in October 2003, drawing the talents of IGCAR and NPCIL.
Development of the 300 MWe AHWR design, for demonstration of technology towards large-scale utilisation of thorium for electricity generation, is being carried out at BARC.
2.2. Nuclear Power Plants: Status and Operation
The nuclear power generation comes under the AEC/DAE, GOI. NPCIL, a public sector enterprise of the DAE is responsible for design, construction, commissioning and operation of the nuclear power stations. It is supported by the different units of the Department for R&D, supply of fuel, heavy water, etc. Power generated from the nuclear power stations is sold to State Electricity Boards as per the power purchase agreements. The power supplied is shared by the States in the respective Electricity Region in which the nuclear power plant is located. The laying of transmission lines for evacuation of power from the nuclear power plants is carried out by the Power Grid Corporation of India Limited (PGCIL), a public sector enterprise of Ministry of Power, GOI. The tariffs for generation of electricity generated by the nuclear power stations are fixed based on the applicable norms and notified by the DAE in consultation with the CEA. AERB is the Competent Authority for the regulation on the safety aspects of nuclear power. Environmental clearances for the nuclear power plant sites are obtained from the Ministry of Environment and Forests, GOI apart from the clearance of AERB.
2.2.1. Status of Nuclear Power Plants
India's first nuclear power station at Tarapur consisting of two boiling water reactors (BWRs) commenced construction in the 1960s. This was essentially to establish the technical and economic viability of nuclear power in India and to gain valuable experience. In parallel, the work on construction of PHWRs was also commenced. Apart from the first two BWR units at Tarapur which are in operation since 1969, twelve PHWR units with two units at each of the four locations Kalpakkam (MAPS), Narora (NAPS), Kakrapar (KAPS) and Kaiga (KGS), and four units at Rawatbhata (RAPS-1&2 and RAPS-3&4) are now in operation. These are in the unit size range of about 200-220 MW (e) (gross). The total nuclear power capacity in operation is now 2770 MW(e).
The technology for setting up of 540 MW (e) PHWRs has also been developed indigenously. The first 2 × 540 MW (e) PHWR project is being set up at Tarapur (TAPP-3&4). Construction work is in progress. These units are scheduled for completion by year 2006/2007. Construction work for setting up of 2 × 1000 MW (e) Russian VVERs at Kudankulam is in progress in co-operation with Russian Federation. Several advanced safety features have been provided in these reactors. Construction works for setting up of 2 × 220 MW (e) units at Kaiga (Kaiga-3&4) and 2 × 220 MW (e) units at Rawatbhata (RAPP-5&6) have already started. Design work for increasing the unit rating of PHWRs, to be set up in future, to 700 MW (e) is in progress.
The work on the second stage of the nuclear power programme is in progress at the Indira Gandhi Centre for Atomic Research (IGCAR). The Fast Breeder Test Reactor (FBTR) 40 MW (th) at Kalpakkam is in operation. Its unique carbide fuel has achieved a burn-up of 110,000 MWD/Tonne. The technology development for the first 500 MW (e) prototype fast breeder reactor (PFBR) has been completed. The project has been approved for construction and land excavation work has been launched in 2003.
Towards building up thorium-based reactors, the strides taken by DAE include setting up of 30 kW (th) neutron source reactor KAMINI at Kalpakkam. The reactor has been in operation since 1997. Kamini uses uranium233-based fuel derived from irradiated thorium. A detailed design report for setting up the Advanced Heavy Water Reactor (AHWR) of 300 MW(e) capacity has already been prepared by BARC. This is a vertical pressure tube reactor design utilising heavy water moderator, boiling light water coolant, thorium-plutonium based fuel and incorporating passive safety systems. It derives about two-third of its power from thorium and DAE/BARC expects to launch its construction in 2004/05 essentially as a technology demonstration project for utilising thorium for electricity generation.
Table-7 gives a status of nuclear power plants in India.
TABLE 7. STATUS OF NUCLEAR POWER PLANTS
Station/ Project |
Type |
Net Capacity (MWe) |
Status |
Operator |
Reactor Supplier |
Construction Start |
Criticality Date |
Grid Connection |
Commercial Operation |
Shutdown Date |
KAIGA-1 |
PHWR |
202 |
Operational |
NPCIL |
NPCIL |
01-Sep-89 |
26-Sep-00 |
12-Oct-00 |
16-Nov-00 |
|
KAIGA-2 |
PHWR |
202 |
01-Dec-89 |
24-Sep-99 |
02-Dec-99 |
16-Mar-00 |
||||
KAKRAPAR-1 |
PHWR |
202 |
01-Dec-84 |
03-Sep-92 |
24-Nov-92 |
06-May-93 |
||||
KAKRAPAR-2 |
PHWR |
202 |
01-Apr-85 |
08-Jan-95 |
04-Mar-95 |
01-Sep-95 |
||||
MAPS-1 |
PHWR |
155 |
01-Jan-71 |
02-Jul-83 |
23-Jul-83 |
27-Jan-84 |
||||
MAPS-2 |
PHWR |
155 |
01-Oct-72 |
12-Aug-85 |
20-Sep-85 |
21-Mar-86 |
||||
NARORA-1 |
PHWR |
202 |
01-Dec-75 |
12-Mar-89 |
29-Jul-89 |
01-Jan-91 |
||||
NARORA-2 |
PHWR |
202 |
01-Nov-77 |
24-Oct-91 |
05-Jan-92 |
01-Jul-92 |
||||
RAJASTHAN-1 |
PHWR |
90 |
AECL |
01-Aug-65 |
11-Aug-72 |
30-Nov-72 |
16-Dec-73 |
|||
RAJASTHAN-2 |
PHWR |
187 |
AECL/ DAE |
01-Apr-68 |
08-Oct-80 |
01-Nov-80 |
01-Apr-81 |
|||
RAJASTHAN-3 |
PHWR |
202 |
NPCIL |
01-Feb-90 |
24-Dec-99 |
10-Mar-00 |
01-Jun-00 |
|||
RAJASTHAN-4 |
PHWR |
202 |
01-Oct-90 |
03-Nov-00 |
17-Nov-00 |
23-Dec-00 |
||||
TARAPUR-1 |
BWR |
150 |
GE |
01-Oct-64 |
01-Feb-69 |
01-Apr-69 |
28-Oct-69 |
|||
TARAPUR-2 |
BWR |
150 |
01-Oct-64 |
28-Feb-69 |
05-May-69 |
28-Oct-69 |
||||
TARAPUR-3 |
PHWR |
490 |
Under Construction |
NPCIL |
08-Mar-00 |
Jan-07 |
||||
TARAPUR-4 |
PHWR |
490 |
12-May-00 |
Mar-06 |
||||||
KAIGA-3 |
PHWR |
202 |
30-Mar-02 |
Mar-07 |
||||||
KAIGA-4 |
PHWR |
202 |
10-May-02 |
Sept-07 |
||||||
KUDANKULAM-1 |
PWR |
905 |
ASE |
31-Mar-02 |
Dec-07 |
|||||
KUDANKULAM-2 |
PWR |
905 |
31-Mar-02 |
Dec-08 |
||||||
RAJASTHAN-5 |
PHWR |
202 |
NPCIL |
18-Sept-02 |
Aug-07 |
|||||
RAJASTHAN-6 |
PHWR |
202 |
23-Jan-03 |
Feb-08 |
||||||
PFBR |
FBR |
470 |
UnderConstruction |
BHAVINI |
BHAVINI |
2003 (Excavation work Started) |
March 2011 |
2.2.2. Performance of NPPs.
Figures 2 & 3 along with Tables 8 & 9 give the details of performance
of nuclear power plants in operation. At present, the nuclear share of total
electricity generation is about 3.7%.
FIG. 2. Generation Trend
FIG.3. Capacity Factor Trend
TABLE 8. PERFORMANCE OF NPPs IN OPERATION (GENERATION IN 106 kWh)
Units |
Capacity (MWe) |
Calendar Years |
|||||
1997 |
1998 |
1999 |
2000 |
2001 |
2002 |
||
TAPS-1 |
160 |
1078 |
1284 |
944 |
1296 |
1190 |
1296 |
TAPS-2 |
160 |
867 |
974 |
1219 |
1122 |
1316 |
1277 |
RAPS-2^ |
200 |
– |
599 |
1361 |
1628 |
1482 |
1568 |
MAPS-1 |
170 |
1026 |
803 |
1356 |
765 |
1321 |
1017 |
MAPS-2 |
170 |
1091 |
1258 |
994 |
1439 |
1271 |
30 |
NAPS-1 |
220 |
1755 |
1665 |
1271 |
1556 |
1744 |
1744 |
NAPS-2 |
220 |
1736 |
1476 |
1580 |
1487 |
1484 |
1870 |
KAPS-1 |
220 |
1039 |
1239 |
1592 |
1850 |
1710 |
1897 |
KAPS-2 |
220 |
1227 |
1476 |
1704 |
1674 |
1885 |
1763 |
KAIGA-2 |
220 |
– |
– |
25# |
1215@ |
1440 |
1656 |
RAPS-3 |
220 |
– |
– |
– |
1024* |
1535 |
1483 |
KAIGA-1 |
220 |
– |
– |
– |
224$ |
1369 |
1801 |
RAPS-4 |
220 |
– |
– |
– |
73X |
1340 |
1861 |
Total
-NPCIL
|
2620 |
9819 |
10774 |
12046 |
15335 |
19087 |
19263 |
^ Includes energy equivalent of steam supply to nearby Heavy Water Plant; #
Infirm Power Generation;
Includes Infirm Power generation - @ 99 Million kWh ; *129 Million kWh; $ 31
Million kWh; X 48 Million kWh .
TABLE 9. PERFORMANCE OF NPPs IN OPERATION (CAPACITY FACTORS %)
Units |
Capacity (MWe) |
Calendar Years |
|||||
1997 |
1998 |
1999 |
2000 |
2001 |
2002 |
||
TAPS-1 |
160 |
77 |
92 |
67 |
92 |
85 |
92 |
TAPS-2 |
160 |
62 |
69 |
87 |
80 |
93 |
91 |
RAPS-2 |
200 |
– (2) |
602 |
78 |
93 |
85 |
89 |
MAPS-1 |
170 |
69 |
54 |
91 |
51 |
89 |
68 |
MAPS-2 |
170 |
73 |
84 |
67 |
96 |
85 |
91 (2) |
NAPS-1 |
220 |
91 |
86 |
66 |
81 |
90 |
90 |
NAPS-2 |
220 |
90 |
77 |
82 |
77 |
77 |
97 |
KAPS-1 |
220 |
54 |
64 |
83 |
96 |
89 |
98 |
KAPS-2 |
220 |
64 |
77 |
88 |
87 |
98 |
91 |
KAIGA-2 (3) |
220 |
– |
– |
- |
73 |
75 |
86 |
RAPS-3 (3) |
220 |
– |
– |
- |
79 |
80 |
77 |
KAIGA-1 (3) |
220 |
– |
– |
- |
73 |
71 |
93 |
RAPS-4 (3) |
220 |
– |
– |
- |
89 |
70 |
97 |
Total-
NPCIL
|
2620 |
73 |
74 |
79 |
82 |
83 |
90 |
Notes Fig-2 &3 and Tables-8 &9.:
1. RAPS-1 (100 MW(e)) the first PHWR not included. It generated 313, 709, 964,
772, 105, 293 Million kWh in 1997, 98, 99, 2000, 01, 02 respectively including
energy equivalent of steam supplied to nearby heavy water plant. This unit is
under shut down since May 02 for detailed in-service inspection for a decision
on en-masse coolant channel replacement and upgradation.
2. RAPS-2 was under long capital maintenance outage for en-masse replacement
of coolant channels, from August 1, 1994 to 6th June 1998. MAPS-2 was under
capital maintenance for en-masse replacement of coolant channels from January
9th, 2002 and has commenced commercial operations from Aug 03. The capacities
of these units for the corresponding periods not included for computing capacity
factor.
3. Kaiga-2, RAPS-3, Kaiga-1 and RAPS-4 commenced commercial operation in March
2000, June 2000, November 2000 and
December 2000 respectively.
During the rolling 12 months period (1.10.2001 to 30.9.2002), KAPS-1 achieved the distinction of being the best performing unit amongst PHWR category. It was ranked first in the world amongst 31 operating CANDUs/ PHWRs with a Gross Capacity Factor (GCF) of 98.4%.
For the calendar year 2002, three NPCIL plants were amongst the best five PHWR
plants in the world. KAPS-1 with a GCF of 98.4% is at number two, NAPS-2 with
a GCF of 97.0% is at number four and RAPS-4 with a GCF of 96.6% is at number
five.
Tarapur Atomic Power Station completed "Refuelling Outage" of unit-2
in a record time of 27 days. This record was broken by the first unit of Tarapur
Atomic Power Station, which completed "Refuelling Outage" in 20 days
and started operation on 12.4.2003.
TAPS-unit 2 also achieved impressive performance of continuous run of 194 days
from 22.12.2002 to 4.7.2003.
KAPS-2 completed its Annual maintenance shutdown (ASD) in a record time of 18
days.
2.2.3. Plant Upgradation and Plant Life Management
Technology, tools and procedures have been successfully developed and deployed based on indigenous efforts for in-service inspection, complex in-core maintenance and major refurbishment work. Tools for In-service Inspection of Coolant Channels and Garter Spring relocation have also been indigenously developed.
Plant life extension activities are progressively being implemented at TAPS. Enmasse coolant channel replacement and up-gradation work of RAPS-2 was completed based on indigenously developed tools and technology and the unit was put back in service in 1998. The repair of Over Pressure Relief Device (OPRD) at RAPS -1 was successfully carried out based on indigenously developed tools and technology. Enmasse replacement of coolant channels and upgradation of plant systems for MAPS-2 was successfully completed and the unit has been put back into service in August 2003. MAPS-1 has been shutdown for taking up EMCCR and upgradation works from August 20,2003.
2.2.4. Nuclear Power Development Projections and Plans
Based on the nuclear power projects under construction and upgradation works, capacity additions of 1350 MW (e) by March 2007 and further 2660 MW (e) by December 2008 will materialise. With this, the total nuclear power capacity will grow to 4120 MW (e) by March 2007 and 6780 MW (e) by December 2008. Excavation work for PFBR has been started and on its completion in December 2011, installed capacity will reach 7280 MW(e). Additional units are also proposed to be added [including a mix of units of PHWR-700 MW (e), LWR-1000 MW (e), FBR-500 MW (e) and AHWR-300 MW (e)] to reach a total nuclear power capacity of about 20,000 MW (e) by the year 2020.
2.2.5. Decommissioning Information and Plans
No nuclear power reactors are planned as of now to be taken up for decommissioning. The emphasis is on plant life extension.
2.3. Supply of NPPs
India's first nuclear power station, Tarapur, was constructed by the International General Electric Co., USA based on a turnkey contract. The second nuclear power station at Rajasthan was built as a collaborative venture with Atomic Energy of Canada Limited (AECL), Canada. For all subsequent nuclear power stations, DAE/NPCIL assumed total responsibility for design, manufacture, construction, commissioning and operation. NPCIL carries out the nuclear design. Balance of plant engineering is done by Indian Consulting Engineering firms (employed by NPCIL) who have expertise in the fossil thermal power plant engineering.
Manufacturing of most of the materials, components and equipment required for
nuclear power plants is done indigenously. India has heavy engineering plants
in both public and private sectors, manufacturing large steam generators, turbines,
electrical equipment, heat exchangers, pumps, pressure vessels and other industrial
equipment. The Indian Nuclear Power Programme utilises these facilities for
manufacture of nuclear and conventional equipment. In the early stage of the
programme these facilities were augmented, whenever necessary, with balancing
machinery and technical inputs to meet nuclear quality assurance requirements.
Quality surveillance representatives of NPCIL are posted at the major manufacturer's
shops for this purpose.
NPCIL integrates all the activities relating to setting up the nuclear power
plant. It plays the role similar to that of a turnkey supplier. The strategy
of adopting large EPC/supply-cum-erection packages has been adopted in the projects
under construction with the growth of domestic industry. Fuel, heavy water,
zircaloy components, reactor control equipment, are supplied by the units of
DAE from the facilities set up for this purpose.
2.4. Operation of NPPs
NPCIL operates and maintains the NPPs in operation. Each station has Operation, Maintenance, Technical and Training Groups. These functions are carried out by specially trained and qualified operating and maintenance personnel at each nuclear power station. The NPPs include reactor components and process systems, turbine generators, electrical system equipment, instrumentation and control systems (I&C), cooling water intake and out fall structures, heavy water upgrading plant (at PHWR stations), waste management facilities and the like, to be operated and maintained. Whenever required, the services of equipment suppliers are availed through contracts for major maintenance and overhaul. Three groups of technical and scientific personnel are required for the nuclear power programme: qualified professionals, i.e., engineers and scientists who later become senior engineers and managers; semi-professionals having engineering diplomas or advanced trade certificates who constitute the supervisory personnel; and, technicians like operators and maintainers with high school education and trade certificates. Professionals get inducted into the Atomic Energy Organisation by completing one-year training course at the BARC training school in Trombay or its affiliates at Indore, Hyderabad and NTCs of NPCIL. Separate training programmes at different levels are conducted at the NPCIL's Nuclear Training Centres of operating stations for qualifying and licensing of operating personnel, as per the regulatory requirements. Training simulators are used to provide training in all aspects of operation, including handling of unusual incidents. Key operations personnel are also imparted rigorous training in various systems of the plant on training simulators.
NPCIL is a member of World Association of Nuclear Operators (WANO). WANO Peer Review of the nuclear power plants are being undertaken progressively by NPCIL. NPCIL is also a member of Candu Owners Group (COG). All the nuclear power stations namely TAPS-1&2, RAPS-1&2, MAPS-1&2, NAPS-1&2, KAPS-1&2, RAPS-3&4 and Kaiga-1&2 have been certified as per ISO-14001 for Environmental Management System.
2.5. Fuel Cycle, Spent Fuel and Waste Management
Fuel cycle and waste management services are provided by various units of the Department of Atomic Energy (DAE). Uranium Corporation of India Ltd., (UCIL), a public sector company of DAE, carries out mining and processing of uranium deposits surveyed by the Atomic Minerals Directorate of Exploration & Research (AMD) of DAE. Nuclear Fuel Complex (NFC), an industrial unit of DAE, utilizes the uranium concentrates supplied by UCIL to fabricate PHWR's nuclear fuel assemblies. For the BWR's in Tarapur, NFC manufactures the fuel assemblies from imported uranium. NFC also supplies the required zircaloy components. Heavy water required for the initial charge and subsequent make-up requirements of the nuclear power plants are supplied by the Heavy Water Board of DAE.
Spent fuel from the PHWRs is reprocessed to extract the plutonium contained in it. Build up of plutonium inventory is vital for development of the second stage of the Indian nuclear power programme consisting of FBRs. The fuel reprocessing plants are set up by the BARC based on the technology developed by it. Power Reactor Fuel Reprocessing Plants at Tarapur and Kalpakkam are operational.
Processes for treating reactor-produced wastes have been established and plants meeting regulatory requirements have been in operation during the past several decades. This is also the case with waste generated from fuel reprocessing plants. The first waste immobilization plant at Tarapur is in service and a Solid Storage Surveillance Facility (S3F) has also been set up for interim storage of waste. A Waste Immobilisation Plant (WIP) has been installed at Trombay and another WIP is under construction at Kalpakkam. R&D work for ultimate disposal of high level and alpha bearing wastes in a repository is in progress.
2.6. Research and Development
2.6.1. R&D Organizations and Institutes
· BARC, is the national research centre for multidisciplinary R&D work in nuclear sciences, reactor engineering, reactor safety, nuclear fuel, control and instrumentation, material science, spent fuel reprocessing and radioactive waste management, development of radiation technology applications etc. R&D work on development of the AHWR is in progress at this Centre and the prototype unit is expected to be launched in a few years. Development works on plant life extension, ageing and in-service inspection are given due importance.
· IGCAR is responsible for R&D related to development of FBR technology. Technology development for the first 500 MW (e) PFBR has been completed and excavation for construction of the reactor at Kalpakkam has been started by Government of India.
· Atomic Mineral Directorate for Exploration and Research (AMD) at Hyderabad, is responsible for survey, exploration and prospecting of atomic minerals, etc.
· The other R&D institutions of the DAE are carrying out advanced research work in hi-tech areas such as accelerators, lasers, biosciences etc. and also in basic science areas such as physics, chemistry, biology and mathematics, etc.
· Academic Institutions and Universities also extend R&D support in specific areas as per needs.
· The Board of Research in Nuclear Sciences (BRNS) and the National Board of Higher Mathematics (NBHM) support research activities in national institutes and universities in the fields of nuclear technology and mathematics.
2.6.2. Development of advanced and new generation nuclear reactor systems
A number of initiatives have been taken on the development of new reactor systems. The details are as follows:
· All PHWRs beyond those presently under construction are proposed to be of 700 MWe unit size. Design work on scaling up the 540 MWe unit PHWR to 700 MWe by permitting partial boiling in the channels, has progressed. These units are proposed to be launched in the next 2-3 years.
· The first 500 MWe PFBR has been authorised for construction. The excavation work on this project has commenced. This will signify the launch of the second stage FBR programme in the country.
· A 300 MWe AHWR is under design. This is a technology demonstration
project for large-scale utilisation thorium for electricity generation.
2.7. International Co-operation and Initiatives
International co-operation is through multilateral mechanism with IAEA as well as through bilateral mechanisms. Under the aegis of the IAEA, India has trained a number of personnel, particularly from the developing countries. India has also hosted a number of workshops, seminars and training courses. The expertise of India's scientists and engineers is made available to other countries through IAEA.
NPCIL is a member of WANO Tokyo Centre, WANO Atlanta Centre and Candu Owners Group (COG). Many Indian professional have participated in the workshops/seminars/training courses, conducted by these organisations. Also many Indian professional have participated as Reviewer / Lead Reviewer in the WANO Peer Review of Plants abroad. NPCIL teams have also visited other NPPs outside India under the Technical Exchange Visit (TEV) programme of WANO. Similarly NPCIL plants have also received TEV team from other NPPs worldwide.
The details on international, multilateral and Bilateral Agreements are given in Annex-2.
2.8. Human Resource Development
Realising the importance of having well trained scientists and engineers in achieving success in the programme, a training school at BARC was established in August 1957. During later stages when the training needs for the operating nuclear power stations arose, the Nuclear Training Centres (NTC) were set up by the Nuclear Power Corporation of India Limited (NPCIL). To meet the expanding needs of Human Resources, Training Schools have also been set up at the Centre for Advanced Technology, Indore (2000) and Nuclear Fuel Complex, Hyderabad (2001). NTCs and training schools at Hyderabad and Indore are affiliated to the BARC Training School with respect to training of engineers and scientists. Thus human resource development has been given the right importance from the early stages by the DAE.
3. NATIONAL LAWS AND REGULATIONS
3.1. Safety Authority and the Licensing Process
The Atomic Energy Regulatory Board (AERB) was formed in November 1983 by the Government of India in exercise of the powers conferred by the Atomic Energy Act of 1962, to carry out regulatory and safety functions as envisaged in the Act. As per its constitution, AERB has the power of the Competent Authority to enforce rules and regulations framed under the Atomic Energy Act for radiation safety in the country. AERB also has the authority to administer the provisions of the Factories Act, for industrial safety of the units of DAE. AERB has been delegated with powers to enforce some of the provisions of the Environmental Protection Act, at DAE installations. Prior to setting up of AERB, the DAE- Safety Review Committee (DAE-SRC) was carrying out these functions. DAE-SRC was supported by the Unit level Safety Committees.
Enforcement of safety related regulation at all nuclear facilities lies with
the Atomic Energy Regulatory Board (AERB), empowered by the Government of India.
The regulatory organisation is shown in Fig. 4. The AERB conducts in-depth reviews
so that nuclear facilities do not pose any radiological risk to the public and
plant personnel. The review process is shown in Fig. 5. The authorisation process
involves various major activities like site approval, construction, commissioning,
operation and decommissioning. The authorisation process is an ongoing process
starting with site selection and feasibility study, continuing through the construction
and operation of the facility until the decommissioning of the plant. The applicant
is required to provide all relevant information, such as safety principles,
analysis, criteria and standards proposed for each major stages, and quality
assurance demonstrating that the plant will not pose any undue radiological
risks to site personnel and the public.
FIG. 4 ORGANISATION CHART ATOMIC ENERGY REGULATORY BOARD
AERB has advisory committees for site selection, design review and authorisation, and licenses for commissioning. The advisory committees are assisted by unit level safety committees, which undertake detailed safety assessments at the design and commissioning stages of nuclear facilities. AERB then issues its authorisation based on the recommendations of the advisory committee. Safety assessments during plant operation are done by the Safety Committee for Operating Plants (SARCOP). Authorisation is granted only for a limited period and further authorisation is required beyond that period. Authorisation also includes explicit conditions that the applicant must adhere to. AERB also ensures that all the nuclear facilities have put in place an emergency preparedness procedure and organisation.
3.2. Main National Laws and Regulations
The Atomic Energy Act 1962 is the main law. The various activities relating to the Indian atomic energy programme are governed by this Act. A number of rules, codes, and regulations covering the entire nuclear fuel cycle have been defined by AERB as well as DAE under the Atomic Energy Act of 1962, for instance:
· Radiation Protection Rules, 1971;
· Atomic Energy (arbitration procedure) Rules, 1983;
· Atomic Energy (working of mines, minerals and handling of prescribed
substances) Rules, 1984;
· Atomic Energy (safe disposal of radioactive waste) Rules, 1987;
· Atomic Energy (factories) Rules, 1996;
· Atomic Energy (control of irradiation of foods) Rules, 1996.
4. CURRENT ISSUES AND DEVELOPMENTS ON NUCLEAR POWER.
4.1. Energy Policy
The energy policy includes nuclear energy as one of the options for electricity generation to reach a nuclear power capacity of 20000 MWe by 2020.
4.2. Privatisation and Deregulation
The nuclear power generation and related fuel cycle activities are under the Central Government. NPCIL, a wholly owned company of GOI, DAE, is responsible for setting up and operating the nuclear power plants. The other related fuel cycle (both front-end and back end) activities are carried out by the different units of DAE, GOI. The 500 MWe PFBR recently approved is being set up through a separate company.
As of now, there is no equity participation by the private sector in the area of nuclear power generation. Possibility of joint ventures with public/private sector is being explored. This is essentially with a view to attracting investment in the nuclear power sector for capacity addition. This, however, will require amendments to the Atomic Energy Act, 1962.
4.3. Role of the Government in nuclear R&D
The GOI has a key role in R&D of nuclear technology. BARC and IGCAR are the two key Government organisations devoted to R&D of nuclear technology. R&D is also carried out by other units in the DAE and the university system in the country under funding from DAE.
4.4. Nuclear Energy and Climatic Change
India is a large country and so needs a large electricity generating capacity. Power generation in India was 4.1 billion kWhr in 1947-48 and in 2002-03, it was more than 600 billion kWhr. In the next 50 years, it may increase by a factor of 12 or more. At present, a major component of electricity is generated using fossil fuels and there are environmental concerns like green house gas (GHG) emissions associated with the energy generation using fossil resources. If India continues to rely on fossil resources as at present, it will have serious effects on local, regional and global environment. Therefore, it is necessary that India continues to develop nuclear energy and meets a significant percentage of its electricity needs based on nuclear energy.
4.5. Safety and Waste Management Issues
Utmost attention is given to safety in nuclear power plants. The overriding attention to safety encompasses the entire gamut of activities associated with nuclear power plants (NPPs), that is, siting, design, construction, commissioning, and operation. In all these activities, a major effort is devoted to ensuring safety of operating personnel, public as well as the environment.
A systematic approach using well-defined principles is followed in the design
of the nuclear power plants to provide the required safety features adopting
principles of defence-in-depth, diversity and redundancy. Nuclear Power Plants
are constructed in accordance with the design intent, and with required quality
of workmanship to very strict quality standards. Commissioning of the systems
to test and demonstrate adequacy of each system and the plant as a whole by
actual performance tests to meet the design intent is carried out before commencing
the operation of the plant. Operation of the plant is carried out as per defined
and approved procedures defining the safety limits for various system parameters,
in technical specifications that are thoroughly reviewed by the internal safety
committees and approved by AERB. Further AERB, through formal clearances that
authorise actions and stipulate specific conditions, enforces safety at various
stages of the plant. These include site approval, review and approval of design
of systems important to safety and authorisations for construction, commissioning
and operation and safety review during operational phase. The regulatory framework
in India is indeed robust. All these measures are for ensuring safe operation
of the plants, safety of occupational workers and members of public.
All nuclear power plant sites in India are self sufficient in the management of radioactive waste generated there. Adequate facilities have been provided for handling, treatment and disposal of relevant wastes at these sites. Management of radioactive wastes is carried out in conformity with the guidelines specified by the Regulatory Authorities based on internationally accepted principles in line with the guidelines laid down by the international agencies.
4.6. Other Issues and Developments
The NPPs presently in operation are generating electricity at competitive tariffs. Measures to reduce construction period of NPPs, standardisation and scaling up unit sizes are being taken to strengthen the economic competitiveness of nuclear power.
The nuclear power technology in India has matured as is evident from the excellent performance of the indigenously constructed plants of the first stage nuclear power programme. The performance of these units has seen progressive improvements during the past 5 years. The current emphasis is on accelerating the growth of nuclear capacity addition. The factors receiving attention are:
· Faster construction of the projects by standardisation, higher level of mechanisation in construction and strengthening measures/strategy for project management; Scaling up PHWR unit sizes to 700 MWe.
· Launching construction of 500 MWe PFBR signifying the commencement of the second stage FBR programme.
· Design of AHWR 300 MWe a technology demonstration project for utilisation of thorium for electricity generation.
· Finding financial resources for nuclear power capacity addition. NPCIL's current operating base is small to generate sufficient internal surpluses to finance significant capacity addition. In addition to financial resources through borrowing from the capital market, budgetary support from Government and internal resources through the operating stations, strategies such as joint ventures are being explored;
· Focus on further enhancement of performance and safety of NPPs in operation by adopting front line information technology, improved techniques for predictive maintenance, in-service inspection and component replacement;
· Achieving an installed capacity of 20,000 MW (e) by 2020. Strategies
are being worked out on the possibility of achieving this objective. Additional
capacities are envisaged through PHWRs and FBRs based on indigenous technology
and Advanced Light Water Reactors (ALWRs) based on imported technology.
REFERENCES
[1] Country Profile of India 1995 - 96, Economist Intelligence Unit.
[2] Annual Report 2002-03, Ministry of Power, Government of India
[3] Annual Report 2002-03, Ministry of Non-Conventional Energy Sources
[4] India 2002, A Reference Manual, Compiled and Edited by Research, Reference
and Training Division, Publication Division, Ministry of Information and Broadcasting,
Government of India Division.
[5] Annual Report 2002-03, Ministry of Coal
[6] Annual Report 2002-03, Government of India, Department of Atomic Energy.
[7] Data & Statistics, The World Bank, www.worldbank.org/data.
[8] IAEA Energy and Economic Data Base (EEDB).
[9] IAEA Power Reactor Information System (PRIS).
Appendix 1.
Salient Milestones of Indian Atomic Energy Programme
Date |
Milestone |
March.
12, 1944 |
Dr.
Homi Jehangir Bhabha writes to Sir Dorabji Tata Trust for starting Nuclear
Research in India. |
December
19, 1945 |
Tata
Institute of Fundamental Research, Mumbai is
inaugurated. |
April
15, 1948 |
Atomic
Energy Act is passed. |
August
10, 1948 |
Atomic
Energy Commission is constituted. |
July
29, 1949 |
Rare
Minerals Survey Unit is set up. Later, this unit becomes Atomic Minerals
Division. It is renamed as Atomic Minerals
Directorate for Exploration and Research on July 29, 1998. |
August
18, 1950 |
Indian
Rare Earths Limited is set up for recovering minerals, processing
of rare earths compounds and Thorium - Uranium concentrates. |
August
03, 1954 |
Department
of Atomic Energy is created. |
August
01, 1955 |
Thorium
Plant at Trombay goes into production. |
August
04, 1956 |
APSARA
- first research reactor in Asia, attains criticality at Trombay, Mumbai. |
January
20, 1957 |
Atomic
Energy Establishment, Trombay (AEET) is inaugurated. |
August
19, 1957 |
Atomic
Energy Establishment Training School starts functioning. |
January
30, 1959 |
Uranium
Metal Plant at Trombay produces Uranium. |
February
19, 1960 |
First
lot of 10 Fuel Elements for CIRUS reactor is fabricated at Trombay |
July
10, 1960 |
CIRUS
– the 40 MW (th) research reactor, attains criticality. |
January
14, 1961 |
Research
Reactor ZERLINA attains criticality. (It is decommissioned in 1983) |
January
22, 1965 |
Plutonium
Plant is inaugurated. |
January
12, 1967 |
Atomic
Energy Establishment Trombay (AEET) is renamed as Bhabha Atomic Research
Centre. |
April
11, 1967 |
Electronics
Corporation of India Limited (ECIL) is set up at Hyderabad for producing
electronic systems, instruments and components. |
June
1, 1967 |
Constitution
of Power Projects Engineering Division, Mumbai, which was subsequently
converted to Nuclear Power Board on August 17, 1984. |
October
04, 1967 |
Uranium
Corporation of India Limited is set up at Jaduguda, Jharkhand for mining
and milling of uranium ores. |
December
31, 1968 |
Nuclear
Fuel Complex is set up at Hyderabad. |
March
12, 1969 |
Reactor
Research Centre is started at Kalpakkam. It is renamed as Indira Gandhi
Centre for Atomic on December 18, 1985.
|
May
01, 1969 |
Heavy
Water Projects is constituted. Later, it becomes Heavy Water Board in
February 17, 1989. |
October
28, 1969 |
Tarapur
Atomic Power Station starts commercial operation. |
September
06, 1970 |
Uranium233
is separated from irradiated thorium |
February
18, 1971 |
Plutonium
fuel for Research Reactor PURNIMA-I is fabricated at Trombay. |
May-June,
1971 |
Zirconium
Oxide and Sponge Plants of Nuclear Fuel Complex, Hyderabad are commissioned. Subsequently all the other plants
of NFC went into production by 1974. |
May
18, 1972 |
Research
Reactor PURNIMA-I attains criticality. |
December
16, 1973 |
Unit
-1 of Rajasthan Atomic Power Station near Kota begins commercial operation.
Unit -2 commenced commercial operation on April 1, 1981. |
May
18, 1974 |
Peaceful
underground Nuclear Experiment is conducted at Pokhran, Rajasthan. |
June
16, 1977 |
Variable
Energy Cyclotron becomes operational at Kolkata. |
Nov
18, 1979 |
Plutonium-Uranium
mixed oxide fuel is fabricated at Trombay. |
Date |
Milestone |
November
19, 1982 |
Power
Reactor Fuel Reprocessing Plant at Tarapur is commissioned. |
November
15, 1983 |
Atomic
Energy Regulatory Board is constituted. |
January
27, 1984 |
Madras
Atomic Power Station-Unit I at Kalpakkam starts commercial operation.
Unit II goes commercial on March 21, 1986. |
February
19, 1984 |
Centre
for Advanced Technology at Indore (Madhya Pradesh) is inaugurated. |
March
08, 1984 |
Plutonium-Uranium
mixed Carbide Fuel for Fast Breeder Test
Reactor is fabricated in BARC. |
May
10, 1984 |
Research
Reactor PURNIMA-II, a Uranium-233 fuelled
Reactor, attains criticality. |
March
05, 1985 |
Waste
Immobilisation Plant (WIP) at Tarapur is
commissioned. |
August
08, 1985 |
Research
Reactor DHRUVA [100 MW (th)] attains
criticality. It attains full power on January 17, 1988. |
October
18, 1985 |
Fast
Breeder Test Reactor (FBTR) at Kalpakkam attains criticality. |
September
17, 1987 |
Nuclear
Power Corporation of India Limited is formed by converting the erstwhile
Nuclear Power Board. |
December
30, 1988 |
12
MV Pelletron Accelerator at Mumbai is inaugurated. |
March
12, 1989 |
Narora
Atomic Power Station Unit-1 attains criticality. On January 1, 1991 this
unit commences commercial operation. Its Unit-2 attains criticality on
October 24, 1991 and commenced commercial operation on July 1, 1992. |
November
09, 1990 |
Research
Reactor PURNIMA-III, a Uranium233 fuelled reactor, attains criticality. |
September
3, 1992 |
Kakrapar
Atomic Power Station Unit -1 attains criticality and on May 6, 1993 this
unit commences commercial operation. Its Unit –2 attains criticality on
January 8, 1995 and commences commercial operation on September 1, 1995. |
March
27, 1996 |
Kalpakkam
Reprocessing Plant (KARP) is cold commissioned. |
October
20, 1996 |
Kalpakkam
Mini Reactor (KAMINI), with Uranium-233 fuel, attains criticality at Indira
Gandhi Centre for Atomic Research, Kalpakkam, Tamilnadu. |
March.
31, 1997 |
Rajasthan
Atomic Power Station Unit-1 is recommissioned after repair of OPRD valve. |
September
17, 1997 |
Research
Reactor KAMINI attains full power level of 30 kW (th). |
May
11 & 13, 1998 |
Five
underground nuclear tests are conducted at Pokhran Range, Rajasthan. |
May
27, 1998 |
Rajasthan
Atomic Power Station Unit-2 is recommissioned after en-masse replacement
of coolant channels. |
August
10, 1998 |
500
KeV industrial electron accelerator developed indigenously by the BARC
is commissioned for its first phase of operation. |
September
15, 1998 |
Kalpakkam
Reprocessing Plant (KARP) is dedicated to the Nation. |
April
22, 1999 |
450
MeV Synchrotron Radiation Source Indus-1 achieves Electron beam current
of 113 milli-ampere superseding the design
value of 100 milli-ampere. |
September
24, 1999 |
Unit
-2 of Kaiga Atomic Power Station attains criticality and on March 16,
2000 this unit commences commercial operation. Its Unit-1 attains criticality
on September 26, 2000 and commences commercial operation on November 16,
2000. |
December
24, 1999 |
Unit
-3 of Rajasthan Atomic Power Station attains criticality and on June 1,
2000 this unit commences commercial operation. Its Unit-4 attains criticality
on November 3, 2000 and commences commercial operation on December 23,
2000. |
January
1, 2000 |
BRIT's
plant for radiation processing of spices commissioned at Vashi, Navi Mumbai |
April
21, 2000 |
Folded
Tandem Ion Accelerator (FOTIA) delivers first beam on target. |
Date |
Milestone |
March
31,2002 |
Kudankulam
Nuclear Power Project Units-1&2, First Pour of Main Plant Concrete
|
March
30,2002 |
Kaiga-3&4
Project, First Pour of Concrete. |
September
18,2002 |
RAPP-5&6
Project First Pour of Concrete |
October
31, 2002 |
Waste
Immobilization and Uranium Thorium Separation Plants at Trombay and the
Radiation Processing Plant Krushak at Lasalgaon dedicated to Nation |
November
2002 |
Turamdih
Mine, Jharkhand inaugurated. |
July
23,2003 |
MAPS-2
connected to grid after enmasse coolant channel replacement and upgradation
of it systems |
2003 |
1.7
MeV Tandetron Accelerator and demo facility and Lead Mini Cell for reprocessing
FBTR carbide Fuel on lab scale commissioned at IGCAR |
October
22, 2003 |
Formation
of Bharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI) |
Appendix 2.
International, Multilateral and Bilateral Agreements
Agreements with IAEA
·
Amendment to the Article VI of the IAEA Statue |
Entry into force: |
28 December 1989
|
·
Amendment to the Article XIV of the IAEA Statute |
Not ratified
|
|
·
Agreement
on privileges and immunities |
Entry into force: |
10 March 1961
|
·
Additional protocol |
Not signed |
|
·
Supplementary agreement on provision of technical
assistance by the IAEA |
Non-Party; Text of agreement handed over to authorities by ADG-ADEX on: |
6 Oct. 1993 |
·
RCA |
Entry into force: |
6 July 1987 |
·
The Agency's assistance in furthering projects
by the supply of materials |
Entry into force: |
9 December 1966 |
MULTILATERAL SAFEGUARDS AGREEMENTS
·
Safeguards transfer relating to the bilateral
agreement with the United States of America |
Entry into force: |
27 January 1971
|
·
Safeguards transfer relating to the bilateral
agreement with Canada; INFCIRC/211 |
Entry into force: |
30 September 1971
|
·
Application of safeguards in connection with
the supply of heavy water from the Soviet Union; INFCIRC/260 |
Entry into force: |
17 November 1977
|
·
Application of safeguards in connection with
the supply of a nuclear power station from the USSR; INFCIRC/360 |
Entry into force: |
27 September 1988
|
·
Application of safeguards in connection with
the supply of nuclear material from France INFCIRC/374 |
Entry into force: |
11 October 1989
|
·
Agreement for the application of safeguards
to all nuclear material subject to Agency Safeguards under INFCIRC/154,
Part 1 INFCIRC/433 INFCIRC/433/Mod. 1 |
Entry into force:
|
1 March 1994 12 September 1994
|
·
Improved procedures for designation of safeguards
inspectors |
Accepted on: |
9 January 1989
|
Main Treaties or Agreements
·
NPT |
Non Party |
|
·
Convention on physical protection of nuclear
material |
Entry into force |
11 April 2002
|
·
Convention on early notification of a nuclear
accident |
Entry into force: |
28 February 1988
|
·
Convention on assistance in the case of a nuclear
accident or radiological emergency |
Entry into force: |
28 February 1988
|
·
Vienna convention on civil liability for nuclear
damage |
Non Party
|
|
·
Paris convention on civil liability for nuclear
damage |
N.A.
|
|
·
Joint protocol |
Non Party |
|
·
Protocol to amend the Vienna convention on civil
liability |
Not signed
|
|
·
Convention on Supplementary compensation for
nuclear damage |
Not signed |
|
·
Convention on nuclear safety |
Signature: |
20 September 1994 |
·
Joint convention on the safety of spent fuel
management and the safety of radioactive waste management |
Not signed |
|
·
Agreement establishing the Asian Regional Co-operative
Project on Food Irradiation |
Entry into force: |
23 May 1980 |
Memorandum of Understanding between the IAEA and the Department of Atomic
Energy, Government of India, concerning strengthening of Co-operation
in connection with the Agency's regional and inter-regional training events,
individual and group fellowship programmes carried out as part of the
Technical Co-operation Activities of the IAEA |
May 2000 |
Other Relevant International Treaties, etc
·
Zangger Committee |
N.A. |
·
Nuclear Export Guidelines |
Export control system in place since 1948 when the Atomic Energy Act was passed by the Constituent Assembly |
·
Acceptance of NUSS Codes regulatory |
Summary: Valuable guidance for national requirements. Useful reference in safety assessments. India's regulatory requirements are generally consistent with codes. Aims to meet requirements although they are not binding. Letter of: 17 June 1988 |
Bilateral Agreements
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Egypt |
10 July 1962 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Belgium |
30 January 1965 |
·
Setting up of an Isotope Dispensation Unit at Kabul University |
Afghanistan |
14 May 1966 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Czech Republic |
9 November 1966 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Germany |
5 October 1971 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Iraq |
28 March 1974 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Poland |
9 September 1977 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Russian Federation |
22 January 1979 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Syria |
1 May 1980 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Indonesia |
9 January 1981 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Cuba |
18 May 1985 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Viet Nam |
25 May 1986
|
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Algeria |
25 September 1990 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Philippines |
29 April 1991 |
·
Co-operation agreement concerning peaceful uses
of nuclear energy |
Peru |
12 February 1992 |
Appendix 3.
DIRECTORY OF THE MAIN ORGANIZATIONS, INSTITUTIONS AND COMPANIES
INVOLVED IN NUCLEAR POWER RELATED ACTIVITIES
NATIONAL ATOMIC ENERGY AUTHORITY |
||
|
||
Atomic Energy Commission |
Tel: 91 22 2202
2543 |
|
Anushakti Bhavan |
Fax: 91 22 2204 8476 |
|
Mumbai -400 001, India |
|
|
|
|
|
Department of Atomic Energy (DAE) http://www.dae.gov.in/ |
|
|
|
|
|
NUCLEAR RESEARCH
INSTITUTES |
||
|
||
Bhabha Atomic Research Centre (BARC) |
Tel.: 91 22 2550 5050 |
|
Mumbai or 2551 9613 |
Fax: 91 22 2550 5151
|
|
|
|
|
Indira Gandhi Centre for Atomic Research |
|
|
(IGCAR), Kalpakkam http://www.igcar.ernet.in/ |
||
|
||
Institute for Plasma Research, Gandhinagar |
|
|
|
|
|
Institute of Physics, Bhubaneswar |
||
|
|
|
|
|
|
Saha Institute of Nuclear Physics, Kolkata |
||
|
|
|
Tata Institute of Fundamental Research |
||
Mumbai |
|
|
|
|
|
HIGH ENERGY RESEARCH INSTITUTES |
||
|
|
|
Centre for Advanced Technology (CAT), Indore: |
||
|
|
|
Nuclear Science Centre, New Delhi |
|
|
|
|
|
Variable Energy Cyclotron Centre (VECC), Kolkata |
||
|
||
NUCLEAR POWER PLANTS |
||
|
||
Kakrapar Atomic Power Station |
||
|
|
|
Kaiga Generating Station |
|
|
|
|
|
Madras Atomic Power Station http://www.dae.gov.in/maps.htm |
|
|
|
|
|
|
|
|
Rajasthan Atomic Power Station |
||
|
|
|
Tarapur Nuclear Power Station |
||
|
|
|
OTHER ORGANIZATIONS |
||
|
|
|
Nuclear Power Corporation of India Limited (NPCIL) |
||
|
|
|
Electronics Corporation of India Ltd (ECIL) |
||
|
|
|
Heavy Water Board, Mumbai |
||
|
|
|
Indian Rare Earths Ltd. |
||
|
|
|
Nuclear Fuel Complex, Hyderabad |
||
|
|
|
Uranium Corporation of India Ltd. |
||
|
||
Board of Radiation & Isotope Technology, Mumbai |
|
|
|
|
|
Harish-Chandra Research Institute(HCRI), Allahabad |
|
|
|
|
|
Tata Memorial Centre:Mumbai |
||
|
|
|
The Institute of Mathematical Sciences |
||
Chennai |
|
|
|
|
|
Central Power Research Institute (CPRI) |
||
Bangalore |
|