GERMANY
1. ENERGY, ECONOMICS AND ELECTRICITY INFORMATION
1.1 General Overview
The Federal Republic of Germany is situated in central Europe, in the north bordering on the North Sea, Denmark and the Baltic Sea, in the east on Poland and the Czech Republic, in the south on Austria and Switzerland and in the west on France, Luxembourg, Belgium and the Netherlands.
The climate is moderate and influenced mainly by winds from the West, the eastern part has more continental character. In the lowlands of the northern part the average July temperature is 16 - 18°C, the average precipitation amounting to 600 - 750 mm per annum. Half of the territory is used for agricultural purpose, one third is covered by woods, 12 % are taken by settlements and traffic area.
As a result of World War II Germany was split. Until 1990 two parts named Germany existed, the Federal Republic of Germany (FRG - Bundesrepublik Deutschland, hereafter referred to as West Germany) and the German Democratic Republic (GDR - Deutsche Demokratische Republik, known as East Germany). In October 1990, the GDR joined West Germany. Germany is a federal republic. This means, that unless otherwise specified, the execution of federal laws lies within the responsibility of the federal states, the 16 Länder.
After the reunification Berlin again became capital of Germany. Part of the
Government, however, still remains in the former (provisional) capital Bonn.
Area and population development is shown in Table 1 (for the country map see
Figure 2).
TABLE 1: POPULATION INFORMATION
Growth rate (%) |
||||||||
1960 |
1970 |
1980 |
1991 |
2000 |
2001 |
2002 |
1980 to 2000 |
|
Population (millions) |
55.4 (17.2) |
60.7 (17.1) |
61.1 (16.7) |
80.3 |
82.3 |
82.4 |
82.5 |
0.25 |
Population density (inh./km²) |
226 (164) |
248 (163) |
252 (159) |
230 |
235 |
235 |
236 |
|
Urban population (% of total) |
82.8 |
|||||||
Land Area (1000 km²) |
349.5 |
Numbers in brackets refer to data from the former GDR.
Source: Country Information
The gross domestic product (GDP) statistics are given in Table 2. Reunification has turned out to be a lengthy and difficult process. Germany has to fund improvements in infrastructure, environment, and industry in the eastern part, while many eastern companies collapsed acting in the unaccustomed western competition.
Germany imported 62 % of its primary energy supply in 2001, including oil,
which accounts for nearly 40 % of its energy consumption. There are substantial
reserves of both hard coal and lignite, the amount in place is about 5 times
the recoverable quantities mentioned in Table 3. However, domestic hard coal
is much more expensive than imported coal and expansion of open cast lignite
mining is limited by environmental considerations. Hydro energy anyway contributes
only a small amount, and possible sites are already in use, so there are no
considerable reserves left. Uranium extraction has tapered off since 1991 and
has more or less stopped by now. Energy statistics are given in Table 4.
TABLE 2: GROSS DOMESTIC PRODUCT (GDP)
|
1960 |
1970 |
1980 |
1991 |
2000 1) |
2001 1) |
2002 1) |
GDP
|
154,800 |
345,300 |
752,600 |
1,502,200 |
2,030,000 |
2,073,700 |
2,110,400 |
GDP
|
185,200 |
810,600 |
1,769,800 |
1,870,300 |
1,857,200 |
1,995,600 |
|
GDP
per capita |
3,051 |
13,159 |
22,040 |
22,730 |
22,540 |
24,190 |
|
GDP by sector (%) |
|||||||
Agriculture |
8.1 (-) |
4.7 (-) |
2.9 (-) |
1.7 |
1.2 |
N/A |
1.1 |
Industry |
65.5 (-) |
68.1 (-) |
65.2 (-) |
45.5 |
29.8 |
N/A |
28.8 |
Services |
26.4 (-) |
27.2 (-) |
31.9 (-) |
52.8 |
69 |
N/A |
70.1 |
1.2 Energy Policy
Since the 1970s, a central intention of the German energy policy has been to shift electricity production away from imported oil and gas towards (previously domestic) coal and nuclear power. The share of oil and gas in electricity production was reduced from the peak of 30 % in 1975 to 9 % in 2002, while during the same period the share of nuclear has grown from 9 % to 31 %, whereas that of coal (hard coal 22 % and lignite 29 %) has remained at around 50 %. Since the 1990s all Federal Governments promoted the utilization of renewable energies. The utilities are required by law to buy electricity generated by independent producers using renewables. In comparison with the generation price of nuclear or coal plants rather high minimum payments to the small producers are guaranteed. Also direct government subsidies for the construction of wind and photovoltaic generators are granted. In 2002, the share of electricity production from renewables comes up to 9 % - Hydro already makes 5 %, Wind another 3.5 % - and it is intended to double this share by the year 2010. Nevertheless, in the medium-term large scale electricity production will continue to come from Germany's coal and nuclear power plants.
In the past, the Federal Government encouraged the utilities to increasingly use domestic hard coal for electricity generation, this rose up to 45 million tons of hard coal per year in 1995. Subsidies were paid by the Government and amounted to € 5000 million per annum in 1994, but will be reduced continuously to € 2700 million per annum in 2005. Lignite production in Germany is not subsidized, nevertheless it accounts for nearly one third of the electricity production.
To comply with environmental regulations since the mid 1980s, German utilities implemented state of the art technologies to reduce emissions from electricity generation through coal. Also they invested in underground transmission networks. Both influenced company costs and electricity prices.
The current Federal Government (since September 1998) decided to phase out the use of nuclear power for commercial electricity production (see chapter 4).
|
Solid |
Liquid |
Gas |
Uranium |
Hydro 1) |
Total |
Total
amount in place (EJ) |
1,052 |
2.3 |
10.3 |
0 |
0.8 |
1,065 |
1) For comparison purposes a rough attempt is made to convert hydro capacity
to energy by multiplying the gross theoretical annual capability (World Energy
Council - 1998) by a factor of 10
Source: Country Information
TABLE 4: ENERGY STATISTICS
Annual growth rate (%) |
||||||||
|
1980 |
|||||||
|
1960 |
1970 |
1980 |
1991 |
2000 |
2001 1) |
2002 1) |
to |
|
2000 |
|||||||
Energy consumption (EJ) |
|
|||||||
- Total 2) |
6.3
(2.9) |
9.9
(3.1) |
11.6
(3.8) |
14.61 |
14.36 |
14.59 |
14.29 |
- 0.4 |
- Solids 3) |
4.9
(2.8) |
4.0
(2.6) |
3.5
(2.5) |
4.84 |
3.56 |
3.56 |
3.54 |
- 2.7 |
- Liquids |
1.3
(0.1) |
5.1
(0.4) |
5.4
(0.8) |
5.55 |
5.50 |
5.58 |
5.36 |
- 0.6 |
- Gases |
N/A |
0.6
(0.0) |
2.1
(0.3) |
2.43 |
3.03 |
3.15 |
3.14 |
+ 1.2 |
- Nuclear |
0.0
(0.0) |
0.03
(0.01) |
0.45
(0.13) |
1.61 |
1.85 |
1.87 |
1.80 |
+
6.0 |
- Hydro + Wind |
N/A |
N/A |
N/A |
0.05 |
0.12 |
0.12 |
0.15 |
N/A |
- Others 4) |
0.2
(0.0) |
0.3
(0.0) |
0.2
(0.0) |
0.13 |
0.30 |
0.31 |
0.30 |
N/A |
Energy production (EJ) |
|
|
|
|
|
|||
- Total |
5.7 (2.6) |
5.4 (2.3) |
5.3 (2.5) |
6.97 |
5.61 |
5.57 |
5.55 |
- 1.7 |
- Solids |
5.3
(2.6) |
4.3
(2.3) |
3.7
(2.3) |
4.44 |
2.54 |
2.43 |
2.44 |
- 4.4 |
- Liquids |
0.2
(0.0) |
0.3
(0.0) |
0.2
(0.0) |
0.15 |
0.13 |
0.14 |
0.15 |
- 2.2 |
- Gases |
N/A |
0.5
(0.0) |
0.7
(0.1) |
0.58 |
0.66 |
0.68 |
0.68 |
- 0.1 |
- Nuclear |
0.0
(0.0) |
0.03
(0.01) |
0.45
(0.13) |
1.61 |
1.85 |
1.87 |
1.80 |
+
6.0 |
- Hydro |
N/A |
N/A |
N/A |
0.05 |
0.09 |
0.08 |
0.09 |
N/A |
- Wind |
N/A |
N/A |
N/A |
0.00 |
0.03 |
0.04 |
0.06 |
N/A |
- Others 4) |
0.2
(0.0) |
0.3
(0.0) |
0.2
(0.0) |
0.14 |
0.31 |
0.33 |
0.33 |
N/A |
Net import (EJ) |
|
|
|
|
|
|||
- Total |
0.7
(0.3) |
4.9
(0.7) |
6.9
(1.2) |
8.86 |
9.09 |
8.89 |
+ 0.5 |
|
- Solids |
-0.5
(0.2) |
-0.4
(0.3) |
-0.2
(0.2) |
0.80 |
0.97 |
0.90 |
N/A |
|
- Liquids |
1.2
(0.1) |
5.1
(0.4) |
5.6
(0.8) |
5.38 |
5.44 |
5.23 |
N/A |
|
- Gases |
N/A |
0.1
(0.0) |
1.4
(0.2) |
2.65 |
2.68 |
2.75 |
N/A |
|
- Electricity |
+
0.04 (-) |
+
0.08 (-) |
+
0.06 (-) |
0.01 |
+
0.03 |
0.00 |
0.01 |
N/A |
1) Preliminary data.
2) Total energy consumption = Primary energy production + Net import of energy.
3) Solid fuels include coal and lignite.
4) Others are geothermal, solar energy etc.
Source: Country Information.
1.3 The Electricity System
The German electricity market was opened by the new energy law in 1998. Up to that time the electricity suppliers had regional monopolies. Now, the German public electricity sector is characterized by a pluralistic structure in electricity generation, transportation and distribution. Participants are large, medium and small-sized electricity suppliers, grid operators, electricity traders (electricity spot market), numerous large and small power plants (see Table 5), and so-called "small producers" not accounted for in Table 5. In 2001, around 1 100 electricity suppliers to final consumers operated in Germany, much more than before the liberalization of the market. Among them the three largest companies supply 53 %, and the next largest only 3 % of the final electricity consumption in Germany. Shareholders of the public electricity supply companies in 2001 included both, private investors - also from abroad - as well as governmental interests. All nuclear power plants in operation are run by private corporations under commercial legislation and with their sales revenues from electricity production and trade.
The larger utilities use a mix of power producing facilities, including nuclear power. So electricity prices in general reflect this energy-mix. Few distributors offer "Ökostrom" - electricity
TABLE 5: STRUCTURE OF THE ELECTRICITY SECTOR (2001)
|
Number
of utilities *) |
Thereof
from abroad *) |
Electricity
suppliers to final consumers |
1
100 |
80 |
Grid
operators |
900 |
10 |
Electricity
producers |
520 |
-- |
“New”
electricity traders |
150 |
80 |
Traders
on electricity spot market |
110 |
40 |
Electricity
distributors only from renewables |
30-40 |
-- |
Services
for measurement and payment |
20 |
-- |
*) Partially estimated, double counting
Source: Country Information
TABLE 6: ELECTRICITY PRODUCTION AND INSTALLED CAPACITIES
Annual growth rate (%) |
||||||||
1980 |
||||||||
1960 |
1970 |
1980 |
1991 |
2000 1) |
2001
1) |
2002 1) |
to |
|
2000 |
||||||||
Electricity production (TWh) |
|
|||||||
- Total gross |
119.0 (40.3) |
237.7 (67.7) |
365.2 (98.9) |
540.2 |
573.4 |
582.3 |
581.5 |
+
1.1 |
- Fossil 2) |
106.0 (39.7) |
218.8 (65.9) |
306.4 (85.3) |
359.2 |
345.8 |
354.8 |
354.0 |
-
0.6 |
- Nuclear |
0.0 (0.0) |
2.7 (0.5) |
41.4 (11.9) |
147.4 |
169.6 |
171.3 |
164.8 |
+
6.0 |
- Hydro |
13.0 (0.6) |
16.2 (1.3) |
17.4 (1.7) |
19.2 |
27.7 |
26.0 |
26.5 |
+
1.9 |
- Wind |
0.0 |
0.0 |
0.0 |
0.1 |
9.5 |
10.5 |
16.8 |
N/A |
- Others 3) |
N/A |
N/A |
N/A |
14.3 |
20.8 |
19.7 |
19.4 |
N/A |
Gross
Capacity of |
||||||||
- Total |
28.4 (7.9) |
47.6 (12.1) |
82.7 (19.7) |
104.2 |
126.9 |
125.0 |
N/A |
+
1.1 |
- Fossil 2) |
25.0 (7.6) |
42.0 (11.3) |
67.5 (16.5) |
72.4 |
84.0 |
82.3 |
N/A |
±
0 |
- Nuclear |
0.0 (0.0) |
0.9 (0.1) |
8.7 (1.7) |
23.7 |
23.6 |
22.4 |
22.4 |
+
4.2 |
- Hydro |
3.4 (0.3) |
4.7 (0.7) |
6.5 (1.5) |
6.9 |
9.0 |
8.5 |
N/A |
+
0.6 |
- Wind |
0.0 (0.0) |
0.0 (0.0) |
0.0 (0.0) |
N/A |
6.1 |
8.8 |
12.0 |
N/A |
- Others 3) |
N/A |
N/A |
N/A |
1.2 |
4.2 |
3.0 |
N/A |
N/A |
1) Preliminary data.
2) hard coal, lignite, gas, oil
3) Geothermal, solar, biomass etc.
Source: Country Information.
only from renewables - at a slightly higher price. There is no company exclusively using nuclear power, neither in production nor in distribution.
The Federal Ministry of Economics and Labour (BMWA) outlines the national energy policy. As mentioned before, electricity supply is organized by private corporations which of course decide on economic means and follow commercial legislation. Decisions on new production facilities and similar matters are due to market forces and price competition and also have to reflect political preferences, as e.g. the obligation to accept at all times electricity produced from renewables at a fixed high price (see also chapter 1.2).
In 2002, the net generation of all power plants amounted to 504 TWh, with a net capacity of 103 GWe. In 2001, nuclear power took 22 % of the capacity, had a share of 34 % in electricity production and more than half of the base load (51 %). Electricity supply companies also purchases electricity from around 10 000 small producers using renewables for power production, predominantly hydro and wind energy as well as solar energy, biomass and waste materials. In 2002, renewables fed in 45 TWh.
Table 6 shows the statistics on electricity production and installed capacities, Table 7 shows energy related ratios.
TABLE 7: ENERGY RELATED RATIOS
|
1960 |
1970 |
1980 |
1991 |
2000 1) |
2001 1) |
2002 1) |
Energy consumption per capita (GJ/capita) |
114 (169) |
163 (181) |
188 (228) |
182 |
174 |
177 |
173 |
Electricity production per capita (kW·h/capita) |
2,148 |
3,916 |
5,929 |
6,727 |
6,967 |
7,067 |
7,049 |
Electricity production / Energy production (%) |
7.5 (5.5) |
16 (6.3) |
25 (14) |
28 |
37 |
32 |
38 |
Nuclear / total electricity (%) |
N/A |
1.1 (0.7) |
11.6 (12.0) |
27.3 |
29.6 |
29.4 |
28.3 |
Ratio of external dependency (%) 2) |
11 (10) |
49 (23) |
59 (32) |
N/A |
62 |
62 |
62 |
Load factor of electricity plants (%) |
|||||||
- Total |
48 (58) |
57 (64) |
50 (57) |
59 |
52 |
53 |
N/A |
- Fossil |
48 (60) |
60 (67) |
52 (59) |
57 |
47 |
49 |
N/A |
- Nuclear |
N/A |
34 (57) |
54 (80) |
71 |
82 |
87 |
84 |
- Hydro |
44 (23) |
39 (21) |
31 (13) |
32 |
35 |
35 |
N/A |
- Wind |
N/A |
N/A |
N/A |
N/A |
18 |
14 |
16 |
1) Preliminary data.
2) Net import / Total energy consumption.
Source: Country Information .
2. NUCLEAR POWER SITUATION
2.1 Historical Development and Current Nuclear Power Organizational Structure
2.1.1 Historical Development Concerning NPPs
After World War II, allied regulations prohibited any activity in nuclear research and industrial development in the two parts of Germany. After West Germany had officially renounced to produce, possess or use nuclear weapons, it was admitted, in 1955, to the western community of nations as a sovereign state. Research and development of nuclear energy for peaceful purposes could start.
By this time, some countries already had been working for ten years in nuclear technology. To close the gap, an agreement was reached between the scientific, economic and political sectors to organize an extensive international co-operation. The German Atomic Programme was formulated to coordinate the work, including the construction of a series of prototype reactors, formulating the concepts for a closed nuclear fuel cycle, and for the disposal of radioactive waste in deep geological formations.
In 1955, the Federal Government established an atomic ministry (Bundesministerium für Atomfragen). Germany became a founding member of the European Atomic Energy Community (EURATOM) and the present Nuclear Energy Agency (NEA) of OECD. Agreements for co-operation with France, the United Kingdom and the USA were concluded. With the assistance of US manufacturers, Germany started developing commercial nuclear power plants (Siemens/Westinghouse for PWR, AEG/General Electric for BWR). The German electric utilities supported the development.
In the following years several nuclear research centers were created in West
Germany:
1956: - Kernforschungszentrum Karlsruhe (KfK),
- Gesellschaft für Kernenergieverwertung in Schiffbau und Schifffahrt (GKSS)
in Geesthacht,
- Kernforschungsanlage Jülich (KFA),
1959: - Hahn-Meitner-Institut für Kernforschung (HMI) in Berlin,
- Deutsches Elektronen-Synchrotron (DESY) in Hamburg,
1969: - Gesellschaft für Schwerionenforschung (GSI) in Darmstadt.
Most of these research centres as well as university institutes were equipped with research reactors. At present most research reactors are shut down and being decommissioned. Since the late 1980s some of the research centres changed their areas of activity - and some of them also their names - to environmental issues. Due to financial conditions, nuclear research became more and more limited to basic nuclear physics.
In 1958, a 16 MWe experimental nuclear power plant (Versuchsatomkraftwerk Kahl, VAK) was ordered from GE/AEG and reached criticality in 1960. The domestic German nuclear development began in 1961 with the order of the 15 MWe pebble-bed high-temperature reactor (Arbeitsgemeinschaft Versuchsreaktor in Jülich, AVR) from BBK/BBC. Power reactors with 250-350 MWe and 600-700 MWe were ordered between 1965 and 1970. After about 15 years, the gap between the German and the international technological state of the art was closed. The German nuclear industry received the first orders from abroad, from the Netherlands (Borssele) and from Argentina (Atucha). In 1972, the construction of the world's then largest reactor, Biblis A with 1200 MWe, started in Germany. Between 1970 and 1975, on the average three units were ordered annually.
In 1969, Siemens and AEG founded Kraftwerk Union (KWU) by merging their respective nuclear activities. The domestic development of KWU nuclear power plants with PWRs started. On the basis of several years of operational experience, finally a standardized 1300 MWe PWR ("Konvoi") was introduced, mainly to speed up the licensing process. However, after some "pre-Konvoi" units, the construction of only three Konvoi-units was actually realized (Isar-2, Neckarwestheim-2, and Emsland). The Konvoi-units were ordered in 1982 and commissioned in 1988/89, the last NPP projects in Germany. Since then, nuclear continuously has a share of approximately one third of the electricity production in Germany.
In East Germany, nuclear power started developing with the assistance of the Soviet Union in 1955. Research in nuclear physics could begin, the Central Institute for Nuclear Physics was founded in 1956 at Rossendorf. There, in 1957, a research reactor supplied by the Soviet Union started operation. The first East German 70 MWe nuclear power plant Rheinsberg, equipped with a Russian type PWR, was connected to the grid in 1966. Between 1974 and 1979, the Greifswald NPP units 1-4 were connected to the grid, all equipped with Russian WWER-440/W-230 reactors. In 1989, unit 5, a WWER-440/W-213 reactor, was in the process of commissioning. Following the German unification, comprehensive safety assessments of the Soviet type NPPs in East Germany were carried out. These analyses showed safety deficiencies in comparison with the current West German nuclear safety requirements. Due to technical and economic reasons - in particular uncertainties in the licensing process and also decreasing electricity consumption - it was decided not to upgrade these plants. They were prepared for decommissioning. Also, work on the nuclear plants under construction (units 6, 7 and 8 at Greifswald with WWER-440/W-213 reactors and two WWER-1000 reactors near Stendal) was abandoned.
Two prototypes of advanced reactor design were developed in Germany: the pebble-bed
high-temperature reactor (Thorium-Hochtemperaturreaktor, THTR 300) at HRB/BBC
and a fast breeder reactor (Schneller Natriumgekühlter Reaktor, SNR 300)
at Interatom/Siemens. Due to economical and political reasons, the former, after
a successful commissioning and operation for some years, was shut down, and
the latter was completed but never commissioned.
All nuclear power plants currently in operation in Germany were built by KWU or Siemens/AEG respectively. The second German supplier for NPPs, the company BBR, a joint venture of Brown, Boveri & Cie. and Babcock&Wilcox from the USA, meanwhile ABB, respectively sold to BNFL/UK in December 1999, now renamed Westinghouse, supplied only one PWR plant, Mülheim-Kärlich, which is shut down by court order since 1988 for procedural reasons. After signing the agreement between Government and utilities in June 2001 (see chapter 4), an application for decommissioning was made.
For several years, German utilities together with Siemens/KWU and in close co-operation with its French counterparts (EdF and Framatome) had been developing an advanced PWR, the European Pressurized Water Reactor EPR. The reactor design is "evolutionary" and shows enhanced safety features, the design includes provisions to control core meltdown accidents. German utilities also supported the Siemens/KWU development of an advanced BWR (SWR 1000) with additional passive safety features. In 2001, Siemens/KWU merged its nuclear branch with Framatome SA to Framatome ANP (Advanced Nuclear Power) GmbH, which continues both projects EPR and SWR 1000.
Since the early 1970s, the quite successful German nuclear power programme faced a steadily increasing opposition against the national use of nuclear energy. On the one hand violent demonstrations and occupation of potential sites took place, mainly at Brokdorf, Wyhl and Wackersdorf. On the other hand "concerned citizens" raised objections in administrative courts. Consequently, construction and licensing of nuclear power plants were considerably delayed due to ongoing litigation. Today, the construction of new NPPs for electricity production is forbidden by law (see chapter 4).
2.1.2 Historical Development Concerning the Nuclear Fuel Cycle
In Germany all facilities necessary for a closed nuclear fuel cycle had been erected: in the former West Germany a very small uranium mine Ellweiler with yellow cake production, in the former East Germany the large uranium production facility Wismut, which in the beginning also supplied uranium to the Soviet Union. Ellweiler has been closed and Wismut - with an accumulated uranium production as top 3 in the world after the USA and Canada - is being decommissioned.
The project for a reprocessing plant at Wackersdorf was abandoned in 1988, partly due to public opposition and partly also due to economic reasons. Therefore, the German utilities have contracts for reprocessing spent fuel with COGEMA/France and BNFL/UK. The contracts under private law were accompanied by governmental agreements. Radioactive waste resulting from reprocessing spent fuel in foreign facilities is brought back to Germany, the plutonium from reprocessing is used for MOX fuel fabrication. The new MOX fuel fabrication plant at Hanau was completed, but the operation license was not granted due to political complications and the plant is now being dismantled. The reprocessing pilot plant WAK is being decommissioned, a facility to vitrify the resulting high active waste concentrate meanwhile is under construction and close to commissioning.
Since the early 1960s West Germany started to set up a programme for radioactive waste management and disposal. The radioactive waste disposal policy was based on the decision that all types of radioactive waste are to be disposed of in deep geological formations. Realistically, such a decision is only acceptable if a barrier for radionuclide releases exists which remains effective over the long periods of time, which radionuclides need to decay significantly. Thus, vitrified fission product solution from reprocessing and spent fuel elements as well as spent sealed radiation sources and miscellaneous waste from small waste generators are affected by this decision. It also applies to alpha bearing waste originating in particular from reprocessing facilities, nuclear research facilities or the nuclear fuel cycle industry. Near-surface disposal or shallow land burial was excluded in Germany from the very beginning, because of the high population density and climatic conditions; furthermore appropriate deep geological formations exist.
Development work in this field started with the Asse research mine in a salt dom in Niedersachsen, where low- and medium-level radioactive waste was disposed of on an experimental basis until the end of 1978. In 1979, an agreement on the principles for NPP waste management was reached between the Federal Government and the Länder. The Land Niedersachsen agreed to assess the salt dome of Gorleben for its suitability to host a repository for all types of radioactive waste, in particular high level waste originating from reprocessing and spent fuel elements. According to the new energy policy (see chapter 4), the underground investigation of the Gorleben salt dome has been interrupted in October 2000, for at least three, but at most ten years (Gorleben moratorium). The former iron ore mine Schacht Konrad - also in Niedersachsen - has been licensed for low and intermediate level waste (waste with negligible heat generation), but still construction of the final repository facility could not begin due to legal restrictions.
In the late 1960s, East-German studies on disposal of radioactive waste resulted
in the decision to use the abandoned salt mine Morsleben (ERAM) as repository
for low and intermediate level waste with low concentrations of alpha emitters.
In 1981, after extensive investigations, the first license for final disposal
was granted. Along with the German unification in 1990, the operation license
was limited until June 30, 2000, later extended to 2005. Due to court order
in 1998 concerning the so-called eastern emplacement field, the waste disposal
was stopped completely. Now, the licensing procedure for decommissioning is
in progress.
FIGURE 1: PARTICIPANTS IN THE NUCLEAR LICENSING PROCEDURE FOR NPPS
2.1.3 Organizational Charts
The interaction of the different authorities and organizations involved in
the nuclear licensing procedure is shown in Figure 1. The institutions mentioned
are explained in more detail in chapter 3. Table 8 shows the licensing and supervisory
authorities for the individual power plants.
2.2 Nuclear Power Plants: Status and Operation
In 2002, a total gross capacity of 22.4 GWe was installed in the 19 operating
German nuclear power plants, 0.7 % more than in 1999. This was realized either
by increasing the thermal reactor power (KKP 2, KKU) or by optimizing the steam
turbine (KKE, KKI 1, KKI 2) respectively. Increasing of thermal reactor power
is also foreseen for several other plants. The generated nuclear electricity
(gross) amounted up to 165 TWh in 2002, 0.4 % less than in the previous year,
and about one third of the electricity supplied by public utilities. This nuclear
share is roughly constant since 1985, but will decrease within the next two
decades due to the political decision to phase out. Table 9 shows the status
of nuclear power plants by the end of 2002, Figure 2 the siting. In Table 10
the projected shutdown dates for the 19 plants are given.
Land |
Nuclear Installation |
Licensing Authority |
Supervisory Authority |
Baden-Württemberg |
Obrigheim |
Wirtschaftsministerium
after consultation with Ministerium für Umwelt und Verkehr und Innenministerium |
Ministerium für Umwelt
und Verkehr |
Bayern |
Isar 1 |
Staatsministerium
für Landesentwicklung und Umweltfragen, in agreement with Staatsministerium für Wirtschaft, Verkehr und Technologie |
Staatsministerium
für Landesentwicklung und Umweltfragen |
Hessen |
Biblis A |
Ministerium für Umwelt,
Landwirtschaft und Forsten |
|
Niedersachsen |
Stade |
Umweltministerium |
|
Rheinland-Pfalz |
Mülheim-Kärlich |
Ministerium für Umwelt
und Forsten |
|
Schleswig-Holstein |
Brunsbüttel |
Ministerium für Finanzen
und Energie |
2.3 Supply of NPPs
No exclusively German supplier of NPPs has remained with the start of the 21st century. In 2001, the remaining domestic manufacturer Siemens/KWU merged its nuclear business with Framatome SA to Framatome ANP (Advanced Nuclear Power). The former nuclear branch of Siemens - KWU in Erlangen - now acts as an operational center, called Framatome ANP GmbH. The main activities are projects and engineering, nuclear services, nuclear fuel and mechanical equipment. The second German supplier for NPPs, BBR, meanwhile Westinghouse Reaktor GmbH, now concentrates on nuclear services
TABLE 9: STATUS OF NUCLEAR POWER PLANTS
Station |
Type
|
Net |
Status |
Operator |
Reactor |
Construction |
Criticality |
Grid |
Commercial |
Shutdown |
Capacity |
Supplier |
Date |
Date |
Date |
Date |
Date |
||||
BIBLIS-A (KWB A) |
PWR |
1167 |
Operational |
RWE |
KWU |
01-Jan-70 |
16-Jul-74 |
25-Aug-74 |
26-Feb-75 |
|
BIBLIS-B (KWB B) |
PWR |
1240 |
Operational |
RWE |
KWU |
01-Feb-72 |
25-Mar-76 |
25-Apr-76 |
31-Jan-77 |
|
BROKDORF (KBR) |
PWR |
1370 |
Operational |
E.ON |
KWU |
01-Jan-76 |
08-Oct-86 |
14-Oct-86 |
22-Dec-86 |
|
BRUNSBUETTEL (KKB) |
BWR |
771 |
Operational |
KKB |
KWU |
15-Apr-70 |
23-Jun-76 |
13-Jul-76 |
09-Feb-77 |
|
EMSLAND (KKE) |
PWR |
1329 |
Operational |
KLE |
SIEM, KWU |
10-Aug-82 |
14-Apr-88 |
19-Apr-88 |
20-Jun-88 |
|
GRAFENRHEINFELD (KKG) |
PWR |
1275 |
Operational |
E.ON |
KWU |
01-Jan-75 |
09-Dec-81 |
30-Dec-81 |
17-Jun-82 |
|
GROHNDE (KWG) |
PWR |
1360 |
Operational |
KWG |
KWU |
01-Jun-76 |
01-Sep-84 |
04-Sep-84 |
01-Feb-85 |
|
GUNDREMMINGEN-B (KRB B) |
BWR |
1284 |
Operational |
KGB |
KWU |
20-Jul-76 |
09-Mar-84 |
16-Mar-84 |
19-Jul-84 |
|
GUNDREMMINGEN-C (KRB C) |
BWR |
1288 |
Operational |
KGB |
KWU |
20-Jul-76 |
26-Oct-84 |
02-Nov-84 |
18-Jan-85 |
|
ISAR-1 (KKI 1) |
BWR |
878 |
Operational |
E.ON |
KWU |
01-May-72 |
20-Nov-77 |
03-Dec-77 |
21-Mar-79 |
|
ISAR-2 (KKI 2) |
PWR |
1400 |
Operational |
E.ON |
KWU |
15-Sep-82 |
15-Jan-88 |
22-Jan-88 |
09-Apr-88 |
|
KRUEMMEL (KKK) |
BWR |
1260 |
Operational |
KKK |
KWU |
05-Apr-74 |
14-Sep-83 |
28-Sep-83 |
28-Mar-84 |
|
NECKARWESTHEIM-1 (GKN 1) |
PWR |
785 |
Operational |
GKN |
KWU |
01-Feb-72 |
26-May-76 |
03-Jun-76 |
01-Dec-76 |
|
NECKARWESTHEIM-2 (GKN 2) |
PWR |
1269 |
Operational |
GKN |
SIEM, KWU |
09-Nov-82 |
29-Dec-88 |
03-Jan-89 |
15-Apr-89 |
|
OBRIGHEIM (KWO) |
PWR |
340 |
Operational |
KWO |
SIEM, KWU |
15-Mar-65 |
22-Sep-68 |
29-Oct-68 |
01-Apr-69 |
|
PHILIPPSBURG-1 (KKP 1) |
BWR |
890 |
Operational |
EnBW |
KWU |
01-Oct-70 |
09-Mar-79 |
05-May-79 |
26-Mar-80 |
|
PHILIPPSBURG-2 (KKP 2) |
PWR |
1392 |
Operational |
EnBW |
KWU |
07-Jul-77 |
13-Dec-84 |
17-Dec-84 |
18-Apr-85 |
|
STADE (KKS) |
PWR |
640 |
Operational |
E.ON |
KWU |
01-Dec-67 |
08-Jan-72 |
29-Jan-72 |
19-May-72 |
|
UNTERWESER (KKU) |
PWR |
1345 |
Operational |
E.ON |
KWU |
01-Jul-72 |
16-Sep-78 |
29-Sep-78 |
06-Sep-79 |
|
AVR JUELICH (AVR) |
HTGR |
13 |
Shut Down |
AVR |
BBK |
01-Aug-61 |
16-Aug-66 |
17-Dec-67 |
19-May-69 |
31-Dec-88 |
GREIFSWALD-1(KGR 1) |
WWER |
408 |
Shut Down |
EWN |
AEE, KAB |
01-Mar-70 |
03-Dec-73 |
17-Dec-73 |
12-Jul-74 |
18-Dec-90 |
GREIFSWALD-2 (KGR 2) |
WWER |
408 |
Shut Down |
EWN |
AEE, KAB |
01-Mar-70 |
03-Dec-74 |
23-Dec-74 |
16-Apr-75 |
14-Feb-90 |
GREIFSWALD-3 (KGR 3) |
WWER |
408 |
Shut Down |
EWN |
AEE, KAB |
01-Apr-72 |
06-Oct-77 |
24-Oct-77 |
01-May-78 |
28-Feb-90 |
GREIFSWALD-4 (KGR 4) |
WWER |
408 |
Shut Down |
EWN |
AEE, KAB |
01-Apr-72 |
22-Jul-79 |
03-Sep-79 |
01-Nov-79 |
02-Jun-90 |
GREIFSWALD-5 (KGR 5) |
WWER |
408 |
Shut Down |
EWN |
AEE, KAB |
01-Dec-76 |
26-Mar-89 |
24-Apr-89 |
- |
30-Nov-89 |
GUNDREMMINGEN-A (KRB A) |
BWR |
237 |
Shut Down |
KGB |
AEG, GE |
12-Dec-62 |
14-Aug-66 |
01-Dec-66 |
12-Apr-67 |
13-Jan-77 |
HDR GROSSWELZHEIM |
BWR |
23 |
Shut Down |
FZK |
AEG, KWU |
01-Jan-65 |
14-Oct-69 |
14-Oct-69 |
02-Aug-70 |
20-Apr-71 |
KNK II |
FBR |
17 |
Shut Down |
FZK |
IA |
01-Sep-74 |
10-Oct-77 |
09-Apr-78 |
03-Mar-79 |
23-Aug-91 |
LINGEN (KWL) |
BWR |
240 |
Shut Down |
KWL |
AEG |
01-Oct-64 |
31-Jan-68 |
01-Jul-68 |
01-Oct-68 |
05-Jan-77 |
MUELHEIM-KAERLICH (KMK) |
PWR |
1219 |
Shut Down |
RWE |
BBR |
15-Jan-75 |
01-Mar-86 |
14-Mar-86 |
01-Oct-87 |
09-Sep-88 |
MZFR |
PHWR |
52 |
Shut Down |
FZK |
SIEMENS |
01-Dec-61 |
29-Sep-65 |
09-Mar-66 |
19-Dec-66 |
03-May-84 |
NIEDERAICHBACH (KKN) |
HWGCR |
100 |
Shut Down |
FZK |
SIEM, KWU |
01-Jun-66 |
17-Dec-72 |
01-Jan-73 |
01-Jan-73 |
31-Jul-74 |
RHEINSBERG (KKR) |
PWR |
62 |
Shut Down |
EWN |
AEE, KAB |
01-Jan-60 |
11-Mar-66 |
06-May-66 |
11-Oct-66 |
01-Jun-90 |
THTR-300 |
HTGR |
296 |
Shut Down |
HKG |
HRB |
01-May-71 |
13-Sep-83 |
16-Nov-85 |
01-Jun-87 |
29-Apr-88 |
VAK KAHL |
BWR |
15 |
Shut Down |
VAK |
GE, AEG |
01-Jul-58 |
13-Nov-60 |
17-Jun-61 |
01-Feb-62 |
25-Nov-85 |
WUERGASSEN (KWW) |
BWR |
640 |
Shut Down |
E.ON |
AEG, KWU |
26-Jan-68 |
20-Oct-71 |
18-Dec-71 |
11-Nov-75 |
26-Aug-94 |
Legend: |
|||
|
|
|
|
PWR |
Pressurized Water Reactor |
|
|
BWR |
Boiling Water Reactor |
in operation |
|
FBR |
Fast Breeder Reactor |
|
|
HTR |
High Temperature Reactor |
|
|
PTR |
Pressure Tube Reactor |
shut down |
|
SSR |
Superheated Steam-Cooled Reactor |
|
|
Numbers indicate Gross Capacity [MWe], 12/2002 |
|
|
|
|
|
|
|
Source: Country Information
FIGURE 2: NUCLEAR POWER PLANTS IN GERMANY
2.4 Operation of NPPs
The companies operating the NPPs are owned by only a few major utilities. These are, since some years, in a process of concentration and reordering. Operating personnel is in sufficient supply at the moment, regularly retrained for their job at plant specific full scope simulators at the Kraftwerksschule in Essen. But personnel may become a difficult issue due to the policy to phase out the use of nuclear power and diminishing interest in nuclear education in Germany. For maintenance, the operator receives support from manufacturers and service suppliers specialized in this field (for operation data see chapter 2.2).
2.5 Fuel Cycle and Waste Management
All facilities necessary to close the nuclear fuel cycle have been realized
in Germany. Today, only a few of them are in operation, several are shut down
and being decommissioned or did not receive an operation license (see chapter
2.1.2). According to the new energy policy and the respective amendment of the
Atomic Energy Act, the waste management of nuclear power plants comprises
· transport of spent fuel for reprocessing only until June 30, 2005 at
the latest and utilisation of recovered nuclear fuel;
· from July 1, 2005, use of the local interim storage facilities for
spent fuel until a final repository will be commissioned;
· interim storage of spent fuel at central (external) interim storage
facilities and, as soon as possible, at local interim storage facilities; and
· conditioning and interim storage of radioactive waste from operation
and decommissioning of the nuclear power plants until a final repository will
be commissioned.
At Gronau, the enrichment plant of URENCO expanded from a capacity of originally 400 SWU/year to 1 400 SWU/year within the last years and it is intended to increase the capacity further to 4 500 SWU/year.
At Lingen, the fuel fabrication facility ANF is in operation and produces uranium fuel elements for LWRs. In 2002, the increase of the throughput capacity up to 500 t Uranium per year was licensed.
Three central interim storage facilities for spent fuel are in operation: The transport flask store Ahaus (TBLA) for irradiated fuel, the transport flask store Gorleben (TBLG) for both, irradiated fuel and vitrified reprocessing products and the interim storage facility Zwischenlager Nord (ZLN) exclusively for spent fuel from decommissioning the NPPs in Greifswald and Rheinsberg.
According to the new German energy policy additional local interim storage facilities for spent fuel are to be built on the NPP sites. License applications have been introduced for 13 sites; meanwhile one storage is in operation.
At the beginning of 2002, the licensed storage pond capacity, erected within the NPPs, amounted to 6 327 t HM, of which 751 t were not occupied (additional empty space for one core load each not counted).
The waste conditioning facility PKA at the Gorleben site is now completed, but only a limited operation license to repair damaged containers was granted by the competent Länder authority in 2000.
Concerning the final repository, the Federal Government has in mind that a future facility for all types of radioactive waste will be available around 2030. A working group on the site selection for a possible repository, set up by BMU, has produced a report on a comprehensive and suitable site selection procedure.
2.6 Research and Development Activities
Basic nuclear research is supported by the BMBF (Federal Ministry of Education and Research), the applied nuclear research - especially nuclear reactor safety and repository research - by the BMWA (Federal Ministry of Economics and Labour), and regulatory nuclear investigations by BMU (Federal Ministry for the Environment, Nature Conservation and Nuclear Safety). The national development activities on disposal are refinanced by the utilities. Research in nuclear matters at universities and research centers is decreasing. Nothing more is done on future nuclear reactors because of the political decision to phase out nuclear for commercial electricity production (see also chapter 2.1).
2.7 International Co-operation and Initiatives
As member state of the EU, OECD/NEA, and IAEA, Germany supports various international programmes in nuclear safety and nuclear waste management. In direct international co-operation Germany also supports projects and organizations, e.g. the licensing and supervisory authorities, technical support organizations and also research institutes.
As EU member Germany takes part in many European nuclear researchactivities,
e.g.:
· PHEBUS-FP programme covering severe accidents on PWR;
· PHARE and TACIS programmes, general projects to support Central Europe
and the CIS countries in nuclear safety.
As NEA member, Germany participates, among other things, in:
· the ICDE project on collection and analysis of data on common cause
failure event;
· the HALDEN project on fuel and material issues;
· the MASCA project on in-vessel phenomena during a servere accident
as a follow up of the RASPLAV project;
· the CABRI project on the behaviour of high burn-up and MOX fuel elements
under RIA conditions;
· the MCCI project on melt coolability and concrete interaction;
· the PSB-VVER project on VVER-1000 code validation; and in
· the SETH project on thermal-hydraulic experiments in support of accident
management.
The Framatome ANP directly participates in several international projects,
e.g.:
· HALDEN, the NEA project on fuel and material issues;
· PKL3, partly financed by the OECD, on boron dilution scenarios at the
PKL large scale test facility in Erlangen;
· PANDA, an investigation at PSI of the function and reliability of passive
condensers under servere accident conditions;
· PHARE/TACIS, the EU project to support Central Europe and the CIS countries
in nuclear safety;
· INPRO, an IAEA project on innovative nuclear reactors and fuel cycles;
and
· CAMP, an USNRC organized improvement of a code analysis and maintenance
programme.
3. NATIONAL LAWS AND REGULATIONS
3.1 Safety Authority and the Licensing Process
In accordance with the federal structure of Germany, its Constitution (Basic Law) bestows upon the Federal Government the responsibility for legislation and regulation regarding "production and utilization of nuclear energy for peaceful purposes, construction and operation of facilities serving such purposes, protection against hazards arising from the release of nuclear energy or ionizing radiation and disposal of radioactive substances."
The Atomic Energy Act was promulgated December 23, 1959, right after the Federal Republic of Germany had officially renounced any acquisition, development or use of nuclear weapons. Before unification its scope of application was restricted to West Germany (within its boundaries up to 1990) and to the Land Berlin.
In Germany the legislation and its execution must also take into account any binding requirement from regulations of the European Union. With respect to radiation protection there are, e.g., the EURATOM Basic Safety Standards for the protection of the health of workers and the general public against the dangers arising from ionizing radiation. These were issued on the basis of Articles 30 to 33 of the EURATOM Treaty. In accordance with Chapter 7 of the EURATOM Treaty any use of ores, source material and special fissile material is subject to the Safeguards of the European Atomic Energy Community.
With respect to nuclear safety and waste management, the Atomic Energy Act is the core of national regulations in Germany. Its primary purpose is to protect life, health and property against the hazards of nuclear energy and the detrimental effects of ionizing radiation and, furthermore, to provide for the compensation for any damage and injuries incurred. And according to the amendment of 2002, another purpose is to phase out the use of nuclear energy for commercial electricity production: "No further licenses will be issued for the construction and operation of installations for the fission of nuclear fuel for the commercial generation of electricity or of facilities for the reprocessing of irradiated nuclear fuel." The Atomic Energy Act is supplemented by the Precautionary Radiation Protection Act, which came about in the wake of the reactor accident at Chernobyl.
These regulations are put into concrete terms by ordinances, by general administrative provisions, by regulatory guidelines, by safety standards of the Nuclear Safety Standards Commission (KTA), by recommendations from the Reactor Safety Commission (RSK) and the Commission on Radiological Protection (SSK) and by conventional technical standards (e.g. DIN). The NUSS Code is not implemented into national regulations, but national regulations are at least comparable.
According to the Atomic Energy Act, a license is required for the construction,
operation or any other holding of a stationary installation for the production,
treatment, processing or fission of nuclear fuel or reprocessing or irradiated
fuel (but no further license for commercial NPPs will be granted). A license
is also required for essentially modifying such installation or its operation
and for decommissioning. The applicant can only be granted a license if he meets
the individual requirements spelled out in § 7 Atomic Energy Act as license
prerequisites:
· trustworthiness and qualification of the responsible personnel;
· necessary knowledge of the otherwise engaged personnel regarding safe
operation of the installation;
· necessary precautions against damage in the light of the state of the
art in science and technology;
· necessary financial security with respect to legal liability for paying
damage compensation;
· protection against disruptive actions or other interference by third
parties; and
· consideration of public interests with respect to environmental impact.
The Radiation Protection Ordinance regulates in a legally binding way the reporting by name of the responsible persons for the radiation protection of the licensee, the dose limits of radiation exposure during operating conditions for the personnel engaged at the plant and for the general public. Furthermore, it contains planning values for doses from potential exposure in case of design basis accidents of NPPs.
Concerning the safety of nuclear power plants, the Federal Environmental Ministry (BMU) has the federal competence, whereas the execution of federal laws lies within the responsibility of the federal states, the Länder. So the licensing of nuclear installations is carried out by the Länder, where different ministries are responsible for licensing of construction, operation, essential modification and decommissioning of nuclear power plants. For technical matters in the licensing procedure and the supervision of nuclear facilities, the regulatory authorities of the Länder are supported by independent technical support organizations, in general the nuclear departments of the Technical Inspection Agencies (TÜV).
The actual details and procedure of licensing are specified in the Nuclear Licensing Procedure Ordinance. It deals specifically with the application procedure, with the submission of supporting documents and with the participation of the general public. It deals, furthermore, with the assessment of any environmental impact and with the consideration of other licensing requirements (e.g. regarding the possible release or discharge of non-radioactive pollutants into air or water).
To preserve the legal uniformity for the entire territory of the Federal Republic of Germany, the BMU supervises the licensing and supervisory activities of the Länder authorities (so-called "federal executive administration"). Supervision by BMU includes the right to issue binding directives.
In performing its federal supervision, the BMU is supported by the Federal Office for Radiation Protection (BfS) in all matters concerning nuclear safety and radiation protection. The BfS is responsible - inter alia - for the construction and operation of nuclear waste repositories, subcontracting for this task with the Deutsche Gesellschaft zum Bau und Betrieb von Endlagern für Abfallstoffe mbH (DBE). Further advisory support for the BMU comes from the RSK, the SSK and the GRS, a central technical support organization (see Figure 1).
As in licensing, the prime objective of the regulatory supervision of nuclear installations is to protect the general public and workers in these installations against the hazards connected with the operation of the installation. Officials of the supervisory authorities as well as the authorized experts working on behalf of the supervisory authority have access to the nuclear installation at all times and are authorized to perform the necessary examinations and to request any pertinent information. Nuclear installations are subject to continuous regulatory supervision. However, the Länder perform this supervisory procedure on behalf of the Federal Government.
In the case of non-compliance with legal provisions or requirements of the
license permit, and whenever it must be suspected that life, health or property
of third parties is endangered, the competent supervisory authority of the Land
is authorized by § 19 Atomic Energy Act to issue orders stating:
· that protective measures must be applied and, if so, which ones;
· that radioactive materials must be stored at a place prescribed by
the authority; and
· that the handling of radioactive materials, the construction and operation
of nuclear installations must be interrupted or temporarily or - in case of
a revocation of the license - permanently be suspended.
The high safety standards already applied make it highly improbable that serious damage would be caused by nuclear power plants. Nevertheless and with due respect for the potential degree of such a damage, it has always been an essential licensing prerequisite in Germany that sufficient financial security is provided for covering possible claims for damage compensation. Current liability regulations take the Paris Convention (on Third Party Liability in the Field of Nuclear Energy) and the Brussels Supplementary Convention into account. Both conventions have been incorporated into the Atomic Energy Act. The corresponding details are regulated by the Nuclear Financial Security Ordinance. The licensees are required to take out liability insurance policies for a maximum financial sum that is specified in the individual nuclear licensing procedure. The Federal Government and the Land issuing the license jointly carry an additional indemnity which may be claimed by the damaged party. The maximum required financial security from liability insurances is limited to € 2 500 million.
The individual power utilities or their subsidiaries are the licensees of the NPPs. They build up financial reserves to be prepared for the follow-up costs connected with the operation of a nuclear power plant such as the decommissioning and dismantling of the installations, and the treatment and disposal of radioactive material including spent fuel. So far, reserves amounting to € 35 000 million have been set aside, of which about 45 % are earmarked for decommissioning and dismantling and about 55 % for waste management.
The responsibility for the disposal of radioactive waste lies with the Federation, the BfS is the legally responsible authority. All other radioactive waste management facilities, i.e. spent fuel interim storage, are within the responsibility of the waste producers. The Länder have to construct and operate regional state collecting facilities for the interim storage of radioactive waste originating, in particular, from radioactive applications in medicine, industry, or universities. The protection objective of disposal of radioactive waste in a repository is laid down in the Atomic Energy Act and the Radiation Protection Ordinance. The Federal Mining Act regulates the aspects concerning the operation of a disposal mine. The Safety Criteria for the Disposal of Radioactive Waste in a Mine specify the measures to be taken in order to achieve that this objective has been reached. In addition, environmental legislation must be taken into account, in particular an environmental impact assessment has to be performed.
3.2 Main National Laws and Regulations on Nuclear Power and Waste Management
· Atomic Energy Act (Atomgesetz)
· Precautionary Radiation Protection Act (Strahlenschutzvorsorgegesetz)
· Environmental Impact Assessment Act (Umweltverträglichkeitsprüfungsgesetz)
· Federal Mining Act (Bundesberggesetz)
· Radiation Protection Ordinance (Strahlenschutzverordnung)
· Nuclear Licensing Procedure Ordinance (Atomrechtliche Verfahrensverordnung)
· Nuclear Financial Security Ordinance (Atomrechtliche Deckungsvorsorge-Verordnung)
· Repository Financing Ordinance (Endlagervorausleistungsverordnung)
· Ordinance on the Verification of Trustworthiness (Atomrechtliche Zuverlässigkeitsüberprüfungs-Verordnung)
· Nuclear Safety Commissioner and Reporting Ordinance (Atomrechtliche
Sicherheitsbeauftragten- und Meldeverordnung)
· Ordinance on Nuclear Waste Transboundary Movement (Atomrechtliche Abfallverbringungsverordnung)
· Nuclear Power Plant Safety Criteria (Sicherheitskriterien für
Kernkraftwerke)
· Safety Criteria for Disposal of Radioactive Wastes in a Mine (Sicherheitskriterien
für die Endlagerung radioaktiver Abfälle in einem Bergwerk)
4. CURRENT ISSUES AND DEVELOPMENT ON NUCLEAR POWER
4.1 Energy Policy
In 1986, after the Chernobyl nuclear accident, political consensus on the use of nuclear energy was lost in Germany. Up to that time, all three parties in parliament had more or less supported the increasing use of nuclear power. Now, society split into two parts, one in favour and one against using nuclear power. The Social Democratic Party (SPD), at that time in opposition to the Federal Government coalition of Christian Democratic Party (CDU) and Free Democratic Party (FDP), adopted a resolution to phase out nuclear power within ten years. It took another twelve years until in September 1998 SPD and the green party Bündnis90/Die Grünen (Greens) won the federal election and together took over the Federal Government.
The political situation regarding the relation between the Federation and the Länder is complicated by changing political majorities. Federation and Länder, both have their responsibilities in nuclear licensing and nuclear safety matters (see chapter 3.1). The Länder are represented in the second parliament chamber (Bundesrat). Since 1982 CDU/FDP led the Federal Government, but the following elections for the Länder resulted in a SPD majority in the Bundesrat. At present, SPD/Greens are leading the Federal Government, but meanwhile the majority of SPD-governed Länder in the Bundesrat got lost.
The intention of the current Federal Government still is to phase out the use of nuclear power for commercial electricity production. Finally an agreement between the Federal Government and the utilities on the matter was signed in June 2001. In April 2002, the respective amendment to the Atomic Energy Act came into force. The main purpose of the amendment is to terminate in an orderly manner the use of nuclear energy for commercial electricity production. At the same time, safe operation of the NPPs for their remaining operative life-times is to be achieved. Beside the limiting of NPP lifetime to a 32 year equivalent on the average (Table 9), the erection of new NPPs is forbidden. Therefore, the share of nuclear power in the national energy mix will decrease continuously within the next two decades. Furthermore, consensus is sought in the issue of radioactive waste disposal. The utilities agreed to build interim storage facilities at the NPP sites, in order to minimize transports of spent fuel, at least for the near future. Starting from July 2005, the management of spent fuel from the NPPs will be restricted to direct disposal; reprocessing will no longer be permitted.
Following the new energy policy, the German programme for the disposal of radioactive waste is presently under review The political objective is to erect one single repository in Germany for all types of radioactive waste by 2030. Further sites in various host rocks will be investigated for suitability. Thus, BMU has set up an expert group to develop new repository site selection criteria and respective procedures on a scientific basis and on thorough discussions with public participation. In 2002 a final report was issued on a comprehensive and suitable site selection procedure.
The new German energy policy will not affect Germany's responsibility regarding
its interna-tional obligations and does not reduce the efforts towards nuclear
safety.
BWR |
PWR |
Brunsbüttel 2/2009 Isar 1 3/2011 Philippsburg 1 3/2011 Krümmel 3/2016 Gundremmingen B 7/2016 Gundremmingen C 1/2017 |
Obrigheim 12/2004 Stade
2003 Biblis A 2/2007 Biblis B 1/2009 Neckarwestheim 1 12/2008 Unterweser 9/2011 Grafenrheinfeld 6/2014 Grohnde 2/2017 Philippsburg 2 4/2017 Brokdorf 12/2018 Isar 2 4/2020 Emsland 6/2020 Neckarwestheim 2 4/2021
|
Source: Country Information
The Federal Government intends to establish a new consensus in politics and society on energy policy for the long term. It is of considerable importance to foster a forward-looking and sustainable energy supply policy through improved energy efficiency and enhanced energy savings. Renewable energy is increasingly supported. Suppliers, according to the new energy law, have to buy the electricity from renewables when it is produced and at the fixed high price. Furthermore the general framework for raising energy efficiency is improved, in particular for combined heat and power production. Nevertheless, within the changing scope of global markets and European energy trade, the liberalization of markets for electricity and natural gas and the commitments to reduce the emission of greenhouse gases have to be taken into account.
4.2 Privatization and Deregulation
In April 1998, the act on the reorganization of the electricity supply industry came into force in Germany. By this act the European domestic market directive "Electricity" was implemented into German law. The German electricity market was liberalized completely in one step, not using the gradual opening conditions also in line with the directive. Up to this liberalization, the German electricity market had been characterized by closed supply areas. Demarcation areas and supply contracts provided a monopoly position of the respective utility. With the new regulation of April 1998 the competition also started in the electricity market, a dynamically developing process ever since.
After only a few months of competition, the sector already found itself in a transformation of its structures, which had developed throughout decades. The situation was characterized by reorganization of the companies according to "generation", "transportation" and "distribution", by co-operation agreements, transfers of shares in companies and mergers of companies and by the appearance of additional market participants in the new business sector "electricity trade". The current situation is illustrated in Table 5 (see chapter 1.3). Among the new market participants there are several companies from abroad - Europe and USA - with financial participations up to 100 %.
At the beginning only special-tariff customers - mainly industry - took advantage of price reductions, and since the middle of 1999 also private households took advantages. The total price reduction for industrial and commercial customers reached up to 40 % comparing 1995 and 2000, for private customers up to 20 %. Since 2000, the special measures resulting from governmental decisions on environmental policy (e.g. taxes like "Ökosteuer" and subsidies to increase the share of renewables) made prices rise again. In 1998 the governmental share in all electricity cost amounted to 2 300 million €, whereas in 2002 it already rose to 9 440 million €. With the liberalization of the market the closed supply areas where obsolete, customer now can choose their power supplier. But only just over 2 % of the 43 million private and commercial customers have changed the supplier. However, at the same time 12 million new contracts have been signed, mostly with the previous supplier and under more favorable cost conditions. Under these tightening financial circumstances backfitting of plant safety, maintenance and review of the nuclear power plants have to be carried out.
4.3 Role of the Government in Nuclear R&D
For activities supported by the Federal Government see chapter 2.6. Besides that, the Association of Major Power Utilities (VGB), of which all German and several foreign licensees of nuclear power plants are members, annually spends between approximately € 2 and 3 millions for the evaluation and feed-back of operating experience. In addition, VGB has financed about 350 projects over the past ten years, three-quarters of which - for a total amount of about € 70 million - were directly aimed at improving safety.
4.4 Nuclear Energy and Climate Change
The position of the German Government with respect to CO2 emissions creates a new challenge for the electricity supply industry. In the course of the climate debate, Germany committed itself in 1995 to reduce CO2 emissions by 25 % compared to 1990, by the year 2005. Part of the challenge could be achieved by closing down aged and inefficient industries and power productions in the former GDR and erection of new facilities. But in the meantime it is no longer sufficient to replace old devices by current technologies. A strong reduction in the burning of hydrocarbon fuels will be necessary. The options for the electricity supply industry are to increase energy efficiency, both in electricity generation and end-use consumption, and to switch to generating technologies which do not burn fossil fuel. For the public it means to reduce energy consumption in general. In 2000 the CO2 emission volume was 858 Mt CO2, which is 15 % less than the 1 014 Mt CO2 in 1990. But for the electricity supply industry alone, which makes around one third of the CO2 emission in Germany, numbers have increased again by 8 % from 1999 - the least emissions - to 2002.
Furthermore, in the Kyoto Protocol to the Convention on Climate Change in 1997, the European Union ensured that their overall emission of greenhouse gases will be at least 8 % below the 1990 level in 2012. According to a burden sharing of the European Union in 1998, Germany has to reduce of 21 % of its overall greenhouse gases compared to the 1990 level.
REFERENCES
Statistisches Bundesamt, Wiesbaden, http://www.destatis.de
Daten zur Umwelt 1997, Umweltbundesamt
Arbeitsgemeinschaft Energiebilanzen http://www.ag-energiebilanzen.de
Deutsches Institut für Wirtschaftsforschung, Berlin, http://www.diw.de
VDEW-Jahresbericht 2002, http://www.strom.de
Report under the Convention on Nuclear Safety by the Government of the Federal Republic of Germany for the Second Review Meeting in April 2002, http://www.bfs.de
Report under the Joint Convention by the Government of the Federal Republic
of Germany for the First Review Meeting in November 2003, http://www.bmu.de
Appendix 1.
International, Multilateral and Bilateral Agreements
AGREEMENTS WITH THE IAEA
·
NPT related safeguards
agreement EURATOM/IAEA, INFCIRC/193 |
Entry into force: |
21 February 1977 |
·
Protocol Additional to
the Euratom Agreement, INFCIRC/193(GOV/1998/28) |
Signed: |
22 September 1998 |
·
Improved procedures for
designation of safeguards |
Proposal rejected by EURATOM but special procedures
agreed upon |
16 February 1989 |
·
Agreement on privileges
and immunities, INFCIRC/9 |
Entry into force: |
4 August 1960 |
MULTILATERAL
SAFEGUARDS AGREEMENTS
·
Brazil/Germany/IAEA,
INFCIRC/237
·
application suspended,
INFCIRC/237/Add.1 |
Entry into force: Entry into force: |
26 February 1976 21 October 1999 |
·
Spain/Germany/IAEA, INFCIRC/305 |
Entry into force: |
29 September 1982 |
OTHER
RELEVANT INTERNATIONAL TREATIES
·
NPT, INFCIRC/140 |
Entry into force: |
2 May 1975 |
·
Convention on the physical
protection of nuclear material, INFCIRC/274 |
Entry into force: |
6 October 1991 |
·
Convention on early notification
of a nuclear accident, INFCIRC/335 |
Entry into force: |
15 October 1989 |
·
Convention on assistance
in the case of a nuclear accident or radiological emergency, INFCIRC/336 |
Entry into force: |
15 October 1989 |
·
Paris convention on third
party liability in the field of nuclear energy |
Entry into force: |
30 September 1975 |
·
Convention relating to
civil liability in maritime carriage of nuclear materials |
Entry into force: |
30 December 1975 |
·
Joint protocol relating
to the application of the Vienna and Paris conventions, |
Entry into force: |
13 September 2001 |
·
Vienna convention on
civil liability for nuclear damage, INFCIRC/500 |
Not signed |
|
·
Convention on supplementary
compensation for nuclear damage |
Not signed |
|
·
Convention on nuclear
safety, |
Entry into force: |
20 April 1997 |
·
Joint Convention on the
safety of spent fuel management and on the safety of radioactive waste
management, INFCIRC /546 |
Entry into force: |
18 June 2001 |
·
ESPOO-Convention |
Entry into force: |
8 August 2002 |
·
Aarhus-Convention |
Signed |
21 December 1998 |
·
European Atomic Energy
Community (EURATOM) |
Member |
|
·
ZANGGER Committee |
Member |
|
·
Nuclear Export Guidelines
|
Adopted |
|
·
Nuclear Suppliers Group |
Member |
|
·
Acceptance of NUSS Codes |
In general, national regulations are consistent
with codes |
letter of 6 March 1989 |
BILATERAL
AGREEMENTS CONCERNING THE SAFETY OF NUCLEAR INSTALLATIONS AND RADIATION PROTECTION
Agreement
with |
Major
agreement content |
Argentina |
Exchange of information and co-operation |
Austria |
Mutual assistance in case of an emergency |
Belgium |
Mutual assistance in case of an emergency |
Brazil |
Co-operation Exchange of information and co-operation |
Bulgaria |
Exchange of information |
China |
Promotion of co-operation |
Czechoslovakia |
Exchange of information |
Denmark |
Mutual information on close border nuclear installations |
Finland |
Early notification in case of an emergency and exchange
of information |
France |
Exchange of information |
Hungary |
Exchange of information |
Japan |
Exchange of information |
Lithuania |
Mutual assistance in case of an emergency |
Luxembourg |
Mutual assistance in case of an emergency |
Netherlands |
Mutual information on close border nuclear installations |
Norway |
Exchange of information |
Poland |
Mutual assistance in case of an emergency |
Russian Federation |
Early information in case of an emergency and exchange
of information |
Spain |
Co-operation |
Sweden |
Early notification in case of an emergency and exchange
of information |
Switzerland |
Radiological emergency preparedness |
United Kingdom |
Exchange of information and co-operation in drafting safety
standards |
Ukraine |
Exchange of information |
USA |
Exchange of information and co-operation |
Appendix 2.
DIRECTORY OF THE MAIN ORGANIZATIONS,INSTITUTIONS AND COMPANIES INVOLVED
IN NUCLEAR POWER RELATED ACTIVITIES
Bundesministerium für Wirtschaft und Arbeit (BMWA) |
Berlin |
|
Bundesministerium für Umwelt, Natur-schutz und Reaktorsicherheit
(BMU) |
Bonn |
|
Bundesministerium für Bildung
und |
Berlin |
|
Bundesamt für Strahlenschutz (BfS) |
Salzgitter |
|
Wirtschaftsministerium
Baden-Württemberg |
Stuttgart |
|
Ministerium für Umwelt
und Verkehr Baden-Württemberg |
Stuttgart |
|
Bayerisches Staatsministerium
für Wirtschaft, Verkehr und Technologie |
München |
|
Bayerisches Staatsministerium
für Landesentwicklung und Umweltfragen |
München |
|
Hessisches Ministerium
für Umwelt, ländlichen Raum und Verbraucherschutz |
Wiesbaden |
|
Niedersächsisches Umweltministerium |
Hannover |
|
Ministerium für Umwelt
und Forsten, |
Mainz |
|
Ministerium für Finanzen
und Energie, |
Kiel |
Main
power utilities
EnBW Energie Baden-Württemberg AG |
Karlsruhe |
|
E.ON Energie AG |
München |
|
Hamburgische Electricitätswerke AG (HEW) |
Hamburg |
|
RWE Energie AG |
Essen |
MANUFACTURER, SERVICES
AND OTHER NUCLEAR ORGANIZATIONS
Babcock Noell Nuclear |
Würzburg |
|
Brennelementlager Gorleben
(BLG) |
29475 Gorleben |
Lüchower Str. 8 |
Brennelement-Zwischenlager Ahaus (BZA) |
48683 Ahaus |
Ammeln 59 |
Brenk-Systemplanung |
Aachen |
|
Bundesanstalt für Geowissenschaften und Rohstoffe (BGR) |
Hannover |
|
Deutsche Gesellschaft
zum Bau und Betrieb von Endlagern für Abfallstoffe (DBE) |
Peine |
|
Deutsche Kernreaktor-Versicherungsgemeinschaft (DVKG) |
50950 Köln |
Postfach 52 01 29 |
Deutsches Atomforum (DAtF) |
Bonn |
|
Fachverband für Strahlenschutz |
Berlin |
|
Fichtner |
Stuttgart |
|
Framatome-ANP (Germany) |
Erlangen |
|
Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) |
Köln |
|
Gesellschaft für Nuklear-Behälter (GNB) |
Essen |
|
Gesellschaft für Nuklear-Service (GNS) |
Essen |
|
Internationale Länderkommission Kerntechnik (ILK) |
|
|
Kerntechnischer Ausschuß (KTA) |
Salzgitter |
|
Kerntechnischer Hilfsdienst |
Eggenstein-Leopoldshafen |
|
Kraftanlagen Nukleartechnik |
Heidelberg |
|
Kraftwerksschule |
Essen |
|
KSB Pumpen + Armaturen |
|
|
Physikalisch-Technische Bundesanstalt (PTB) |
Braunschweig |
|
Reaktor-Sicherheitskommission (RSK) |
Bonn |
|
RWE NUKEM Group |
|
|
Siempelkamp Nukleartechnik (SNT) |
Krefeld |
|
STEAG Energie- und Kerntechnik |
Essen |
|
Strahlenschutzkommission (SSK) |
Bonn |
|
Studsvik SINA Industrieservice |
Pforzheim |
|
TÜV Nord Gruppe |
Hamburg |
|
TÜV Süddeutschland |
München |
|
Urenco Deutschland |
Jülich |
|
Verband der Elektrizitätswirtsschaft (VDEW) |
Frankfurt/Main |
|
Vereinigung der Großkraftwerksbetreiber (VGB) |
Essen |
|
Westinghouse Electric Company |
|
|
Wismut |
Chemnitz |
NUCLEAR RESEARCH INSTITUTES
Forschungszentrum Jülich |
Jülich |
|
Forschungszentrum Karlsruhe |
Karlsruhe |
|
Hahn-Meitner-Institut Berlin (HMI) |
Berlin |
|
Max-Planck-Institut für Kernphysik |
Heidelberg |
|
Gesellschaft für Schwerionenforschung (GSI) |
Darmstadt |
|
Deutsches Elektronen-Synchrotron (DESY) |
Hamburg |