INDONESIA
1. ECONOMIC, ENERGY AND ELECTRICITY INFORMATION
1.1 General Overview
The Republic of Indonesia is located in Southeast Asia between 6o08' north
and 11o15' south latitude, and from 94o45' to 141o05' east longitude, and placed
on an archipelago of about 18,000 islands astride the equator. Sumatra, the
westernmost major island, lies south of Myanmar, while Irian Jaya or Papua on
the island of New Guinea is the country's eastern extreme. Indonesia, formerly
part of the Netherlands East Indies, proclaimed its independence on August 17,
1945, after more than 350 years under the Dutch control. The country is administratively
divided into 32 provinces.
Indonesia is a maritime country with a total area of 9.8 million square kilometres in which the sea area, including Exclusive Economic Zone, is about 81% of the total or equals to 7.9 million square kilometres, and the land area is about 1.9 million square kilometres.

Figure 1 Map of Indonesia
Most islands are hot and humid throughout the year. The temperature ranged from 27.6o to 36.8o C during the day and from 14.6o to 24.6o C during the night. The humidity ranged from 63% to 83%. Rain falls primarily from December to March, when the winter monsoon dominates. Only western Java and the Lesser Sunda Islands have a dry season, from June to September.
As in many rainy, tropical areas, the soils are predominantly infertile in Indonesia
because of leaching. The most productive are those on Java and adjacent islands.
Soil nutrients there are replenished by frequent volcanic eruptions, and the
lava's alkalinity is conducive to plant growth.
Forests cover more than half of Indonesia's land area, and a significant portion
is mountainous and volcanic. Java alone is home to 112 volcanoes, fifteen of
which are still active. Volcanic activity through the ages has given the soil
on Java and Bali a much higher degree of fertility than found in most other
areas of Indonesia.
One of Indonesia's principal mineral resources is petroleum, which is extracted
in eastern Sumatra and Kalimantan. Indonesia's oil reserves are not large (proven
reserves about 5 billion barrels in 2002), being only about 1.2% of the world's
oil reserves. Indonesia, a member of the OPEC since 1962, placed its oil industry
under government control in 1965.
Indonesia is the world's largest producer of liquefied natural gas. In year
2002, the total gas reserves are respectively about 507 TSCF. Compared to the
world reserves, Indonesia's natural gas reserves are small, only about 3.3%.
The total known coal resources of Indonesia in 2002 has reached 50 billion tonnes,
about 3% of the world's coal reserves. But the amount of economically exploitable
coal is still limited. The proven reserves is only 5 billion tonnes, the rest
is still inferred or indicated and hypothetical reserves.
Other mineral resources are Tin, Bauxite, Copper, etc. Tin is abundant on some
islands, and Indonesia ranks third in world tin production after Malaysia and
Thailand. Bauxite is mined on Sumatra, nickel on Sulawesi, coal on Sumatra and
Kalimantan, iron ore on Java, and copper on Irian Jaya.
Indonesia is the world's fourth most populous nation and continues to grow quite rapidly. According to the 2000 National Population Census, the population in the mid 2000 is about 203.5 million, with the growth rate of 1.35% during 1990-2000. A significant decline of growth rate has occurred in West Sumatra, Jakarta, Central Java, and Maluku with the growth less than 1%, respectively. The population in 2003 is estimated at about 215 million (July 2003). In 2002, about 43.1% of the population live in urban area. The population growth from 2002 to 2010 is predicted at about 9.4%, while for 2003 is estimated about 1.52%. Table 1 shows data of population from 1970 to 2002.
TABLE 1. POPULATION INFORMATION
|
|
|
|
|
|
|
|
|
Growth |
|
|
|
|
|
|
|
|
|
rate (%) |
|
|
|
|
|
|
|
|
|
1990 |
|
|
|
1970 |
1980 |
1990 |
2000 |
2001 |
2002 |
To |
|
|
|
|
|
|
|
|
|
2002 |
|
|
|
|
|
|
|
|
|
|
|
Population (millions) |
|
120.3 |
151.0 |
182.8 |
203.5 |
206.3 |
209.0 |
1.35 |
|
Population density (inhabitants/kmē) |
63.3 |
79.5 |
96.2 |
107.1 |
108.6 |
110.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Predicted population growth rate (%) 2002
to 2010 |
|
9.4 |
|
|
|
|
||
|
Area (1000 kmē) |
|
|
|
1904.6 |
|
|
|
|
|
Urban population in 2002 as percent of total |
|
43.1 |
|
|
|
|
||
Source: National Statistic Bureau Database.
The results of the 2000 National Population Census also shows that Java Islands, which has area of 7% of the total area, resided by around 59% of the population, while Maluku and Papua which have area of 25% of the total area, inhabited by 2% of the total population. Population density of Java is around 945 persons per square kilometres, Bali 555 persons per square kilometres, and Papua 5 person per square kilometres. Jakarta is the most crowded city with population density nears to 13 thousand persons per square kilometres. The largest cities are Jakarta (the capital), Bandung, Surabaya, Semarang, Malang, Surakarta, and Yogyakarta, all of which are on Java, and Medan, on Sumatra.
According to the UNDP Human Development Report 2003, the life expectancy at
birth for all population of Indonesia is 66.2 years (2001). The number of life
expectancy slightly increase to be about 68.94 years (2003, est., CIA Factbook);
adult literacy rate for 2001 is about 87.3%, and it is estimated about 88.5%
for 2003 (CIA Factbook). Indonesia has a Human Development Index (HDI) ranking
of 112 among 175 nations, and is thereby placed among the medium HDI countries.
1.1.1. Economic Overview
The Republic of Indonesia achieved remarkable economic development success over
the past three decades and was considered to be among the best performing East
Asian economies until the regional financial crisis of 1997. Indonesia had an
average growth rate of 7.1 percent between 1985 and 1995, a real gross domestic
product (GDP) growth of 7.8 percent in 1996, a poverty reduction from 60 percent
of the population to 11 percent, and a significant overall improvement in general
standard of living. With these statistics, Indonesia was seen as a "model
of development", and relatively well placed to weather the troubling signs
of the Asian crisis. However, during the first two years of the crisis, Indonesia
was subjected to unprecedented economic pressures
The Indonesia's economy was plunged into a deep recession in 1998 accompanied
by rising inflation, falling exchange rate, increasing interest rates and sinking
asset value. The crisis severely set the clock on the achievement of a decade
of sustained high growth. During recession, GDP growth was contracted by less
than minus 13.5%.
By the end of 1999, national economic grew 0.79%. The economic growth was 4.92
% in 2000, 3.44% in 2001 and 3.66% in 2002.
TABLE 2. GROSS DOMESTIC PRODUCT (GDP)
|
|
|
|
|
|
|
|
|
Growth |
|
|
|
|
|
|
|
|
|
rate (%) |
|
|
|
|
|
|
|
|
|
1990 |
|
|
|
|
1980 |
1990 |
2000 |
2001 |
2002 |
To |
|
|
|
|
|
|
|
|
|
2002 |
|
GDP (millions of current US$) |
|
|
78,013 |
114,427 |
153,256 |
151,583 |
151,451 |
2.4 |
|
GDP (millions of constant 1990 US$) |
|
64,222 |
114,426 |
172,844 |
171,629 |
168,106 |
3 |
|
|
GDP per capita (current US$/capita) |
|
517 |
626 |
724 |
707 |
698 |
0.9 |
|
Source: IAEA Energy and Economic Database.
1.1.2. Energy Situation
The energy sector is of particular importance in the development of the Indonesian
economy. Indonesia has considerable reserves of primary energy resources, even
though not abundant. Indonesian current per capita energy consumption is relatively
low compared to that of other ASEAN countries. The increase of population, especially
in the rural areas which does not yet have adequate access to electric power,
is an indication of an expected high-growth rate of electricity demand. Most
energy resources are located outside the Island of Java; yet Java, with its
large population and industry, constitutes the major area of energy demand.
1.2. Energy Policy
In order to successfully support the national development programme in Indonesia
and in consideration to the changes of global strategic environment, Government
of Indonesia is now planning an integrated and solid energy policy called National
Energy Policy. The policy will be issued officially in January or February of
2004.
Actually, there are five main energy policy measures:
· Diversification: to maximize and economize the supply of energy, to
curb the rate of excessive use of hydrocarbon resources, to reduce the dependence
on a single type fuel (i.e. petroleum) and later to replace it with other available
fuels. In 1995 oil shares was around 60%, and in 2020 is projected to be around
40%;
· Intensification: to increase and expand the exploration of the available
energy sources aiming to secure sufficient supply of energy;
· Conservation: to economize energy production and utilization;
· Energy Price: to formulate energy prices based on economic values and
by taking into consideration its environmental cost;
· Clean Energy Technologies: to support the environmental programme and
towards a sustainable development.
TABLE 3. ESTIMATED ENERGY RESERVES
|
|
Estimated energy reserves in |
|||||
|
|
(Exajoule) |
|||||
|
|
|
|
|
|
|
|
|
|
Solid |
Liquid |
Gas |
Uranium |
Hydro |
Total |
|
|
|
|
|
(1) |
(2) |
|
|
|
|
|
|
|
|
|
|
Total amount in place |
119.93 |
29.69 |
83.28 |
3.44 |
206.97 |
443.32 |
|
|
|
|
|
|
|
|
|
(1) This
total represents essentially recoverable reserves. |
|
|
|
|
||
|
(2) For comparison
purposes a rough attempt is made to convert hydro capacity to energy by
multiplying |
||||||
|
the gross theoretical annual capability
(World Energy Council - 2002) by a factor of 10. |
|
|||||
Source: IAEA Energy and Economic Database.
The focuses of the policy are as follows:
· Supporting national stability and fueling macro economic recovery by
ensuring the availability of energy in enough number and realistic price, which
is efficient, safe, reliable and environment-friendly.
· Conducting energy sector restructuring through regulation and legislation.
· Improving the efficiency of the State-owned companies.
· Improving bureaucracy efficiency.
· Supporting the implementation of Regional Autonomy based on legislation
and its rule of implementation.
The goals of the policy are outlined as the following:
· Supporting to increase private companies' role in energy business that
leads to establishing free market mechanism.
· Reaching electrification ratio of 90% in the year 2020
· Increasing the share of renewable energy to be at least 5% in the year
2020. The renewable energy which consist of fulfill geothermal, biomass and
micro/mini-hydro
· Increasing strategic partnership between domestic and international
companies to explore and/or exploit energy source in-country and abroad as well.
· Supporting domestic energy companies to "go international"
to compete in global market
· Decreasing energy intensity to 1% per year so that the energy intensity
becomes 3 SBM/ thousand US, and its elasticity becomes 1 dollar in the year
2020.
· Increasing the domestic manpower share/role in energy industry so that
the dependence foreign companies and or manpower can be minimized.
The Implementation of the energy policy covers several aspects such as the
issuance of regulations, standards, energy-pricing incentives and disincentives,
and the application of appropriate technologies. The technologies that would
be considered are identified as follows:
· Technologies to produce substitutes for oil, as oil are non-renewable
and are a very limited resource.
· Technologies to support a more sustainable energy supply.
· Technologies for clean and efficient energy to support environmental
programmes and towards sustainable development.
TABLE 4. ENERGY STATISTICS(*)
|
|
|
|
|
|
|
|
Average annual |
|
|
|
|
|
|
|
|
|
growth rate (%) |
|
|
|
|
|
|
|
|
|
1970 |
1990 |
|
|
1970 |
1980 |
1990 |
2000 |
2001 |
2002 |
To |
To |
|
|
|
|
|
|
|
|
1990 |
2002 |
|
|
|
|
|
|
|
|
|
|
|
Energy consumption |
|
|
|
|
|
|
|
|
|
- Total (1) |
1.35 |
2.29 |
5.01 |
6.60 |
6.63 |
6.70 |
6.79 |
2.45 |
|
- Solids (2) |
0.88 |
1.14 |
1.46 |
2.14 |
2.13 |
2.13 |
2.57 |
3.19 |
|
- Liquids |
0.41 |
0.97 |
2.19 |
3.47 |
3.49 |
3.50 |
8.75 |
3.99 |
|
- Gases |
0.05 |
0.16 |
1.26 |
0.84 |
0.85 |
0.89 |
17.89 |
-2.87 |
|
- Primary electricity (3) |
0.01 |
0.03 |
0.11 |
0.16 |
0.17 |
0.19 |
10.89 |
4.56 |
|
Energy production |
|
|
|
|
|
|
|
|
|
- Total |
2.72 |
5.03 |
7.93 |
9.77 |
9.80 |
9.91 |
5.49 |
1.87 |
|
- Solids |
0.88 |
1.14 |
1.59 |
3.81 |
4.06 |
4.23 |
3.00 |
8.51 |
|
- Liquids |
1.78 |
3.25 |
3.89 |
3.69 |
3.55 |
3.37 |
3.97 |
-1.19 |
|
- Gases |
0.05 |
0.61 |
2.35 |
2.11 |
2.03 |
2.12 |
21.62 |
-0.84 |
|
- Primary electricity (3) |
0.01 |
0.03 |
0.11 |
0.16 |
0.17 |
0.19 |
10.89 |
4.56 |
|
Net import (Import - Export) |
|
|
|
|
|
|
|
|
|
- Total |
-1.27 |
-2.57 |
-2.68 |
-3.91 |
-4.14 |
-4.42 |
3.80 |
4.24 |
|
- Solids |
0.00 |
0.00 |
-0.13 |
-1.67 |
-1.94 |
-2.18 |
30.10 |
26.54 |
|
- Liquids |
-1.27 |
-2.05 |
-1.47 |
-0.68 |
-0.51 |
-0.38 |
0.71 |
-10.68 |
|
- Gases |
|
-0.51 |
-1.09 |
-1.56 |
-1.69 |
-1.86 |
|
4.57 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) Energy
consumption = Primary energy consumption + Net import (Import - Export)
of secondary energy. |
|
|
||||||
|
(2) Solid
fuels include coal, lignite and commercial wood. |
|
|
|
|
|
|
||
|
(3) Primary
electricity = Hydro + Geothermal + Nuclear + Wind. |
|
|
|
|
|
|||
|
(*) Energy
values are in Exajoule except where indicated. |
|
|
|
|
|
|
||
Source: IAEA Energy and Economic Database.
The nuclear energy option is unquestionably capable of meeting the objectives of reducing the dependence on oil and gas, so that oil and gas could be used for export and feed-stocks to support the take-off era. Nuclear energy provides a secured long-term energy supply as well as supporting the reduction of potential of air pollution. According to the results of the study on the Comprehensive Assessment of Different Energy Sources for Electricity Demand (2001-2002), it is reasonable to operate nuclear power plant in about 2016.
1.3 The Electricity System
1.3.1. Structure of the Electricity Sector
The State Electricity Company (PLN) supplied most electricity used in Indonesia,
while the rest produced by private companies. Since PLN could not serve the
entire regions of Indonesia, Non-PLN companies emerged to produce electricity
on their own capacity, for example those managed by cooperatives, local government,
and other private companies.
On August 1998, the government of Republic Indonesia has taken out certain policy
regarding restructuring of electric power sector, which called as a white paper.
In the white paper, the main target is to power generation industry, which is
formerly monopoly in nature become competition, where the price of electric
power determined by market price in competition.
It is hoped that competition will exist in electric power generation site and
to retail site, while transmission and distribution are monopoly in nature.
For creating competition at generation site, Government (PLN) has established
two generation companies such as PT. Indonesia Power and Java-Bali Electric
Company (PJB) and affiliated firm of State Electricity Enterprise PLN. All generators
in Java and Bali are separated as two parts, there is a part for PT. Indonesia
Power and the rest is for Java-Bali Electric Company. Private company gives
a chance for making Generation Company (GenCo), which the Company can sell power
to the Transmission Company (Transco) as sold agent. Then sold agent (Transco)
sell the electric power to the distribution company (Disco) and Distribution
Company sell to the retail, which connected directly to the electric's consumer.
This concept is known as Multi-Buyer Multi-Seller (MBMS) and the plan is supposed
to be started in the year of 2003.
In the electric sector restructuring, Government has submit the legislation
plan of electric power to Indonesian Legislative Assembly to be legalized, as
substitute for electric power constitution, which is much relevant to the concept
of restructuring. But until this time, the Indonesian Legislative Assembly cannot
issue the electrical power legislation plan because there are many things to
be discussed to make it perfect. In fact it is impossible to do the MBMS in
2003, and then the Government has changed the target of MBMS realization into
2007.
1.3.2. Decision Making Process
According to the Act No.10 of 1997, Article 13(d) which performs to the mention
above is described that the decision over the construction nuclear power plant
is established by the Government after Consultation with the People's House
of Representatives of the Republic of Indonesia. The consultations are conducted
for each site where one or more nuclear power plants are to be built in this
consultation. The Government shall give its utmost considerations to the comments
and recommendations from the People's House of Representatives of the Republic
of Indonesia, and the results of the consultations shall be respected and shall
become the guidance by the Government and People's House of Representatives
of the Republic of Indonesia.
1.3.3. Main Indicators
Installed capacity of PLN electricity tended to increase during the last five
years, with 10.62 % increase per year. The PLN total installed capacity up to
2001 was 21,058.83 MW with more than 29 million consumers or increase 1.43%
compared to 20,761 MW in 2000. In Java the installed capacity in year 2001 was
15,494 MW or 74% of the total installed capacity. The peak load for Indonesia
was 16,314 MW in 2001, or increase 6,5% from that of 2000.
TABLE 5. ELECTRICITY PRODUCTION AND INSTALLED CAPACITY
|
|
|
|
|
|
|
|
Average annual |
|
|
|
|
|
|
|
|
|
growth rate (%) |
|
|
|
|
|
|
|
|
|
1970 |
1990 |
|
|
1970 |
1980 |
1990 |
2000 |
2001 |
2002 |
To |
To |
|
|
|
|
|
|
|
|
1990 |
2002 |
|
Electricity production (TW.h) |
|
|
|
|
|
|
|
|
|
- Total (1) |
4.67 |
14.23 |
48.90 |
99.51 |
105.73 |
111.97 |
12.46 |
7.15 |
|
- Thermal |
3.23 |
11.23 |
37.53 |
83.14 |
88.24 |
92.56 |
13.05 |
7.81 |
|
- Hydro |
1.44 |
3.01 |
10.24 |
13.72 |
14.71 |
16.54 |
10.31 |
4.08 |
|
- Nuclear |
|
|
|
|
|
|
|
|
|
- Geothermal |
|
|
1.13 |
2.65 |
2.77 |
2.87 |
|
8.11 |
|
Capacity of electrical plants (GWe) |
|
|
|
|
|
|
|
|
|
- Total |
1.61 |
4.88 |
12.92 |
25.41 |
27.17 |
28.90 |
10.99 |
6.94 |
|
- Thermal |
1.29 |
3.90 |
9.63 |
20.65 |
22.09 |
23.48 |
10.56 |
7.71 |
|
- Hydro |
0.31 |
0.98 |
3.15 |
4.39 |
4.71 |
5.04 |
12.25 |
4.00 |
|
- Nuclear |
|
|
|
|
|
|
|
|
|
- Geothermal |
|
|
0.14 |
0.36 |
0.38 |
0.39 |
|
8.83 |
|
- Wind |
|
|
|
|
|
|
|
|
|
(1) Electricity
losses are not deducted. |
|
|
|
|
|
|
|
|
Source: IAEA Energy and Economic Database.
PLN sold electricity of 84,520.3GWh. The number increased 5,355.5 GWh or 6.3%
over that of 2000. The sales to industrial sector were 35,593.2 GWh, household
33,339.7 GWh, commercial/business sector 11,395.3 GWh, for public service 4,192
GWh.
The number of PLN's consumers in 2001 had been increased to be 29.8 million
consisting of household of 27.88 million or 93.4%, industrial consumer of 46.0
thousand or 1.5%, commercial 1.17 million or 3.9% and public of 728.8 thousands
or 2.4%.
Electricity consumption per capita has also been increased from 130 kWh at the
first year of long-term development plan (1969/1970) to be 405 kWh per annum
at the end of 2001. In addition, consumption per consumer had been increased
from 1,638 kWh to be 2834 kWh.
TABLE 6. ENERGY RELATED RATIOS
|
|
|
|
1970 |
1980 |
1990 |
2000 |
2001 |
2002 |
|
|
|
|
|
|
|
|
|
|
|
Energy consumption per capita (GJ/capita) |
11 |
15 |
27 |
31 |
31 |
31 |
||
|
Electricity per capita (kW.h/capita) |
|
37 |
90 |
263 |
465 |
488 |
511 |
|
|
Electricity production/Energy production (%) |
2 |
3 |
6 |
10 |
10 |
11 |
||
|
Nuclear/Total electricity (%) |
|
|
|
|
|
|
|
|
|
Ratio of external dependency (%) (1) |
|
-94 |
-112 |
-54 |
-59 |
-62 |
-66 |
|
|
Load factor of electricity plants |
|
|
|
|
|
|
|
|
|
- Total (%) |
|
|
33 |
33 |
43 |
45 |
44 |
44 |
|
- Thermal |
|
|
29 |
33 |
44 |
46 |
46 |
45 |
|
- Hydro |
|
|
53 |
35 |
37 |
36 |
36 |
37 |
|
- Nuclear |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) Net import
/ Total energy consumption. |
|
|
|
|
|
|
|
|
Source: IAEA Energy and Economic Database.
2. NUCLEAR POWER SITUATION
2.1. Historical Development and current nuclear power organizational structure
2.1.1 Overview
We all have come to realize that the increasing demand and supply of energy
is a reality and a necessity to support social-economic development. Developing
countries, like Indonesia and other South East Asian countries, have low a standards
of living and low consumption of energy. In their endeavours to reach a high
quality of life, they need a lot of energy and electricity to fuel their social-economic
development. The electricity demand in Indonesia is very high due to the National
Economic Development based on industrialization and supported by a strong agriculture
base. It can be noted that in the last five years, the annual electricity growth
rate has been assumed at around 15% per annum. However, due to the economic
crisis the electricity demand has experienced a reduction. Nevertheless, it
is forecast that eventually in the early 2000s the economic growth in Indonesia
will gradually increase. As a consequence, the electricity growth rate will
also increase in the next coming decades.
Increased concern on the long-term effect of greenhouse gas emissions calls
for greater priority in utilizing electricity generation, which is produce less
greenhouse gases. So, it is very important to reduce the greenhouse gas emissions
that are forecast to lead to atmospheric warming with global and regional climate
changes, which is mainly due to fossil fuel combustion. With awareness to the
environmental benefits of nuclear power, which produces remarkably little environmental
pollution without any greenhouse gas emissions and with its potential as a sustainable
long-term energy supply into the distant future, nuclear energy is an option
that must be developed in Indonesia.
Indonesia became a Member State of the IAEA in 1957 and has been an active participant
in its Technical Co-operation (TC) Programme since then. BATAN, the National
Nuclear Energy Agency of Indonesia was established in 1965. The multidisciplinary
research complex at Serpong is focal point of nuclear R&D in the country.
Major facilities at this centre include a 30 MW, high flux multipurpose research
reactor, a nuclear fuel element centre, a low energy cyclotron based radioisotope
production centre, and a radioactive waste management technology centre. Two
other research reactors have been set up at the nuclear institutes at Bandung
and Yogyakarta. Although the country has not established any nuclear power plant
so far, the decision to launch a nuclear power program, was taken by the Government
in the late 80's. Subsequently, considerable Agency assistance was provided
to facilitate the implementation of Indonesia's first nuclear power reactor
project. An independent nuclear regulatory authority, BAPETEN, for licensing
and inspection of nuclear facilities and radiation sources was established in
May, 1998. Agency has been associated with the evolution and growth of Indonesia's
nuclear programme, which has covered the entire spectrum of its activities,
other than the power reactors.
During the last 4 years, Indonesia received total assistance amounting to US$3.541m
for its broad-based program. Over 90% of these funds were disbursed in seven
areas, namely: agriculture (22.75%), industry and hydrology (17.39%), general
atomic energy development (15.21%), nuclear engineering and technology (11.07%),
application of isotopes and radiation in medicine (10.06%), nuclear safety (8.15%),
and nuclear chemistry (7.07%). While the years up to 1990 were capacity building
in Indonesia's partnership with the Agency, a clear shift to end-user orientation
is discernible in the program during the last ten years.
In addition to making excellent use of the country TC program, Indonesia has
been an excellent partner in the Regional Cooperation Agreement (RCA) program.
It was one of the six founding members who launched the RCA program in 1972.
According to a recent review of the Technology Transfer through RCA program,
Indonesia participated in 28 areas of RCA activities and has attained a sustainable
(highest) level of technology transfer in six of these areas and a self-reliant
level in another 18. This was achieved through the devotion, dedication and
hard work of scientists, engineers and technicians, sustained support from the
Government, and a judicious combination of IAEA country projects with the RCA
program. This is a good achievement and reflects the growing maturity of Indonesia's
nuclear program.
2.1.1 Basic Policy
The basic policy of BATAN has been formulated in accordance with and in support
of the Broad National Policy Guidelines (GBHN) and national policies to implement
the GBHN. Strategy has been established and priority areas have determined to
facilitate the development and utilization of nuclear science and technology,
and for the effective dissemination of information, relating to its benefits,
to the public.
· Implementation Strategy
The implementation strategy is designed to give the highest impact in the most
cost effective manner. The strategy includes the following elements:
o The programs and activities are designed to provide cost-effective S&T
solutions to various national development problems. In that sense, these activities
are largely demand/market driven, end-user oriented and have a significant socio-economic
impact. Some activities relating to capacity building and scientific research
and development in new technologies are being pursued in parallel.
o Development of national networks comprising the relevant Government agencies/institutions
at the regional levels, national R&D institutions, Universities, end-user/beneficiary
groups
o Development of links and cooperation with technologically advanced countries
and international organizations, such as the Agency.
· Priority Areas
For the last few years, programs of activities have been designed and implemented
to strengthen the development of following sectors of national interest.
o Priority Area 1: Basic Human Needs
The objective is to establish research and development programmes in support
of the Government Policy and to utilize the results to meet the basic needs
of the Indonesian people.
Priority Areas
a) Agriculture
v Evolution of mutants of nationally important crops such as nice, soybean and
mungbean, with improved yield, disease resistance, and other desirable characteristics
v Optimization of plant-soil interaction
v Integrated pest management
v Biotechnology, including the development of bio-fertilizers
v Post-harvest treatment using gamma and particle beam irradiation.
b) Livestock
v Enhanced milk and meat production through improved nutrition and reproduction
technologies
v Health and disease control
c) Health
v Radiopharmaceuticals production
v Development and production of low cost tissue grafts and other biocompatible
materials
v Establishing new radiotherapy, x-ray diagnostic and nuclear medicine facilities,
and launching QA/QC programmes in existing units
d) Environmental Protection
v Identification and characterization of pollutants.
o Priority Area 2: Management and Sustainable Utilization of Natural Resources
The objective of this priority is to identify, develop and utilize natural resources,
in particular water, geothermal, and mineral resources in support of the national
development programmes by using appropriate nuclear techniques
Priority Areas
a) Water resources development and management
b) Geothermal energy resources
c) Mineral resources
o Priority Area 3: Nuclear Energy, Nuclear Safety and Radiological Protection
of the Environment
The objective is energy planning with nuclear option for the Indonesian archipelago-
introduction of small and medium sized power reactors in the national energy
system.
Priority Areas
a) Updating long-term energy planning with nuclear option in national energy
system
b) Preliminary Economic Feasibility Study of Nuclear Desalination
c) Mapping, drilling, reserve estimation, research and development and feasibility
studies relating to the mining of nuclear materials.
d) Public information and education to get better public acceptance on utilization
of nuclear power plant.
e) Human resource development for the introduction of nuclear power in Indonesia
and related nuclear safety and radiological protection infrastructure.
o Priority Area 4: Industrial Development
The objective is to support the development of national industries, through
the utilization of appropriate nuclear techniques.
Priority Areas
a) Partnership with industry in promoting applications of isotopes and radiation
in general, and for the production of radioisotopes and basic human needs in
particular
b) Utilization of nuclear techniques as applied to material science, physics,
chemistry, electronics and informatics to support national industry.
o Priority Area 5: Strengthening National Capability in Nuclear Science and
Technology
The objective os to establish a systematic human resource development programme
for sustained support to national nuclear R&D efforts.
Priority Areas
a) Sustained support for nuclear R&D
b) Nuclear safety, radiation protection and waste management, both regulatory
and operational aspects
c) Human resource development
BATAN has prepared a landmark to guide its program. This landmark can be seen
in the following table.
|
No. |
Government Focus |
Short Term, Year of Achievement |
Medium and Long Term, Year of Achievement |
|
1 |
Food (Agriculture/ Animal Husbandry) |
10% of the number of national high varieties of food
crops and additional the kinds of animal feed supplements, and their sustainable
availability, 2004 |
National reference centre for the application of isotope
and radiation technologies in the field of agriculture and animal husbandry,
2008 |
|
2 |
Ocean and Earth |
Regional laboratory reference centre in utilization of
nuclear techniques for the development of exploration and exploitation
of geothermal, 2005 |
National facility for non-rector radioactive waste management,
2007 |
|
3 |
Biotechnology/ Health |
Nuclear technology based equipments to overcome the cancer
and bacteria infectious diseases in Indonesia, 2005 |
National reference centre for nuclear technology based
public health, 2010 |
|
4 |
Informatics and Microelectronics |
Reliable Information technology for digital library and
human resources management, 2005 |
Nuclear technology information centre for public information
and education, development of computation methods, computer modelling
and simulation and knowledge preservation, 2010 |
|
5 |
Energy |
Nuclear option as a part of a long term national energy
system, 2004 |
Nuclear science and tech-nology base in operation, 2010 |
|
First NPP in operation, 2016 |
|||
|
6 |
Manufacture |
Commissioning of electron beam machine for industry,
2003 |
Reference centre for engineering and maintenance of nuclear
equipment in health, nuclear safety and industry, 2008 |
2.1.2 Current Organizational Chart(s)

2.2. Nuclear Power Plants: Status and Operations
Energy sector is directed to ensure the security of energy supply, which is
essential to support the national sustainable development programmes. Nuclear
and renewable energy are included in Indonesia's plans to fulfil security supply
in this sector. With the help of the Agency, a Comprehensive Assessment of Different
Energy Sources (CADES) for Electricity Generation in Indonesia was completed
in 2002, which shows that the first nuclear power reactor may be introduced
as early as 2016. Nuclear desalination plant is expected in operation by 2018,
while by 2025, it is expected that 5 % of the total electricity for Java-Bali
grid will be generated from nuclear energy. Survey, exploration, transformation
and generation of energy constitute vital activities in the energy sector. In
order to achieve those long term target, decision on nuclear option as a part
of a long term national energy system should be taken at the end of 2004, while
as a medium target is operation of a nuclear science and technology base should
be achieved at 2010.
2.3 Supply of NPPs
At present time, there is no nuclear plant and nuclear energy company in Indonesia.
2.4 Operation of NPPs
At present time, all nuclear installations are owned and operated by the government,
that is, the National Nuclear Energy Agency (BATAN) which based on the Act No.10
of 1997 is a supreme executive and to promote the application and the research
activities in the field of atomic energy in Indonesia.
The management of the Indonesian NPP is determined by the financing conditions
for the NPP development. For the conventional financing scheme the NPP Owner
will be a government-owned company. Therefore, the GOI will designate the organization
that will own and operate the NPP. There is still a possibility that the National
Electric Company (PT. PLN) will act as the utility.
2.5 Fuel Cycle and Waste Management
Since Indonesia is not operating any NPP, program on fuel cycle and waste management
is focused to that related to research reactor and industry used nuclear source.
There are a facility for production and experiment of research reactor fuel
element, and a facility for production and experiment of nuclear power plant
fuel element. There is also an installation to manage nuclear waste.
2.6 Research and Development
Nuclear R&D activities are classified into reactor safety, radiation safety,
environmental safety, and radioactive waste treatment. The Serpong Nuclear Energy
Research Establishment (PPTN-Serpong) is a research facility and complete nuclear
technology development. By the completion of the establishment of the Multipurpose
Reactor and Supporting Laboratories, PPTN Serpong is able to play as the motivator
and supporter for the nuclear industries development for the needs of peace
in Indonesia. The role is carried out through:
· Mastering and developing of nuclear technology and Science.
· Education and training for becoming experts and skilled workers on
the field of nuclear.
· Manufacturing the basics components for the nuclear process equipment.
The unit organizations in the PPTN Serpong are as follows:
· Centre for Research and Development of Material Science and Technology.
· Centre for Development of Research Reactor Technology.
· Centre for Development of Nuclear Fuel and Recycling Technology,
· Centre for Development of Nuclear instrumentation
· Centre for Development of Radioisotope and Radiopharmaceutical.
· Centre for Development of Radioactive Waste Management.
· Centre for Management and Guidance for the industry.
· Centre for Development of information and Computation Technology.
· Centre for Development of Nuclear Safety Technology.
· Centre for Development of Advanced Reactor System.
The activities on reactor safety cover safety assessment, using deterministic
and probabilistic methods, reliability of material, component and system, thermal
hydraulic experiment, and coolant chemistry study. These activities mainly carry
out at the Centre for Development of Nuclear Safety Technology, BATAN.
The activities on radiation safety cover evaluation and application of standards
and principle of radiation safety, radiation protection, radiation effect, radiation
measurement, calibration and standardization of measuring equipment. These activities
mainly carry out at the Centre for Research and Development of Radiation Safety
and Nuclear Biomedicine, BATAN.
The activities on environmental safety cover environmental impact analysis and
emergency planning and preparedness. These are carried out together by some
centres, mainly at Centre for Development of Nuclear Safety Technology and Centre
for Research and Development of Radiation Safety and Nuclear Biomedicine, BATAN.
The activities on radioactive waste treatment cover waste treatment, storage,
and disposal studies. These activities are mainly carried out by the Centre
for Development of Radioactive Waste Management, BATAN.
2.7 International Co-operation and Initiatives
2.7.1. Memberships in international organizations
IAEA membership since August 7, 1957.
2.7.2. International agreements
|
|
Entry
into force: |
14 July
1980 |
|
|
|
|
|
|
|
|
NF/CIRC No. 136 |
Entry
into force: |
19 Dec.
1969 |
|
|
|
|
|
Signature: |
29 Sept.
1999 |
|
|
|
|
|
Accepted
on |
8 June
1989 |
|
|
|
|
|
Entry
into force: |
4 July
1980 |
|
|
|
|
|
Entry
into force: |
12 June
1987 |
|
|
|
|
|
Entry
into force: |
4 June
1971 |
|
|
|
|
|
Entry
into force: |
12 July
1979 |
|
|
|
|
|
Entry
into force: |
8 Feb.
1987 |
|
|
|
|
|
Entry
into force: |
13 Dec.
1993 |
|
|
|
|
|
Entry
into force: |
13 Dec.
1993 |
|
|
|
|
|
Non-Party |
|
|
|
|
|
|
Non-Party |
|
|
|
|
|
|
Signature: |
6 Oct.
1997 |
|
|
|
|
|
Signature: |
6 Oct.
1997 |
|
|
|
|
|
Signature: |
20 Sept.
1994 |
|
|
|
|
|
Signature: |
6 Oct.
1997 |
|
|
|
|
|
Non-Member |
|
|
|
|
|
|
Not adopted |
|
|
|
|
|
|
No reply |
|
2.7.3. Bilateral agreements
o Agreement signed with JAERI (Japan) on Operation of Research Reactors. This
assistance is related to the operation and utilization of the Multipurpose Research
Reactor in BATAN.
o Agreement signed with MITI (Japan) on Nuclear Safety Regulation and on Safety
Analysis (Assessment) for transient and accident condition in a nuclear power
reactor.
o Agreement signed with STA (Japan) on Scientific Exchange Programme. Indonesian
Scientists work together with Japanese Scientists to conduct experiments.
o Agreement signed with Germany on Thermo-hydraulic Experiments and Thermo-hydraulic
Analysis (use of code ATHLET).
2.7.4. Past technical co-operation with IAEA
INS/1/015 Utilization of Multi-Purpose Research Reactor (1985), with an objective
to establish a coordinated experimental programme on the use of the multi-purpose
research reactor and ancillary facilities.
The National Atomic Energy Agency (BATAN) embarked on a large scale development
programme to establish a new complex of nuclear research centres in Serpong.
The programme comprises a group of facilities/laboratories including a 30 MW
multi-purpose research reactor, installations for manufacturing fuel elements
for research reactors and NPPs as well as for the production of radioisotopes
and the treatment of radioactive wastes.
This footnote-a/ project, made operational through an extra-budgetary contribution from Germany, provided a two-year expert mission and two short missions to assist in planning this development. Three fellowships and one scientific visit were awarded and some extra equipment was provided. The experimental capabilities for materials research of the multi-purpose research reactor centre at Serpong have been upgraded and its technical and managerial competence has been strengthened. Radioisotopes are being produced.
INS/4/023 Research Reactor Calculations and Experiments (1989), with an objective
to gain expertise in reactor physics calculations with the MPR-30 reactor.
In order to utilize fully the integrated facilities at the 30 MW multi-purpose
research reactor at Serpong and the 1 MW TRIGA Mark-II research reactor at Bandung,
a good understanding of the reactor physics parameters is essential. The project
was originally approved for the research reactor at Serpong and was later extended
to include the reactor at Bandung. The Agency provided a signals analyser, a
radiation detector, and related equipment, together with extensive expert advice
on measurements, calculations and neutron noise analysis. Four fellowships and
one scientific visit were awarded. The manpower and infrastructure at Serpong
and Bandung have been strengthened to allow effective utilization of both research
reactors.
INS/4/029 Upgrading Safety Instrumentation of Bandung Research Reactor (1993),
with an objective to upgrade the aging instrumentation system related to nuclear
safety of the Bandung Triga Mark II research reactor.
At the Research Centre for Nuclear Techniques in Bandung, a 1 MWth TRIGA Mark
II research reactor has been used for radioisotope production, research and
training since 1964. The Government requested the Agency's assistance to upgrade
the instrumentation system related to safety. The Agency provided monitoring
equipment, radiation detectors, and equipment for reactor tank cleaning. Two
expert missions assisted in planning an instrumentation upgrade, advised on
planning power upgrading, and helped in improving the emergency core cooling
system and the ventilation system of the reactor building. Three fellowships
were completed. The operational safety of the reactor has now been improved
and it is expected that the life of the reactor will be extended.
INS/4/030 Research Reactor Calculations and Experiments - Phase II (1993), with
an objective to develop manpower for research in neutronics, thermo-hydraulics,
kinetics and noise analysis using the 30 MWth multi-purpose research reactor
at Serpong.
The Reactor Physics Division of the Multipurpose Reactor Centre, BATAN, sought
the Agency's assistance to continue its research activities initiated under
a completed TC project INS/4/023. Under this project, Agency experts assisted
in developing neutron noise analysis techniques, measuring reactor parameters,
and performing neutronic and thermo-hydraulics calculations. An instrumentation
tape recorder and a noise amplifier were provided to the Centre. Two fellowships
were awarded to local staff. The project resulted in an upgraded reactor physics
laboratory at Serpong. The well trained counterpart staff is now capable of
undertaking reactor physics theoretical calculations and experiments at low
and high power for a 30 MWth multipurpose research reactor to support its applications.
INS/9/012 Nuclear Power Plant Sitting (1988), with an objective to evaluate
a power reactor site investigation plan in order to obtain firm data on which
conclusions concerning the most suitable site can be based.
20 missions of IAEA experts have been carried out from 1989 to 1996.
INS/9/013 Strengthening Nuclear Safety Infrastructure (1989), with an objective
to strengthen research capabilities in different fields of reactor safety.
The National Atomic Energy Agency (BATAN) is responsible for research and development
in reactor safety technology for the Reactor Safety Technology Research Centre
at Serpong. Under this multi-year project, the centre has been furnished with
a general thermo-hydraulic loop, a corrosion loop, a test rig and a material
testing laboratory with government support. In the meantime, the Agency has
provided expert services to assist counterpart staff in various aspects of reactor
safety. They undertook five missions and advised on reactor material testing,
reactor protection system, accident analysis for nuclear power plants, and man-machine
interface design. A national seminar on emergency preparedness and a national
workshop on nuclear safety regulatory control of nuclear power plants were also
held to train the local staff. The project has strengthened the capabilities
of the Centre in ensuring reactor safety in Indonesia.
INS/9/014 Research Reactor Safety (1989), with an objective to acquire expertise
in the thermo-hydraulic aspect of reactor safety of the MPR-30.
A 30 MWth multipurpose research reactor was commissioned in 1987 in Serpong, West Java. Commissioning of the integrated facilities was the responsibility of the National Atomic Energy Agency. To study the safety aspects of reactor operation and to evaluate the thermo-hydraulic data derived during commissioning, it was necessary to determine accurately the reactor's thermo-hydraulic parameters by means of measurements and calculations, using computer codes. The project was approved in 1989 with footnote-a status and was upgraded in 1990. Germany also made additional extra-budgetary contributions for the provision of an expert. The Agency supplied equipment, including a computer system. Three Agency experts carried out four missions and advised on thermo-hydraulic assessment of the reactor, accident analysis, safety analysis calculations, and development of computer codes for flow distribution calculations. Two counterpart staff were awarded long-term fellowship training. As a result of the project, the counterpart at the Siwabessy Multipurpose Reactor Centre, Serpong, has developed expertise in the thermo-hydraulics of reactor safety.
2.7.5. Ongoing technical co-operation with IAEA
INS/0/015 Human Resource Development and Nuclear Technology Support (1999),
with an objective to upgrade and strengthen the skills and capabilities of technical
personnel within the broad range of the applications of nuclear science and
technology.
INS/4/028 Support for the First Nuclear Power Plant (1993), with an objective
to train personnel to be able to discharge the owner's function in relation
to the acquisition of the first nuclear power plant in Indonesia.
INS/9/021 NPP Site Confirmation and Structural Safety (1997), with an objective
to confirm acceptability of the site for an NPP with regard to volcanic and
geological stability and foundation safety; to finalize the definition of site-related
design basis parameters and resolve site-related structural safety problems.
The current technical cooperation can be seen in the following table.
|
Project Number |
Title |
1st
Year of Approval |
|
INS/0/016 |
Comparative Assessment of Different Energy Sources for
Electricity Generation |
2001 |
|
INS/0/017 |
Human Resource Development And Nuclear Technology Support |
2003 |
|
INS/5/030 |
Sustainable Agriculture Development in Yogyakarta |
2001 |
|
INS/5/031 |
Mutation Breeding of Horticultural Crops |
2001 |
|
INS/5/032 |
Improving Beef and Dairy Cattle Production in Yogyakarta |
2001 |
|
INS/6/011 |
Detecting Drug-resistant Strains of Tuberculosis |
2003 |
|
INS/6/012 |
Initiation of Radiotherapy Centre on Borneo Island |
2003 |
|
INS/8/023 |
Groundwater Resources Exploitation in the Gunung Kidul
Area |
2001 |
|
INS/9/022 |
Inspection Procedures and Methods for Assessing Reactor
Tank Liners |
2003 |
2.8. Human Resources Development
Human resource development programme is prepared by the Human Resource Bureau
and the Centre for Education and Training (CET). The programme consists of carrier
development, education and training. Education and training could be implemented
in the CET, the School of Nuclear Energy operated by BATAN, universities in
the country and abroad, research institutes in the country and abroad.
3. NATIONAL LAWS AND REGULATIONS
3.1. Safety Authority and the Licensing Process
3.1.1 Governmental Organizations
In recognition of the need to develop a viable nuclear regulatory infrastructure
in order to proceed with the development of nuclear power, the government of
Indonesia has issued the new basic nuclear energy act on April 1997 (Act No.
10 of 1997) to replace the Act No. 31 of 1964 which have become inappropriate.
In this new Act, the authority in executing and regulating nuclear energy is
separated into two different institutions to avoid the overlapping of activities
on the use and control as well as to optimize the control of nuclear energy
in order to improve nuclear safety.
One of the responsibility to regulate and control of nuclear energy is vested
in the regulatory body, and in April 1998 the new President Decree No.76 of
1998 was issued to established the Nuclear Energy Control Board (NECB, also
known as BAPETEN) which has responsibility to regulate and control the use of
radioactive materials, radiation sources, nuclear reactors and nuclear materials
in Indonesia.
The other is the institution which has responsibility to promote the applications
of nuclear energy is vested in the promotional body, and the other new President
Decree No.197 of 1998 was also issued to established the National Nuclear Energy
Agency (NNEA, also known as BATAN) which has responsibility to execute, and
to promote the research and the use of nuclear energy in Indonesia.
In the year of 2000, the Government of Republic of Indonesia issued Presidential
decree No. 178/2000 concerning the new structural organization of Non Ministry
Governmental Agency where BATAN is one of its components. For implementation
of the presidential decree, the chairman of BATAN issued decree No. 166/Ka/IV/2001
concerning structural organization of BATAN. In this recent organization BATAN
is headed by a Chairman with four Deputies and one Executive Secretariat as
described in Figure 2.
3.1.2. Nuclear Safety Legislation
In the Act No.10/1997 on Nuclear Energy, basic changes to the previous Act No.31/1964
are as follows:
1. Separation of the Regulatory Body from the Promotion Body:
· The Promotion Body will be responsible to undertake only basic and
non-commercial researches.
· The Regulatory Body will be responsible to regulate and control all
nuclear activities in Indonesia.
2. Introduction of a Nuclear Energy Council which will be responsible to give
advice to both Promotion and Regulatory Bodies concerning nuclear energy development
in Indonesia.
3. Radioactive waste management control including the need of approval from
parliament regarding decision for permanent site of high level waste disposal.
4. Financial protection in the form of liability insurance (strict liability/liability
without fault) required in all aspects of nuclear activities.
5. Cooperation of private sectors in the nuclear application activities for
commercial purposes.
6. Criminal and financial penalties for regulation violation.
In case to a specific requirement, IAEA NUSS Code(s) might be adopted and apply
as a base in drafting such a specific legislation need. Moreover, the possibly
document(s) from related NPP supplier countries might also be adopted as further
standards to the extent practicable.
In consideration that nuclear energy involves the life and safety of the people, a public role shall be enhanced in the form of an advisory counsel, a non-structural and independent institution that consists of experts and public figures, having the task to give advices and opinion on the use of nuclear energy.
To take in mind the public aspiration on the use of nuclear energy, especially
a construction of a nuclear power plant and a final radioactive waste repository,
the Government, before taking decision, shall consult with the People's House
of Representatives of the Republic of Indonesia.
Furthermore, it is also necessary to give considerations on other regulations
related to the Act on Nuclear Energy, such as Act Number 1 Year 1970 on Work
Safety, Act Number 8 Year 1978 on the Ratification of Treaty on Nuclear Proliferation
of Nuclear Weapons, Act Number 4 Year 1982 on Basic Stipulations on Environmental
Management, Act Number 5 Year 1984 on Industry, Act Number 15 Year 1985 on Electricity,
Act Number 3 Year 1992 on the Insurance for Workers, Act Number 23 Year 1992
on Health, Act Number 24 Year 1992 on Landscape, and Act Number 10 Year 1995
on Customs.
3.1.3. Role & responsibility of the regulatory body
BAPETEN as an independent regulatory body has responsibility to assure that
any activity related to the use of any nuclear energy is obligated to maintain
the safety, security, and peace, as well as the health of the workers and the
public, and also the protection of the environment. These are administered by:
· Drafting and establishing nuclear safety regulations
· Controlling nuclear installations and nuclear materials through licensing
and inspection systems that covered all stages of NPP establishment (from site
selection to decommissioning stages);
· Controlling the use of radioactive materials and other radiation sources
through licensing and inspection systems.
The primary objective of the regulatory body is to ensure that site personnel,
the public and the environment are protected from possible adverse effects arising
from nuclear activity. In order to achieve these objectives, BAPETEN has responsibility
in:
· the rulemaking of national policy in the field of the control of nuclear
energy utilisation;
· the planning of national program in the field of the control of nuclear
energy utilisation;
· the guidance and the rulemaking and the implementation of nuclear safety,
radiation safety, and safeguards assessments;
· the implementation of licensing and inspection to the development and
the operation of nuclear reactor, nuclear installation, nuclear material facility,
radiation source, and the development of nuclear preparedness;
· the implementation of co-operation in the field of control of nuclear
energy utilization with other Government agencies or organizations either internally
or externally to the Government of Indonesia;
· the implementation of safeguards and SSAC (State's system on accounting
for and control of nuclear material);
· the implementation of the guidance and counselling for the effort that
related to the safety and health of the worker and the people, and the effort
of environmental conservation.
3.1.4. Organization of the regulatory body
BAPETEN which is headed by a Chairman, 2 Deputies, one Safety Committee, and one Safeguards, has 6 Directorate, and one Secretariat which is to regulate, and control the use of radioactive material, radiation, nuclear reactors and the nuclear material in Indonesia and these are located at Jakarta, the capital city. Figure 3 shows the organizational structure of BAPETEN based on the Decree of the Chairman of BAPETEN No.01/K-OTK/VIII-1998 and the BAPETEN is directly under the responsibility of the President.
3.1.5. Regulations & guides
· Act:
- No. 10 of 1997 on Nuclear Energy.
- No. 8 of 1978 on Ratification of NPT.
· Decree of Chairman of BAPETEN:
- No.01/Ka-BAPETEN/V-99 on Working Safety Provision Against Radiation.
- No.02/Ka-BAPETEN/V-99 on Limit Values for Radioactivity in Environment.
- No.03/Ka-BAPETEN/V-99 on Safety Provisions for Radioactive Waste Management.
- No.04/Ka-BAPETEN/V-99 on Safety Requirements for Transport of Radioactive
Material.
- No.05/Ka-BAPETEN/V-99 on Safety Requirements for Design of Research Reactor.
- No.06/Ka-BAPETEN/V-99 on Construction and Operation of Research Reactor.
- No.07/Ka-BAPETEN/V-99 on Quality Assurance for Nuclear Installation.
- No.08/Ka-BAPETEN/V-99 on Safety Provisions for Industrial Radiographic Operation.
- No.09/Ka-BAPETEN/V-99 on Safety Provisions for Well Logging.
- No.10/Ka-BAPETEN/VI-99 on Safety Provisions for Research Reactor Operation.
- No.11/Ka-BAPETEN/VI-99 on Construction and Operation of Irradiators.
- No.12/Ka-BAPETEN/VI-99 on Working Safety Provisions for Nuclear Ore and Mine.
- No.13/Ka-BAPETEN/VI-99 on State System on Accounting for and Control of Nuclear
Material.
- No.14/Ka-BAPETEN/VI-99 on Safety Provision for Gas Mantle Fabrication.
- No.15/Ka-BAPETEN/VIII-99 on the Appointment of Nuclear Safety and Radiation
Safety Inspectors for the year 1999/2001
- No.16/Ka-BAPETEN/IX-99 on the Appointment of Nuclear Safety and Radiation
Safety Inspectors' Assistance for the year 1999/2001
- No.17/Ka-BAPETEN/IX-99 on Requirements of Radiation Worker Authorization.
- No.18/Ka-BAPETEN/II-00 on Certification and Accreditation for Laboratory,
Radiation Protection Course, and Certification Institutions.
- No.19/Ka-BAPETEN/II-00 on License Exemptions
- No.01-P/Ka-BAPETEN/VI-99 on Guide for Selection of Nuclear Reactor Site.
- No.02-P/Ka-BAPETEN/VI-99 on Guide for Physical Protection of Nuclear Material.
- No.03-P/Ka-BAPETEN/VI-99 on Technical Guide for Preparation of Environmental
Impact Analysis Report in the NPP's Construction and Operation Planning.
- No.04-P/Ka-BAPETEN/VI-99 on Technical Guide for Preparation of Environmental
Impact Analysis Report in the Nuclear Installation's Construction and Operation
Planning.
to be issued:
- Guide for Preparation of Safety Analysis Report.
- Technical Guide for Radioactive Waste Management by Licensee
- Calibration of Nuclear Instrument, Radiation Output, Radionuclide Standardization
Facilities, and Calibration Facilities.
- Requirements for the Transport of Specified Types of Radioactive Materials
Consignments.
· Government Regulation (GR)
- No. 11 of 1975 on Working Safety Provision against Radiation (to be revised).
- No. 12 of 1975 on Licensing of the Use of Radioactive Material and/or Radiation
Source (to be revised).
- No. 13 of 1975 on Transport of Radioactive Material (to be revised).
- GR on Radioactive Waste Management(to be issued)
- GR on Construction and Operation of Nuclear Reactors(to be issued)
· President Decree:
- No 49 of 1986 on Ratification of Convention on the Physical Protection of
Nuclear Materials.
- No. 80 of 1993 on Ratification of an Amendment of Article VI of The Statute
Of The International Atomic Energy Agency.
- No. 81 of 1993 on Ratification of Convention on Early Notification of A Nuclear
Accident.
- No. 76 of 1998 on Nuclear Energy Control Board (BAPETEN)
Most of these documents were written to control the implementation of nuclear energy specifically as it applies to research activities. For applicability to a commercial NPP, the documents would have to be reviewed; and revisions or additions as appropriate.
3.1.6. Licensing process
Based on the draft government regulation, the construction and operation of a nuclear reactor can be performed after approval has been issued by NECB.
The approval will be issued in stages: Site Permit, Construction Permit, Operating
License, and Decommissioning Permit.
Evaluation of application of each stage is carried out within a certain period:
12 months for Site Permit, 24 months for Construction Permit, 18 months for
Operating License, and 12 months for Decommissioning Permit. During the period
of evaluation, NECB can ask the applicant to provide additional information(s)
on the proposed installation as deemed necessary.
Most notably is the length of time required in the whole licensing process,
but there is a consideration to revise the draft to, for example, shorten the
time required and also to provide such a flexibility as in the case where a
rigorous safety review has already taken place by a competent regulatory authority
in another country, it is showed on the diagram of the entire licensing process
as below:

Site Permit
Application of site permit should be submitted to NECB by proposing the candidate
site. The basic objectives in the site permit stage are to establish the conceptual
design of the facility and to determine whether it is feasible to design, construct,
and operate the facility on the proposed site to meet the safety objectives
and requirements established by NECB. The primary documentation required is
a Site Evaluation Report providing information on:
· The characteristic of conceptual design of the reactor and its installation
and the planned operation of the reactor;
· The latest data on population density as well as estimation of population
density in the future and the specific characteristics in the surroundings of
the proposed site;
· The physical conditions of the site, including seismological, meteorological,
geological, hydrological and radiological aspects;
· Steps taken to maintain the security of the environmental conditions
(ecological, meteorological and cultural values), and the existence of natural
reservations, airports, food industries, and other places/building based on
Government Provision(s).
· Analysis of the supposed "major accident" and "hypothetical
accident" shall be conducted to check that radiation dose received by individual
is still within the dose criteria as below:
Exclusion Area
|
|
||
|
|
Whole body |
: 0.25
Sv (25 rem) |
during 2 hours immediately |
|
|
Thyroid |
: 3.00
Sv (300 rem) |
|
Low Population Zone
|
|
||
|
|
Whole body |
: 0.25
Sv (25 rem) |
after the accident |
|
|
Thyroid |
: 3.00
Sv (300 rem) |
|
|
|
|
|
|
|
Distance from a population center is at least
one and one-third times the distance from the reactor to the outer boundary
of the low population zone (refer to the criterion of 20,000 man-Sv). |
|||
The other important document required is an Environmental Impact Analysis Report,
which consists of:
1. Terms of Reference for Environmental Impact Analysis
2. Environmental Impact Analysis
3. Plan for Environmental Management
4. Plan for Environmental Monitoring
The Environmental Impact Analysis consists of the following:
· Design description of the complete nuclear reactor, ECCS, safe shutdown
system, containment system, and waste management system;
· Estimation of the impact on the environment during reactor construction,
operation, decommissioning, and a nuclear accident through air, water and soil,
as well as biological and socioeconomic impacts to the public within the area
surroundings the reactor.
The Site Permit will be issued after the application, including all enclosures there in meet the provision and other requirements set by the NECB. The Site Permit is valid for a period of 4 years, and could be extended up to 2 x 1 year.
Construction Permit
Prior to granting a construction permit, the NECB must be assured that the reactor
design meets the safety principles and requirements set out by the NECB and
the plant will be built in accordance to appropriate quality standards. The
primary documents required are Preliminary Safety Analysis Report, a Probabilistic
Safety Assessment, and a statement on construction schedule.
The Construction Permit is given for a period up to 8 years, after all requirements,
including design alterations and all modifications intended to minimize negative
impacts have been fulfilled.
The Permit is granted by imposing a condition that any modification to the design,
structures, systems or components which influence the nuclear safety can be
performed only after consent has been obtained from the NECB.
In case the construction is not started within a period of 18 months after the
issuance of the Construction Permit, then the Licensee should notify the NECB,
presenting the reasons for the delay. If the reasons are not acceptable, the
permit might be revoke by NECB.
In case the Licensee considers that the construction could not be completed
within the defined time period, an application for extension of the permit should
be submitted at least 3 months before it expires, presenting the underlying
reasons. Extension of the Construction Permit can be given each time for 1-year
period.
Operating License
When the construction approaches its completion and at the latest before fuel
loading, the Licensee should submit an application for an Operation License.
NECB, before issuing, have to be assured mainly that the plant, as built, conforms
to the design previously submitted and approved, and that the plans for operation
are satisfactory.
The requirements include submission of a Final Safety Analysis Report, completion
of a previously approved commissioning programme, examination and authorization
of personnel, approval of operating policies and principles, preparation of
plans and procedures for dealing with nuclear emergencies, and specific programmes
for QA during Operation and Maintenance of the nuclear reactor.
The Operating License is issued in 2 stages as follow:
1. A Provisional Operating License is issued for a maximum period of 24 months,
including pre-operational and preliminary operational stages;
2. If and only if the provisional operation stage runs well and all requirements
including implementation of the environmental management and monitoring plans
are fulfilled, then a Long Term Operating License could be issued for a maximum
period of 40 years. Otherwise, the Provisional Operating License will be extended
for a certain period as stated by the NECB based on results of evaluation from
the latest condition.
Among the term included in the Operating License is the requirement that the
Licensee informs the NECB promptly of any occurrence or situation, which could
alter the safety of the plant. The NECB retains the right to impose additional
conditions at any time.
Although the primary responsibility for the safe operation of the plant remains
with the Licensee, there is periodic inspection and audit by NECB inspectors,
annual reviews of operation, and major reviews at the time of renewal of the
Operating License.
The Operating License may be revoked by the NECB for the following one or more
reasons:
· There is an evidence that false information have been submitted to
the NECB in the application or report concerning the reactor and reactor operation;
· The Licensee does not comply with the specifications and/or the conditions
approved by the NECB;
· The Licensee does not comply with the provisions mentioned in the existing
regulations.
Decommissioning permit
If the Licensee does not wish to renew the Operating License, he should submit an application for decommissioning to the NECB. The application for the permit should include decommissioning plans and procedures in accordance with provisions set by the NECB.
During and after decommissioning, NECB carries out the inspection to check whether
the job has been done satisfactorily and safely, and the installation holds
no more hazards to the public and the environment.
Licensing operating personnel
According to BAPETEN's decree No.17/Ka-BAPETEN/IX-99 on Requirements of Radiation
Worker Authorization, personnel willing to work as reactor operators should
apply for Work Licenses to NECB. The Operator License and Supervisor License
are issued separately for reactor operators and reactor operator supervisor,
respectively through examination conducted by NECB. Both Licenses are valid
for a period of 2 years and can be extended for another period of 2 years if
all requirements are fulfilled.
Besides the examination for the new reactor operator, NECB also conduct refreshment
examination for the Work License holder.
3.1.7. Requirements on the licenses
The applicant or licensee shall be required to submit and make available to
the regulatory body in due time all information requested in each stages of
the licensing process as follow:
· For Site Permit:
1. Site Evaluation Report
2. Environmental Impact Analysis Report
· For Construction Permit:
3. Preliminary Safety Analysis Report
4. Probabilistic Safety Assessment
5. Construction Schedule
· For Operating License:
6. Final Safety Analysis Report (FSAR)
7. Physical Protection Plan for nuclear materials and nuclear installation
8. Financial capability evidence for operating the nuclear reactor
9. Evidence of nuclear liability insurance
10. Approval or license(s) from other government authority (license for land
use, building erection, etc.)
· For Decommissioning Permit:
11. Plan for Decommissioning
3.1.8. Review & assessment
During the Licensing Process
At present time, there is no clearly defined and established procedure for the
review and assessment of documents during the licensing process. NECB only made
an evaluation, referring to IAEA NUSS, some people made the procedure(s) for
their own use, while others use the procedure(s) based on the way the previous
person did.
As a new established institution, NECB has only a very limited personnel, both
quantitatively and qualitatively and furthermore, NECB still does not has neither
technical supports institution nor technical assistance from any consultants
to cooperate with for undertaking such an assessment and technical review needed
in every step of the licensing process. As a consequences, at present NECB does
not perform a thorough review and assessment (through testing and examination
of system, structures and components) of the operators technical submission
appropriately, and rely on the results done by the operators in all technical
aspects in the licensing process.
However, NECB define the safety principles and criteria (based on IAEA NUSS
documents) on which its judgment is based.
During Operation
a. Submitted Documents and Assessment
An operating license holder is obliged to submit the documents related to:
· Implementation guides, technical guides for operation, maintenance
and repairs.
· Establishment of organization responsible to nuclear emergency programme.
· Establishment of organization responsible to radiation protection programme.
· Establishment of QA organization and programme
NECB evaluate all those submitted documents.
b. Plant Modifications
No thorough review and assessment is undertaken (such as testing, examinations
and the like) of the document(s) related to plant modifications.
c. Periodic Safety Reviews (PSR)
There is no regulation concerning these requirements.
d. Submitted Information on the Operation
The Licensee is obliged to report periodically the following programme:
· Routine operation programme
· Environmental monitoring programme and meteorological conditions.
The submitted documents which consist of those programs are then evaluated by
NECB on a monthly basis and, resume and report are made yearly.
e. Event Assessment
If an abnormality or a discrepancy during operation or an accident occurs to
assert the radiation hazard, the operator shall take safety measures in accordance
with the procedures previously agreed by NECB, to prevent radiation hazard and
to mitigate the radiation damage. After that, the operator shall made an evaluation
and assessment of the cause of event appropriately, and report it to NECB together
with all the safety measures taken by the operator.
3.1.9. Inspection & enforcement
The objective of the inspections is to ensure conformance of materials, components,
systems and structures, as well as operational activities, processes, procedures
and personnel competence with the predetermined requirements.
Inspection Program and Procedures
At present time, NECB only has established the programme and procedures of inspection
for normal operation stage, since NECB only deal with research reactors and
mainly in the operation stage. The programme and procedures, especially the
procedures, are being revised from time to time in order to meet the conditions
of each research reactor.
The programme and procedures for other stages are still not established yet.
Inspections
The NECB performs inspections periodically (announced) and occasionally (including
unannounced) during the licensing process to ensure whether all safety requirements
are met.
· Prior to the issuance of site license, the site inspection is performed
to evaluate the data submitted by the applicant.
· During the construction stage, inspections are performed to verify
whether provisions affixed to the construction license are fulfilled and complied.
· Prior to the issuance of temporary operating license, inspections are
performed to verify whether all provisions and inspection follow-up instruction
are complied.
· Prior to the issuance of long term operating license, inspections are
performed to verify continuing compliance of all the provisions, and
· Prior to the issuance of decommissioning permit inspections are performed
to verify the compliance of all the provisions and of the decommissioning preparation.
NECB also perform national-level safeguards inspections on nuclear fuel materials.
Enforcement
At present time, the NECB have adequate powers to enforce compliance with its regulations and safety requirements, i.e. power to enforce licensee to modify or correct any aspect of safety, i.e. procedures, practices, systems, structures or components as necessary to ensure nuclear safety.
According to the BAPETEN's decree No.15/Ka-BAPETEN/VIII-99 on the Inspector of BAPETEN year 1999/2001, the inspector are authorized to make warning or directive, order to curtail activities, revocation of license or authorization, or penalties to the licensee.
3.1.10. Emergency preparedness
The programme and activities of emergency planning and preparedness in Indonesia
are based on the existing nuclear facilities, i.e. research reactors, research
reactor fuel fabrication plant, radioactive waste treatment installation and
radioisotopes production installation. The preparation covers on-site or within
facilities, off-site facilities and in the public domain including transport
accidents.
Bapeten is introducing to facilities a National Emergency Preparedness based
on IAEA Tec-Doc 953, conducted an evaluation to sites/facilities, National Seminar
on Emergency Preparedness which invited all related organization and institution.
The following numbers of facilities are subjects to emergency planning and categorized
based on TEC-DOC 953 are applied:
|
FACILITY |
Number of Facility |
Category |
|
Medium research reactor : -
MPRR 30 MWt |
1 |
II |
|
MPR Fuel fabrication Installation |
1 |
II |
|
Small research reactor : -
Bandung-NRC 2 MW -
Yogyakarta-NRC 250 kWt |
2 |
III |
|
Radioisotope production |
1 |
III |
|
Nuclear installation : -
Radiometallurgy inst. -
Radwaste proc. -
Nuclear fuel element research center
-
Inventory spent fuel fac. |
4 |
III |
|
Radiography |
80 |
IV |
|
Logging |
19 |
IV |
|
Gauging |
161 |
IV |
|
Analysis |
49 |
IV |
|
Research |
20 |
IV |
|
Thorium appl. |
2 |
IV |
|
Baggage fluoroscopy |
3 |
IV |
|
Tracer |
2 |
IV |
|
Radioactive Material Storage |
59 |
IV |
|
Irradiator |
3 |
IV |
|
Calibration |
4 |
IV |
|
Diagnostic |
1767 |
IV |
|
Nuclear medicine |
20 |
IV |
|
Therapy |
25 |
IV |
Based on national experience and EPREV Mission recommendation, BAPETEN has proposed
a draft on National Nuclear Emergency Preparedness in Indonesia which will be
developed mainly for Category II of Radiological emergency preparedness.
Although there is still not yet a formal co-ordination between levels of government
(national, provincial, regional, and district) in nuclear or radiological emergency
preparedness, some nuclear facilities already have an emergency plan and preparedness.
Moreover, there is National Disaster Management Coordination Agency (NDMCA)
with Coordination Ministry of Welfare act as the national-level coordinator,
that responsible to non-radiological emergency response. NDMCA has a relatively
established co-ordination line from the upper national level down to the district
level.
Figure as below shows the draft on The National Nuclear Emergency Preparedness
Organization in which nuclear emergency function, both co-ordinators and technical
supports are implemented into the NDMCA co-ordination line. However, in case
of nuclear accident, BAPETEN shall take over a role of national-level coordinator
from Coordination Ministry of Welfare since the Act No.10/1997 stipulates that
BAPETEN is the only government organization that has a right to declare an emergency
situation in Indonesia.
In the Serpong Nuclear Energy Research Establishment (PPTN-Serpong), preparation of the emergency preparedness Involve all BATAN's Centers located on that area, Puspiptek as an area supporting center, Local Government (district), and other district authorities such as district police, fire fighters and hospital. Those emergency arrangements were established since beginning operation period of the nuclear facility in 1987. For the time being, the emergency procedure is being revised to accommodate interaction between each nuclear laboratory. During the last 10 years, 3-4 times emergency exercise were conducted together with national police authority, special section of the Indonesian army responsible for nuclear, biology and chemicals.
For the RSG-GAS reactor personnel, periodic exercises on fire fighting with
simulation of radioactive releases and evacuation have been done once a year.
3.1.11. Information to the public
One of the most important issues in introduction of nuclear power is the Public
Acceptance. The basis of public acceptance is public understanding, in which
accurate and justified actual information on the benefits and risks of nuclear
power must be provided to the public. A continuing and effective public acceptance
program must always be pursued to enhance public perception on nuclear technology.
Accidents like the Chernobyl andThree Mile Island (TMI) have had a large impact
to the public, but, through a program of sound public acceptance, misinformation
and misunderstandings resulting in negative perceptions could be well prevented.
We are hoping the following elaboration of our public acceptance program would
have high expectations and results.
The objective of the public acceptance program is to provide the public with
information on every activities in the nuclear energy conducted by nuclear facilities
such as BATAN and other stakeholders in Indonesia, and also to encourage the
involvement of all parties concerned in the decision-making through inter-departmental
organization activities.
The objective is to provide information are publicly opened, factual, and presented
in the context of all energy sources.
It is recognized that the contents of information given should be varied enough
in order to satisfy the different public expectations and in the language appropriate
and understandable to the audience.
An important aspect in conducting Public Acceptance is the means on how to do
it in an effective manner. We believe that the different audiences in Indonesia
will be reached through several events normally held each year, such as: exhibitions,
opening events, visits by the decision makers to the nuclear facilities, national
seminars on nuclear technology and energy, etc.
Public Acceptance activities shall be more frequently conducted in areas near
the site, as well as in certain areas where top level decision makers are present,
such as the central government and the parliament in the capital city.
Recent activity in this area was "IAEA Seminar on Public Information for
Mass Media and Top Level Government" held in Jakarta on July 14-16, 1997.
Information concerning results of research in Agricultural, Medicine and the
Outlook of Nuclear Power Generation was presented to the audience that consist
of mass media, government officials and participants from other countries. Such
seminars with a focused audience will be held more often in the future.
According to Environmental Law No. 4 of 1982, people are entitled to look at
the documents submitted as the application for the license of NPP.
3.1.12. International activities of the regulatory body/p>
Up to the present time, the contact with international organization is only
with the IAEA. Indonesia is party to the Convention on Early Notification of
a Nuclear Accident and Convention on Assistance in the Case of Nuclear Accident
or Radiological Emergency.
The contact is based upon formal exchange information, and the contacts are
made at Governmental level.
The participation of the Regulatory Body in the activities of international
organizations are in the form of seminars, in training courses and in giving
the opportunity to the IAEA's trainees to come to the Regulatory Body.
4. CURRENT ISSUES AND DEVELOPMENTS ON NUCLEAR POWER
4.1 Nuclear Energy Policy
In order to meet the rapid increase of domestic energy demand, it is becoming more difficult to depend on the existing resources which are now getting more limited. It is projected that oil will still play an important role in the domestic energy mix. Although its share is declining, the total consumption is increasing. As a result, the current status of Indonesia as an oil exporting country will likely to change into an oil importing country in the not too distant future.
Gas and coal will be dominating the domestic energy mix in the Second Long Term Development Plan. However it creates several environmental problems. The utilization of clean coal technology and energy diversification program will, therefore, need to be given priority to anticipate future energy problems. The development of the wise utilization of natural gas, both in domestic use and export, is to be considered in response to the increasing energy demand.
The introduction of Nuclear Power Plant (NPP) in Indonesia is not only to reach an optimum energy mix considering costs and environment, but also to relieve the pressure arising from increasing domestic demand for oil and gas (so that oil and gas could be used for export). Thus, the role of Nuclear Power Plants is clearly to stabilize the supply of electricity, conserve strategic oil and gas resources and protect the environment from harmful pollutants as a result of the use of coal or fossil fuels. This concept is exactly congruent to the national energy policy which stresses diversification, conservation and environmental awareness in energy supply development.
BATAN is now preparing a roadmap of the NPP introduction to be integrated to the domestic energy mix. The roadmap is prepared based on the following assumptions:
4.1.1 Study on National Energy Planning
A study on national energy planning is conducted in 2001. The study's objective is to support the national planning and decision making process in Indonesia's energy and electricity sectors, taking into account key economic, environmental and social aspects. The study is intended to comprehensively assess the potential contribution of various energy sources to the optimal long-term development of Indonesia's energy and demand up to 2025 consistent with sustainable development.
The study team comprised members from the following Indonesian institutions: the Agency of Assessment and Application of Technology ( BPPT), the National Nuclear Energy Agency (BATAN), the Directorate General of Electricity and Energy Development (DJLPE), the Directorate General of Oil and Gas (DJMIGAS), the Environmental Impact Control Agency (BAPEDAL), the National Center for Statistics Agency (BPS), the State Electricity Company (PT. PLN Persero) and the Non-Governmental Organization for Environment (NGO). The International Atomic energy agency (IAEA) assists the Government of Indonesia in executing this study by giving aid in the form computer software and assistance from its experts.
The results of the study can be summarized as the following:
4.2 Nuclear Energy Program
4.2.1 Site Preparation.
The site of Muria Peninsula is ready to use since there are many data taken from this site. BATAN will prepare PSAR-SP (Preliminary Safety Analysis Report - Site Part) for Muria Site that can be used as a reference to the owner. Before NPP construction takes place a site investigation should be implemented to get data on foundation needed in construction design. Along with the above activities, BATAN will also perform other site investigation to get potential sites for the subsequent NPPs.
4.2.2 URD and BIS Preparation
Documents on User Requirement Document and Bid Invitation Specification should be prepared. The URD consists of 2 volumes:
Document of BIS consists of 7 volumes as the following:
4.2.3 Option for NPP type
BATAN is now developing some criteria for deciding the NPP type that will be utilized in Indonesia. The criteria consist of items as the following:
Based on the above criteria and a wish to master one of NPP technologies, BATAN suggests that it is better for Indonesia to build PWR-type NPP in a DUPIC-scheme (direct use of spent PWR fuel in Candu reactors).
4.2.4 Preparation for Licences
Many licences should be prepared for NPP operation. The licences that should be prepared are:
4.2.5 Study for Financial Scheme
The goal of study on economics and financing is to predict the fund for construction of NPP in Indonesia based on conventional model (credit export, self-financed) and on other models (BOO, Counter Trade). The study result could be used as a reference by Government and Utilities. The study will be implemented in year 2003-2007.
4.2.6 Study on Technology Transfer and National Participation
The introduction of NPP in Indonesia is aimed to heighten Indonesian manpower in nuclear science and technology, to support national industries, and to lower unemployment. In order to get a sound scenario for technology transfer and national participation, BATAN has been implementing study on Technology Transfer and National Participation. It is hoped that the study will produce a recommendation that can be used to prepare a specific strategy.
4.2.7 Man-power development
Man-power development related to nuclear power program is performed by BATAN, Universities and other institutions. The main goal of the development is to obtain skilled man-power who has high dedication and safety-culture in enough number to participate in nuclear power program from planning to decommissioning stages.
The development program is hoped to produce man-power that can participate in each stage of NPP construction and operation.
4.2.8 Public Acceptance
One of the most important issues in introduction of nuclear power is the Public Acceptance. The basis of public acceptance is public understanding, in which accurate and justified actual information on the benefits and risks of nuclear power must be provided to the public. A continuing and effective public acceptance program must always be pursued to enhance public perception on nuclear technology. Accidents like the Chernobyl and Three Mile Island (TMI) have had a large impact to the public, but, through a program of sound public acceptance, misinformation and misunderstandings resulting in negative perceptions could be well prevented. We are hoping the following elaboration of our public acceptance program would have high expectations and results.
The objective of the public acceptance program is to provide the public with information on every activity in the nuclear energy conducted by nuclear facilities such as BATAN and other stakeholders in Indonesia, and also to encourage the involvement of all parties concerned in the decision-making through inter-departmental organization activities.
The objective is to provide information are publicly opened, factual, and presented in the context of all energy sources.
It is recognized that the contents of information given should be varied enough in order to satisfy the different public expectations and in the language appropriate and understandable to the audience.
An important aspect in conducting Public Acceptance is the means on how to do it in an effective manner. We believe that the different audiences in Indonesia will be reached through several events normally held each year, such as: exhibitions, opening events, visits by the decision makers to the nuclear facilities, national seminars on nuclear technology and energy, etc.
Public Acceptance activities shall be more frequently conducted in areas near the site, as well as in certain areas where top level decision makers are present, such as the central government and the parliament in the capital city.
Recent activity in this area was "IAEA Seminar on Public Information for Mass Media and Top Level Government" held in Jakarta on July 14-16, 1997. Information concerning results of research in Agricultural, Medicine and the Outlook of Nuclear Power Generation was presented to the audience that consist of mass media, government officials and participants from other countries. Such seminars with a focused audience will be held more often in the future.
According to Environmental Law No. 4 of 1982, people are entitled to look at the documents submitted as the application for the license of NPP.
One of obstacles for the introduction of NPP in Indonesia is public acceptance. Therefore, BATAN established a program for public education and public information on nuclear technology in cooperation with institutions and universities in the country. The program consists, among many, the following items:
4.3 Nuclear Energy and Climate Change
It is said that nuclear energy has a positive effect to the environment since it does not emit any pollutant, such as CO2, CO, SOx, NOx, PM10. Its always be associated with thermal-power plant. Although NPP can be used to hinder climate change, Indonesia does not officially declare the utilization of nuclear energy as a mean in environmental control.
4.4 Safety and Waste Management Issues
Safety issues are the first priority in activities related to nuclear application in all fields. Therefore, one of criteria to choose a NPP to be applied is that the NPP is already proven in many countries.
BATAN has expertise in managing radioactive waste produced by nuclear activities in Indonesia. Most of the waste is in low level. In the future, one of issues in waste management related to NPP operation is high-level waste management, and study to prepare a site for waste disposal.
REFERENCES
[1] Data & Statistics/The World Bank, www.worldbank.org/data.
[2] IAEA Energy and Economic Data Base (EEDB).
[3] IAEA Power Reactor Information System (PRIS).
Appendix
DIRECTORY OF THE MAIN ORGANIZATIONS, INSTITUTIONS AND COMPANIES INVOLVED IN
NUCLEAR POWER RELATED ACTIVITIES
|
NATIONAL ATOMIC ENERGY AUTHORITY |
|
|
|
|
|
National
Atomic Energy Agency |
|
|
(BATAN) |
|
|
Jl .K.H.Abdul
Rohim |
|
|
Kuningam
Barat, Mampang Prapatan |
Tel: (62-21)511110 ; 5204246 |
|
P.O. Box
4390 |
Fax: (62-21)511110 |
|
Jakarta
12043 |
Telex: 62354 |
|
Indonesia |
Cable: BATAN.JAKARTA |
|
|
|
|
Nuclear
Energy Control Board |
|
|
(Regulatory
Authority) |
|
|
BAPETEN |
|
|
Gedung 123 |
|
|
Kompleks
PUSPIPTEK Serpong |
Tel: (62-21) 2301249; 2301252 |
|
Tangerang
15313 |
Fax: (62-21) 2301253 |
|
Indonesia |
e-mail: darurat@centrin.net.id |
|
|
Homepage: www.bapeten.org |
|
Nuclear
Energy Advisory Assembly |
|