RUSSIA

TABLE 1. POPULATION INFORMATION

Average annual growth rate (%)
1980 1990 2000 2005 2011 2000
to
2011
Population (millions) 137.4 148 145.9 143,5 143,1 -0,16
Population density (inhabitants/kmē) 8.0 8.7 8.5 8,4 8,4 -0,1
Urban Population as % of total 69 74 73 72,9 73,9 0,1
Area (1,000 kmē) 17,075.4  

TABLE 2. GROSS DOMESTIC PRODUCT (GDP)

Average annual growth rate (%)
2000 2005 2010 2000 to 2010
GDP (billions of current US$) 973.0 1371 1479.31 4.73
GDP (billions of constant 2000 US$) 259.6 349.7 414.4 5.42
GDP per capita (thousands PPP* US$/capita) 8.807 12.123 15.807 7.65
GDP per capita (thousands of current US$/capita) 6.849 9.650 10.341 4.61

TABLE 3. ESTIMATED ENERGY RESERVES

Estimated available energy sources
Fossil Fuels Nuclear Renewable Total
Solid Liquid Gas Uranium Hydro
Total amount in specific units* 157,01 10,8 33,1 1000000 16000
Total amount in Exajoule (EJ) 4789 503.3 1274.1 157 57.6 6781

TABLE 4. ENERGY STATISTICS (EJ)

Average annual
growth rate (%)
1992 2000 2005 2006 2010 2000
to
2010
Energy consumption1
- Total 34.4 27.8 31.2 32.5 32.75 1,62
- Solids2 7.7 5.24 5.32 5.32 4.35 -1,54
- Liquids 9.5 7.53 9.18 9.64 10.27 3,31
- Gases 14.5 13.19 14.63 15.38 16.79 2,48
- Nuclear 0.42 0.46 0.54 0.55 0.60 2,76
- Hydro 0.6 0.595 0.63 0.63 0.59 -0,07
- Other
Renewables
Energy production
- Total 48.2 40.74 49.87 51.16 50.67 2,21
- Solids 7.8 5.6 6.5 6.74 6.99 2,25
- Liquids 16.7 13.6 19.7 20.11 21.27 5,12
- Gases 20.9 19.7 21.6 22.18 21.98 1.01
- Nuclear 0.42 0.46 0.54 0.55 0.60 2,76
- Hydro 0.6 0.595 0.63 0.63 0.59 -0,07
- Other
Renewables
Net import (Import - Export)
- Total -13.5 -13 -18.69 -18.7 -17.73 -3,30

TABLE 5. ELECTRICITY PRODUCTION, CONSUMPTION AND CAPACITY

Average annual
growth rate (%)
1970 1980 1990 2000 2005 2006 2011 2000
to
2011
Capacity of electrical plants (GWe)                
- Thermal 81.3 121.1 149.7 138.9 149.2 149.2 149.6 0,64
- Hydro 23.0 35.1 43.4 44.4 46.1 46.1 46.2 0,33
- Nuclear 0.8 9.2 20.2 21.2 23.2 23.2 25.3 1,61
- Wind
- Geothermal
- other renewable
- Total 105.1 165.4 213.3 204.5 219 219 221.1 0,68
Electricity production (TW.h)
- Thermal 373 622 797 568.5 629.2 664.1 705 2,10
- Hydro 94 129 167 165.4 174.4 175 163 0,1
- Nuclear 4 54 118 129 149.5 154.7 172.4 2,80
- Wind
- Geothermal
- other renewable
- Total (1) 470 805 1082 877.8 953.1 995.6 1040,4 1,53
Total Electricity consumption (TW.h) N/A N/A 1073.8 863.7 939 962.5 1021 1,51

TABLE 6. ENERGY RELATED RATIOS

1970 1980 1990 2000 2005 2006 2010
Energy consumption per capita (GJ/capita) 160 250 260 190 214 228 230
Electricity consumption per capita (kW.h/capita) N/A N/A 7311 5915 6544 6740 7135
Electricity production/Energy production (%) N/A N/A N/A 7,75 6,87 7,01 8,61
Nuclear/Total electricity (%) 0.74 6.71 10.91 15 15,7 15,7 16,6
Ratio of external dependency (%) (1) N/A N/A N/A -48,1 -60 -58 -53

TABLE 7. STATUS OF NUCLEAR POWER PLANTS

Station Types Net
Capacity
Operator Status Reactor
Supplier
Criticality Construction
Date
Grid
Date
Commercial
Date
Shutdown
Date
UCF
for
year
2011
BALAKOVO-1 PWR 950 Operational REA ROSATOM 1980-12-01 1985-12-12 1985-12-28 1986-05-23 86.2
BALAKOVO-2 PWR 950 Operational REA ROSATOM 1981-08-01 1987-10-02 1987-10-08 1988-01-18 85.8
BALAKOVO-3 PWR 950 Operational REA ROSATOM 1982-11-01 1988-12-16 1988-12-25 1989-04-08 98.3
BALAKOVO-4 PWR 950 Operational REA ROSATOM 1984-04-01 1993-03-24 1993-04-11 1993-12-22 86.4
BELOYARSKY-3 (BN-600) FBR 560 Operational REA ROSATOM 1969-01-01 1980-02-26 1980-04-08 1981-11-01 79.2
BILIBINO-1 LWGR 11 Operational REA ROSATOM 1970-01-01 1973-12-11 1974-01-12 1974-04-01 87.4
BILIBINO-2 LWGR 11 Operational REA ROSATOM 1970-01-01 1974-12-07 1974-12-30 1975-02-01 84.4
BILIBINO-3 LWGR 11 Operational REA ROSATOM 1970-01-01 1975-12-06 1975-12-22 1976-02-01 88.0
BILIBINO-4 LWGR 11 Operational REA ROSATOM 1970-01-01 1976-12-12 1976-12-27 1977-01-01 77.3
KALININ-1 PWR 950 Operational REA ROSATOM 1977-02-01 1984-04-10 1984-05-09 1985-06-12 87.9
KALININ-2 PWR 950 Operational REA ROSATOM 1982-02-01 1986-11-25 1986-12-03 1987-03-03 87.0
KALININ-3 PWR 950 Operational REA ROSATOM 1985-10-01 2004-11-25 2004-12-16 2005-11-08 84.9
KALININ-4 PWR 950 Operational REA ROSATOM 1986-08-01 2011-11-08 2011-11-24 0.0
KOLA-1 PWR 411 Operational REA ROSATOM 1970-05-01 1973-06-26 1973-06-29 1973-12-28 83.6
KOLA-2 PWR 411 Operational REA ROSATOM 1970-05-01 1974-11-30 1974-12-09 1975-02-21 83.6
KOLA-3 PWR 411 Operational REA ROSATOM 1977-04-01 1981-02-07 1981-03-24 1982-12-03 71.7
KOLA-4 PWR 411 Operational REA ROSATOM 1976-08-01 1984-10-07 1984-10-11 1984-12-06 79.3
KURSK-1 LWGR 925 Operational REA ROSATOM 1972-06-01 1976-10-25 1976-12-19 1977-10-12 90.8
KURSK-2 LWGR 925 Operational REA ROSATOM 1973-01-01 1978-12-16 1979-01-28 1979-08-17 75.4
KURSK-3 LWGR 925 Operational REA ROSATOM 1978-04-01 1983-08-09 1983-10-17 1984-03-30 90.8
KURSK-4 LWGR 925 Operational REA ROSATOM 1981-05-01 1985-10-31 1985-12-02 1986-02-05 64.5
LENINGRAD-1 LWGR 925 Operational REA ROSATOM 1970-03-01 1973-09-12 1973-12-21 1974-11-01 61.8
LENINGRAD-2 LWGR 925 Operational REA ROSATOM 1970-06-01 1975-05-06 1975-07-11 1976-02-11 94.4
LENINGRAD-3 LWGR 925 Operational REA ROSATOM 1973-12-01 1979-09-17 1979-12-07 1980-06-29 83.8
LENINGRAD-4 LWGR 925 Operational REA ROSATOM 1975-02-01 1980-12-29 1981-02-09 1981-08-29 81.0
NOVOVORONEZH-3 PWR 385 Operational REA ROSATOM 1967-07-01 1971-12-22 1971-12-27 1972-06-29 87.9
NOVOVORONEZH-4 PWR 385 Operational REA ROSATOM 1967-07-01 1972-12-25 1972-12-28 1973-03-24 82.1
NOVOVORONEZH-5 PWR 950 Operational REA ROSATOM 1974-03-01 1980-04-30 1980-05-31 1981-02-20 25.1
ROSTOV-1 PWR 950 Operational REA ROSATOM 1981-09-01 2001-02-23 2001-03-30 2001-12-25 88.2
ROSTOV-2 PWR 950 Operational REA ROSATOM 1983-05-01 2010-01-22 2010-03-18 2010-12-10 90.2
SMOLENSK-1 LWGR 925 Operational REA ROSATOM 1975-10-01 1982-09-10 1982-12-09 1983-09-30 66.2
SMOLENSK-2 LWGR 925 Operational REA ROSATOM 1976-06-01 1985-04-09 1985-05-31 1985-07-02 90.3
SMOLENSK-3 LWGR 925 Operational REA ROSATOM 1984-05-01 1989-12-29 1990-01-17 1990-10-12 74.0
AKADEMIK LOMONOSOV 1 PWR 32 Under Construction REA ROSATOM 2007-04-15 2013-12-31
AKADEMIK LOMONOSOV 2 PWR 32 Under Construction REA ROSATOM 2007-04-15 2013-12-01
BALTIISK-1 PWR 1082 Under Construction REA ROSATOM 2012-02-22 2017-01-01 2017-12-01
BELOYARSKY-4 (BN-800) FBR 804 Under Construction REA ROSATOM 2006-07-18
KURSK-5 LWGR 915 Under Construction REA ROSATOM 1985-12-01
LENINGRAD 2-1 PWR 1085 Under Construction REA ROSATOM 2008-10-25
LENINGRAD 2-2 PWR 1085 Under Construction REA ROSATOM 2010-04-15
NOVOVORONEZH 2-1 PWR 1114 Under Construction REA ROSATOM 2008-06-24 2013-12-31
NOVOVORONEZH 2-2 PWR 1114 Under Construction REA ROSATOM 2009-07-12
ROSTOV-3 PWR 1011 Under Construction REA ROSATOM 2009-09-15
ROSTOV-4 PWR 1011 Under Construction REA ROSATOM 2010-06-16
APS-1 OBNINSK LWGR 5 Permanent Shutdown REA MSM 1951-01-01 1954-05-06 1954-06-27 1954-12-01 2002-04-29
BELOYARSKY-1 LWGR 102 Permanent Shutdown REA MSM 1958-06-01 1963-09-01 1964-04-26 1964-04-26 1983-01-01
BELOYARSKY-2 LWGR 146 Permanent Shutdown REA MSM 1962-01-01 1967-10-10 1967-12-29 1969-12-01 1990-01-01
NOVOVORONEZH-1 PWR 197 Permanent Shutdown REA MSM 1957-07-01 1963-12-17 1964-09-30 1964-12-31 1988-02-16
NOVOVORONEZH-2 PWR 336 Permanent Shutdown REA MSM 1964-06-01 1969-12-23 1969-12-27 1970-04-14 1990-08-29
BALAKOVO-5 PWR 950 Suspended Constr. REA 1987-04-01
BALAKOVO-6 PWR 950 Suspended Constr. REA 1988-05-01
SOUTH URALSK 1 FBR 750 Suspended Constr. REA ROSATOM 1986-01-01
SOUTH URALSK 2 FBR 750 Suspended Constr. REA ROSATOM 1986-01-01
VORONEZH (HEAT ONLY)-1 BWR 0 Suspended Constr. REA 1983-09-01
VORONEZH (HEAT ONLY)-2 BWR 0 Suspended Constr. REA 1985-05-01
BASHKIRSK-1 PWR 950 Cancelled Constr. REA 1983-01-01 1993-12-01
BASHKIRSK-2 PWR 950 Cancelled Constr. REA 1983-12-01 1993-12-01
GORKIY (HEAT ONLY) BWR 0 Cancelled Constr. REA 1982-01-01 1993-12-01
KURSK-6 LWGR 925 Cancelled Constr. REA 1986-08-01 1993-12-01
SMOLENSK-4 LWGR 925 Cancelled Constr. REA 1984-10-01 1993-12-01
TATAR-1 (KAMA) PWR 950 Cancelled Constr. REA 1987-04-01 1993-12-01
TATAR-2 (KAMA) PWR 950 Cancelled Constr. REA 1988-05-01 1993-12-01

TABLE 8. PLANNED NUCLEAR POWER PLANTS

Station/Project Name Type Capacity MWe Expected Construction Start Year Expected Commercial Year
Kalinin 4 V-320 1000 Const 2011
Kursk 5 RBMK 1000 Const indefinite
Vilyuchinsk KLT-40S 40 x 2 Const 5/09 2014
Beloyarsk 4 BN-800 FBR 880 Const 2014
Novovoronezh II -1 VVER 1200/ V-392M 1200 Const 6/08 2014
Leningrad II-1 VVER 1200/ V-491 1200 Const 10/08 2013
Novovoronezh II -2 VVER 1200/ V-392M 1200 Const 7/09 2016
Rostov 3 VVER 1000/ V-320 1100 Planned 2009 2014
Leningrad II -2 VVER 1200 1200 Planned 2009 2014
Rostov 4 VVER 1000/ V-320 1100 Planned 2010 2016
Baltic 1 (Kaliningrad) VVER 1200 1200 Planned 2010 2016
Leningrad II -3 VVER 1200 1200 Planned 2011 2017
Leningrad II -4 VVER 1200 1200 Planned 2014 2019
Baltic 2 (Kaliningrad) VVER 1200 1200 Planned 2012 2018

TABLE 9. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED

Reactor name
 
Shut down
date
Shutdown reason Decom. Strategy Current decom. Phase Current Fuel managemt phase Decom. Licensee License terminate
APS-1 2002/04/29 Lifetime expiration Long Term Shutdown Permanent Shutdown Storage ROSATOM N/A
BELOYARSKY-1
1983/01/01 Lifetime expiration Long Term Shutdown Permanent Shutdown Storage ROSATOM N/A
BELOYARSKY-2 1990/01/01 Lifetime expiration Long Term Shutdown Permanent Shutdown Storage ROSATOM N/A
NOVOVORONEZH-1 1988/02/16 Lifetime expiration Long Term Shutdown Permanent Shutdown Storage ROSATOM N/A
NOVOVORONEZH-2 1990/08/29 Lifetime expiration Long Term Shutdown Permanent Shutdown Storage ROSATOM N/A